CN104694141A - Protection plate fixing device and method during replacement of coke oven column - Google Patents

Protection plate fixing device and method during replacement of coke oven column Download PDF

Info

Publication number
CN104694141A
CN104694141A CN201510080831.9A CN201510080831A CN104694141A CN 104694141 A CN104694141 A CN 104694141A CN 201510080831 A CN201510080831 A CN 201510080831A CN 104694141 A CN104694141 A CN 104694141A
Authority
CN
China
Prior art keywords
protecting sheet
support
furnace stay
stay
replaced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510080831.9A
Other languages
Chinese (zh)
Other versions
CN104694141B (en
Inventor
郭涛
隋明明
曹毅
林金良
陈勇
刘涛
李树华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201510080831.9A priority Critical patent/CN104694141B/en
Publication of CN104694141A publication Critical patent/CN104694141A/en
Application granted granted Critical
Publication of CN104694141B publication Critical patent/CN104694141B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/08Bracing or foundation of the ovens

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

The invention provides a protection plate fixing device and method during replacement of a coke oven column. The fixing device comprises a bracket and an adjusting structure, wherein the first end of the bracket is used for being fixed on a normal oven column, the second end of the bracket is used for extending to the outer side of a protection plate fixed by a to-be-replaced oven column; the bracket is used for being arranged on the outer side of the protection plate; and the adjusting structure is arranged at the second end of the bracket and is used for pressing against the outer side of the protection plate and adjusting the pressure applied to the protection plate. When the oven column is replaced, the oven column fixed protection plate can be effectively replaced, the operation is convenient, the structure is simple, the pressure applied to the protection plate is adjustable, and the coke oven production is not influenced.

Description

Protecting sheet stationary installation and method during replacing coke oven stay
Technical field
The present invention relates to Coke-oven Maintenance technical field, particularly protecting sheet stationary installation and method during one replacing coke oven stay.
Background technology
Coke oven is used for making coal carbonization to produce coke, is the main Thermal Equipment of coking.Coke oven is made up of body of heater and auxiliary facility, and body of heater comprises the parts such as furnace roof, combustion chamber, coking chamber, chute district, regenerator.Head of combustion chamber then clasping have coke oven guard plate, be furnace stay outside it, inner side is coking furnace shaft.
Protecting sheet passes through the pressure fixing of furnace stay outside body of heater, and Main Function is that the protectiveness pressure that furnace stay produces is passed to coking furnace shaft, in a lateral direction free expansion occurs to prevent coking furnace shaft.In process of production, furnace stay due to the impact by the factors such as high temperature, occur comparatively large deformation and pressure needed for coking furnace shaft cannot be provided time, will change.
In the prior art, when changing furnace stay, often use channel-section steel to substitute furnace stay and apply pressure outside protecting sheet, occur to prevent protecting sheet coming off or moving.Although use channel-section steel to substitute furnace stay to fix protecting sheet and can reach and prevent protecting sheet from occurring coming off or the object of movement, but still there is some problems.Such as, the pressure that channel-section steel provides is uncontrollable and regulate, if pressure is bigger than normal, protecting sheet compressing body of heater, causes body of heater to damage; If pressure is less than normal, coming off or moving appears in protecting sheet, and adjustment difficulty is larger.Meanwhile, because channel-section steel installation dimension is comparatively large, affects the normal traveling of coke-oven locomotive, cause coke oven partial outage, larger to coke oven Influence of production.
Summary of the invention
The object of the present invention is to provide a kind of protecting sheet stationary installation and method when changing coke oven stay, uncontrollable and regulate, on problems such as coke oven impact are larger to solve channel-section steel pressure that prior art exists.
To achieve these goals, the technical scheme of stationary installation provided by the invention is:
Protecting sheet stationary installation during a kind of replacing coke oven stay, it comprises: support, and first end is for being fixed on normal furnace stay, and the outside of the protecting sheet that the second end is fixed to furnace stay to be replaced extends, for being arranged on the outside of this protecting sheet; Adjustment structure, is located at the second end of described support, for supporting the pressure put in the outside of this protecting sheet and adjustment on this protecting sheet.
Preferably, in above-mentioned protecting sheet stationary installation, described support is multiple, extends from multiple directions to the outside of this protecting sheet to make its second end.
Preferably, in above-mentioned protecting sheet stationary installation, described support is shaft-like, and first end is for being welded on normal furnace stay.
Preferably, in above-mentioned protecting sheet stationary installation, described support is shaft-like, and the second end is provided with the screw perpendicular to this protecting sheet; Described adjustment structure is bolt, and described bolt is engaged in described screw, and free end supports the outside at this protecting sheet.
Preferably, in above-mentioned protecting sheet stationary installation, also comprise the multiple infrared equipments for measuring distance, whether multiple described infrared equipment, for being fixed on normal furnace stay, changes with the position detecting multiple reference point on this protecting sheet.
To achieve these goals, the technical scheme of fixing means provided by the invention is:
Protecting sheet fixing means during a kind of replacing coke oven stay, it comprises the following steps: according to furnace stay position to be replaced, the protecting sheet need fixed when determining furnace stay to be replaced; Be fixed on the normal furnace stay of furnace stay both sides to be replaced by the first end of at least one support, the second end is then arranged on the outside of this protecting sheet; Adjustment structure is set at support second end, and adjustment structure is supported on the outside of this protecting sheet, thus reach the object of fixing this protecting sheet; Change furnace stay to be replaced; Furnace stay to be replaced takes off adjustment structure after changing; Support on normal furnace stay is removed.
Preferably, in above-mentioned protecting sheet fixing means, the first end of support is welded on normal furnace stay; When support on normal furnace stay is removed, directly the first end of support is cut from normal furnace stay.
Preferably, in above-mentioned protecting sheet fixing means, support is four, and the second end and this protecting sheet 4 angles of four supports are corresponding.
Preferably, in above-mentioned protecting sheet fixing means, adjustment structure is the bolt being arranged on support second end, and the free end end face of bolt supports the outside at this protecting sheet.
Preferably, in above-mentioned protecting sheet fixing means, when adjustment structure fixes this protecting sheet, be also included on this protecting sheet and select multiple reference point, whether the position utilizing multiple distance measuring equipment to detect multiple reference point in real time changes.
Analyze known, the present invention, when changing furnace stay, can effectively substitute furnace stay and fix protecting sheet, and easy to operate, structure is simple, the pressure adjustable be applied on protecting sheet, does not affect coke oven production.
Accompanying drawing explanation
Fig. 1 is the application structure schematic diagram of stationary installation embodiment of the present invention.
Fig. 2 is the structure for amplifying schematic diagram of local A in Fig. 1.
Fig. 3 is the fit structure schematic diagram of support of the present invention and bolt.
In figure, the normal furnace stay of 1-; 2-support; The parallel end of 21-; 22-first end; 23-second end; 3-furnace stay to be replaced; 4-protecting sheet; 5-bolt.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further details.
Fig. 1, Fig. 2 clearly illustrate structure and application site, the application structure of stationary installation embodiment of the present invention.As shown in the figure, this stationary installation embodiment comprises multiple support 2, adjustment structure.Preferably, support 2 is in shaft-like, and adjustment structure is bolt 5.Specifically, the first end of support 2 is fixed on normal furnace stay 1, and the second end extends, for bolt 5 being arranged on the outside of protecting sheet 4 to the outside of the protecting sheet 4 that furnace stay 3 to be replaced is fixed.The second end of support 2 is located at by bolt 5, and free end (small end) is supported in the outside of protecting sheet 4, for fixing protecting sheet 4, and by rotating, can regulate the pressure put on protecting sheet 4.
In order to not produce the sense repeated, below in conjunction with the application process of stationary installation embodiment of the present invention, its structure is described further.
First, according to furnace stay 3 position to be replaced, the protecting sheet 4 need fixed when determining to change furnace stay 3 to be replaced.During normal production, protecting sheet 4 is fixed by the furnace stay to be replaced 3 be close to outside it, and after certain hour, furnace stay 3 to be replaced is out of shape, and is difficult to effectively support protecting sheet 4, fix, and needs to change, and in Renewal process, reply protecting sheet 4 is fixed, and avoids it to move.
The first end of four supports 2 is fixed on the normal furnace stay 1 of furnace stay 3 both sides to be replaced.Wherein, the first end of every two supports 2 is fixed on the two ends of same normal furnace stay 1, and preferably, support 2 is in long strip-board shape structure, and first end is welded on the side of normal furnace stay 1, to avoid taking larger space.Second end of four supports 2 is then outside corresponding four bights being arranged on protecting sheet 4.Need to illustrate in advance, before support 2 is welded on normal furnace stay 1, the second end of support 2 has been provided with screw (unmarked).
In the screw of support 2 second end, screw in bolt 5, and the free end end face of bolt 5 is supported on the outer side of protecting sheet 4, thus reach the object of fixing protecting sheet 4.
Now, i.e. replaceable furnace stay to be replaced 3.Because bolt 5 tightly support protecting sheet 4, protecting sheet 4 can not be moved, be out of shape.
Furnace stay 3 to be replaced takes off bolt 5 after changing.
Support 2 on normal furnace stay 1 is cut, removes.
When protecting sheet 4 fixed by bolt 5; after furnace stay 3 to be replaced is removed; certain slight movement or distortion may be there is in protecting sheet 4; in order to whether position, the shape that can detect protecting sheet 4 change; the present embodiment can also comprise the multiple infrared equipment (not shown) for measuring distance; the indication mechanism that infrared equipment comprises feeler mechanism, is connected with feeler mechanism, detection data are sent to indication mechanism by feeler mechanism.
During application, multiple infrared equipment is fixed on the different positions on normal furnace stay 1, before changing furnace stay 3 to be replaced, measures the distance of different reference point on an infrared equipment to protecting sheet 4, and record.After furnace stay 3 to be replaced takes off; if the position of protecting sheet 4 is moved; when rotating bolt 5 drives protecting sheet 4 to set back; infrared equipment detects the distance of reference point in real time; until the reference point distance detected in real time equals the reference point distance of original record, can ensure that the position of protecting sheet 4 is identical with the position changed before furnace stay to be replaced like this.
The support process of normal furnace stay of the present invention 3 pairs of protecting sheets 4 is:
The cross section of normal furnace stay 3 is " work " character form structure; the structure of normal furnace stay 3 is divided into the first back up pad, the second back up pad and web plate; the shape of protecting sheet 4 is " work " glyph shape; under normal circumstances; first back up pad of normal furnace stay 3 is used for propping up protecting sheet 4, carries out spacing to protecting sheet 4.
As shown in Figure 1 and Figure 2, below specific works process of the present invention is described in detail:
First, determine which furnace stay is furnace stay 3 to be replaced;
Secondly, according to furnace stay 3 to be replaced, the protecting sheet 4 protecting this furnace stay 3 to be replaced is determined; Weld two supports 2 in the web plate position of the normal furnace stay 1 of furnace stay 3 both sides to be replaced simultaneously, as shown in Figure 3, support 2 is a plate construction, the first end 22 of support 2 is welded to connect with the web plate of normal furnace stay 1, parallel end 21 and the protecting sheet 4 of support 2 are set in parallel, have a threaded hole at the second end 23 place of support 2, this threaded hole is vertical setting with the parallel end 21 of support 2, the screw hole of bolt 5 and the second end 23; By screwing bolt 5, the free end of bolt 5 is made to hold out against protecting sheet 4, specifically holding out against step is: four supports 2 respectively with two ends, top and the following justify align of " work " glyph shape of protecting sheet 4, the free end of four bolts 5 holds out against the two ends, top of " work " glyph shape of protecting sheet 4 and following two ends respectively simultaneously;
Now, i.e. replaceable furnace stay to be replaced 3.Because bolt 5 tightly support protecting sheet 4, protecting sheet 4 can not be moved, be out of shape.
Furnace stay 3 to be replaced takes off bolt 5 after changing.
Support 2 on normal furnace stay 1 is cut, removes.
As shown in Figure 3, the width of the first end 22 of support 2 of the present invention is greater than the width of the second end 23, like this design can when support 2 being welded on normal furnace stay 1 handled easily; Moreover the end of the second end 23 of support 2 of the present invention is semicircular arc; like this can so that arrange threaded hole; be benchmark when arranging threaded hole with semi arch, the thickness as outside of the threaded hole obtained is impartial, reaches the object of stress equalization when bolt 5 pairs of protecting sheets 4 exert a force.
In sum, the present invention, when changing furnace stay, can effectively substitute furnace stay and fix protecting sheet, easy to operate, and structure is simple, can also apply different pressure, regulate its position as required to protection.Installation site does not affect the normal traveling of coke-oven locomotive simultaneously, does not affect coke oven and produces.
As known by the technical knowledge, the present invention can be realized by other the embodiment not departing from its spirit or essential feature.Therefore, above-mentioned disclosed embodiment, with regard to each side, all just illustrates, is not only.Within the scope of the present invention all or be all included in the invention being equal to the change in scope of the present invention.

Claims (10)

1. protecting sheet stationary installation during replacing coke oven stay, is characterized in that, comprising:
Support, first end is for being fixed on normal furnace stay, and the outside of the protecting sheet that the second end is fixed to furnace stay to be replaced extends, for being arranged on the outside of this protecting sheet;
Adjustment structure, is located at the second end of described support, for supporting the pressure put in the outside of this protecting sheet and adjustment on this protecting sheet.
2. protecting sheet stationary installation according to claim 1, is characterized in that, described support is multiple, extends from multiple directions to the outside of this protecting sheet to make its second end.
3. protecting sheet stationary installation according to claim 1, is characterized in that, described support is shaft-like, and first end is for being welded on normal furnace stay.
4. protecting sheet stationary installation according to claim 1, is characterized in that, described support is shaft-like, and the second end is provided with the screw perpendicular to this protecting sheet;
Described adjustment structure is bolt, and described bolt is engaged in described screw, and free end supports the outside at this protecting sheet.
5. according to the arbitrary described protecting sheet stationary installation of claim 1-4; it is characterized in that; also comprise the multiple infrared equipments for measuring distance, whether multiple described infrared equipment, for being fixed on normal furnace stay, changes with the position detecting multiple reference point on this protecting sheet.
6. protecting sheet fixing means during replacing coke oven stay, is characterized in that, comprise the following steps:
According to furnace stay position to be replaced, the protecting sheet need fixed when determining furnace stay to be replaced;
Be fixed on the normal furnace stay of furnace stay both sides to be replaced by the first end of at least one support, the second end is then arranged on the outside of this protecting sheet;
Adjustment structure is set at support second end, and adjustment structure is supported on the outside of this protecting sheet, thus reach the object of fixing this protecting sheet;
Change furnace stay to be replaced;
Furnace stay to be replaced takes off adjustment structure after changing;
Support on normal furnace stay is removed.
7. protecting sheet fixing means according to claim 6, is characterized in that, the first end of support is welded on normal furnace stay;
When support on normal furnace stay is removed, directly the first end of support is cut from normal furnace stay.
8. protecting sheet fixing means according to claim 6, is characterized in that, support is four, and the second end and this protecting sheet 4 angles of four supports are corresponding.
9. protecting sheet fixing means according to claim 6, is characterized in that, adjustment structure is the bolt being arranged on support second end, and the free end end face of bolt supports the outside at this protecting sheet.
10. protecting sheet fixing means according to claim 6; it is characterized in that; when adjustment structure fixes this protecting sheet, be also included on this protecting sheet and select multiple reference point, whether the position utilizing multiple distance measuring equipment to detect multiple reference point in real time changes.
CN201510080831.9A 2015-02-13 2015-02-13 Protection plate fixing device and method during replacement of coke oven column Active CN104694141B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510080831.9A CN104694141B (en) 2015-02-13 2015-02-13 Protection plate fixing device and method during replacement of coke oven column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510080831.9A CN104694141B (en) 2015-02-13 2015-02-13 Protection plate fixing device and method during replacement of coke oven column

Publications (2)

Publication Number Publication Date
CN104694141A true CN104694141A (en) 2015-06-10
CN104694141B CN104694141B (en) 2017-05-03

Family

ID=53341707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510080831.9A Active CN104694141B (en) 2015-02-13 2015-02-13 Protection plate fixing device and method during replacement of coke oven column

Country Status (1)

Country Link
CN (1) CN104694141B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107011926A (en) * 2017-06-14 2017-08-04 五冶集团上海有限公司 The device and method of protection board is fixed in being changed for coke oven stay
CN107033928A (en) * 2017-06-14 2017-08-11 五冶集团上海有限公司 Device, the system and method changed for coke oven stay
CN107163955A (en) * 2017-07-13 2017-09-15 南京钢铁股份有限公司 Platform above section furnace stay more changing device and its replacing options in a kind of coke side stove
JP2020033499A (en) * 2018-08-31 2020-03-05 三菱ケミカル株式会社 Oven fastening structure of chamber type coke oven

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4026768A (en) * 1974-05-31 1977-05-31 Dr. C. Otto & Comp. G.M.B.H. Door extracting and cleaning machine for coke ovens
CN201144207Y (en) * 2007-12-17 2008-11-05 中冶焦耐工程技术有限公司 Coke oven stay spring and support combination thereof
CN201339010Y (en) * 2008-12-20 2009-11-04 山西太钢不锈钢股份有限公司 Adjusting tool of coke oven circulating perforated brick
CN101781573A (en) * 2010-04-07 2010-07-21 天津二十冶建设有限公司 Quick installation method of coke oven guard plate and oven column
CN102002374A (en) * 2010-12-06 2011-04-06 中国二十二冶集团有限公司 Thermal-exchange construction method of coke oven column
JP2011121999A (en) * 2009-12-08 2011-06-23 Jfe Steel Corp Oven outlet structure of coke oven and method for producing coke therewith
CN103173230A (en) * 2013-03-29 2013-06-26 中国一冶集团有限公司 Transporting and constructing method and device for coke-oven checker bricks
CN103215051A (en) * 2013-04-03 2013-07-24 中国一冶集团有限公司 Local-slippage construction method of furnace column
CN204058352U (en) * 2014-06-20 2014-12-31 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of coke oven stay spring setting device
CN204529734U (en) * 2015-02-13 2015-08-05 山东钢铁股份有限公司 Protecting sheet stationary installation during replacing coke oven stay

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4026768A (en) * 1974-05-31 1977-05-31 Dr. C. Otto & Comp. G.M.B.H. Door extracting and cleaning machine for coke ovens
CN201144207Y (en) * 2007-12-17 2008-11-05 中冶焦耐工程技术有限公司 Coke oven stay spring and support combination thereof
CN201339010Y (en) * 2008-12-20 2009-11-04 山西太钢不锈钢股份有限公司 Adjusting tool of coke oven circulating perforated brick
JP2011121999A (en) * 2009-12-08 2011-06-23 Jfe Steel Corp Oven outlet structure of coke oven and method for producing coke therewith
CN101781573A (en) * 2010-04-07 2010-07-21 天津二十冶建设有限公司 Quick installation method of coke oven guard plate and oven column
CN102002374A (en) * 2010-12-06 2011-04-06 中国二十二冶集团有限公司 Thermal-exchange construction method of coke oven column
CN103173230A (en) * 2013-03-29 2013-06-26 中国一冶集团有限公司 Transporting and constructing method and device for coke-oven checker bricks
CN103215051A (en) * 2013-04-03 2013-07-24 中国一冶集团有限公司 Local-slippage construction method of furnace column
CN204058352U (en) * 2014-06-20 2014-12-31 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of coke oven stay spring setting device
CN204529734U (en) * 2015-02-13 2015-08-05 山东钢铁股份有限公司 Protecting sheet stationary installation during replacing coke oven stay

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高宝林等: "焦炉护炉设备安装与控制", 《煤化工》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107011926A (en) * 2017-06-14 2017-08-04 五冶集团上海有限公司 The device and method of protection board is fixed in being changed for coke oven stay
CN107033928A (en) * 2017-06-14 2017-08-11 五冶集团上海有限公司 Device, the system and method changed for coke oven stay
CN107033928B (en) * 2017-06-14 2023-07-14 五冶集团上海有限公司 Device, system and method for replacing coke oven column
CN107163955A (en) * 2017-07-13 2017-09-15 南京钢铁股份有限公司 Platform above section furnace stay more changing device and its replacing options in a kind of coke side stove
JP2020033499A (en) * 2018-08-31 2020-03-05 三菱ケミカル株式会社 Oven fastening structure of chamber type coke oven
JP7151283B2 (en) 2018-08-31 2022-10-12 三菱ケミカル株式会社 Furnace tightening structure of chamber-type coke oven

Also Published As

Publication number Publication date
CN104694141B (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN104694141A (en) Protection plate fixing device and method during replacement of coke oven column
CN103234508B (en) The measurement of high-temperature pipe circumferential deformation is extended device
CN204529734U (en) Protecting sheet stationary installation during replacing coke oven stay
CN106053250B (en) Device and method for measuring ultrahigh-temperature bending elastic modulus and fracture strain of material
CN104713447A (en) Test tool for inner-high-pressure-shaped complicated automobile tube beams
CN202814809U (en) Four-point bending test device with adjustable space between pressure heads for asphalt mixture
CN101985134B (en) Contact-type plate-shaped measuring apparatus
CN108692693B (en) Radian measurement structure of jaw type online roll gap instrument
CN109550796B (en) Online roller shape detection device and method thereof
CN203289283U (en) 600 MW thermal power generator set generator rotor retaining ring disassembling tool
CN104406564A (en) Aluminum plate flatness detection machine
CN204495239U (en) The cubing of a kind of internal high pressure forming Complicated Automobile Guan Liang
CN103115579A (en) Displacement sensor adopting laser range finder to detect air preheater rotor deformation
CN209927309U (en) Fixing device for adjusting and installing detection rod
CN104479695B (en) Pushing ram correcting method
CN109821906A (en) The device of two roller aluminum plate & strip hot-rolling machine roller temperature on-line checkings
CN206330538U (en) Hot-rolled pipe linearity on-line checking instrument
CN203791395U (en) Straightening warp detection device for medium plate straightening plate
CN207016710U (en) Coke oven masonry protection device
CN206018691U (en) A kind of enamel elliptical tube air preheater of maintenance easy to install
CN104226731B (en) The method of heavy plate mill working roll backplate straightening
CN109490095B (en) Method for testing bending performance of corrugated plate of large-scale generator
CN218404863U (en) Be applied to track expansion joint of both sides wheel
Kubota et al. Design and thermal performance of an improved mechanically attached module for divertor plate of LHD
CN219358483U (en) Clamp tool for auxiliary repair of arc-shaped plate of turbine diffuser

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant