CN113803525A - 钢圆筒防护水下生产系统管汇的海床撑杆固定方法 - Google Patents
钢圆筒防护水下生产系统管汇的海床撑杆固定方法 Download PDFInfo
- Publication number
- CN113803525A CN113803525A CN202111136768.8A CN202111136768A CN113803525A CN 113803525 A CN113803525 A CN 113803525A CN 202111136768 A CN202111136768 A CN 202111136768A CN 113803525 A CN113803525 A CN 113803525A
- Authority
- CN
- China
- Prior art keywords
- manifold
- lifting lug
- steel cylinder
- lifting
- seabed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/123—Devices for the protection of pipes under water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
本发明涉及一种钢圆筒防护水下生产系统管汇的海床撑杆固定方法,包括以下步骤:在钢圆筒内预埋第一吊耳并浇筑水泥,以使所述第一吊耳伸出浇筑后的钢圆筒的上表面;在管汇上预焊接第二吊耳,吊装管汇入水并就位于浇筑后的钢圆筒的上方;测量第一吊耳和第二吊耳之间的长度,并按照测量的长度预制撑杆;将撑杆安装在第一吊耳和第二吊耳之间。本发明可以满足管汇固定的稳定性要求,并且可以适用于管汇的实际就位位置。
Description
技术领域
本发明涉及海洋工程技术领域,具体是关于一种钢圆筒防护水下生产系统管汇的海床撑杆固定方法。
背景技术
在渤海通航区域内,为了保障通航安全,交通部门不允许在该区域内建立高于海床泥面的海洋工程开发设施。因此,开发设施需要设置位于泥面以下,并设置水下生产系统防护设施,以避免和航道上的船舶发生碰撞,减少对于航路的干扰,实现对于通航区内油气资源的开发。
然而,在使用钢圆筒防护设施时,由于安装精度的限制,管汇的实际就位位置具有一定的不确定性。因此管汇的固定方法在保证固定稳定性的同时,还需要具有根据管汇实际就位位置进行调整的能力。然而传统的固定方法不能满足以上两点要求。
发明内容
针对上述问题,本发明的目的是提供一种钢圆筒防护水下生产系统管汇的海床撑杆固定方法,可以满足管汇固定的稳定性要求,并且可以适用于管汇的实际就位位置。
为实现上述目的,本发明采取以下技术方案:
本发明所述的钢圆筒防护水下生产系统管汇的海床撑杆固定方法,包括以下步骤:
在钢圆筒内预埋第一吊耳并浇筑水泥,以使所述第一吊耳伸出浇筑后的钢圆筒的上表面;
在管汇上预焊接第二吊耳,吊装管汇入水并就位于浇筑后的钢圆筒的上方;
测量第一吊耳和第二吊耳之间的长度,并按照测量的长度预制撑杆;
将撑杆安装在第一吊耳和第二吊耳之间。
所述的海床撑杆固定方法,优选地,吊装管汇入水并就位与于浇筑后的钢圆筒的上方的方法为:
管汇通过浮吊吊装入水,然后下放,管汇下放过程中潜水员在钢圆筒附近观察管汇。
所述的海床撑杆固定方法,优选地,所述测量第一吊耳和第二吊耳之间长度的方法为:
由潜水员使用钢线绳拉线法进行测量。
所述的海床撑杆固定方法,优选地,所述第一吊耳为四个,四个所述第一吊耳两两为一组,两组所述第一吊耳分别位于管汇的两侧。
所述的海床撑杆固定方法,优选地,相应地,所述第二吊耳也为四个,四个所述第二吊耳的位置与四个所述第一吊耳的位置相对应。
本发明由于采取以上技术方案,其具有以下优点:
(1)本发明在管汇就位后,根据测量结果预制撑杆,不受管汇实际就位位置的限制;
(2)本发明操作步骤较少,操作过程简单,安装难度低;
(3)本发明各结构均为钢制,采用焊接或螺栓连接,固定效果好。
总之,本发明因其自身实施简单、造价低廉与稳定性强等优势,为位于海床泥面下钢圆筒防护水下生产系统中的管汇固定提供了一种既经济又高效的方法,使位于海床泥面下钢圆筒防护水下生产系统可以大规模应用于通航区内的油气生产工作,在通航区油气田开发中具有广阔的应用前景。
附图说明
图1为本发明的钢圆筒和管汇的俯视结构示意图;
图2为本发明管汇撑杆连接示意图。
图中各附图标记为:
1-钢圆筒;2-管汇;3-第一吊耳;4-第二吊耳;5-撑杆。
具体实施方式
以下将结合附图对本发明的较佳实施例进行详细说明,以便更清楚理解本发明的目的、特点和优点。应理解的是,附图所示的实施例并不是对本发明范围的限制,而只是为了说明本发明技术方案的实质精神。
本发明提供一种钢圆筒防护水下生产系统管汇的海床撑杆固定方法,包括以下步骤:在钢圆筒内预埋第一吊耳并浇筑水泥,以使所述第一吊耳伸出浇筑后的钢圆筒的上表面;在管汇上预焊接第二吊耳并使管汇吊装入水并就位与于浇筑后的钢圆筒的上方;测量第一吊耳和第二吊耳之间的长度,并按照测量的长度预制撑杆;将撑杆安装在第一吊耳和第二吊耳之间。本发明可以满足管汇固定的稳定性要求,并且可以适用于管汇的实际就位位置。
如图1和2所示,本发明所述的钢圆筒防护水下生产系统管汇的海床撑杆固定方法,包括以下步骤:
S1.在钢圆筒1内预埋第一吊耳3并浇筑水泥,以使所述第一吊耳3伸出浇筑后的钢圆筒1的上表面;
S2.在管汇2上预焊接第二吊耳4,吊装管汇2入水并就位于浇筑后的钢圆筒1的上方,其中可以在陆地上对第二吊耳4进行预焊接;
S3.测量第一吊耳3和第二吊耳4之间的长度,并按照测量的长度预制撑杆5;
S4.将撑杆5安装在第一吊耳3和第二吊耳4之间。
在上述实施例中,优选地,吊装管汇2入水并就位与于浇筑后的钢圆筒1的上方的方法为:管汇2通过浮吊吊装入水,然后下放,管汇2下放过程中潜水员在钢圆筒1附近观察管汇,避免碰撞钢圆筒1。由于吊装的精确度有限,管汇2的就位位置具有一定的不确定性。
在上述实施例中,优选地,所述测量第一吊耳和第二吊耳之间长度的方法为:由潜水员使用钢线绳拉线法进行测量。其中,钢线绳拉线法是指浅水员将钢线绳的一端固定在第一吊耳上,向第二吊耳的方向拉动并拉直,在第二吊耳处的的钢线绳上做标记,然后测量此段钢线绳的长度。
在上述实施例中,优选地,所述第一吊耳为四个,四个所述第一吊耳两两为一组,两组所述第一吊耳分别位于管汇的两侧。
在上述实施例中,优选地,相应地,所述第二吊耳也为四个,四个所述第二吊耳的位置与四个所述第一吊耳的位置相对应。
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。
Claims (5)
1.一种钢圆筒防护水下生产系统管汇的海床撑杆固定方法,其特征在于,包括以下步骤:
在钢圆筒内预埋第一吊耳并浇筑水泥,以使所述第一吊耳伸出浇筑后的钢圆筒的上表面;
在管汇上预焊接第二吊耳,吊装管汇入水并就位于浇筑后的钢圆筒的上方;
测量第一吊耳和第二吊耳之间的长度,并按照测量的长度预制撑杆;
将撑杆安装在第一吊耳和第二吊耳之间。
2.根据权利要求1所述的海床撑杆固定方法,其特征在于,吊装管汇入水并就位与于浇筑后的钢圆筒的上方的方法为:
管汇通过浮吊吊装入水,然后下放,管汇下放过程中潜水员在钢圆筒附近观察管汇。
3.根据权利要求1所述的海床撑杆固定方法,其特征在于,所述测量第一吊耳和第二吊耳之间长度的方法为:
由潜水员使用钢线绳拉线法进行测量。
4.根据权利要求1所述的海床撑杆固定方法,其特征在于,所述第一吊耳为四个,四个所述第一吊耳两两为一组,两组所述第一吊耳分别位于管汇的两侧。
5.根据权利要求4所述的海床撑杆固定方法,其特征在于,相应地,所述第二吊耳也为四个,四个所述第二吊耳的位置与四个所述第一吊耳的位置相对应。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111136768.8A CN113803525B (zh) | 2021-09-27 | 2021-09-27 | 钢圆筒防护水下生产系统管汇的海床撑杆固定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111136768.8A CN113803525B (zh) | 2021-09-27 | 2021-09-27 | 钢圆筒防护水下生产系统管汇的海床撑杆固定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113803525A true CN113803525A (zh) | 2021-12-17 |
CN113803525B CN113803525B (zh) | 2023-04-11 |
Family
ID=78896822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111136768.8A Active CN113803525B (zh) | 2021-09-27 | 2021-09-27 | 钢圆筒防护水下生产系统管汇的海床撑杆固定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113803525B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115163921A (zh) * | 2022-06-30 | 2022-10-11 | 中海石油(中国)有限公司 | 位于海床泥面下钢圆筒防护水下生产系统管汇的安装方法 |
CN115199817A (zh) * | 2022-06-30 | 2022-10-18 | 中海石油(中国)有限公司 | 一种钢圆筒防护水下生产系统管汇安装定位装置及方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007060291A1 (en) * | 2005-11-23 | 2007-05-31 | Rautaruukki Oyj | Foundation arrangement |
JP2012012815A (ja) * | 2010-06-30 | 2012-01-19 | Chugoku Electric Power Co Inc:The | 塔状構造物の基礎構築方法およびその基礎構造 |
CN202559371U (zh) * | 2012-05-08 | 2012-11-28 | 山东电力工程咨询院有限公司 | 打入式独柱、独桩海上测风塔基础 |
CN103046906A (zh) * | 2011-10-11 | 2013-04-17 | 天津市海王星海上工程技术有限公司 | 一种新型水下管汇基础结构 |
JP2013195209A (ja) * | 2012-03-19 | 2013-09-30 | Takenaka Komuten Co Ltd | 変位計測システム |
CN103758096A (zh) * | 2014-01-23 | 2014-04-30 | 天津大学 | 一种新型海上勘探平台及其施工方法 |
KR20150142841A (ko) * | 2014-06-12 | 2015-12-23 | 한국해양과학기술원 | 착저식 해양지반 콘 관입 시험장치 |
US20170101760A1 (en) * | 2015-10-07 | 2017-04-13 | Timothy Seay | Post support and post support system |
US9732540B1 (en) * | 2015-03-13 | 2017-08-15 | Mark Edward Jansen | Fence post installation system |
CN110714475A (zh) * | 2019-10-15 | 2020-01-21 | 上海宝冶集团有限公司 | 一种风力发电机基础锚栓件的定位装置 |
CN211080288U (zh) * | 2019-11-01 | 2020-07-24 | 中国水利水电第八工程局有限公司 | 一种用于风力发电机锚栓笼安装的调整装置 |
CN112227413A (zh) * | 2020-10-29 | 2021-01-15 | 惠生(南通)重工有限公司 | 短结构压载型吸力桩 |
CN112647590A (zh) * | 2020-12-01 | 2021-04-13 | 河北建工集团有限责任公司 | 预制装配式钢筋混凝土梁柱钢节点预制组合柱的施工方法 |
-
2021
- 2021-09-27 CN CN202111136768.8A patent/CN113803525B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007060291A1 (en) * | 2005-11-23 | 2007-05-31 | Rautaruukki Oyj | Foundation arrangement |
JP2012012815A (ja) * | 2010-06-30 | 2012-01-19 | Chugoku Electric Power Co Inc:The | 塔状構造物の基礎構築方法およびその基礎構造 |
CN103046906A (zh) * | 2011-10-11 | 2013-04-17 | 天津市海王星海上工程技术有限公司 | 一种新型水下管汇基础结构 |
JP2013195209A (ja) * | 2012-03-19 | 2013-09-30 | Takenaka Komuten Co Ltd | 変位計測システム |
CN202559371U (zh) * | 2012-05-08 | 2012-11-28 | 山东电力工程咨询院有限公司 | 打入式独柱、独桩海上测风塔基础 |
CN103758096A (zh) * | 2014-01-23 | 2014-04-30 | 天津大学 | 一种新型海上勘探平台及其施工方法 |
KR20150142841A (ko) * | 2014-06-12 | 2015-12-23 | 한국해양과학기술원 | 착저식 해양지반 콘 관입 시험장치 |
US9732540B1 (en) * | 2015-03-13 | 2017-08-15 | Mark Edward Jansen | Fence post installation system |
US20170101760A1 (en) * | 2015-10-07 | 2017-04-13 | Timothy Seay | Post support and post support system |
CN110714475A (zh) * | 2019-10-15 | 2020-01-21 | 上海宝冶集团有限公司 | 一种风力发电机基础锚栓件的定位装置 |
CN211080288U (zh) * | 2019-11-01 | 2020-07-24 | 中国水利水电第八工程局有限公司 | 一种用于风力发电机锚栓笼安装的调整装置 |
CN112227413A (zh) * | 2020-10-29 | 2021-01-15 | 惠生(南通)重工有限公司 | 短结构压载型吸力桩 |
CN112647590A (zh) * | 2020-12-01 | 2021-04-13 | 河北建工集团有限责任公司 | 预制装配式钢筋混凝土梁柱钢节点预制组合柱的施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115163921A (zh) * | 2022-06-30 | 2022-10-11 | 中海石油(中国)有限公司 | 位于海床泥面下钢圆筒防护水下生产系统管汇的安装方法 |
CN115199817A (zh) * | 2022-06-30 | 2022-10-18 | 中海石油(中国)有限公司 | 一种钢圆筒防护水下生产系统管汇安装定位装置及方法 |
CN115163921B (zh) * | 2022-06-30 | 2024-03-08 | 中海石油(中国)有限公司 | 位于海床泥面下钢圆筒防护水下生产系统管汇的安装方法 |
CN115199817B (zh) * | 2022-06-30 | 2024-03-08 | 中海石油(中国)有限公司 | 一种钢圆筒防护水下生产系统管汇安装定位装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113803525B (zh) | 2023-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113803525B (zh) | 钢圆筒防护水下生产系统管汇的海床撑杆固定方法 | |
CN104727336A (zh) | 浅海风电场大型单管桩基础施工方法 | |
CN109811767A (zh) | 吸力桶基础沉桩定位架 | |
CN109594580A (zh) | 一种非嵌岩后桩法斜桩导管架施工方法及系统 | |
CN102691314A (zh) | 沉管内部纠偏精调系统及其调节工艺 | |
CN100585095C (zh) | 在水下进行钢沉井的定位下沉方法 | |
CN1125214C (zh) | 组合式简易隧道管段沉放平台 | |
CN109185558B (zh) | 一种大直径grp管道水下安装的方法 | |
CN113970013A (zh) | 一种位于海床泥面下钢圆筒内水下生产管汇撑杆固定方法 | |
CN115199817B (zh) | 一种钢圆筒防护水下生产系统管汇安装定位装置及方法 | |
CN112112186B (zh) | 一种海上换流站上分体式导管架基础的安装方法 | |
CN102661444B (zh) | 海洋石油平台深水双管系的安装方法 | |
CN116161172A (zh) | 一种组合式混凝土锚碇海上施工方法 | |
CN101929581A (zh) | 水下管卡子的安装方法 | |
CN107399412A (zh) | Mopu的建造方法 | |
CN103465742B (zh) | 步履式半潜两栖工程船 | |
CN109941399B (zh) | 水下拦阻网的锚链防护方法 | |
CN109038380B (zh) | 一种海上升压站 | |
CN219530009U (zh) | 一种海底管线跨越保护装置 | |
CN105804087A (zh) | 大型深基坑支护梁下钢结构安装方法 | |
CN205077529U (zh) | 一种水下建筑物定位转移测量装置 | |
CN110844012A (zh) | 一种深吃水半潜式海上换流站 | |
CN220035401U (zh) | 一种可快速施工的平台钢管桩与钢护筒整体封底稳固结构 | |
CN115163921B (zh) | 位于海床泥面下钢圆筒防护水下生产系统管汇的安装方法 | |
CN212294631U (zh) | 一种大直径钢筋笼吊装及定位卡具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |