CN101781573A - Quick installation method of coke oven guard plate and oven column - Google Patents

Quick installation method of coke oven guard plate and oven column Download PDF

Info

Publication number
CN101781573A
CN101781573A CN201010140937A CN201010140937A CN101781573A CN 101781573 A CN101781573 A CN 101781573A CN 201010140937 A CN201010140937 A CN 201010140937A CN 201010140937 A CN201010140937 A CN 201010140937A CN 101781573 A CN101781573 A CN 101781573A
Authority
CN
China
Prior art keywords
guard plate
oven
furnace
furnace stay
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010140937A
Other languages
Chinese (zh)
Other versions
CN101781573B (en
Inventor
王贤军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201010140937 priority Critical patent/CN101781573B/en
Publication of CN101781573A publication Critical patent/CN101781573A/en
Application granted granted Critical
Publication of CN101781573B publication Critical patent/CN101781573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The invention discloses a quick installation method of a coke oven guard plate and an oven column, comprising the following steps: 1) after a coke oven body is built, a temporary fixed mount is respectively arranged on the positions on two sides of an oven top machine, which correspond to the installation positions of a guard plate and an oven column; 2) after the guard plate is hung to the proper position and adjusted, a binding piece connects the upper part of the guard plate with the temporary fixed mount so as to temporarily fix the guard plate; 3) after the guard plate is temporarily fixed, the oven column is hung to the proper position, and then the oven column is adjusted, the binding piece connects the upper part of the oven column with the temporary fixed mount so as to temporarily fix the oven column; 4) the cross-brace of the oven column is installed to formally fix the guard plate and the oven column; and 5) the binding piece and the temporary fixed mount are disassembled. The invention is simple and easy to realize, is easy to operate and master, can be flexibly adjusted according to the conditions, such as manpower, equipment and the like, can centralize the superior force of relevant type of work and improves quality and efficiency; the coke oven guard plate and the oven column can be intensively installed so as to reduce lifting machine transit shipment time and save installation time and machinery cost.

Description

A kind of coke oven guard plate and furnace stay quick installation method
Technical field
The present invention relates to a kind of installation method of coke oven for iron, particularly a kind of coke oven guard plate and furnace stay quick installation method.
Background technology
The installation of coke oven body furnace retaining ironware is an important ring of coke oven construction, and installation is big, and installation period directly has influence on the time of heatingup of coke oven battery and operation, and installation quality is very big to later stage production run influence.The installation of protecting sheet and furnace stay generally adopts traditional mechanical coke both sides that method is installed synchronously in the industry, promptly machine, burnt both sides must be installed protecting sheet and furnace stay equipment synchronously behind coke furnace building; just can fix, adjust with the horizontal brace pressurization; can not single-piece fix, maneuverability is poor, and efficient is low.Or first column installs method, though more flexible than conventional mounting method, implement comparatively loaded down with trivial details, technical difficult grasp.
Summary of the invention
The present invention provides a kind of maneuverability, coke oven guard plate and furnace stay quick installation method that efficient is high for solving the technical problem that exists in the known technology.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of coke oven guard plate and furnace stay quick installation method, may further comprise the steps: after 1) coking furnace shaft was built by laying bricks or stones, the installed position of corresponding protecting sheet and furnace stay was installed the working fastening frame respectively in furnace roof mechanical coke both sides; 2) with the protecting sheet hoisted in position and after adjusting,, come protecting sheet is carried out working fastening by being connected with the working fastening frame with the top of colligation part with protecting sheet; 3) lift furnace stay after the protecting sheet working fastening, after the furnace stay hoisted in position is adjusted,, come furnace stay is carried out working fastening by being connected with the working fastening frame with the top of colligation part with furnace stay; 4) horizontal brace of installation furnace stay is carried out formally fixing to protecting sheet and furnace stay; 5) remove colligation part and working fastening frame.
Described working fastening frame is an elongated angle steel.
Described colligation part is a steel wire.
Advantage and positively effect that the present invention has are: adopt after coke furnace building is finished, install the working fastening frame at furnace roof, when protecting sheet and furnace stay are installed, adjusting in place with the colligation part their bindings temporarily more earlier is fixed on the working fastening frame of having installed, carry out the fixed method at last, do not need complex apparatus and material, only need simple operation to realize, simple, easy to operate and control; The equipment single-piece installs and fixes, and can adjust flexibly according to situations such as manpower, equipment; Can concentrate relevant work post advantage strength, improve the quality and efficient; Can install concentratedly, reduce the lifting machine connecting time, thereby save settling time and machinery expenses.
Description of drawings
Fig. 1 implements structural representation of the present invention.
Among the figure: 1, coking furnace shaft, 2, the working fastening frame, 3, protecting sheet, 4, the colligation part, 5, furnace stay, 6, the colligation part.
Embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
Seeing also Fig. 1, a kind of coke oven guard plate of the present invention and furnace stay quick installation method: comprise the steps: 1) after coking furnace shaft 1 built by laying bricks or stones, the installed position of corresponding protecting sheet 3 and furnace stay 5 was installed working fastening frame 2 respectively in furnace roof mechanical coke both sides; Working fastening frame 2 preferably adopts elongated angle steel, on furnace roof, slots, one side with being placed in the groove of angle steel, make the other side of angle steel stretch out furnace roof, and beat connecting hole stretching out on the angle steel limit of furnace roof; 2) with protecting sheet 3 hoisted in position and after adjusting, the lower end of protecting sheet 3 is placed on the brace table of coking furnace shaft 1, with colligation part 4 protecting sheet 3 is connected with working fastening frame 2, one end colligation of colligation part 4 is fixed on the top of protecting sheet 3, the other end is fixed on the working fastening frame 2, and protecting sheet 3 is carried out working fastening; 3) lifting furnace stay 5 after protecting sheet 3 working fastenings, after the adjustment of furnace stay 5 hoisted in position, the lower end of furnace stay 5 is placed on the support bracket of coking furnace shaft 1, be connected with working fastening frame 2 with the top of colligation part 6 furnace stay 5, one end colligation of colligation part 6 is fixed on the top of furnace stay 5, the other end is fixed on the working fastening frame 2, and furnace stay 5 is carried out working fastening; 4) horizontal brace of installation furnace stay 5 is carried out formally fixing to protecting sheet 3 and furnace stay 5; In the present embodiment the horizontal brace of furnace stay 5 upper ends for pressurization mechanical coke both sides, be positioned on the furnace roof to drawing horizontal brace, the horizontal brace of furnace stay 5 lower ends is shorter, the pre-buried steel plate that is used for straining with furnace stay 5 usefulness on the furnace bottom crossbeam is installed horizontal brace between furnace stay 5 lower ends and pre-embedded steel slab in advance; 5) remove colligation part 4,6 and working fastening frame 2.
Above-mentioned colligation part 4,6 preferably adopts steel wire, and under the prerequisite that strength of joint meets the demands, diameter is less, and conveniently is easy to get at the construction field (site).
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to above-mentioned embodiment; above-mentioned embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (3)

1. coke oven guard plate and furnace stay quick installation method is characterized in that, may further comprise the steps:
1) after coking furnace shaft was built by laying bricks or stones, the installed position of corresponding protecting sheet and furnace stay was installed the working fastening frame respectively in furnace roof mechanical coke both sides;
2) with the protecting sheet hoisted in position and after adjusting,, come protecting sheet is carried out working fastening by being connected with the working fastening frame with the top of colligation part with protecting sheet;
3) lift furnace stay after the protecting sheet working fastening, after the furnace stay hoisted in position is adjusted,, come furnace stay is carried out working fastening by being connected with the working fastening frame with the top of colligation part with furnace stay;
4) horizontal brace of installation furnace stay is carried out formally fixing to protecting sheet and furnace stay;
5) remove colligation part and working fastening frame.
2. coke oven guard plate according to claim 1 and furnace stay quick installation method is characterized in that, described working fastening frame is an elongated angle steel.
3. coke oven guard plate according to claim 1 and furnace stay quick installation method is characterized in that, described colligation part is a steel wire.
CN 201010140937 2010-04-07 2010-04-07 Quick installation method of coke oven guard plate and oven column Active CN101781573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010140937 CN101781573B (en) 2010-04-07 2010-04-07 Quick installation method of coke oven guard plate and oven column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010140937 CN101781573B (en) 2010-04-07 2010-04-07 Quick installation method of coke oven guard plate and oven column

Publications (2)

Publication Number Publication Date
CN101781573A true CN101781573A (en) 2010-07-21
CN101781573B CN101781573B (en) 2013-02-13

Family

ID=42521727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010140937 Active CN101781573B (en) 2010-04-07 2010-04-07 Quick installation method of coke oven guard plate and oven column

Country Status (1)

Country Link
CN (1) CN101781573B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101921602A (en) * 2010-08-27 2010-12-22 中国一冶集团有限公司 Construction method for compressing protection plates of coke oven by adopting gantry hanger
CN103666494A (en) * 2012-09-24 2014-03-26 五冶集团上海有限公司 Coke oven column installation method
CN104694141A (en) * 2015-02-13 2015-06-10 山东钢铁股份有限公司 Protection plate fixing device and method during replacement of coke oven column
CN107879261A (en) * 2017-12-05 2018-04-06 中国电建集团贵阳勘测设计研究院有限公司 A kind of tilting arch trash rack hanging apparatus and hanging method
CN108913164A (en) * 2018-08-20 2018-11-30 中国五冶集团有限公司 The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method
CN110317615A (en) * 2019-07-03 2019-10-11 五冶集团上海有限公司 A kind of coke oven stay, protection board method for dismounting
CN112080292A (en) * 2020-09-22 2020-12-15 中国五冶集团有限公司 Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method
CN113528157A (en) * 2021-08-26 2021-10-22 中国十九冶集团有限公司 Construction method for mounting newly-built coke oven protection plate
CN113732697A (en) * 2021-09-29 2021-12-03 中国十九冶集团有限公司 Combined installation method for iron parts of coke oven protection
CN113845027A (en) * 2021-09-24 2021-12-28 中国十九冶集团有限公司 Construction method for temporarily fixing coke oven column installation
CN113998587A (en) * 2021-08-26 2022-02-01 中国十九冶集团有限公司 Support suspension device for mounting newly-built coke oven protection plate
CN115261032A (en) * 2022-08-25 2022-11-01 中化二建集团有限公司 Construction method of coke oven protection iron part

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005195207A (en) * 2004-01-05 2005-07-21 Shinagawa Refract Co Ltd Precast block for coke oven door and its manufacturing method
CN201121179Y (en) * 2007-10-25 2008-09-24 攀枝花新钢钒股份有限公司 Protection plate for chute area of coke oven
CN201367299Y (en) * 2008-11-12 2009-12-23 中冶京唐建设有限公司 Sling for lifting large-scale coke oven doors

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005195207A (en) * 2004-01-05 2005-07-21 Shinagawa Refract Co Ltd Precast block for coke oven door and its manufacturing method
CN201121179Y (en) * 2007-10-25 2008-09-24 攀枝花新钢钒股份有限公司 Protection plate for chute area of coke oven
CN201367299Y (en) * 2008-11-12 2009-12-23 中冶京唐建设有限公司 Sling for lifting large-scale coke oven doors

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
胡亚玲: "焦炉护炉铁件安装工艺", 《科技情报开发与经济》 *
贺广利: "焦炉护炉铁件安装工法(GF/JA37-1997)", 《安装》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101921602A (en) * 2010-08-27 2010-12-22 中国一冶集团有限公司 Construction method for compressing protection plates of coke oven by adopting gantry hanger
CN101921602B (en) * 2010-08-27 2013-02-27 中国一冶集团有限公司 Construction method for compressing protection plates of coke oven by adopting gantry hanger
CN103666494A (en) * 2012-09-24 2014-03-26 五冶集团上海有限公司 Coke oven column installation method
CN103666494B (en) * 2012-09-24 2015-08-12 五冶集团上海有限公司 A kind of Coke oven column installation method
CN104694141A (en) * 2015-02-13 2015-06-10 山东钢铁股份有限公司 Protection plate fixing device and method during replacement of coke oven column
CN104694141B (en) * 2015-02-13 2017-05-03 山东钢铁股份有限公司 Protection plate fixing device and method during replacement of coke oven column
CN107879261A (en) * 2017-12-05 2018-04-06 中国电建集团贵阳勘测设计研究院有限公司 A kind of tilting arch trash rack hanging apparatus and hanging method
CN108913164A (en) * 2018-08-20 2018-11-30 中国五冶集团有限公司 The symmetrical lifting coke oven furnace stay of truck crane, protection board structure and protection board pressure method
CN110317615A (en) * 2019-07-03 2019-10-11 五冶集团上海有限公司 A kind of coke oven stay, protection board method for dismounting
CN112080292A (en) * 2020-09-22 2020-12-15 中国五冶集团有限公司 Symmetrically-hoisted furnace protection iron part protection plate, furnace column structure and installation method
CN113528157A (en) * 2021-08-26 2021-10-22 中国十九冶集团有限公司 Construction method for mounting newly-built coke oven protection plate
CN113998587A (en) * 2021-08-26 2022-02-01 中国十九冶集团有限公司 Support suspension device for mounting newly-built coke oven protection plate
CN113845027A (en) * 2021-09-24 2021-12-28 中国十九冶集团有限公司 Construction method for temporarily fixing coke oven column installation
CN113732697A (en) * 2021-09-29 2021-12-03 中国十九冶集团有限公司 Combined installation method for iron parts of coke oven protection
CN115261032A (en) * 2022-08-25 2022-11-01 中化二建集团有限公司 Construction method of coke oven protection iron part
CN115261032B (en) * 2022-08-25 2024-06-11 中化二建集团有限公司 Coke oven protecting iron piece construction method

Also Published As

Publication number Publication date
CN101781573B (en) 2013-02-13

Similar Documents

Publication Publication Date Title
CN101781573B (en) Quick installation method of coke oven guard plate and oven column
KR20130121398A (en) The pole fittings changing method use lifting apparatus
CN107503773A (en) A kind of beat clamping device for the installation of constructing tunnel bow member
CN103741964B (en) The method for dismounting of rake mast-up and armored concrete channel roof slab
CN207646612U (en) A kind of cast-in-place bridge steel pipe support lateral of fast-assembling
CN207634092U (en) A kind of beat clamping device for the installation of constructing tunnel arch
CN213537032U (en) Special clamp crown block for carbon pre-roasting anode workshop
CN105715028B (en) Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear
CN204708076U (en) A kind of regulable control dotter
CN104836161A (en) Hanger frame of fixed-steering pulley
CN105356327A (en) Position adjustment device for maintenance of electronic element
CN102491191A (en) Tower crane, derrick mast device and hoisting method thereof
CN106992474A (en) 10kV ends dismount aid
CN202423997U (en) Combined ground wire lifting mechanism
CN205387447U (en) A device that equipment hoisted on was used for overhead power line pole and mounting tool thereof
CN211058842U (en) Auxiliary mounting device for support front beam jack
CN205257845U (en) Small -size hoisting machine utensil
CN104295106A (en) Roof truss secondary member lifting appliance
CN210655932U (en) Novel pipeline hoist and mount device
CN203889951U (en) Turntable for construction machinery and equipment
CN102154989A (en) Steel-concrete structure hanging box and dismantling method thereof
CN205270668U (en) Reinforcement cutting shear moving platform
CN201400556Y (en) Hoisting tool dedicated for steel rail adjustment
CN201400840Y (en) Steel rail hoisting tool
CN205016899U (en) Unsettled transformer mounting bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 300301 Dongli District, flawless Street Jintang Highway Bridge No. ten

Patentee after: MCC TIANGONG GROUP TIANJIN CO., LTD.

Address before: 300301, Tanggu District, Tianjin twenty Street flawless

Patentee before: Tianjin MCC20 Construction Co., Ltd.