Traversing special hanger between a kind of ladle turret is striden
Technical field
The utility model belongs to ladle suspender technical field, particularly provide a kind of ladle turret stride between traversing special hanger, be applicable to and stride a same category of device installation work after factory building forms.
Background technology
At present according to the constructional feature of the most of factory building of China, after factory building forms, ladle turret install generally be set up platform, lay the track slippage, the whole platform of two car hangs in place.The method long construction period, the measure cost height, and when device assembles, have a strong impact on the normal use that overhead traveling crane is produced in former military service.In order to solve in the engineering in the past problems such as a large amount of structure steel fabrications to civil engineering flat-bed dependence and bearing platform slide device, lifting the traversing suspender of coaster between ladle turret is striden arises at the historic moment, it by special hanger ingenious solved in the past take in the ladle turret installation process two stride the overhead traveling crane time long, take long, gyro-rotor of transport channel time with base is accurately located, built-up time is grown, a measure expense high-technology difficult problem, the utility model operating technique is not subjected to the restriction of device structure form can realize fast hoisting, and the duration shifts to an earlier date greatly.Lifting the traversing suspender of coaster between striding all has to utilize to newly-built, extension project and overhauling reform metallurgical construction project engineering and is worth, to other can not utilize overhead traveling crane directly the high equipment partial installation of accuracy requirement in place also have important references and be worth.
Summary of the invention
The purpose of this utility model be to provide a kind of ladle turret stride between traversing special hanger, solved in the past in the engineering a large amount of structure steel fabrications of civil engineering flat-bed dependence, bearing platform slide device, taken problems such as producing overhead traveling crane for a long time.It is after factory building forms, because the conventional mounting mode has been avoided in the restriction in time and space, utilizes design-calculated one cover private station to hang traversing suspender ladle turret is carried out accurately installing fast.During the suspender design, can be according to the maximum package tonnage of ladle turret, two overhead traveling crane end positions, the box type structure girder of design corresponding size specification.This construction method has changed elder generation's welding in the past and has set up the frock platform, and elevator and sliding rail are set, and the installation method that lifts with overhead traveling crane integral body reaches the laborsaving economical purpose that saves time then.
The utility model is made up of box type structure girder, two set of wheels and 10 tons of chain block three parts.Box type structure girder and two set of wheels are welded to connect, and chain block is suspended on the baffle plate welding hanger, utilizes steel rope, hangs and pulls calabash.
Box type structure girder is welded by 2 big H shaped steel, 1 little H shaped steel, 2 end face baffle plates, 4 hangers, some gusset webs, and wherein end face baffle plate 19 should weld after set of wheels has been assembled.
Each set of wheels is made up of 4 wheels, 4 bearing cap shims, 4 antifriction-bearing boxs, 3 axles, wherein, the first processing axle 12 and antifriction-bearing box combine and assemble, antifriction-bearing box is fixed by bearing cap shim, locknut, and bearing cap shim is connected with screw with wheel; The second processing axle 14 and antifriction-bearing box combine and assemble, antifriction-bearing box is fixed by bearing cap shim, locknut, and bearing cap shim is connected with screw with wheel, and the other end is fixed with the baffle plate nut collar, sees Fig. 2.
The utility model utilizes two to stride overhead traveling crane and the suspender that designs carries out substep accurately assembling fast with ladle turret three-major-items (base, gyro-rotor, slewing frame), and all the other smallclothes make full use of 10 tons of ladle turrets and overhaul cucurbit and install.Suspender is made up of box type structure girder, two groups of wheels, according to the precision of equipment installation two ends 2 10 tons of chain blocks can be set flexibly.Utilize two cars and suspender with three-major-items (base, gyro-rotor, slewing frame) accurately assembling fast, all the other smallclothes make full use of 10 tons of maintenance of ladle turret cucurbit and install.
Stride overhead traveling crane limit design one cover special hanger according to the maximum heavy mail and two that rises of ladle turret, adopt the traversing installation of special hanger, changed in the past set up the frock platform earlier, the installation method of elevator and sliding rail is set, save a large amount of manpower and materials and fee of material.
According to the precision of equipment installation requirement, can 10 tons of chain block accurate adjustments of reasonable disposition, solve base and worn the difficult problem that holding-down bolt, bearing are worn bolt.
Lift three-major-items (base, gyro-rotor, slewing frame) by two cars, overhead traveling crane is produced in liberation afterwards, and all the other smallclothes make full use of ladle turret maintenance cucurbit and install, and have reduced the time of producing overhead traveling crane that takies so to greatest extent, save the plenty of time, guaranteed ordinary production.
The beneficial effects of the utility model are, between striding, ladle turret lifts the application of the traversing suspender of coaster, solve in the engineering in the past problems such as a large amount of structure steel fabrications to civil engineering flat-bed dependence and bearing platform slide device, it takies two to stride the overhead traveling crane time long by ingenious solution of special hanger in the process of ladle turret partial installation in the past, it is long to take the transport channel time, gyro-rotor and base are accurately located, built-up time is long, set up platform and lay a slide rail measure cost high-technology difficult problem, the utility model operating technique is not subjected to the restriction of device structure form, liberated overhead traveling crane early, realized the equipment fast hoisting, duration shifts to an earlier date greatly, reaches the laborsaving economical purpose that saves time.Lifting the traversing suspender of coaster between striding all has to utilize to newly-built, extension project and overhauling reform metallurgical construction project engineering and is worth, to other can not utilize overhead traveling crane directly the high equipment partial installation of accuracy requirement in place also have important references and be worth.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the suspender overall schematic.Wherein, hanger 1, little H shaped steel 2, big H shaped steel 3, wheel 5, structure connecting panel 6, processing axle 9, baffle plate 19.
Fig. 2 is a suspender A-A cross-sectional schematic.Wherein, hanger 1, little H shaped steel 2, big H shaped steel 3, bearing cap shim 4, wheel 5, structure connecting panel 6, nut collar 7, baffle plate 8, processing axle 9, connecting panel 10, web 11, the first processing axle 12, antifriction-bearing box 13, the second processing axle 14, locknut 15, screw 16, rib 17, rib 18.
Fig. 3 is a base lifting scheme of installation.Wherein, rotary table base 20,480/80T overhead traveling crane 21,160T overhead traveling crane 22.
Fig. 4 is a gyro-rotor lifting scheme of installation.Wherein, rotary table base 20, gyro-rotor 23.
Fig. 5 is a slewing frame lifting scheme of installation.Wherein, rotary table base 20, gyro-rotor 23, slewing frame 24.
Fig. 6 is a yoke holder back stall lifting scheme of installation.Wherein, yoke holder back stall 25.
The specific embodiment
1, among Fig. 1 and Fig. 2, can be according to the maximum package tonnage of ladle turret, two overhead traveling crane end positions, the box type structure girder of design corresponding size specification carries out each component processing of suspender then and makes.
2, Shoudu Iron and Steel Co capital Tang first stage of the project continuous casting main building column six-column seven and column eight-column nine need to install two 2150 conticasters, two ladle turrets lay respectively at F and stride between column six-column seven and column eight-column nine lines, about 410 tons of every ladle turret gross weight.Before suspender uses, suspender is tested for 1.25 times by the maximum nuclear that carries of design, checked, can satisfy operating needs to determine it according to the hoisting crane acceptance specification.
3, among Fig. 3, about 32 tons of base and axis of revolution load-bearing, before the lifting, arrange 30 groups of adjusting blocks, to grind centering, extract 8 groups then out, base suspender hoisted in position. the coaster two ends are fixed with the 10T chain block and are regulated base and wear anchor (bolt) hole, two overhead traveling crane drivers listen lifting unified command, the two overhead traveling cranes hook amplitude of having walked to be not more than 300mm. during lifting
4, base in place after, carry out bolted, the bolt of lower base tightening sequence is carried out foreign side's handbook regulation, use the drawbench binding bolt, tightening bolt must be undertaken by cornerwise order, divides and carries out for three times, tighten to 1/3 of prescribed torque for the first time, tighten to 1/2 of prescribed torque for the second time, tighten the moment of torsion that reaches the drawing technical requirements for the third time, eventually tight power is 1190KN.The T2 transit survey is adopted at the center in length and breadth, and level, absolute altitude adopt the indium steel ruler to measure, and observed reading five equilibrium on the gear ring face is got 8 points, levelness 0.05mm/m.
5, after the base centering, carry out gyro-rotor lifting, during the steel rope wire rope handling one four strands, will put contact and become the line contact, promptly concentrated load becomes uniform load, improves like this to lift safety factor.Two overhead traveling crane drivers listen lifting unified command, the two overhead traveling cranes hook amplitude of having walked to be not more than 300mm during lifting, see Fig. 4.
6, gyro-rotor in place after, according to foreign side's technical requirements, to ladle turret bull gear bolted, fastening force 800KN.By foreign side's personnel inspection bolt tension length, after the gyro-rotor acceptance(check), carry out slewing frame and install.Gyro-rotor lifting (see figure 5), the time two overhead traveling crane drivers listen the lifting unified command, the two overhead traveling cranes hook amplitude of having walked is not more than 300mm.It is to wear bearing pin Φ 300 (how to guarantee the concentricity in bearing pin and hole during gap 0.056~0.189mm) that slewing frame is installed main difficult point.Can use the frame level visual control, coating butter on bearing pin reduces the resistance in the process of walking.
7, after ladle turret base, gyro-rotor, slewing frame lift, utilize 80 ton overhead travelling cranes to hold in the palm back stall and forks arm assembling (see figure 6), each about 53 tons, utilize 480/80 ton overhead travelling crane integral hoisting, when noting lifting, that end jack of holding pin is low, whole arm angle at 45 approximately, whole forks arm oblique cutting is gone into slewing frame, is beneficial to like this to wear the maintenance holding pin.
8,160 tons of production overhead traveling cranes have been liberated in the installation of preceding base, gyro-rotor, slewing frame, and holder back stall and yoke lifting are finished and liberated 480/80 ton overhead travelling crane, have guaranteed to produce and have carried out smoothly.Remaining part such as oil cylinder, actuating device, slip ring, platform stair etc. do not need to take the production overhead traveling crane, all can utilize ladle turret top 10T maintenance cucurbit to install.
9, after overall package is finished, carry out hydraulic piping, power transmission debugging.