CN114197716A - 预制叠合板后浇缝隙钢板封堵模具及其施工方法 - Google Patents
预制叠合板后浇缝隙钢板封堵模具及其施工方法 Download PDFInfo
- Publication number
- CN114197716A CN114197716A CN202010985524.6A CN202010985524A CN114197716A CN 114197716 A CN114197716 A CN 114197716A CN 202010985524 A CN202010985524 A CN 202010985524A CN 114197716 A CN114197716 A CN 114197716A
- Authority
- CN
- China
- Prior art keywords
- post
- plate
- cast
- die
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明涉及预制叠合板后浇缝隙钢板封堵模具,侧板与顶板固接为直角构件,侧板与后浇缝底部侧墙固接;顶板与后浇缝侧边的楼板底面相贴,顶板宽度大于后浇缝;顶板与侧板夹角设斜撑;上述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板与侧墙相贴,将侧板上的螺栓孔与侧墙预留孔相对应;2)用螺栓将模具与侧墙预固定;3)调整模具水平位置,使模具顶板与楼板底面相贴且位于后浇缝底部,完全固定模具;4)从预制楼板顶部缝隙处注浆,待混凝土定型后拆除本模具即可,本发明将缝隙封堵模板与侧墙固定,解决了预制楼板顶部缝隙处注浆时需要从地面支模板的要反复调整模具的繁琐工序。
Description
技术领域
本发明涉及一种装配式二代钢结构混凝土预制叠合板后浇缝隙钢板封堵施工方法。
背景技术
近年来,国家、行业和地方密集出台政策大力发展装配式建筑,强力推进建筑产业现代化。在全面推广装配式建筑过程中,攻克现有技术效率低、质量难控等难难题是加速产业化进程的关键所在。在现有技术应用中,对装配式二代钢结构混凝土预制叠合板与钢柱相搭接处缝隙后浇处理不完善,在预制叠合板与钢柱搭接位置预留缝隙过大,若不予处理对于后期装修是一个巨大隐患。因此对柱浇筑时应同时将缝隙一体填充,缝隙在柱结构以外,属楼板的边缘,模板则需要在楼板底面设置,传统施工中楼板底模支设只能从地面设置脚手架支撑模板。该位置虽然是一个很小的结构,实际模板布置操作起来却很耗费人力和时间,模板搭接不便。这整个模板搭设过程需由多人完成,不便于施工,容易出现表面不平整,形成凹凸面。
发明内容
本发明旨在提供一种装配式二代钢结构混凝土预制叠合板与钢柱相搭接处缝隙后浇处便捷的安装方法,用以解决装配式二代钢结构混凝土预制叠合板与钢柱相搭接处缝隙处模板安装不方便等问题。
一种预制叠合板后浇缝隙钢板封堵模具,侧板与顶板固接为直角构件,侧板与后浇缝底部侧墙相贴,侧板上设螺栓孔,该螺栓孔为长孔,螺栓孔距侧板顶部距离等于侧墙预留螺栓孔至侧墙顶部后浇缝的距离;顶板与后浇缝侧边的楼板底面相贴,顶板宽度大于后浇缝;顶板与侧板夹角设斜撑,斜撑与顶板固接的位置设加强板,斜撑与侧板固接的位置设加强板。
上述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板与侧墙相贴,将侧板上的螺栓孔与侧墙预留孔相对应;2)用螺栓将模具与侧墙预固定;3)调整模具水平位置,使模具顶板与楼板底面相贴且位于后浇缝底部,完全固定模具;4)从预制楼板顶部缝隙处注浆,待混凝土定型后拆除本模具即可。
本发明将缝隙封堵模板与侧墙固定,直接固定于后浇缝底部,解决了预制楼板顶部缝隙处注浆时需要从地面支模板的烦恼,同时固定间距的槽位也避免了过程中反复调整模具的繁琐工序。
附图说明
图1为本发明所述的后浇缝隙钢板封堵模具结构立体图;
图2为本模具实施例正面图;
图3为本模具实施例侧面图;
图4为本模具实施例俯视角图;
图5为装配式二代钢结构混凝土预制叠合板后浇缝隙结构;
图6为本模具安装示意图;
图7为本模具安装结构图。
具体实施方式
下面将结合附图对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1至图4所示,一种预制叠合板后浇缝隙钢板封堵模具,侧板1与顶板2固接为直角构件,侧板1与后浇缝底部侧墙5相贴,侧板1上设螺栓孔3,该螺栓孔3为长孔,螺栓孔3距侧板1顶部距离等于侧墙预留螺栓孔至侧墙5顶部后浇缝的距离;顶板2与后浇缝8侧边的楼板7底面相贴,顶板2宽度大于后浇缝8;顶板2与侧板夹角设斜撑4,斜撑4与顶板2固接的位置设加强板,斜撑4与侧板1固接的位置设加强板。
上述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板1与侧墙5相贴,将侧板1上的螺栓孔与侧墙5预留孔相对应;2)用螺栓将模具与侧墙5预固定;3)调整模具水平位置,使模具顶板2与楼板7底面相贴且位于后浇缝8底部,完全固定模具;4)从预制楼板7顶部缝隙处注浆,待混凝土定型后拆除本模具即可。
下面结合具体实施例,对本发明的技术方案进一步说明:
如图2至4所示,本实例的预制叠合板后浇缝隙钢板封堵模具采用6mm厚的钢板制而成,取宽度600mm的钢板折为90度角,其侧板部分长为500mm,顶板部分长度为200mm。在侧板距底边50mm处设长孔螺栓孔一个,在下部螺栓孔上间距170mm位置设置上部螺栓孔,侧板上至少设置三个螺栓孔。斜支撑左右设置两个,本实例中,斜支撑分别距工具的侧边距离为145mm。
如图5所示,本实施例中要施工的是装配式二代钢结构混凝土预制叠合板后浇缝隙,装配式墙体(包括墙板和楼板7)与钢柱6的连接位置,楼板7与侧墙的搭接位置形成施工缝8。
钢柱6左侧墙体顶部施工缝安装一块本施工缝模板,钢柱6右侧墙体顶部安装一块本施工缝模板,从而封堵施工缝底部。左侧与右侧的施工缝模板切斜角使两侧模板贴合,也可以制为一体的两侧墙施工缝模板。
本发明将缝隙封堵模板与侧墙固定,直接固定于后浇缝底部,解决了预制楼板顶部缝隙处注浆时需要从地面支模板的烦恼,同时固定间距的槽位也避免了过程中反复调整模具的繁琐工序。
Claims (2)
1.一种预制叠合板后浇缝隙钢板封堵模具,其特征是:侧板与顶板固接为直角构件,侧板与后浇缝底部侧墙相贴,侧板上设螺栓孔,该螺栓孔为长孔,螺栓孔距侧板顶部距离等于侧墙预留螺栓孔至侧墙顶部后浇缝的距离;顶板与后浇缝侧边的楼板底面相贴,顶板宽度大于后浇缝;顶板与侧板夹角设斜撑,斜撑与顶板固接的位置设加强板,斜撑与侧板固接的位置设加强板。
2.如权利要求1所述预制叠合板后浇缝隙钢板封堵模具的施工方法:具体步骤是:1)先将模具侧板与侧墙相贴,将侧板上的螺栓孔与侧墙预留孔相对应;2)用螺栓将模具与侧墙预固定;3)调整模具水平位置,使模具顶板与楼板底面相贴且位于后浇缝底部,完全固定模具;4)从预制楼板顶部缝隙处注浆,待混凝土定型后拆除本模具。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010985524.6A CN114197716A (zh) | 2020-09-18 | 2020-09-18 | 预制叠合板后浇缝隙钢板封堵模具及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010985524.6A CN114197716A (zh) | 2020-09-18 | 2020-09-18 | 预制叠合板后浇缝隙钢板封堵模具及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114197716A true CN114197716A (zh) | 2022-03-18 |
Family
ID=80645193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010985524.6A Withdrawn CN114197716A (zh) | 2020-09-18 | 2020-09-18 | 预制叠合板后浇缝隙钢板封堵模具及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114197716A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170014570A (ko) * | 2015-07-30 | 2017-02-08 | 원광대학교산학협력단 | 기초 일체형 pc 벽체를 이용한 건축물의 시공방법 |
CN209145323U (zh) * | 2018-10-18 | 2019-07-23 | 河北省建筑科学研究院 | 既有建筑的低能耗改造阳台 |
CN211081021U (zh) * | 2019-07-12 | 2020-07-24 | 广西建工集团第五建筑工程有限责任公司 | 一种竖向pc构件高压注浆拼缝封堵装置 |
-
2020
- 2020-09-18 CN CN202010985524.6A patent/CN114197716A/zh not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170014570A (ko) * | 2015-07-30 | 2017-02-08 | 원광대학교산학협력단 | 기초 일체형 pc 벽체를 이용한 건축물의 시공방법 |
CN209145323U (zh) * | 2018-10-18 | 2019-07-23 | 河北省建筑科学研究院 | 既有建筑的低能耗改造阳台 |
CN211081021U (zh) * | 2019-07-12 | 2020-07-24 | 广西建工集团第五建筑工程有限责任公司 | 一种竖向pc构件高压注浆拼缝封堵装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321421A (zh) | 一种混凝土水池壁一次成型的施工方法 | |
CN101824908A (zh) | 剪力墙大模板和剪力墙大模板体系 | |
CN106351445B (zh) | 一种劲性混凝土斜墙模板组合支撑加固系统及安装施工方法 | |
CN104712086A (zh) | 一种装配式混凝土空心叠合楼板及其制作方法 | |
CN213359004U (zh) | 一种稳定拼接的提拔墙体 | |
CN205348767U (zh) | 利用钢筋笼作骨架的外挂支模系统 | |
CN114197716A (zh) | 预制叠合板后浇缝隙钢板封堵模具及其施工方法 | |
CN105952140A (zh) | 用于现浇混凝土的工具式钢框木塑模板系统及其施工工艺 | |
CN115288504A (zh) | 大型仓体结构顶部混凝土楼板施工方法 | |
CN115075613B (zh) | 装配式建筑支撑体系及其施工方法 | |
CN201635386U (zh) | 剪力墙大模板和剪力墙大模板体系 | |
CN212002252U (zh) | 一种无梁楼板柱帽模板 | |
CN115233813A (zh) | 带有卡接连接板的梁 | |
CN212926628U (zh) | 一种装配式免支楼板 | |
CN212506978U (zh) | 一种圆弧型坡屋面压型板施工结构 | |
CN208396295U (zh) | 一种明挖车站施工用楼梯支模结构 | |
CN103669831A (zh) | 一种变电站现浇墙体组合钢模及其施工方法 | |
CN108005266A (zh) | 一种带钢边框预制钢筋混凝土剪力墙结构及制备和安装方法 | |
CN204040471U (zh) | 一种新型直拼缝柱帽模板 | |
CN206591819U (zh) | 柱帽模板总成 | |
CN206053129U (zh) | 一种t形轻钢构造柱 | |
CN215717185U (zh) | 一种建筑用梁板、墙板接头结构 | |
CN110984627A (zh) | 一种工业化装配式住宅 | |
CN215888326U (zh) | 一种城市下穿地道钢木组合式单边支模体系结构 | |
CN214330019U (zh) | 一种预制空心楼板加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220318 |
|
WW01 | Invention patent application withdrawn after publication |