Construction method for temporarily fixing coke oven column installation Download PDFInfo
- Publication number
- CN113845027A CN113845027A CN202111123082.5A CN202111123082A CN113845027A CN 113845027 A CN113845027 A CN 113845027A CN 202111123082 A CN202111123082 A CN 202111123082A CN 113845027 A CN113845027 A CN 113845027A
- Authority
- CN
- China
- Prior art keywords
- column
- furnace
- installation
- coke oven
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 239000000571 coke Substances 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 239000003245 coal Substances 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 7
- 230000000694 effects Effects 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 11
- 229910052742 iron Inorganic materials 0.000 description 5
- 230000001681 protective effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Abstract
The invention discloses a construction method for temporarily fixing the installation of a coke oven column, belongs to the technical field of coke oven installation, and provides a construction method for more economically and quickly realizing the temporary fixation of the installation of the coke oven column. The invention utilizes the prior coal charging car track support as a fixture for temporarily fixing the furnace column, realizes the temporary fixation of the furnace column by arranging the corresponding lifting lugs and adopting the steel wire for traction, and has the advantages of more economy and rapidness compared with the traditional method for manufacturing a special fixed support. And after the subsequent fine adjustment of the oven column is finished and finally the oven column is installed and fixed, the corresponding steel wire and the lifting lug can be directly detached, and the influence on the normal production and operation of the coke oven can not be generated.
Description
Technical Field
The invention relates to the technical field of coke oven installation, in particular to a construction method for temporarily fixing the installation of a coke oven column.
Background
The furnace protecting iron parts of the coke oven equipment comprise an oven column, a protecting plate, an oven door frame, an oven door, a longitudinal and transverse brace and the like. The installation of the furnace protecting iron pieces adopts a method of centralized hoisting, unified adjustment and fixation, so that accumulated errors can be eliminated, the installation quality is ensured, after the furnace columns are hoisted uniformly and before the furnace columns are adjusted in place, the furnace columns are required to be fixed temporarily, then the hoisting of the rest furnace protecting iron pieces is carried out, further unified fine adjustment operation is carried out subsequently, and finally, the furnace protecting iron pieces are fixed after all the furnace protecting iron pieces are adjusted and assembled in place. However, the conventional temporary fixing manner for the furnace column generally includes a special fixing bracket for fixing, but this manner requires an additional fixing bracket, so that the disadvantages of high cost, time consuming, labor consuming and the like exist.
Disclosure of Invention
The invention solves the technical problem of providing a construction method for more economically and quickly realizing temporary fixation of the installation of the oven column of the coke oven.
The technical scheme adopted by the invention for solving the technical problems is as follows: the construction method for temporarily fixing the coke oven column comprises the following steps:
A. after the coal charging car rail bracket on the top of the coke oven is installed, a lifting lug is arranged at a position, close to the oven post installation station, on the coal charging car rail bracket;
B. after the installation, leveling and acceptance of the furnace column lower base plate are finished, the furnace column is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and arrangement drawings, and then is hoisted and placed to the furnace column lower base plate by adopting a travelling crane and is close to a corresponding protection plate;
C. the lower part of the furnace column is fixed by a footing bolt, is provided with a nut and is not screwed up temporarily;
D. then, one end of a steel wire is used for tying the furnace column to the pillar, the other end of the steel wire is tied to the lifting lug arranged in the step A, and the temporary fixation of the furnace column is realized by utilizing a coal charging car track bracket and the steel wire;
E. and carrying out subsequent installation construction, and removing the steel wire and the lifting lug after the furnace column is completely and fixedly installed.
Further, the method comprises the following steps: and 2-3 circles of steel wires are pulled between the furnace column and the lifting lugs.
Further, the method comprises the following steps: in the step E, subsequent installation construction comprises installation construction of the longitudinal and transverse braces, and after the installation construction of the longitudinal and transverse braces is completed, the longitudinal and transverse braces are bolted with the furnace pillars through steel wire ropes, so that double fixing effects on the furnace pillars are realized.
The invention has the beneficial effects that: the invention utilizes the prior coal charging car track support as a fixture for temporarily fixing the furnace column, realizes the temporary fixation of the furnace column by arranging the corresponding lifting lugs and adopting the steel wire for traction, and has the advantages of more economy and rapidness compared with the traditional method for manufacturing a special fixed support. And after the subsequent fine adjustment of the oven column is finished and finally the oven column is installed and fixed, the corresponding steel wire and the lifting lug can be directly detached, and the influence on the normal production and operation of the coke oven can not be generated.
Drawings
FIG. 1 is a schematic view of a construction process for installing a temporary fixing of a coke oven column according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
labeled as: the coal charging car comprises a coal charging car track support 1, a furnace column 2, a lifting lug 3, a steel wire 4 and a coke oven top 5.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
It should be noted that, if there are directional indication terms, such as the terms of direction and orientation, above, below, left, right, front and back, in the present invention, for facilitating the description of the relative positional relationship between the components, the absolute position that is not the positional relationship between the related components and the components is specifically referred to, and is only used for explaining the relative positional relationship and the motion situation between the components in a specific posture, and if the specific posture is changed, the directional indication is changed accordingly. When the present invention relates to a number, such as "a plurality", "several", etc., two or more than two are specifically referred to.
As shown in figures 1 and 2, the construction method for temporarily fixing the installation of the oven column of the coke oven comprises the following steps:
A. after the coal charging car track support 1 on the top 5 of the coke oven is installed, a lifting lug 3 is arranged at a position, close to an installation station of the oven post 2, on the coal charging car track support 1;
B. after the installation, leveling and acceptance of the furnace column lower base plate are finished, the furnace column 2 is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and arrangement drawings, and then is hoisted by adopting a traveling crane to be placed on the furnace column lower base plate and is close to the corresponding protection plate;
C. the lower part of the furnace column 2 is fixed by a footing bolt, is provided with a nut and is not screwed up temporarily;
D. then, one end of a steel wire 4 is used for tying the furnace column 2 to the column, the other end of the steel wire 4 is tied to the lifting lug 3 arranged in the step A, and the temporary fixation of the furnace column 2 is realized by utilizing the coal charging car track bracket 1 and the steel wire 4;
E. and carrying out subsequent installation construction, and removing the steel wire 4 and the lifting lug 3 after the furnace column 2 is completely and fixedly installed.
In the step A, the installation and construction of the coal charging car track support 1 can be the same as the original construction mode, the lifting lugs 3 are only pre-installed at proper positions after the installation and construction of the coal charging car track support 1 are completed, if the lifting lugs 3 can be welded and fixed on the coal charging car track support 1 in a welding mode, the lifting lugs 3 are used as a structure for connecting the subsequent steel supply wires 4 and are used as temporary fixing points for the furnace columns 2.
In addition, the step B and the step C are the same as the original hoisting construction mode of the furnace column 2; in addition, before the furnace column 2 is hoisted in the same row, at least five corresponding protection plates of the coke oven need to be installed, so that mutual interference between corresponding protection plates and the hoisting construction of the furnace column 2 can be avoided. Of course, without loss of generality, construction of other necessary structures needs to be completed before the furnace column 2 is hoisted, for example, installation construction and leveling of the furnace column lower backing plate mentioned in the step B, and a corresponding protection plate for closing and matching the furnace column 2 after hoisting; this part of the protective plate is preferably mounted before lifting the furnace column 2, since it fits closely to the furnace column 2. In addition, after the furnace column 2 is hoisted, the lower anchor bolts are adopted for preliminary positioning in the step C, but are not screwed and locked, so that the subsequent fine adjustment operation on the furnace column 2 can be conveniently carried out.
Then, in the present invention, the upper end of the furnace column 2 is connected to the corresponding lifting lug by the steel wire 4 in step D. Through the tractive of steel wire 4 like this, simultaneously with the help of the preliminary location of bolt under the lower margin to stove column 2 lower extreme to and with the help of the dependent action of corresponding protection shield to stove column 2, play the temporary fixation to stove column 2 jointly. Certainly, without loss of generality, the furnace column 2 cannot be completely fixed by the relying action of the steel wire 4, the incompletely screwed and fixed lower foot bolt and the protective plate, but the furnace column 2 is allowed to have a certain movable adjustment amount so as to allow the furnace column 2 to be subjected to subsequent fine adjustment operation; it follows that the temporary fixing of the column 2 in the present invention does not necessarily require the complete fixing of the column 2.
More specifically, in order to ensure the drawing stability of the steel wire 4 to the furnace column 2, the steel wire 4 is preferably arranged to be drawn for 2-3 circles between the furnace column 2 and the lifting lug 3; namely, the steel wire 4 is wound back and forth for a plurality of times to perform drawing so as to improve the drawing effect.
More specifically, the invention also relates to the installation of the iron protection parts of the coke oven in the subsequent part after the furnace column 2 is temporarily fixed, such as the conventional parts of the protection plate, the oven door frame, the oven door, the cross braces and the like in the rest part. And each part needs to be uniformly adjusted after being installed, and is integrally fixed after being finally adjusted in place, so that the integral installation construction is completed. After the integral installation construction is completed, the steel wire 4 and the lifting lug 3 can be disassembled to avoid the influence of the structural components on the subsequent production operation of the coke oven 2 and ensure that the structural components used for temporarily fixing the oven column 2 in the invention can not influence the normal production operation of the coke oven 2.
More specifically, in step E, in the subsequent installation, the installation of the cross braces is generally included, so in the present invention, after the installation of the cross braces is completed, the cross braces are bolted to the furnace pillars 2 by using the wire ropes, so as to realize the double fixing function of the furnace pillars 2, and further provide the temporary fixing effect of the furnace pillars 2. Of course, without loss of generality, the steel wire rope used in step E can also be removed after the furnace column 2 is completely fixed and installed.
Claims (3)
1. The construction method for temporarily fixing the coke oven column installation is characterized by comprising the following steps: the method comprises the following steps:
A. after the coal charging car rail bracket (1) on the coke oven top (5) is installed, a lifting lug (3) is arranged at a position, close to an installation station of the oven post (2), on the coal charging car rail bracket (1);
B. after the installation, leveling and acceptance of the bottom cushion plate of the furnace column are finished, the furnace column (2) is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and layout, and then is hoisted by adopting a travelling crane to be placed on the bottom cushion plate of the furnace column and to be close to the corresponding protection plate;
C. the lower part of the furnace column (2) is fixed by a footing lower bolt, is provided with an upper nut and is not screwed up temporarily;
D. then tying the furnace column (2) to the column by using one end of a steel wire (4), tying the other end of the steel wire (4) to the lifting lug (3) arranged in the step A, and temporarily fixing the furnace column (2) by using the track bracket (1) of the coal charging car and the steel wire (4);
E. and carrying out subsequent installation construction, and removing the steel wire (4) and the lifting lug (3) after the complete fixed installation of the furnace column (2) is completed.
2. The construction method for temporarily fixing the installation of the coke oven column as claimed in claim 1, characterized in that: the steel wire (4) is pulled up for 2-3 circles between the furnace column (2) and the lifting lug (3).
3. The construction method for installing and temporarily fixing the coke oven column of claim 1 or 2, characterized in that: in the step E, subsequent installation construction comprises installation construction of the longitudinal and transverse braces, and after the installation construction of the longitudinal and transverse braces is completed, the longitudinal and transverse braces and the furnace pillar (2) are bolted through a steel wire rope, so that double fixing effects on the furnace pillar (2) are achieved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111123082.5A CN113845027A (en) | 2021-09-24 | 2021-09-24 | Construction method for temporarily fixing coke oven column installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111123082.5A CN113845027A (en) | 2021-09-24 | 2021-09-24 | Construction method for temporarily fixing coke oven column installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113845027A true CN113845027A (en) | 2021-12-28 |
Family
ID=78979303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111123082.5A Pending CN113845027A (en) | 2021-09-24 | 2021-09-24 | Construction method for temporarily fixing coke oven column installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113845027A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114958398A (en) * | 2022-05-29 | 2022-08-30 | 五冶集团上海有限公司 | Construction method for temporarily fixing furnace column |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080209849A1 (en) * | 2007-03-02 | 2008-09-04 | Saturn Machine & Welding Co., Inc. | Method and Apparatus for Replacing Coke Oven Wall |
CN101781573A (en) * | 2010-04-07 | 2010-07-21 | 天津二十冶建设有限公司 | Quick installation method of coke oven guard plate and oven column |
CN103666494A (en) * | 2012-09-24 | 2014-03-26 | 五冶集团上海有限公司 | Coke oven column installation method |
KR101417645B1 (en) * | 2013-06-11 | 2014-07-08 | 주식회사 포스코 | Apparatus for changing tie rod of cokes oven |
CN108913164A (en) * | 2018-08-20 | 2018-11-30 | 中国五冶集团有限公司 | The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method |
CN110373214A (en) * | 2019-06-24 | 2019-10-25 | 五冶集团上海有限公司 | A kind of coke oven stay top cross-brace replacing options |
CN112080292A (en) * | 2020-09-22 | 2020-12-15 | 中国五冶集团有限公司 | Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method |
-
2021
- 2021-09-24 CN CN202111123082.5A patent/CN113845027A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080209849A1 (en) * | 2007-03-02 | 2008-09-04 | Saturn Machine & Welding Co., Inc. | Method and Apparatus for Replacing Coke Oven Wall |
CN101781573A (en) * | 2010-04-07 | 2010-07-21 | 天津二十冶建设有限公司 | Quick installation method of coke oven guard plate and oven column |
CN103666494A (en) * | 2012-09-24 | 2014-03-26 | 五冶集团上海有限公司 | Coke oven column installation method |
KR101417645B1 (en) * | 2013-06-11 | 2014-07-08 | 주식회사 포스코 | Apparatus for changing tie rod of cokes oven |
CN108913164A (en) * | 2018-08-20 | 2018-11-30 | 中国五冶集团有限公司 | The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method |
CN110373214A (en) * | 2019-06-24 | 2019-10-25 | 五冶集团上海有限公司 | A kind of coke oven stay top cross-brace replacing options |
CN112080292A (en) * | 2020-09-22 | 2020-12-15 | 中国五冶集团有限公司 | Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114958398A (en) * | 2022-05-29 | 2022-08-30 | 五冶集团上海有限公司 | Construction method for temporarily fixing furnace column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102352756A (en) | Door arc steel frame reinforcing system | |
CN104527691A (en) | Mounting method and mounting bases for locomotive underframe parts | |
CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
CN113845027A (en) | Construction method for temporarily fixing coke oven column installation | |
CN104831632A (en) | Upper transverse beam and lower transverse beam construction method for bridge cable bent tower | |
CN106044576A (en) | Rail-mounted and wheel-mounted combined type tunnel track-laying crane and construction method thereof | |
KR20170040837A (en) | Heavy lifting device | |
CN1614195A (en) | Construction method for going through subway station by double circular shielding | |
CN209815472U (en) | Prefabricated cabin hoisting structure | |
CN203429556U (en) | System for quickly installing and positioning cable saddle | |
CN106012834A (en) | Internal supporting and tensioning system for spatial warping curve type special-shaped antisymmetric steel main tower | |
CN212687374U (en) | Device for mounting common-box enclosed bus on suspension type support in place | |
CN101760205A (en) | Method for installing coke dry quenching hoister | |
CN212200074U (en) | Whole section of steel reinforcement framework above cast-in-place box girder of movable mould frame is tied up installation device | |
CN106988224A (en) | The arch rib installation system and installation method of bridge | |
CN101713613A (en) | Process for constructing oversize main air draft pipeline of sintering project | |
CN210636823U (en) | Rail type overhead connecting device for pier body steel bar overhead connecting construction | |
CN209652767U (en) | The synchronous device for setting up girder and floorings | |
CN112377672A (en) | Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof | |
CN206800207U (en) | The arch rib installation system of bridge | |
KR102275469B1 (en) | Temporary bents for a railway catenary and construction methods thereof | |
CN109854279A (en) | A kind of constructing tunnel die plate equipment and constructing operation method | |
CN109629448A (en) | The synchronous device and method for setting up girder and floorings | |
CN216530497U (en) | Adjustable cable termination support | |
CN108551107B (en) | Integral installation method for standard power distribution transformer station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211228 |
|
RJ01 | Rejection of invention patent application after publication |