CN113845027A - Construction method for temporarily fixing coke oven column installation - Google Patents

Construction method for temporarily fixing coke oven column installation Download PDF

Info

Publication number
CN113845027A
CN113845027A CN202111123082.5A CN202111123082A CN113845027A CN 113845027 A CN113845027 A CN 113845027A CN 202111123082 A CN202111123082 A CN 202111123082A CN 113845027 A CN113845027 A CN 113845027A
Authority
CN
China
Prior art keywords
column
furnace
installation
coke oven
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111123082.5A
Other languages
Chinese (zh)
Inventor
王卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN202111123082.5A priority Critical patent/CN113845027A/en
Publication of CN113845027A publication Critical patent/CN113845027A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Abstract

The invention discloses a construction method for temporarily fixing the installation of a coke oven column, belongs to the technical field of coke oven installation, and provides a construction method for more economically and quickly realizing the temporary fixation of the installation of the coke oven column. The invention utilizes the prior coal charging car track support as a fixture for temporarily fixing the furnace column, realizes the temporary fixation of the furnace column by arranging the corresponding lifting lugs and adopting the steel wire for traction, and has the advantages of more economy and rapidness compared with the traditional method for manufacturing a special fixed support. And after the subsequent fine adjustment of the oven column is finished and finally the oven column is installed and fixed, the corresponding steel wire and the lifting lug can be directly detached, and the influence on the normal production and operation of the coke oven can not be generated.

Description

Construction method for temporarily fixing coke oven column installation
Technical Field
The invention relates to the technical field of coke oven installation, in particular to a construction method for temporarily fixing the installation of a coke oven column.
Background
The furnace protecting iron parts of the coke oven equipment comprise an oven column, a protecting plate, an oven door frame, an oven door, a longitudinal and transverse brace and the like. The installation of the furnace protecting iron pieces adopts a method of centralized hoisting, unified adjustment and fixation, so that accumulated errors can be eliminated, the installation quality is ensured, after the furnace columns are hoisted uniformly and before the furnace columns are adjusted in place, the furnace columns are required to be fixed temporarily, then the hoisting of the rest furnace protecting iron pieces is carried out, further unified fine adjustment operation is carried out subsequently, and finally, the furnace protecting iron pieces are fixed after all the furnace protecting iron pieces are adjusted and assembled in place. However, the conventional temporary fixing manner for the furnace column generally includes a special fixing bracket for fixing, but this manner requires an additional fixing bracket, so that the disadvantages of high cost, time consuming, labor consuming and the like exist.
Disclosure of Invention
The invention solves the technical problem of providing a construction method for more economically and quickly realizing temporary fixation of the installation of the oven column of the coke oven.
The technical scheme adopted by the invention for solving the technical problems is as follows: the construction method for temporarily fixing the coke oven column comprises the following steps:
A. after the coal charging car rail bracket on the top of the coke oven is installed, a lifting lug is arranged at a position, close to the oven post installation station, on the coal charging car rail bracket;
B. after the installation, leveling and acceptance of the furnace column lower base plate are finished, the furnace column is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and arrangement drawings, and then is hoisted and placed to the furnace column lower base plate by adopting a travelling crane and is close to a corresponding protection plate;
C. the lower part of the furnace column is fixed by a footing bolt, is provided with a nut and is not screwed up temporarily;
D. then, one end of a steel wire is used for tying the furnace column to the pillar, the other end of the steel wire is tied to the lifting lug arranged in the step A, and the temporary fixation of the furnace column is realized by utilizing a coal charging car track bracket and the steel wire;
E. and carrying out subsequent installation construction, and removing the steel wire and the lifting lug after the furnace column is completely and fixedly installed.
Further, the method comprises the following steps: and 2-3 circles of steel wires are pulled between the furnace column and the lifting lugs.
Further, the method comprises the following steps: in the step E, subsequent installation construction comprises installation construction of the longitudinal and transverse braces, and after the installation construction of the longitudinal and transverse braces is completed, the longitudinal and transverse braces are bolted with the furnace pillars through steel wire ropes, so that double fixing effects on the furnace pillars are realized.
The invention has the beneficial effects that: the invention utilizes the prior coal charging car track support as a fixture for temporarily fixing the furnace column, realizes the temporary fixation of the furnace column by arranging the corresponding lifting lugs and adopting the steel wire for traction, and has the advantages of more economy and rapidness compared with the traditional method for manufacturing a special fixed support. And after the subsequent fine adjustment of the oven column is finished and finally the oven column is installed and fixed, the corresponding steel wire and the lifting lug can be directly detached, and the influence on the normal production and operation of the coke oven can not be generated.
Drawings
FIG. 1 is a schematic view of a construction process for installing a temporary fixing of a coke oven column according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
labeled as: the coal charging car comprises a coal charging car track support 1, a furnace column 2, a lifting lug 3, a steel wire 4 and a coke oven top 5.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
It should be noted that, if there are directional indication terms, such as the terms of direction and orientation, above, below, left, right, front and back, in the present invention, for facilitating the description of the relative positional relationship between the components, the absolute position that is not the positional relationship between the related components and the components is specifically referred to, and is only used for explaining the relative positional relationship and the motion situation between the components in a specific posture, and if the specific posture is changed, the directional indication is changed accordingly. When the present invention relates to a number, such as "a plurality", "several", etc., two or more than two are specifically referred to.
As shown in figures 1 and 2, the construction method for temporarily fixing the installation of the oven column of the coke oven comprises the following steps:
A. after the coal charging car track support 1 on the top 5 of the coke oven is installed, a lifting lug 3 is arranged at a position, close to an installation station of the oven post 2, on the coal charging car track support 1;
B. after the installation, leveling and acceptance of the furnace column lower base plate are finished, the furnace column 2 is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and arrangement drawings, and then is hoisted by adopting a traveling crane to be placed on the furnace column lower base plate and is close to the corresponding protection plate;
C. the lower part of the furnace column 2 is fixed by a footing bolt, is provided with a nut and is not screwed up temporarily;
D. then, one end of a steel wire 4 is used for tying the furnace column 2 to the column, the other end of the steel wire 4 is tied to the lifting lug 3 arranged in the step A, and the temporary fixation of the furnace column 2 is realized by utilizing the coal charging car track bracket 1 and the steel wire 4;
E. and carrying out subsequent installation construction, and removing the steel wire 4 and the lifting lug 3 after the furnace column 2 is completely and fixedly installed.
In the step A, the installation and construction of the coal charging car track support 1 can be the same as the original construction mode, the lifting lugs 3 are only pre-installed at proper positions after the installation and construction of the coal charging car track support 1 are completed, if the lifting lugs 3 can be welded and fixed on the coal charging car track support 1 in a welding mode, the lifting lugs 3 are used as a structure for connecting the subsequent steel supply wires 4 and are used as temporary fixing points for the furnace columns 2.
In addition, the step B and the step C are the same as the original hoisting construction mode of the furnace column 2; in addition, before the furnace column 2 is hoisted in the same row, at least five corresponding protection plates of the coke oven need to be installed, so that mutual interference between corresponding protection plates and the hoisting construction of the furnace column 2 can be avoided. Of course, without loss of generality, construction of other necessary structures needs to be completed before the furnace column 2 is hoisted, for example, installation construction and leveling of the furnace column lower backing plate mentioned in the step B, and a corresponding protection plate for closing and matching the furnace column 2 after hoisting; this part of the protective plate is preferably mounted before lifting the furnace column 2, since it fits closely to the furnace column 2. In addition, after the furnace column 2 is hoisted, the lower anchor bolts are adopted for preliminary positioning in the step C, but are not screwed and locked, so that the subsequent fine adjustment operation on the furnace column 2 can be conveniently carried out.
Then, in the present invention, the upper end of the furnace column 2 is connected to the corresponding lifting lug by the steel wire 4 in step D. Through the tractive of steel wire 4 like this, simultaneously with the help of the preliminary location of bolt under the lower margin to stove column 2 lower extreme to and with the help of the dependent action of corresponding protection shield to stove column 2, play the temporary fixation to stove column 2 jointly. Certainly, without loss of generality, the furnace column 2 cannot be completely fixed by the relying action of the steel wire 4, the incompletely screwed and fixed lower foot bolt and the protective plate, but the furnace column 2 is allowed to have a certain movable adjustment amount so as to allow the furnace column 2 to be subjected to subsequent fine adjustment operation; it follows that the temporary fixing of the column 2 in the present invention does not necessarily require the complete fixing of the column 2.
More specifically, in order to ensure the drawing stability of the steel wire 4 to the furnace column 2, the steel wire 4 is preferably arranged to be drawn for 2-3 circles between the furnace column 2 and the lifting lug 3; namely, the steel wire 4 is wound back and forth for a plurality of times to perform drawing so as to improve the drawing effect.
More specifically, the invention also relates to the installation of the iron protection parts of the coke oven in the subsequent part after the furnace column 2 is temporarily fixed, such as the conventional parts of the protection plate, the oven door frame, the oven door, the cross braces and the like in the rest part. And each part needs to be uniformly adjusted after being installed, and is integrally fixed after being finally adjusted in place, so that the integral installation construction is completed. After the integral installation construction is completed, the steel wire 4 and the lifting lug 3 can be disassembled to avoid the influence of the structural components on the subsequent production operation of the coke oven 2 and ensure that the structural components used for temporarily fixing the oven column 2 in the invention can not influence the normal production operation of the coke oven 2.
More specifically, in step E, in the subsequent installation, the installation of the cross braces is generally included, so in the present invention, after the installation of the cross braces is completed, the cross braces are bolted to the furnace pillars 2 by using the wire ropes, so as to realize the double fixing function of the furnace pillars 2, and further provide the temporary fixing effect of the furnace pillars 2. Of course, without loss of generality, the steel wire rope used in step E can also be removed after the furnace column 2 is completely fixed and installed.

Claims (3)

1. The construction method for temporarily fixing the coke oven column installation is characterized by comprising the following steps: the method comprises the following steps:
A. after the coal charging car rail bracket (1) on the coke oven top (5) is installed, a lifting lug (3) is arranged at a position, close to an installation station of the oven post (2), on the coal charging car rail bracket (1);
B. after the installation, leveling and acceptance of the bottom cushion plate of the furnace column are finished, the furnace column (2) is transported to the front of the furnace by adopting a temporary pushing trolley according to the requirements of numbers and layout, and then is hoisted by adopting a travelling crane to be placed on the bottom cushion plate of the furnace column and to be close to the corresponding protection plate;
C. the lower part of the furnace column (2) is fixed by a footing lower bolt, is provided with an upper nut and is not screwed up temporarily;
D. then tying the furnace column (2) to the column by using one end of a steel wire (4), tying the other end of the steel wire (4) to the lifting lug (3) arranged in the step A, and temporarily fixing the furnace column (2) by using the track bracket (1) of the coal charging car and the steel wire (4);
E. and carrying out subsequent installation construction, and removing the steel wire (4) and the lifting lug (3) after the complete fixed installation of the furnace column (2) is completed.
2. The construction method for temporarily fixing the installation of the coke oven column as claimed in claim 1, characterized in that: the steel wire (4) is pulled up for 2-3 circles between the furnace column (2) and the lifting lug (3).
3. The construction method for installing and temporarily fixing the coke oven column of claim 1 or 2, characterized in that: in the step E, subsequent installation construction comprises installation construction of the longitudinal and transverse braces, and after the installation construction of the longitudinal and transverse braces is completed, the longitudinal and transverse braces and the furnace pillar (2) are bolted through a steel wire rope, so that double fixing effects on the furnace pillar (2) are achieved.
CN202111123082.5A 2021-09-24 2021-09-24 Construction method for temporarily fixing coke oven column installation Pending CN113845027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111123082.5A CN113845027A (en) 2021-09-24 2021-09-24 Construction method for temporarily fixing coke oven column installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111123082.5A CN113845027A (en) 2021-09-24 2021-09-24 Construction method for temporarily fixing coke oven column installation

Publications (1)

Publication Number Publication Date
CN113845027A true CN113845027A (en) 2021-12-28

Family

ID=78979303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111123082.5A Pending CN113845027A (en) 2021-09-24 2021-09-24 Construction method for temporarily fixing coke oven column installation

Country Status (1)

Country Link
CN (1) CN113845027A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114958398A (en) * 2022-05-29 2022-08-30 五冶集团上海有限公司 Construction method for temporarily fixing furnace column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080209849A1 (en) * 2007-03-02 2008-09-04 Saturn Machine & Welding Co., Inc. Method and Apparatus for Replacing Coke Oven Wall
CN101781573A (en) * 2010-04-07 2010-07-21 天津二十冶建设有限公司 Quick installation method of coke oven guard plate and oven column
CN103666494A (en) * 2012-09-24 2014-03-26 五冶集团上海有限公司 Coke oven column installation method
KR101417645B1 (en) * 2013-06-11 2014-07-08 주식회사 포스코 Apparatus for changing tie rod of cokes oven
CN108913164A (en) * 2018-08-20 2018-11-30 中国五冶集团有限公司 The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method
CN110373214A (en) * 2019-06-24 2019-10-25 五冶集团上海有限公司 A kind of coke oven stay top cross-brace replacing options
CN112080292A (en) * 2020-09-22 2020-12-15 中国五冶集团有限公司 Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080209849A1 (en) * 2007-03-02 2008-09-04 Saturn Machine & Welding Co., Inc. Method and Apparatus for Replacing Coke Oven Wall
CN101781573A (en) * 2010-04-07 2010-07-21 天津二十冶建设有限公司 Quick installation method of coke oven guard plate and oven column
CN103666494A (en) * 2012-09-24 2014-03-26 五冶集团上海有限公司 Coke oven column installation method
KR101417645B1 (en) * 2013-06-11 2014-07-08 주식회사 포스코 Apparatus for changing tie rod of cokes oven
CN108913164A (en) * 2018-08-20 2018-11-30 中国五冶集团有限公司 The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method
CN110373214A (en) * 2019-06-24 2019-10-25 五冶集团上海有限公司 A kind of coke oven stay top cross-brace replacing options
CN112080292A (en) * 2020-09-22 2020-12-15 中国五冶集团有限公司 Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114958398A (en) * 2022-05-29 2022-08-30 五冶集团上海有限公司 Construction method for temporarily fixing furnace column

Similar Documents

Publication Publication Date Title
CN102352756A (en) Door arc steel frame reinforcing system
CN104527691A (en) Mounting method and mounting bases for locomotive underframe parts
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN113845027A (en) Construction method for temporarily fixing coke oven column installation
CN104831632A (en) Upper transverse beam and lower transverse beam construction method for bridge cable bent tower
CN106044576A (en) Rail-mounted and wheel-mounted combined type tunnel track-laying crane and construction method thereof
KR20170040837A (en) Heavy lifting device
CN1614195A (en) Construction method for going through subway station by double circular shielding
CN209815472U (en) Prefabricated cabin hoisting structure
CN203429556U (en) System for quickly installing and positioning cable saddle
CN106012834A (en) Internal supporting and tensioning system for spatial warping curve type special-shaped antisymmetric steel main tower
CN212687374U (en) Device for mounting common-box enclosed bus on suspension type support in place
CN101760205A (en) Method for installing coke dry quenching hoister
CN212200074U (en) Whole section of steel reinforcement framework above cast-in-place box girder of movable mould frame is tied up installation device
CN106988224A (en) The arch rib installation system and installation method of bridge
CN101713613A (en) Process for constructing oversize main air draft pipeline of sintering project
CN210636823U (en) Rail type overhead connecting device for pier body steel bar overhead connecting construction
CN209652767U (en) The synchronous device for setting up girder and floorings
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN206800207U (en) The arch rib installation system of bridge
KR102275469B1 (en) Temporary bents for a railway catenary and construction methods thereof
CN109854279A (en) A kind of constructing tunnel die plate equipment and constructing operation method
CN109629448A (en) The synchronous device and method for setting up girder and floorings
CN216530497U (en) Adjustable cable termination support
CN108551107B (en) Integral installation method for standard power distribution transformer station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211228

RJ01 Rejection of invention patent application after publication