CN215564350U - Hoisting structure for high-rise building construction - Google Patents

Hoisting structure for high-rise building construction Download PDF

Info

Publication number
CN215564350U
CN215564350U CN202122021645.1U CN202122021645U CN215564350U CN 215564350 U CN215564350 U CN 215564350U CN 202122021645 U CN202122021645 U CN 202122021645U CN 215564350 U CN215564350 U CN 215564350U
Authority
CN
China
Prior art keywords
wire rope
rope
hanging
steel wire
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122021645.1U
Other languages
Chinese (zh)
Inventor
夏星豪
陈东飞
殷杰
李银兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Dakang Construction Engineering Co Ltd
Original Assignee
Chongqing Dakang Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Dakang Construction Engineering Co Ltd filed Critical Chongqing Dakang Construction Engineering Co Ltd
Priority to CN202122021645.1U priority Critical patent/CN215564350U/en
Application granted granted Critical
Publication of CN215564350U publication Critical patent/CN215564350U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the technique of high-rise building construction and specifically relates to a hoist and mount structure for high-rise building construction is related to, including hanging flower basket and the fixed mechanism that hangs that sets up on the floor, it includes the fore-stock to hang the mechanism, the after-poppet, the front-axle beam, the center sill, the back-axle beam, go up the pillar, first dead lever and second dead lever, be provided with work wire rope on the hanging flower basket, work wire rope's one end and hanging flower basket fixed connection, the other end and front-axle beam fixed connection, be provided with the pole setting on the after-poppet, be provided with a plurality of balancing weights in the pole setting, it is provided with reinforcing wire rope on the mechanism to hang. Strengthen wire rope and can improve the stability of hanging the mechanism, the tool to lock turnbuckle can take-up strengthen wire rope, further improves the stability of hanging the mechanism, and the staff can evenly place the balancing weight in the pole setting of after-poppet according to the hanging flower basket loading capacity, has effectively avoided the circumstances that solid rope round pin and wall body take place to separate, has improved the security of hanging the mechanism.

Description

Hoisting structure for high-rise building construction
Technical Field
The application relates to the technical field of high-rise building construction, in particular to a hoisting structure for high-rise building construction.
Background
The hanging basket is a common hoisting machine used in high-altitude operation of building engineering, and is used for curtain wall installation, outer wall cleaning, outer wall heat preservation, outer wall coating and the like. Because the hanging basket is a high-altitude operation device capable of replacing the traditional scaffold, reducing labor intensity, improving working efficiency and being reused, the use of the construction hanging basket gradually becomes a trend and is widely accepted in high-rise and multi-storey high-altitude operation. The hanging basket is convenient to install, a scaffold can be avoided, and the working efficiency is greatly improved.
The utility model discloses a utility model patent with the grant bulletin number of CN202611220U discloses the utility model relates to a ride wall block formula hanging flower basket and hangs mechanism, including solid rope round pin, wall body, wire rope, rope guide slider, ride wall block and hanging flower basket, the lower terminal surface of riding the wall block is equipped with the rectangular channel that can closely cooperate with the wall body, and the rope guide slider is fixed and is ridden wall block up end, and the rope guide slider upper end does not have the rope guide groove, and wire rope one end is fixed in on the wall body through solid rope round pin, and the other end hangs the hanging flower basket along the rope guide groove on the rope guide slider flagging.
In view of the above-mentioned related art, the inventors found that the following drawbacks exist: one end of the steel wire rope is fixedly connected with the wall body through the rope fixing pin, when the bearing capacity of the hanging basket is larger than the friction force between the rope fixing pin and the wall body, the rope fixing pin can be separated from the wall body, the hanging basket falls, safety accidents are caused, and the safety of the hanging mechanism is low.
SUMMERY OF THE UTILITY MODEL
In order to improve the security of hanging the mechanism, this application provides a hoisting structure for high-rise building construction.
The application provides a hoisting structure for high-rise building construction adopts following technical scheme:
a hoisting structure for high-rise building construction comprises a hanging basket and a hanging mechanism fixedly arranged on a floor slab, wherein the hanging mechanism comprises a front support, a rear support, a front beam, a middle beam, a rear beam, an upper support, a first fixing rod and a second fixing rod, the front support and the rear support are arranged on the floor slab at intervals along the length direction perpendicular to the hanging basket, the first fixing rod is fixedly connected with the front support along the vertical direction, the second fixing rod is fixedly connected with the rear support along the vertical direction, one end, away from the front support, of the first fixing rod is fixedly connected with the front beam, the other end of the first fixing rod is fixedly connected with the middle beam, the upper support is fixedly arranged at the top of the first fixing rod along the vertical direction, one end, away from the front beam, of the middle beam is fixedly connected with the rear beam, the second fixing rod is fixedly connected with the rear support along the vertical direction, one end, away from the middle beam, of the rear beam is fixedly connected with the second fixing rod, be provided with work wire rope on the hanging flower basket, work wire rope's one end and hanging flower basket fixed connection, the other end and front-axle beam fixed connection, be provided with the pole setting along vertical direction on the after-poppet, the pole setting is provided with a plurality ofly along the length direction interval of after-poppet, it is provided with a plurality of balancing weights to slide along vertical direction in the pole setting, the top of front-axle beam is rotated and is provided with first rope sheave, the top of going up the pillar is rotated and is provided with the second rope sheave, the top of second dead lever is rotated and is provided with the third rope sheave, the fixed tool to lock turnbuckle that is provided with in top of after-axle beam, be provided with on the before-axle beam and strengthen wire rope, strengthen wire rope one end and first rope sheave fixed connection, the other end pass second rope sheave and third rope sheave in proper order and with tool to lock turnbuckle fixed connection.
Through adopting above-mentioned technical scheme, strengthen wire rope and can improve the stability of hanging the mechanism, the tool to lock turnbuckle can take-up strengthen wire rope, further improves the stability of hanging the mechanism, and the staff can evenly place the balancing weight in the pole setting of after-poppet according to the hanging flower basket loading capacity, has effectively avoided solid rope round pin and wall body to take place the condition of separation, has improved the security of hanging the mechanism.
Optionally, strengthen the direction that the one end that the tool to lock turnbuckle was kept away from to wire rope connects on first rope sheave and is close to the second rope sheave and extend, strengthen wire rope to the direction extension section that is close to the second rope sheave and strengthen the wire rope butt, it is provided with a plurality of wire rope clips along the length direction interval of strengthening wire rope to strengthen wire rope, the wire rope clip is used for fixing strengthening wire rope and strengthening wire rope to the direction extension section that is close to the second rope sheave.
Through adopting above-mentioned technical scheme, the staff uses the wire rope clamp will strengthen wire rope and fix together to the direction extension section that is close to the second rope sheave, effectively prevents to strengthen wire rope and hangs the mechanism and take place the separation, further improves the security of hanging the mechanism.
Optionally, the reinforced steel wire rope is provided with a protrusion towards one side far away from the reinforced steel wire rope towards the extending section close to the second rope pulley, and the protrusion is located between two adjacent steel wire rope clamps.
Through adopting above-mentioned technical scheme, the arch can make things convenient for the staff to inspect whether to strengthen wire rope and take place to become flexible, if the arch removes to the direction that is close to strengthening wire rope, then explains that to strengthen wire rope and take place to become flexible, otherwise then.
Optionally, a hoisting machine is fixedly arranged on the hanging basket, a hanging plate is fixedly arranged at one end, far away from the center sill, of the front beam, a first pin shaft and a second pin shaft are arranged in the hanging plate at intervals along the vertical direction, second rope wheels are fixedly arranged on the first pin shaft and the second pin shaft, one end, far away from the hanging basket, of each working steel wire rope is fixedly connected with the second rope wheel of the first pin shaft, a safety steel wire rope is fixedly arranged on the hanging basket, one end of the safety steel wire rope is fixedly connected with the second rope wheel of the second pin shaft, and the other end of the safety steel wire rope is fixedly connected with the hanging basket.
By adopting the technical scheme, the safety steel wire rope can further improve the stability of connection between the hanging basket and the hanging mechanism, the working steel wire rope and the safety steel wire rope are respectively and fixedly connected with the first pin shaft and the second pin shaft, the working steel wire rope and the safety steel wire rope are effectively prevented from being wound, and the safety of the hanging basket is further improved.
Optionally, the hanging basket is fixedly provided with a safety lock, the safety lock comprises a lock body and a support frame, the support frame is hinged to the side wall of the lock body, the support frame is respectively provided with a lock roller and a guide pulley in a rotating mode, one end, far away from the first pin shaft, of the working steel wire rope penetrates through the guide pulley and the lock roller and is fixedly connected with the elevator, and one end, far away from the second pin shaft, of the safety steel wire rope penetrates through the lock body and extends downwards along the vertical direction.
Through adopting above-mentioned technical scheme, when the hanging flower basket took place to incline, the lock body was fixed safe wire rope, effectively prevented that the hanging flower basket from taking place to incline, when the hanging flower basket from the downward slip of being out of control of vertical direction, the lock running roller was fixed work wire rope with rope guide wheel, effectively prevented that the hanging flower basket from taking place to crash, improved the security of hanging flower basket.
Optionally, one end of the safety steel wire rope close to the second pin shaft is fixedly connected with a limiting block.
Through adopting above-mentioned technical scheme, the rising height of hanging flower basket is injectd to the stopper, effectively prevents that hanging flower basket and front-axle beam from bumping, improves the security of hanging flower basket.
Optionally, one end of the safety steel wire rope, which is far away from the second pin shaft, is fixedly connected with a heavy hammer.
Through adopting above-mentioned technical scheme, the weight prevents effectively that safe wire rope and work wire rope from taking place the winding, improves the security of hanging flower basket.
Optionally, the rear bracket is provided with a fixed steel bar, the upright rod is provided with a plurality of through holes along the vertical direction, and the fixed steel bar penetrates through the through holes of the upright rod and is abutted to the top of the balancing weight.
Through adopting above-mentioned technical scheme, fixed reinforcing bar fixes the balancing weight in the pole setting, effectively avoids taking place relative movement because of the balancing weight and leads to hanging the mechanism and take place relative movement, improves the security that hangs the mechanism.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the reinforced steel wire rope can improve the stability of the suspension mechanism, the lockset turnbuckle can tension the reinforced steel wire rope, so that the stability of the suspension mechanism is further improved, workers can uniformly place the balancing weight on the vertical rod of the rear bracket according to the load capacity of the hanging basket, the situation that the rope fixing pin is separated from the wall body is effectively avoided, and the safety of the suspension mechanism is improved;
2. the heavy hammer effectively prevents the safety steel wire rope and the working steel wire rope from being wound, so that the safety of the hanging basket is improved;
3. the balancing weight is fixed on the vertical rod by the fixed reinforcing steel bar, so that the relative movement of the suspension mechanism caused by the relative movement of the balancing weight is effectively avoided, and the safety of the suspension mechanism is improved.
Drawings
Fig. 1 is an overall structure schematic diagram of a hoisting structure for high-rise building construction according to an embodiment of the present application.
Fig. 2 is a schematic overall structure diagram of a hoisting structure for high-rise building construction from another perspective in the embodiment of the present application.
Fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
Fig. 4 is a partially enlarged schematic view of a portion B in fig. 2.
Fig. 5 is a partially enlarged schematic view of a portion C in fig. 1.
Fig. 6 is a partially enlarged schematic view of a portion D in fig. 1.
Fig. 7 is a partially enlarged schematic view of a portion E in fig. 2.
Fig. 8 is a partially enlarged schematic view of portion F in fig. 1.
Fig. 9 is a partially enlarged schematic view of a portion G in fig. 1.
Fig. 10 is a partially enlarged schematic view of a portion H in fig. 1.
Description of reference numerals: 1. a suspension mechanism; 11. a front bracket; 12. a rear bracket; 121. erecting a rod; 13. a front beam; 131. a first sheave; 132. a hanger plate; 133. a first pin shaft; 134. a second pin shaft; 135. a fourth sheave; 14. a middle beam; 15. a rear beam; 16. an upper pillar; 161. a second sheave; 17. a first fixing lever; 18. a second fixing bar; 181. a third sheave; 19. a balancing weight; 20. a lock turnbuckle; 2. a hanging basket; 3. working steel wire ropes; 4. reinforcing the steel wire rope; 41. a protrusion; 5. a safety wire rope; 6. a steel wire rope clamp; 7. a hoist; 8. a safety lock; 81. a lock body; 82. a support frame; 83. locking the roller; 84. a rope guide pulley; 9. a weight; 10. fixing the steel bars; 21. and a limiting block.
Detailed Description
The present application is described in further detail below with reference to figures 1-10.
The embodiment of the application discloses hoisting structure for high-rise building construction. Referring to fig. 1, the hoisting structure comprises a suspension mechanism 1 and a hanging basket 2, and a reinforced steel wire rope 4 is installed on the suspension mechanism 1. The worker installs two sets of suspension mechanisms 1 on the floor of the building at intervals along the length direction of the hanging basket 2, and the two sets of suspension mechanisms 1 are respectively installed at two ends of the hanging basket 2.
Referring to fig. 1, 2 and 3, the suspension mechanism 1 includes a front bracket 11, a rear bracket 12, a front beam 13, a middle beam 14, a rear beam 15, an upper pillar 16, a first fixing rod 17 and a second fixing rod 18, in this embodiment, the front bracket 11, the rear bracket 12, the front beam 13, the middle beam 14, the rear beam 15, the upper pillar 16, the first fixing rod 17 and the second fixing rod 18 are all made of steel, the front beam 13, the middle beam 14 and the rear beam 15 are rectangular steel pipes with openings at two sides and hollow interiors, and the front beam 13, the middle beam 14 and the rear beam 15 are all provided with a plurality of through holes at intervals along the length direction of the front beam 13, the middle beam 14 and the rear beam 15. The opening of the front beam 13 is larger than the opening of the center beam 14, and the opening of the center beam 14 is larger than the opening of the rear beam 15. First dead lever 17 and second dead lever 18 all include vertical pole and transverse bar, and the transverse bar welds at the top of vertical pole along the length direction of perpendicular to hanging flower basket 2, and the transverse bar is inside cavity and both sides open-ended rectangle steel pipe, and vertical pole has seted up two perforations along the length direction of vertical pole, and the transverse bar is equipped with a plurality of perforations along the length direction interval of transverse bar.
Referring to fig. 1 and 2, the front support 11 and the rear support 12 are installed on a floor at intervals along the length direction perpendicular to the hanging basket 2, two through holes are formed in the side wall of the front support 11 and the side wall of the rear support 12 at intervals along the vertical direction, an opening matched with the vertical rod of the first fixing rod 17 is formed in the top of the front support 11, and an opening matched with the vertical rod of the second fixing rod 18 is formed in the top of the rear support 12. First dead lever 17 is along vertical direction and fore-stock 11 joint, second dead lever 18 is along vertical direction and after-poppet 12 joint, the staff uses two bolts to pass the perforation of fore-stock 11 and the perforation of first dead lever 17 respectively, then uses nut and bolt threaded connection and butt on the lateral wall of fore-stock 11, then uses two bolts to pass the perforation of after-poppet 12 and the perforation of second dead lever 18 respectively, then uses nut and bolt threaded connection and butt on the lateral wall of after-poppet 12.
Referring to fig. 2 and 3, the front beam 13 is clamped with the transverse rod of the first fixing rod 17, and the front beam 13 extends out of a part of the building, then the middle beam 14 is clamped into the opening of the front beam 13, the upper support column 16 is fixedly mounted on the top of the transverse rod of the first fixing rod 17 along the vertical direction, in this embodiment, the upper support column 16 includes a vertical rod and a horizontal rod with an opening at the bottom and a hollow interior, two through holes are opened on the side wall of the horizontal rod of the upper support column 16, and the vertical rod of the upper support column 16 is welded on the top of the horizontal rod of the upper support column 16 along the vertical direction. The horizontal rod of the upper pillar 16 is clamped at the top of the transverse rod of the first fixing rod 17, a worker uses two bolts to respectively penetrate through the through hole of the upper pillar 16, the through hole of the transverse rod of the first fixing rod 17, the through hole of the front beam 13 and the through hole of the middle beam 14 in sequence, then uses a nut and a bolt to be in threaded connection and abuts against the side wall of the upper pillar 16, and the worker respectively uses two bolts to connect one end of the rear beam 15 with the bolt of the second fixing rod 18 and connect the other end of the rear beam with the bolt of the middle beam 14.
Referring to fig. 4, the upright rods 121 are welded to the rear bracket 12 in the vertical direction, and a plurality of upright rods 121 are welded to the rear bracket 12 at intervals in the length direction, and in this embodiment, four upright rods 121 are installed. There are a plurality of balancing weights 19 along vertical direction slidable mounting on pole setting 121, and balancing weight 19 can be iron plate or concrete block, and in this embodiment, balancing weight 19 adopts the iron plate, and the perforation with pole setting 121 opening adaptation is seted up at the middle part of balancing weight 19, balancing weight 19 along vertical direction sliding connection on pole setting 121, the staff can increase or reduce the quantity of balancing weight 19 according to the loading capacity of hanging flower basket 2. In order to improve the stability of the counterweight 19 in connection with the vertical rod 121, the rear bracket 12 is provided with the fixing steel bar 10, the vertical rod 121 is provided with a plurality of through holes along the vertical direction, and the worker inserts the fixing steel bar 10 through the through hole of each vertical rod 121 and abuts against the top wall of the uppermost counterweight 19.
Referring to fig. 1 and 5, one end of the front beam 13, which is far away from the first fixing rod 17, is rotatably connected with a first rope pulley 131, the top of the upper support column 16 is rotatably provided with a second rope pulley 161, the top of the second fixing rod 18 is rotatably provided with a third rope pulley 181, the top of the rear beam 15 is fixedly provided with a lock turnbuckle 20, and a worker sequentially penetrates through the first rope pulley 131, the second rope pulley 161 and the third rope pulley 181 and is fixedly connected with the lock turnbuckle 20. In order to improve the connection stability of the reinforcing steel wire rope 4 and the lock turnbuckle 20, the end of the reinforcing steel wire rope 4 connected with the lock turnbuckle 20 extends towards the third rope wheel 181, the reinforcing steel wire rope 4 abuts against the reinforcing steel wire rope 4 towards the extension section close to the third rope wheel 181, then three steel wire rope clamps 6 are installed at intervals along the length direction of the extension section of the third rope wheel 181, and the reinforcing steel wire rope 4 between the two steel wire rope clamps 6 closest to the third rope wheel 181 is bent towards the direction away from the reinforcing steel wire rope 4 towards the extension section of the third rope wheel 181.
Referring to fig. 2 and 7, one end of the reinforcing steel wire rope 4, which is far from the third sheave 181, is connected to the first sheave 131 and extends in a direction close to the second sheave 161, the extending section of the reinforcing steel wire rope 4 close to the second sheave 161 and the reinforcing steel wire rope 4 are abutted against each other, a plurality of steel wire rope clamps 6 are installed at intervals in the longitudinal direction of the reinforcing steel wire rope 4 in the reinforcing steel wire rope 4, and three steel wire rope clamps 6 are installed in the embodiment. The wire rope clamp 6 fixes the reinforcing wire rope 4 and the extension of the reinforcing wire rope 4 close to the second sheave 161 to each other. The extension section of the reinforcing steel wire rope 4 in the direction close to the second rope sheave 161 is provided with a protrusion 41 to one side far away from the reinforcing steel wire rope 4, the protrusion 41 is positioned between any two adjacent steel wire rope clamps 6, and in this embodiment, the protrusion 41 is positioned between two adjacent first steel wire ropes close to the first rope sheave 131. Strengthen wire rope 4 and can improve the stability of hanging mechanism 1, if protruding 41 removes to the direction that is close to strengthening wire rope 4, then explain that strengthen wire rope 4 takes place not hard up, otherwise then otherwise, protruding 41 can make things convenient for the staff inspection to strengthen wire rope 4 and whether take place not hard up, and the staff can rotate the elasticity that the locking turnbuckle adjusted and strengthened wire rope 4, and it is convenient to adjust the elasticity of strengthening wire rope 4.
Referring to fig. 5, 8 and 9, the lifting machine 7 and the safety lock 8 are mounted on the side walls of the basket 2, and the safety lock 8 is positioned above the lifting machine 7. And a working steel wire rope 3 and a safety steel wire rope 5 are respectively arranged on two sides of the hanging basket 2, and the working steel wire rope 3 and the safety steel wire rope 5 are galvanized steel wire ropes. The one end bolt fixed mounting that the centre sill 14 was kept away from to front beam 13 has hanger plate 132, install first round pin axle 133 and second round pin axle 134 along vertical direction interval in the hanger plate 132, in this embodiment, first round pin axle 133 is located the top of second round pin axle 134, equal fixed mounting has fourth rope sheave 135 on first round pin axle 133 and the second round pin axle 134, the one end of work wire rope 3 is connected on the fourth rope sheave 135 of first round pin axle 133 and to extending to the direction that is close to hanging flower basket 2, the direction extension section and the butt of work wire rope 3 to being close to hanging flower basket 2, and install three wire rope clamp 6 along the length direction interval of work wire rope 3. The safety lock 8 comprises a lock body 81 and a support frame 82, the support frame 82 is hinged on the side wall of the lock body 81, a lock roller 83 and a rope guide wheel 84 are respectively rotatably installed on the support frame 82, and the lock roller 83 is installed at one end far away from the lock body 81. One end of the working wire rope 3, which is far away from the first pin shaft 133, passes through between the lock roller wheel 83 and the rope guide wheel 84, and penetrates into the top opening of the hoisting machine 7, and then penetrates out of the bottom opening of the hoisting machine 7. One end of the safety steel wire rope 5 is connected to the fourth rope pulley 135 of the second pin shaft 134 and extends towards the direction close to the hanging basket 2, the safety steel wire rope 5 is abutted against the safety steel wire rope 5 towards the direction extending section close to the hanging basket 2, and three steel wire rope clamps 6 are installed at intervals along the length direction of the safety steel wire rope 5. When hanging flower basket 2 took place to incline, lock body 81 fixed safe wire rope 5, effectively prevented that hanging flower basket 2 from taking place to incline, when hanging flower basket 2 followed vertical direction downward out of control slip, lock running roller 83 and rope guide wheel 84 fixed work wire rope 3, effectively prevented that hanging flower basket 2 from taking place to crash, improved hanging flower basket 2's security.
Referring to fig. 5 and 10, a stopper 21 is fixedly connected to the safety wire rope 5 just below the lowermost wire rope clamp 6. The limiting block 21 can limit the lifting height of the hanging basket 2, effectively prevent the hanging basket 2 from colliding with the front beam 13, and improve the safety of the hanging basket 2.
Referring to fig. 1 and 5, a weight 9 is fixedly connected to an end of the safety steel wire rope 5 away from the second pin 134, and the weight 9 effectively prevents the safety steel wire rope 5 and the working steel wire rope 3 from being wound, so that the safety of the hanging basket 2 is improved.
The implementation principle of the hoisting structure for high-rise building construction in the embodiment of the application is as follows: strengthen wire rope 4 and can improve the stability of hanging mechanism 1, the tool to lock turnbuckle 20 can take-up strengthen wire rope 4, further improves the stability of hanging mechanism 1, and the staff can evenly place balancing weight 19 in the pole setting 121 of after-poppet 12 according to 2 loading capacity of hanging flower basket, has effectively avoided the circumstances that solid rope round pin and wall body take place to separate, has improved the security that hangs mechanism 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a hoisting structure for high-rise building construction which characterized in that: comprises a hanging basket (2) and a suspension mechanism (1) fixedly arranged on a floor slab, wherein the suspension mechanism (1) comprises a front support (11), a rear support (12), a front beam (13), a middle beam (14), a rear beam (15), an upper support (16), a first fixing rod (17) and a second fixing rod (18), the front support (11) and the rear support (12) are arranged on the floor slab at intervals along the length direction perpendicular to the hanging basket (2), the first fixing rod (17) is fixedly connected with the front support (11) along the vertical direction, the second fixing rod (18) is fixedly connected with the rear support (12) along the vertical direction, one end of the first fixing rod (17), far away from the front support (11), is fixedly connected with the front beam (13), the other end of the first fixing rod is fixedly connected with the middle beam (14), the upper support (16) is fixedly arranged at the top of the first fixing rod (17) along the vertical direction, the middle beam (14) is far away from one end of the front beam (13) and fixedly connected with the back beam (15), the second fixing rod (18) is fixedly connected with the back support (12) along the vertical direction, the back beam (15) is far away from one end of the middle beam (14) and fixedly connected with the second fixing rod (18), the hanging basket (2) is provided with a plurality of working steel wire ropes (3), one end of each working steel wire rope (3) is fixedly connected with the hanging basket (2), the other end of each working steel wire rope is fixedly connected with the front beam (13), the back support (12) is provided with vertical rods (121) along the vertical direction, the vertical rods (121) are arranged along the length direction of the back support (12) at intervals, the vertical rods (121) are provided with a plurality of balancing weights (19) in a sliding manner along the vertical direction, the top of the front beam (13) is rotatably provided with a first rope pulley (131), the top of the upper support (16) is rotatably provided with a second rope pulley (161), the top of second dead lever (18) is rotated and is provided with third rope sheave (181), the fixed tool to lock turnbuckle (20) that is provided with in top of back beam (15), be provided with on fore-stock (11) and strengthen wire rope (4), strengthen wire rope (4) one end and first rope sheave (131) fixed connection, the other end pass second rope sheave (161) and third rope sheave (181) in proper order and with tool to lock turnbuckle (20) fixed connection.
2. The hoisting structure for high-rise building construction according to claim 1, wherein: strengthen wire rope (4) and keep away from the direction extension that the one end of tool to lock turnbuckle (20) is connected on first rope sheave (131) and is close to second rope sheave (161), strengthen wire rope (4) to the direction extension section that is close to second rope sheave (161) and strengthen wire rope (4) butt, strengthen wire rope (4) and be provided with a plurality of wire rope clamps (6) along the length direction interval of strengthening wire rope (4), wire rope clamp (6) are used for fixing strengthening wire rope (4) and strengthening wire rope (4) to the direction extension section that is close to second rope sheave (161).
3. The hoisting structure for high-rise building construction according to claim 2, wherein: the reinforced steel wire rope (4) is provided with a bulge (41) towards one side far away from the reinforced steel wire rope (4) towards the direction extending section close to the second rope wheel (161), and the bulge (41) is positioned between the two adjacent steel wire rope clamps (6).
4. The hoisting structure for high-rise building construction according to claim 1, wherein: fixed lifting machine (7) that is provided with on hanging flower basket (2), the fixed hanger plate (132) that is provided with of one end that well roof beam (14) was kept away from in front beam (13), be provided with first round pin axle (133) and second round pin axle (134) along vertical direction interval in hanger plate (132), all fixed fourth rope sheave (135) that is provided with on first round pin axle (133) and second round pin axle (134), the one end of keeping away from hanging flower basket (2) of work wire rope (3) and fourth rope sheave (135) fixed connection of first round pin axle (133), the fixed safe wire rope (5) that is provided with on hanging flower basket (2), the one end of safe wire rope (5) and fourth rope sheave (135) fixed connection, the other end and hanging flower basket (2) fixed connection of second round pin axle (134).
5. The hoisting structure for high-rise building construction according to claim 4, wherein: fixed safety lock (8) that is provided with on hanging flower basket (2), safety lock (8) are including locking body (81) and support frame (82), support frame (82) articulate on the lateral wall of locking body (81), rotate respectively on support frame (82) and be provided with lock running roller (83) and rope guide wheel (84), the one end that first round pin axle (133) was kept away from in work wire rope (3) is passed between rope guide wheel (84) and the lock running roller (83) and with lifting machine (7) fixed connection, the one end that second round pin axle (134) was kept away from in safety wire rope (5) is passed and is locked body (81) and along vertical direction downwardly extending.
6. The hoisting structure for high-rise building construction according to claim 5, wherein: and one end of the safety steel wire rope (5) close to the second pin shaft (134) is fixedly connected with a limiting block (21).
7. The hoisting structure for high-rise building construction according to claim 5, wherein: and a heavy hammer (9) is fixedly connected to one end, far away from the second pin shaft (134), of the safety steel wire rope (5).
8. The hoisting structure for high-rise building construction according to claim 1, wherein: be provided with fixed reinforcing bar (10) on after-poppet (12), a plurality of perforation has been seted up along vertical direction on pole setting (121), fixed reinforcing bar (10) pass the perforation of pole setting (121) and with the top butt of balancing weight (19).
CN202122021645.1U 2021-08-25 2021-08-25 Hoisting structure for high-rise building construction Active CN215564350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122021645.1U CN215564350U (en) 2021-08-25 2021-08-25 Hoisting structure for high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122021645.1U CN215564350U (en) 2021-08-25 2021-08-25 Hoisting structure for high-rise building construction

Publications (1)

Publication Number Publication Date
CN215564350U true CN215564350U (en) 2022-01-18

Family

ID=79842281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122021645.1U Active CN215564350U (en) 2021-08-25 2021-08-25 Hoisting structure for high-rise building construction

Country Status (1)

Country Link
CN (1) CN215564350U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114572907A (en) * 2022-03-21 2022-06-03 南京辛巴智能装备有限公司 Integrated counterweight support
CN114892947A (en) * 2022-05-31 2022-08-12 中铁二十局集团第六工程有限公司 Non-standard hanging basket support and mounting method
CN114892948A (en) * 2022-05-31 2022-08-12 中铁二十局集团第六工程有限公司 Hanging basket support and mounting method
CN115450414A (en) * 2022-09-29 2022-12-09 中国二十二冶集团有限公司 Method for dispersing heavy hammer positions of hanging basket for outer wall construction
CN114572907B (en) * 2022-03-21 2024-05-28 南京辛巴智能装备有限公司 Integrated counterweight bracket

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114572907A (en) * 2022-03-21 2022-06-03 南京辛巴智能装备有限公司 Integrated counterweight support
CN114572907B (en) * 2022-03-21 2024-05-28 南京辛巴智能装备有限公司 Integrated counterweight bracket
CN114892947A (en) * 2022-05-31 2022-08-12 中铁二十局集团第六工程有限公司 Non-standard hanging basket support and mounting method
CN114892948A (en) * 2022-05-31 2022-08-12 中铁二十局集团第六工程有限公司 Hanging basket support and mounting method
CN115450414A (en) * 2022-09-29 2022-12-09 中国二十二冶集团有限公司 Method for dispersing heavy hammer positions of hanging basket for outer wall construction

Similar Documents

Publication Publication Date Title
CN215564350U (en) Hoisting structure for high-rise building construction
CN110950216A (en) Elevator with telescopic car
CN210105267U (en) Hanging basket suspension structure
CN211341686U (en) Hanging basket support system
CN110565541A (en) Self-anchored construction hanging basket suspension mechanism based on existing structure
CN214328562U (en) Outer cantilever construction hanging bracket for viaduct
CN214329960U (en) Unitized curtain wall loading platform
CN213085125U (en) Elevator shaft traction rotary telescopic construction elevator
CN211254904U (en) Elevator with telescopic car
CN211256707U (en) Self-anchored construction hanging basket suspension mechanism based on existing structure
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN218843701U (en) Anchoring type riding high-suspension hanging basket
CN107814318A (en) Loop wheel machine
CN113137047A (en) Safety construction platform for machine-room-less elevator shaft
CN219471499U (en) Hanging basket device for heightening and erecting building top layer
JP2845673B2 (en) Elevator installation equipment
CN220550838U (en) Building construction external platform
CN215558540U (en) Movable hanging basket
CN218619918U (en) Steel wire rope supporting device for long-distance hoisting of tower-type small gun carrier
CN212609131U (en) Underground mine steel rail hoisting device
CN219732714U (en) Hanging basket structure and hanging basket construction system
CN218492303U (en) Operation frame is deposited to highway engineering precast box girder stretch-draw equipment
CN218346884U (en) Partition plate construction auxiliary device
CN219751697U (en) Side-sway preventing limiting tool for vertical hoisting of object
CN218778649U (en) Curtain wall mounting device for steel structure truss beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant