CN217079619U - Large-span construction hanging basket system - Google Patents

Large-span construction hanging basket system Download PDF

Info

Publication number
CN217079619U
CN217079619U CN202123142208.1U CN202123142208U CN217079619U CN 217079619 U CN217079619 U CN 217079619U CN 202123142208 U CN202123142208 U CN 202123142208U CN 217079619 U CN217079619 U CN 217079619U
Authority
CN
China
Prior art keywords
support
support frame
building wall
transverse
basket system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123142208.1U
Other languages
Chinese (zh)
Inventor
王志东
王东杰
江志平
刘阿锋
姜化强
鲍先锋
吴宁
白世宇
马力
李宏阳
吴昊
陈诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Investment Construction Group Co Ltd
China Construction Third Bureau Urban Construction Co Ltd
Original Assignee
China State Railway Investment Construction Group Co Ltd
China Construction Third Bureau Urban Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Railway Investment Construction Group Co Ltd, China Construction Third Bureau Urban Construction Co Ltd filed Critical China State Railway Investment Construction Group Co Ltd
Priority to CN202123142208.1U priority Critical patent/CN217079619U/en
Application granted granted Critical
Publication of CN217079619U publication Critical patent/CN217079619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model belongs to the technical field of the construction, a large-span construction hanging flower basket system is provided for building wall is last. The large-span construction hanging basket system includes: the first support frame is used for being connected to a building wall; the second support frame is connected with the building wall in a sliding mode, is connected with the first support frame in a rolling mode, and partially extends out of the first support frame; the pulleys are sequentially arranged on the second support frame; the lifting rope sequentially rounds the pulleys; and the hanging basket is connected to the other end of the lifting rope. Through supporting the second support frame on first support frame, can avoid the hanging flower basket of second support frame hoist and mount to the conflict between structure distance and front-axle beam length, improve hoist and mount efficiency.

Description

Large-span construction hanging basket system
Technical Field
The utility model belongs to the technical field of the construction, particularly, relate to a large-span construction hanging flower basket system.
Background
At present, in the construction of commercial complex buildings, especially office high-rise buildings, hanging baskets are often selected to be installed on construction sites in order to solve the problems of material and personnel transportation in the installation stage of curtain walls. The construction hanging basket is limited by safety factors of the hanging basket, the length of a front beam of the hanging basket is limited to some extent, a steel structure is installed outside a main structure to meet the requirement of curtain wall modeling, great difficulty is increased for hanging basket erection, and an unconventional erection system is required to meet the construction requirement at this time.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving or improving above-mentioned current hanging flower basket to the technical problem of structure distance and front-axle beam length conflict.
According to the utility model discloses an aim at provides a large-span construction hanging flower basket system.
The utility model provides a pair of large-span construction hanging flower basket system for on the building wall body, large-span construction hanging flower basket system includes: the first support frame is used for being connected to a building wall; the second support frame is connected with the building wall in a sliding manner, is connected with the first support frame in a sliding manner, and partially extends out of the first support frame; the pulleys are sequentially arranged on the second support frame; the lifting rope sequentially rounds the pulleys; and the hanging basket is connected to the other end of the lifting rope.
In this technical scheme, compare in traditional hanging flower basket system, through supporting the second support frame on first support frame, can avoid the hanging flower basket of second support frame hoist and mount to the conflict between structure distance and front-axle beam length, improved hoist and mount efficiency.
Additionally, the utility model provides a technical scheme can also have following additional technical characterstic:
the first support frame includes: the first transverse bracket is connected with the building wall; the first vertical support is connected with one end, far away from the building wall, of the first transverse support; the first vertical support is used for supporting the first transverse support, the top of the first vertical support is higher than the first transverse support, and the second support is supported on the first vertical support.
Among the above-mentioned technical scheme, a large-span construction hanging flower basket system still includes: the connecting piece is used for connecting with a building wall; wherein, first horizontal support rotates with the connecting piece to be connected, and the one end and the connecting piece of lifting rope are connected.
Among the above-mentioned technical scheme, the second support frame includes: one end of the second transverse bracket is connected with the building wall in a sliding manner; the second vertical support and the second transverse support are mutually crossed and connected; the second vertical support is in rolling connection with the first support frame, the second transverse support is supported on the top of the first support frame, the second transverse support extends out of the first support frame, and the plurality of pulleys are arranged at the end part of the second transverse support and the top of the second vertical support.
Among the above-mentioned technical scheme, a large-span construction hanging flower basket system still includes: the sliding mechanism is arranged on the building wall; wherein, the second horizontal support is connected with the sliding mechanism in a sliding way.
In the above technical solution, the sliding mechanism includes: the guide rail is arranged on the building wall; the sliding block is arranged at one end, close to the building wall, of the second transverse support and is in sliding connection with the guide rail.
Among the above-mentioned technical scheme, the second lateral frame from the one end that is close to building wall to the one end from the bottom up slope support of keeping away from building wall in the top of first support frame.
Among the above-mentioned technical scheme, the tip of second horizontal support is provided with two pulleys from top to bottom.
Among the above-mentioned technical scheme, a large-span construction hanging flower basket system still includes: the rolling mechanism is arranged on the first support frame; wherein, the lower end of the second vertical support is connected with the rolling mechanism.
In the above technical solution, the rolling mechanism includes: the supporting beam is fixed on the top surface of the first transverse bracket; the channel beam is provided with a U-shaped channel and is fixedly connected with the supporting beam; and the idler wheel is arranged at the lower end of the second vertical support, wherein the idler wheel is matched with the U-shaped groove to slide.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages according to embodiments of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a main view structure diagram of a large-span construction hanging basket system of an embodiment of the present invention.
Fig. 2 is a schematic perspective view of a sliding mechanism of a large-span construction hanging basket system according to an embodiment of the present invention.
Fig. 3 is a side view schematic diagram of a rolling mechanism of a large-span construction hanging basket system according to an embodiment of the present invention.
Reference numerals:
1. a wire rope; 2. a second vertical support; 3. a second cross brace; 4. a first cross frame; 5. building a wall body; 6. a hanging basket; 7. a trough beam; 8. a support beam; 9. a connecting member; 10: a sliding mechanism; 101: a slider; 102: a guide rail; 11: a rolling mechanism; 12. a second vertical support; 13. and a roller.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and detailed description. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the scope of the present invention is not limited by the specific embodiments disclosed below.
Technical solutions of some embodiments of the present invention are described below with reference to fig. 1 to 3.
As shown in fig. 1, there is provided a large-span construction basket system for use on a building wall 5, the large-span construction basket system comprising: the hanging rope comprises a first support frame, a second support frame, a plurality of pulleys, a hanging rope 1 and a hanging basket 6, wherein the first support frame is used for being connected to a building wall body 5, the building wall body 5 can be a parapet, and the first support frame is connected with the outer side of the building wall body 5. The first support frame may be a steel structural keel. The second support frame and the building wall 5 are connected in a sliding mode, so that the second support frame can slide, and the second support frame is connected with the first support frame in a rolling mode. A plurality of pulleys are arranged on the second supporting frame in sequence, one end of the lifting rope 1 is connected with the second supporting frame, the lifting rope 1 sequentially bypasses the plurality of pulleys, and the hanging basket 6 is connected to the other end of the lifting rope 1. The second support frame partly extends beyond the first support frame so that the lifting rope 1 can hang the basket 6 outside the first support frame without the first support frame interfering with the basket 6. The first support frame is made of a steel structure, so that the support strength can be ensured. The lifting rope 1 may be a steel wire rope.
Specifically, the first support frame includes: the first transverse support 4 and the first vertical support 12, the first transverse support 4 is connected with the building wall 5, and the first transverse support 4 and the second transverse support 2 can be respectively of a plate-shaped structure. Under the ideal state, first lateral frame 4 level setting, the face of first vertical support 12 and the face mutually perpendicular of first lateral frame 4, first vertical support 12 plays the supporting role to first lateral frame 4. The first vertical support 12 is connected with one end of the first transverse support 4 far away from the building wall 5, wherein the first vertical support 12 is used for supporting the first transverse support 4, the top of the first vertical support 12 is higher than the first transverse support 4, and the second support is supported on the first vertical support 12.
The large-span construction hanging basket system further comprises: and the connecting pieces 9 are used for being connected with the building wall 5. Wherein, the first horizontal bracket 4 is rotatably connected with the connecting piece 9. The connecting piece 9 can be pre-buried on the building wall 5. One end of the lifting rope 1 is connected with the connecting piece 9, the rear end of the hanging basket large arm is tied on a parapet with a certain height away from a roof through a steel wire rope to be tied, the safe and reliable stress of the hanging basket 6 is guaranteed, and the requirement for erecting a frame body in the traditional hanging basket 6 installation mode is eliminated.
The second support frame includes: the second horizontal bracket 2 and the second vertical bracket 3, and the second horizontal bracket 2 and the second vertical bracket 3 may be rod-shaped structures, such as square tubes, respectively. One end of the second transverse support 2 is connected with the building wall 5 in a sliding mode, one end of the second transverse support 2 can be connected with the building wall 5 in a sliding mode through a connecting piece 9, and the second vertical support 3 is connected with the second transverse support 2 in an intersecting mode. The second vertical support 3 is connected with the first support frame in a rolling mode, the second vertical support 3 is connected with the first transverse support 4 of the first support frame in a rolling mode, the second vertical support 3 plays a role in supporting the second transverse support 2, the top of the second vertical support 3 is higher than the second transverse support 2, a pulley is arranged at the top of the second vertical support 3, and the lifting rope 1 can bypass a fixed pulley arranged at the top of the second vertical support 3. The second transverse support 2 is supported at the top of the first support frame, specifically, the second transverse support 2 is supported at the top of a first vertical support 12 of the first support frame, the position of one end of the second transverse support 2 connected with the building wall 5 is lower than the lap joint position of the second transverse support 2 and the first vertical support 12, the second transverse support 2 extends out of the first support frame, specifically, the second transverse support 2 extends out of the first vertical support 12 of the first support frame, a plurality of pulleys are arranged at the end part of the second transverse support 2 and the top of the second vertical support 3, and therefore the lifting rope 1 can be lifted more smoothly in the lifting process.
The second cross support 2 is obliquely supported on the top of the first support frame from the end close to the building wall 5 to the end far away from the building wall 6 from bottom to top.
Continuing to refer to fig. 1, the large-span construction basket system further comprises: the sliding mechanism 10 is arranged on the building wall 5, wherein the second transverse bracket 2 is connected with the sliding mechanism 10 in a sliding manner.
Specifically, as shown in continued reference to fig. 2, the slide mechanism 10 includes: the guide rail 102 is arranged on the building wall, the slide block 101 is arranged at one end, close to the building wall 5, of the second transverse bracket 2, and the slide block 101 is in sliding connection with the guide rail 102. The sliding mechanism 10 can be used to facilitate the horizontal movement of the second support frame.
The first vertical support 12 is a hanging basket front support, and the second horizontal support 2 is a hanging basket large arm. The second transverse support 2 is obliquely supported on the top of the first vertical support 12 from one end close to the building wall 5 to one end far away from the building wall 5 from bottom to top, so that the hanging basket 6 can be more conveniently hoisted by the second support.
The end part of the second transverse bracket 2 is provided with two pulleys from top to bottom, so that the friction resistance of the lifting rope 1 can be further reduced, and the lifting is more convenient.
Continuing to refer to fig. 1, the large-span construction basket system further comprises: the rolling mechanism 11 is arranged on the first support frame, specifically, the rolling mechanism 11 is arranged on the first cross support 4 of the first support frame, and the arrangement of the rolling mechanism 11 is matched with the rotation direction of the first support frame. Wherein, the lower end of the second vertical support 3 is connected with the rolling structure 11. The horizontal movement of the second carriage is facilitated by the sliding mechanism 10 and the rolling mechanism 11.
Continuing to refer to fig. 1 and 3, the rolling mechanism comprises: the supporting beam 8 is fixed on the top surface of the first supporting frame, and the roller 13 is arranged at the lower end of the second vertical support. Specifically, the supporting beam 8 is fixed on the top surface of the first cross support 4 of the first support frame, and the supporting beam 8 may be a square steel pipe. The grooved beam 7 has a U-shaped groove, the grooved beam 7 can be a channel steel, the grooved beam 7 is fixedly connected with a supporting beam 8, wherein the lower end of the second vertical support 12 is provided with a roller 13, and the roller 13 is matched with the U-shaped groove to slide.
The utility model discloses beneficial effect does:
1. a large-span construction hanging flower basket system in this application compares in traditional hanging flower basket system, and the second erects support 3 and is too big apart from the roof parapet structure apart from the span at the steel construction, and when no department of placing, the second erects support 3 and can erect on the top of first lateral frame 4.
2. The rear end of the second transverse support 2 is tied on a parapet wall with a certain height away from the roof through a steel wire rope to be tied, stress safety and reliability of the hanging basket 6 are guaranteed, and the requirements for frame body erection and counter weight establishment in the traditional hanging basket 6 installation mode can be avoided.
In embodiments in accordance with the present invention, the terms "first", "second", "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; the term "plurality" means two or more unless expressly limited otherwise. The terms "mounted," "connected," "fixed," and the like are to be construed broadly, and for example, "connected" may be a fixed connection, a removable connection, or an integral connection; "coupled" may be direct or indirect through an intermediary. The specific meanings of the above terms in the embodiments according to the present invention can be understood by those of ordinary skill in the art as the case may be.
In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "front", "rear", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description according to the embodiments of the present invention, but do not indicate or imply that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the embodiments according to the present invention.
In the description herein, the description of the terms "one embodiment," "some embodiments," "specific embodiments," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example in accordance with an embodiment of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The above is only a preferred embodiment according to the embodiments of the present invention, and is not intended to limit the embodiments according to the present invention, and various modifications and variations may be made to the embodiments according to the present invention by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the embodiments according to the present invention should be included in the protection scope of the embodiments according to the present invention.

Claims (10)

1. The utility model provides a large-span construction hanging flower basket system for building on the wall body, its characterized in that, large-span construction hanging flower basket system includes:
a first support bracket for attachment to the building wall;
the second support frame is connected with the building wall in a sliding mode and is connected with the first support frame in a sliding mode, and the second support frame partially extends out of the first support frame;
the pulleys are sequentially arranged on the second supporting frame;
the lifting rope sequentially rounds the pulleys; and
and the hanging basket is connected to the other end of the lifting rope.
2. The large-span construction basket system according to claim 1, wherein the first support frame comprises:
the first transverse bracket is connected with the building wall; and
the first vertical support is connected with one end, far away from the building wall, of the first transverse support;
the first vertical support is used for supporting the first transverse support, the top of the first vertical support is higher than the first transverse support, and the second support frame is supported on the first vertical support.
3. The large-span construction basket system according to claim 2, further comprising:
the connecting piece is used for connecting with the building wall;
the first transverse support is rotatably connected with the connecting piece, and one end of the lifting rope is connected with the connecting piece.
4. A large span construction basket system according to any one of claims 1 to 3, wherein the second support frame comprises:
one end of the second transverse bracket is connected with the building wall in a sliding manner; and
the second vertical bracket is crossed with the second transverse bracket and connected with the second transverse bracket;
wherein the second vertical support is connected with the first support frame in a rolling way, the second transverse support is supported at the top of the first support frame, and the second transverse support extends out of the first support frame,
the pulleys are arranged at the end part of the second transverse support and the top part of the second vertical support.
5. The large-span construction basket system according to claim 4, wherein the second cross brace is supported on the top of the first support frame to be inclined from a bottom to a top from an end close to the construction wall to an end far away from the construction wall.
6. The large-span construction basket system according to claim 4, further comprising:
the sliding mechanism is arranged on the building wall;
wherein, the second horizontal support is connected with the sliding mechanism in a sliding manner.
7. The large-span construction basket system according to claim 6, wherein the sliding mechanism comprises:
the guide rail is arranged on the building wall;
the sliding block is arranged at one end, close to the building wall, of the second transverse support and is in sliding connection with the guide rail.
8. The large-span construction basket system according to claim 4, wherein the second cross bracket is provided at an end thereof with two pulleys from top to bottom.
9. The large-span construction basket system according to claim 4, further comprising:
the rolling mechanism is arranged on the first support frame;
and the lower end of the second vertical support is connected with the rolling mechanism in a sliding manner.
10. The large-span construction basket system according to claim 9, wherein the rolling mechanism comprises:
the supporting beam is fixed on the top surface of the first supporting frame;
the groove beam is provided with a U-shaped groove and is fixedly connected with the supporting beam; and
the roller is arranged at the lower end of the second vertical bracket;
wherein, the gyro wheel with U type groove matches each other so as to be able to roll.
CN202123142208.1U 2021-12-14 2021-12-14 Large-span construction hanging basket system Active CN217079619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123142208.1U CN217079619U (en) 2021-12-14 2021-12-14 Large-span construction hanging basket system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123142208.1U CN217079619U (en) 2021-12-14 2021-12-14 Large-span construction hanging basket system

Publications (1)

Publication Number Publication Date
CN217079619U true CN217079619U (en) 2022-07-29

Family

ID=82538596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123142208.1U Active CN217079619U (en) 2021-12-14 2021-12-14 Large-span construction hanging basket system

Country Status (1)

Country Link
CN (1) CN217079619U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024093389A1 (en) * 2023-06-20 2024-05-10 中铁七局集团有限公司 Through-type transverse slide rail construction basket for external wall construction of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024093389A1 (en) * 2023-06-20 2024-05-10 中铁七局集团有限公司 Through-type transverse slide rail construction basket for external wall construction of building

Similar Documents

Publication Publication Date Title
CN217079619U (en) Large-span construction hanging basket system
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN214786109U (en) Guiding device for assembling conical-top umbrella-frame type steel truss of squat silo
CN220100596U (en) Through type horizontal sliding rail construction hanging basket for building outer wall construction
CN111252665A (en) Hoisting equipment capable of climbing along inclined vertical surface
CN116734917A (en) Combined detection tool for main body structure of engineering site
CN201292222Y (en) Reciprocating swing machine
CN110886188A (en) Large-span suspension bridge stiffening beam erecting system and use method thereof
CN211691525U (en) Construction device for overhanging type inclined curtain wall
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN214785847U (en) Be applied to hanging flower basket device of single structure concrete beam
CN210140393U (en) Curtain wall suspension hoisting gun carriage
CN114033155A (en) Inclined plane curtain wall rail mounted hanging flower basket construction system
CN204081433U (en) Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN107814318A (en) Loop wheel machine
CN2209702Y (en) Saffold
CN111287440A (en) Operation platform for construction of inclined curtain wall structure
CN218406410U (en) Hanging flower basket installation device
CN201729625U (en) Building indoor hoister
CN216005044U (en) Ceiling aluminum plate unit hoisting device
WO2024093389A1 (en) Through-type transverse slide rail construction basket for external wall construction of building
CN215174860U (en) High altitude lamps and lanterns installing support
CN217998892U (en) Steel pipe frame supporting hanging basket suspension device suitable for parapet wall more than two meters
CN216428990U (en) Support fixing structure of slope roofing hanging flower basket
CN215558540U (en) Movable hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant