CN101760205A - Method for installing coke dry quenching hoister - Google Patents

Method for installing coke dry quenching hoister Download PDF

Info

Publication number
CN101760205A
CN101760205A CN200810203348A CN200810203348A CN101760205A CN 101760205 A CN101760205 A CN 101760205A CN 200810203348 A CN200810203348 A CN 200810203348A CN 200810203348 A CN200810203348 A CN 200810203348A CN 101760205 A CN101760205 A CN 101760205A
Authority
CN
China
Prior art keywords
lift
dry quenching
coke dry
quenching hoister
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810203348A
Other languages
Chinese (zh)
Inventor
魏伟
颜钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Original Assignee
Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Wuye Construction Of Zhongye Chenggong Coltd filed Critical Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority to CN200810203348A priority Critical patent/CN101760205A/en
Publication of CN101760205A publication Critical patent/CN101760205A/en
Pending legal-status Critical Current

Links

Landscapes

  • Coke Industry (AREA)

Abstract

The invention relates to a method for installing a coke dry quenching hoister, belonging to the field of the metallurgical equipment installation. The method for installing the coke dry quenching hoister comprises the following steps: inspecting and accepting a coke dry quenching hoister running track, assembling and installing coke dry quenching hoister track beams and coke dry quenching hoister wheels on the ground, installing a main beam for the coke dry quenching hoister, correcting the frame of the coke dry quenching hoister, fastening high-strength bolts, making the coke dry quenching hoister run, installing a hoisting device, installing a coke dry quenching hoister room and a maintaining system, singly testing the coke dry quenching hoister, penetrating a steel wire rope in the coke dry quenching hoister, installing a hoisting tool, a insulating cover, testing the weight of the coke dry quenching hoister and integrally testing the coke dry quenching hoister. The method for installing the coke dry quenching hoister is characterized in that the coke dry quenching hoister track beams and the main beam are hoisted by parts and components and are assembled into a whole body above the coke dry quenching hoister track, and then other components are installed. Adopting the strict installation sequence and the strict operation process, the method for installing the coke dry quenching hoister is easy to operate, is safe and reliable, ensures high installation accuracy and high working efficiency and saves the cost.

Description

Method for installing coke dry quenching hoister
Technical field
The present invention relates to the metallurgical equipment installing area, be specially a kind of method for installing coke dry quenching hoister.
Background technology
Lift is the key processing equipment that dry coke quenching is adorned burnt system, is installed on the crane girder of quenching channel-section steel structural top.Its function is that follow procedure will be transported to quenching channel-section steel structure and promote the burnt jar of filling red Jiao under the derrick and rise to cat head, and red burnt jar is transported to the dried groove charging apparatus hopper top of putting out along walking rails, again Jiao's jar slow volume is placed down on this hopper, burnt pot bottom gate is opened automatically, with red Jiao dried putting out in the groove of packing into; Again the burnt jar lifting of sky, traveling, following landing are placed on Jiao's jar chassis after adorning burnt finishing.Lift is by PLC and other equipment linkages, and is unattended on the machine, adopts speed control by frequency variation, mainly is made up of bearing frame, lifting mechanism, travel mechanism, lubrication fittings, suspender, coke jar cover, mechanical(superphosphate)den and all kinds of limit detection device.For satisfying specific function, lift has adopted special construction.Its portal structure is different fully with our common bridge crane: general Overhead Crane Bridge has only one deck framework, and lift has two-layer framework, and the upper strata is main carrier bar and framework platform, and lower floor is the framework platform that only bears equipment of itself weight.It is many on end carriage that connected node is installed at the scene of general bridge crane, maximum 4 nodes, 200~300 cover high-strength bolts.And the scene of lift is installed connected node and all is located on the crane span structure beam, and nearly more than 100 of nodes, all adopts high-strength bolt to connect, and high-strength bolt quantity reaches several thousand covers.For the installation that makes this special lifting machine reaches high quality, high precision, the setting accuracy of lift requires more much higher than general bridge crane, and detection method is much also harsh.Because Dry Quenching Technology belongs to emerging field, only there is enterprise of the man a few family of very few number in the unit of domestic this method of employing, also is in the stage of fumbling for the installation of dry coke quenching equipment, exist much not science, irrational place, the installation process complexity, the installation cost height, setting accuracy is undesirable.
Summary of the invention
In order to overcome the defective of prior art, a kind of safe, economic, efficient, reliable metallurgical equipment installation method is provided, the invention discloses a kind of method for installing coke dry quenching hoister.
A kind of method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, it is characterized in that: the walking rails beam, the equal loose mail lifting of girder, the high-altitude is assembled into integral body on the lift walking rails, and then carry out miscellaneous part and install, lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the inboard of lower rim deflection track when wheel is installed, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.
A kind of method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, it is characterized in that: the walking rails beam, girder and other members, comprise that running gear is after ground is assembled into integral body, a hoisted in position, lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the installation of wheel must be the inboard of lower rim deflection track, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.
The present invention is by the erection sequence and the working method of strict design specifications, and is simple to operate, safe and reliable, the setting accuracy height, and the operating efficiency height is saved cost.
Embodiment
Below further specify the present invention by specific embodiment.
Embodiment 1
1. method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, concrete steps are: the walking rails beam, the equal loose mail lifting of girder, the high-altitude is assembled into integral body on the lift walking rails, and then carry out miscellaneous part and install, this scheme generally adopts the 150t crawler crane, its cost is minimum, and the lift Hoisting Program is preferentially selected for use.Lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the inboard of lower rim deflection track when wheel is installed, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.
Embodiment 2
Can not satisfy under the situation of lift lifting in 150t crawler crane lifting ability, select the disclosed method of present embodiment for use.A kind of method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, it is characterized in that: the walking rails beam, girder and other members, comprise that running gear is after ground is assembled into integral body, a hoisted in position, need 3~6 days consuming time, lifting machine must be selected the above crane of 250t for use, its cost is higher, lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the inboard of lower rim deflection track when wheel is installed, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.

Claims (2)

1. method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, it is characterized in that: the walking rails beam, the equal loose mail lifting of girder, the high-altitude is assembled into integral body on the lift walking rails, and then carry out miscellaneous part and install, lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the inboard of lower rim deflection track when wheel is installed, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.
2. method for installing coke dry quenching hoister, comprise that the lift walking rails inspects for acceptance, lift track girder and wheel ground group and installation, the lift girder is installed, the lift framework is proofreaied and correct, high-strength bolt is fastening, the lift traveling, lifting gear is installed, lift mechanical(superphosphate)den and maintenance system are installed, the examination of lift list, the lift reeve, suspender is installed, insulation plate, lift test mass and lift joint-trial step, it is characterized in that: the walking rails beam, girder and other members, comprise that running gear is after ground is assembled into integral body, a hoisted in position, lift is before installation, at first on walking rails, four reference points are set by lift travelling wheel size, the inboard that is installed in lower rim deflection track of wheel, tack bolt and steady brace on the node at first are installed during the assembling of lift bearing frame, then put on all high-strength bolts, fastening then high-strength bolt, change steady brace into permanent bolt at last, each node high-strength bolt tightening sequence of lift framework is from node intermediary one row, the mid-way of row begins, become symmetric two ends to extend to row, until whole bolts of row are tightened 80% of pre-fastening moment, successively with secondary series, the 3rd row ... tighten 80% of pre-fastening moment to last row, last 100% of the pre-fastening moment of tightening successively, the correction of lifting mechanism is that benchmark carries out to both sides with the step-down gear, travel mechanism is proofreaied and correct simultaneously step by step from two sidecar wheels, proofreaies and correct drive-motor at last.
CN200810203348A 2008-11-25 2008-11-25 Method for installing coke dry quenching hoister Pending CN101760205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810203348A CN101760205A (en) 2008-11-25 2008-11-25 Method for installing coke dry quenching hoister

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810203348A CN101760205A (en) 2008-11-25 2008-11-25 Method for installing coke dry quenching hoister

Publications (1)

Publication Number Publication Date
CN101760205A true CN101760205A (en) 2010-06-30

Family

ID=42491588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810203348A Pending CN101760205A (en) 2008-11-25 2008-11-25 Method for installing coke dry quenching hoister

Country Status (1)

Country Link
CN (1) CN101760205A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267046A (en) * 2011-07-11 2011-12-07 中国一冶集团有限公司 Device for separating dry-quenching hoister frame
CN102275829A (en) * 2011-07-11 2011-12-14 中国一冶集团有限公司 Frame high-altitude piece mounting method of dry quenching lifter device
CN103159135A (en) * 2011-12-16 2013-06-19 北京三博中自科技有限公司 Method and system for obtaining coke weight based on dry quenching lifting device
CN106938390A (en) * 2016-01-05 2017-07-11 五冶集团上海有限公司 Dry coke quenching burnt tank carrier loader installation method in bulk

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101104808A (en) * 2006-12-10 2008-01-16 孙明君 Dry quenching coke fitting device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101104808A (en) * 2006-12-10 2008-01-16 孙明君 Dry quenching coke fitting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
颜钰: "干熄焦设备安装技术研究与实践", 《重庆大学工程硕士学位论文》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267046A (en) * 2011-07-11 2011-12-07 中国一冶集团有限公司 Device for separating dry-quenching hoister frame
CN102275829A (en) * 2011-07-11 2011-12-14 中国一冶集团有限公司 Frame high-altitude piece mounting method of dry quenching lifter device
CN102267046B (en) * 2011-07-11 2012-12-26 中国一冶集团有限公司 Device for separated assembling of dry-quenching hoister frame
CN102275829B (en) * 2011-07-11 2013-06-05 中国一冶集团有限公司 Frame high-altitude piece mounting method of dry quenching lifter device
CN103159135A (en) * 2011-12-16 2013-06-19 北京三博中自科技有限公司 Method and system for obtaining coke weight based on dry quenching lifting device
CN106938390A (en) * 2016-01-05 2017-07-11 五冶集团上海有限公司 Dry coke quenching burnt tank carrier loader installation method in bulk

Similar Documents

Publication Publication Date Title
CN101712444B (en) Method for hoisting large-size workpiece in ordinary plant and hydraulic jacking equipment thereof
CN102267664B (en) Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof
CN103410094B (en) Installation construction method for bridge rigid hinge
CN101215615A (en) Combination method mounting technique for ultra-large type steel converter
CN110407097A (en) The construction method of the novel phase modifier of lifting based on portal frame and Lao Xinge device
CN107313360B (en) Sliding cable type support-free support replacing operation platform
CN110104564B (en) General assembly process of bridge crane
CN109797649B (en) Maintenance vehicle hoisting scheme without influence on bridge floor traffic
CN101760205A (en) Method for installing coke dry quenching hoister
CN101858163A (en) Method for installing flare tower frame in bulk
CN110216434B (en) Guide trolley device and method for replacing large ship lift safety reel shaft
CN201458582U (en) Ladle turret bay transverse movement hoisting tool
CN102001588B (en) Coke quenching vehicle displacement detection device and use method thereof
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN110316662A (en) A kind of large span gantry crane construction method of installation
CN103848333B (en) Door frame Lift-on/Lift-off System and using method thereof
CN102275829A (en) Frame high-altitude piece mounting method of dry quenching lifter device
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN211034860U (en) Hydraulic lifting construction device for steel structure net rack
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN112249915A (en) Large bridge crane hoisting method for closed occasions of factory buildings
CN106833687B (en) The suspension dust gathering arrester installation method of coke oven
CN102030271B (en) Lifting device with fixed pulley set dismantling and landing automatically and self-dismantling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100630