CN113774893A - Cemented soil slope filling construction method - Google Patents

Cemented soil slope filling construction method Download PDF

Info

Publication number
CN113774893A
CN113774893A CN202111014878.7A CN202111014878A CN113774893A CN 113774893 A CN113774893 A CN 113774893A CN 202111014878 A CN202111014878 A CN 202111014878A CN 113774893 A CN113774893 A CN 113774893A
Authority
CN
China
Prior art keywords
cemented soil
slope
soil
cemented
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111014878.7A
Other languages
Chinese (zh)
Inventor
苏安双
贾金生
李兆宇
郑璀莹
张守杰
罗鑫
李玲玉
李曙光
冯炜
王月
张家阳
郑健
吴志琴
徐丽丽
王群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sinoconfix Technology Co ltd
China Institute of Water Resources and Hydropower Research
Heilongjiang Provincial Hydraulic Research Institute
Original Assignee
Beijing Sinoconfix Technology Co ltd
China Institute of Water Resources and Hydropower Research
Heilongjiang Provincial Hydraulic Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sinoconfix Technology Co ltd, China Institute of Water Resources and Hydropower Research, Heilongjiang Provincial Hydraulic Research Institute filed Critical Beijing Sinoconfix Technology Co ltd
Priority to CN202111014878.7A priority Critical patent/CN113774893A/en
Publication of CN113774893A publication Critical patent/CN113774893A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Abstract

A cemented soil slope filling construction method relates to a slope filling construction method. The invention solves the problems of low construction efficiency and incapability of ensuring the mixing quality of cemented soil existing in the field mixing of the existing cemented soil. The method comprises the following steps: the cemented soil is mixed by adopting a centralized plant mixing process; step two: transporting the cemented soil to an operation slope; step three: uniformly paving the cemented soil along the operation slope by adopting a paving machine; step four: sprinkling water on the paved cemented soil slope surface by a sprinkling truck, wherein the allowable deviation of the water content of the cemented soil slope surface before rolling and the optimal water content is +/-2%; step five: rolling the spread and watered cemented soil for many times; step six: repeatedly rolling the compacted cemented soil along the operation slope by adopting a smooth surface rolling machine until the indentation is eliminated; step seven: and covering and watering the compacted cemented soil slope for maintenance, keeping the cemented soil surface moist, wherein the maintenance period is not less than 14 days. The invention is used for cemented soil slope filling construction.

Description

Cemented soil slope filling construction method
Technical Field
The invention relates to the field of cemented soil site construction, in particular to a cemented soil slope filling construction method.
Background
The cemented soil is a material with certain strength formed by mixing, paving, rolling and maintaining a cementing material, soil materials and water according to a certain proportion, can be used for filling, protecting and reinforcing treatment of hydraulic engineering, and can also be used for modification of special soil. With the continuous and deep research on various performances of cemented soil, the cemented soil is implemented from an experimental stage to a construction stage.
At present, cemented soil is usually mixed on a construction site in the construction process of the cemented soil, which is a common mode in the construction process of a plurality of buildings, because the required cemented soil is more in the construction process, the on-site mixing can not meet the continuous construction operation, the construction efficiency is low, in addition, the mixing process and the mixing quality can not be completely ensured, and further the construction quality of the cemented soil can not be ensured.
In conclusion, the problems of low construction efficiency and incapability of ensuring the mixing quality of cemented soil exist in the field mixing of the existing cemented soil.
Disclosure of Invention
The invention aims to solve the problems that the existing cemented soil on-site mixing is low in construction efficiency and the cemented soil mixing quality cannot be guaranteed, and further provides a cemented soil slope filling construction method.
The technical scheme of the invention is as follows:
a cemented soil slope filling construction method comprises the following steps:
the method comprises the following steps: the cemented soil mixing adopts a centralized plant mixing process, and the output of cemented soil mixing production equipment is more than 360m 3/h;
step two: transporting vehicles are equipped according to the cemented soil filling engineering quantity, the construction strength and the transport distance, and the cemented soil is transported to the operation slope;
step three: uniformly paving the cemented soil along the operation slope by adopting a paving machine, wherein the paving thickness of the slope is not less than 150mm and not more than 450 mm;
step four: sprinkling water on the paved cemented soil slope surface by a sprinkling truck, wherein the allowable deviation of the water content of the cemented soil slope surface before rolling and the optimal water content is +/-2%;
step five: repeatedly rolling the spread and watered cemented soil along the operation slope surface by a rolling machine to reach the required rolling times;
step six: repeatedly rolling the compacted cemented soil along the operation slope by adopting a smooth surface rolling machine until indentation is eliminated, so that the rolled slope is smooth;
step seven: and covering and watering the compacted cemented soil slope for maintenance, keeping the cemented soil surface moist, wherein the maintenance period is not less than 14 days.
Compared with the prior art, the invention has the following effects:
according to the invention, the cemented soil is produced by a centralized plant-mixing process, rapid and continuous industrial preparation is realized, the cemented soil after being mixed is transported to the operation slope for filling construction, the mechanization degree is high in the whole construction process, the construction efficiency is greatly improved, and the filling construction quality of the cemented soil is powerfully ensured.
Drawings
FIG. 1 is a schematic diagram of a consolidated soil plant mix. Fig. 2 is a schematic illustration of cemented soil transport. Fig. 3 is a schematic view of construction and paving of a cemented soil slope. Fig. 4 is a schematic view of construction and rolling of a cemented soil slope. FIG. 5 is a schematic view of the construction of the cemented soil slope by sprinkling water and curing.
Detailed Description
The first embodiment is as follows: the present embodiment is described with reference to fig. 1 to 5, and the cemented soil slope filling construction method of the present embodiment includes the following steps:
the method comprises the following steps: the cemented soil mixing adopts a centralized plant mixing process, and the output of cemented soil mixing production equipment is more than 360m 3/h;
step two: transporting vehicles are equipped according to the cemented soil filling engineering quantity, the construction strength and the transport distance, and the cemented soil is transported to the operation slope;
step three: uniformly paving the cemented soil along the operation slope by adopting a paving machine, wherein the paving thickness of the slope is not less than 150mm and not more than 450 mm;
step four: sprinkling water on the paved cemented soil slope surface by a sprinkling truck, wherein the allowable deviation of the water content of the cemented soil slope surface before rolling and the optimal water content is +/-2%;
step five: repeatedly rolling the spread and watered cemented soil along the operation slope surface by a rolling machine to reach the required rolling times;
step six: repeatedly rolling the compacted cemented soil along the operation slope by adopting a smooth surface rolling machine until indentation is eliminated, so that the rolled slope is smooth;
step seven: and covering and watering the compacted cemented soil slope for maintenance, keeping the cemented soil surface moist, wherein the maintenance period is not less than 14 days.
The second embodiment is as follows: the present embodiment will be described with reference to fig. 1 to 5, and the process of mixing cemented soil by a centralized plant in the first step of the present embodiment is as follows: and (3) conveying the soil material to a mixing station, mixing the cementing material into the soil material according to the required designed mixing proportion, fully mixing, controlling the water addition amount according to the optimal water content in the mixing process, and mixing for not less than 3min to produce the cemented soil material. So set up, concentrate to mix cemented soil not only can guarantee the quality of cemented soil, but also can guarantee the uniformity of the cemented soil of whole filling process, effectively avoided the cemented soil that mixes in different periods to have inconsistent problem, guarantee cemented soil filling quality. Other components and connections are the same as in the first embodiment.
The third concrete implementation mode: in the fifth step of the present embodiment, the cemented soil after being sprinkled with water is rolled along the working slope at a speed of 2-3km/h by a rolling machine with a weight of 7t, which is described with reference to fig. 1 to 5. So set up, be convenient for guarantee to roll the effect. Other compositions and connections are the same as in the first or second embodiments.
The fourth concrete implementation mode: the present embodiment is described with reference to fig. 1 to 5, and the rolling in step five of the present embodiment adopts a sectional construction method: the length of 30m is a unit section, the rolling tracks of two adjacent sections of the overlapping belts are overlapped with each other, the width of the overlapping belt is 0.3 m-0.5 m, and the overlapping belts are rolled to the compactness required by the design. So set up, be convenient for guarantee the planarization that rolls. Other compositions and connection relationships are the same as in the first, second or third embodiment.
The fifth concrete implementation mode: the embodiment is described with reference to fig. 1 to 5, the cemented soil rolling in the fifth step of the embodiment should be continuously performed within 2 hours, and the dry density and the water content of the cemented soil after compaction are subjected to field sampling test. So set up, be convenient for guarantee cemented soil rolls the quality. Other compositions and connection relationships are the same as those in the first, second, third or fourth embodiment.
The sixth specific implementation mode: before the steps of the embodiment are started, the base cleaning treatment is carried out on weeds, plant roots and stems, large stones and the like on the slope surface by using a backhoe excavator to ensure that the base surface of the side slope is flat. So set up, the clearance side slope road bed guarantees the smooth filling of cemented soil. Other compositions and connection relationships are the same as in the first, second, third, fourth or fifth embodiment.
The seventh embodiment: the present embodiment will be described with reference to fig. 1 to 5, and in the present embodiment, the leveled slope surface is roughened, and then cemented soil is spread and rolled. So set up, be convenient for guarantee the joint strength between cemented soil and the domatic. Other compositions and connection relationships are the same as in the first, second, third, fourth, fifth or sixth embodiment.
The specific implementation mode is eight: the present embodiment will be described with reference to fig. 1 to 5, and the cemented soil mixing of the present embodiment adopts a centralized plant mixing process: the cemented soil takes fine soil as a raw material, the soil material excavated in a stock ground is fully crushed and needs to be screened by a sieve with the aperture of 5mm, and the cemented soil is ensured not to contain soil blocks with the particle size larger than 5 mm. So set up, be convenient for guarantee the quality of mixing of cemented soil. Other compositions and connection relationships are the same as those of embodiment one, two, three, four, five, six or seven.
The invention comprises centralized plant mixing, transportation, paving, sprinkling, rolling, shaping and maintenance. The centralized plant mixing is mixing production equipment of cemented soil, and soil materials and cementing materials are mixed and stirred uniformly. And the transportation is to transport the uniformly mixed cemented soil to the operation slope surface by a dump truck. And the paving step is to uniformly lay the cemented soil to a certain thickness along the operation slope surface by a paving machine. And the sprinkling is to spray water on the paved cemented soil slope surface through a sprinkling truck so as to reach the water content required by the design. And in the rolling, the spread and watered cemented soil is repeatedly rolled to a certain number of times along the operation slope surface through a rolling machine so as to achieve the compactness required by the design. And the shaping is to repeatedly roll the compacted cemented soil along the operation slope by adopting a smooth surface rolling machine until indentation is eliminated, so that the rolled slope is smooth and flat. And maintaining, namely maintaining the surface of the cemented soil moist on the compacted cemented soil slope surface by adopting the modes of covering, sprinkling and the like so as to achieve the strength required by design.

Claims (8)

1. A cemented soil slope filling construction method is characterized in that: it comprises the following steps:
the method comprises the following steps: the cemented soil mixing adopts a centralized plant mixing process, and the output of cemented soil mixing production equipment is more than 360m 3/h;
step two: transporting vehicles are equipped according to the cemented soil filling engineering quantity, the construction strength and the transport distance, and the cemented soil is transported to the operation slope;
step three: uniformly paving the cemented soil along the operation slope by adopting a paving machine, wherein the paving thickness of the slope is not less than 150mm and not more than 450 mm;
step four: sprinkling water on the paved cemented soil slope surface by a sprinkling truck, wherein the allowable deviation of the water content of the cemented soil slope surface before rolling and the optimal water content is +/-2%;
step five: repeatedly rolling the spread and watered cemented soil along the operation slope surface by a rolling machine to reach the required rolling times;
step six: repeatedly rolling the compacted cemented soil along the operation slope by adopting a smooth surface rolling machine until indentation is eliminated, so that the rolled slope is smooth;
step seven: and covering and watering the compacted cemented soil slope for maintenance, keeping the cemented soil surface moist, wherein the maintenance period is not less than 14 days.
2. The cemented soil slope filling construction method according to claim 1, characterized in that: the process of mixing the cemented soil in the first step by adopting a centralized plant comprises the following steps: and (3) conveying the soil material to a mixing station, mixing the cementing material into the soil material according to the required designed mixing proportion, fully mixing, controlling the water addition amount according to the optimal water content in the mixing process, and mixing for not less than 3min to produce the cemented soil material.
3. The cemented soil slope filling construction method according to claim 2, characterized in that: and fifthly, rolling the spread and sprinkled cemented soil along the operation slope at the speed of 2-3km/h by adopting a 7t rolling machine.
4. The cemented soil slope filling construction method according to claim 3, characterized in that: and the rolling in the fifth step adopts a sectional construction mode: the length of 30m is a unit section, the rolling tracks of two adjacent sections of the overlapping belts are overlapped with each other, the width of the overlapping belt is 0.3 m-0.5 m, and the overlapping belts are rolled to the compactness required by the design.
5. The cemented soil slope filling construction method according to claim 4, characterized in that: and (5) continuously rolling the cemented soil in the step five, finishing within 2h, and carrying out field sampling test on the dry density and the water content of the compacted cemented soil.
6. The cemented soil slope filling construction method according to claim 5, characterized in that: before the first step, carrying out base cleaning treatment on weeds, plant roots and stems and large stones on the slope surface by adopting a backhoe excavator to ensure that the base surface of the side slope is flat.
7. The cemented soil slope filling construction method according to claim 6, characterized in that: and performing chiseling treatment on the leveled slope surface, and then spreading and rolling the cemented soil.
8. The cemented soil slope filling construction method according to claim 7, characterized in that: the cemented soil is mixed by adopting a centralized plant mixing process: the cemented soil takes fine soil as a raw material, the soil material excavated in a stock ground is fully crushed and needs to be screened by a sieve with the aperture of 5mm, and the cemented soil is ensured not to contain soil blocks with the particle size larger than 5 mm.
CN202111014878.7A 2021-08-31 2021-08-31 Cemented soil slope filling construction method Pending CN113774893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111014878.7A CN113774893A (en) 2021-08-31 2021-08-31 Cemented soil slope filling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111014878.7A CN113774893A (en) 2021-08-31 2021-08-31 Cemented soil slope filling construction method

Publications (1)

Publication Number Publication Date
CN113774893A true CN113774893A (en) 2021-12-10

Family

ID=78840275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111014878.7A Pending CN113774893A (en) 2021-08-31 2021-08-31 Cemented soil slope filling construction method

Country Status (1)

Country Link
CN (1) CN113774893A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332676A (en) * 2006-06-15 2007-12-27 Minoru Maekawa Construction method of surface-compacted concrete pavement
CN102900003A (en) * 2012-10-12 2013-01-30 中交第三公路工程局有限公司 Steel bridge deck pavement interface handling structure layer and construction process
CN108468325A (en) * 2018-03-23 2018-08-31 葛洲坝中固科技股份有限公司 A kind of large area borders on the sea beach ooze rapid curing construction method
CN108589688A (en) * 2018-05-14 2018-09-28 中国科学院武汉岩土力学研究所 A kind of coral sand ground deep layer vibroflotation cooperation shallow-layer watering impact-rolling strengthening construction engineering method
CN113005839A (en) * 2021-03-15 2021-06-22 云南省设计院集团工程投资有限公司 Treatment process of bad soil roadbed
CN113123323A (en) * 2021-04-21 2021-07-16 鹏图建设有限公司 Lime soil construction process
CN113213883A (en) * 2021-05-24 2021-08-06 四川交通职业技术学院 Reclaimed water stabilizing material prepared from waste earthwork and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332676A (en) * 2006-06-15 2007-12-27 Minoru Maekawa Construction method of surface-compacted concrete pavement
CN102900003A (en) * 2012-10-12 2013-01-30 中交第三公路工程局有限公司 Steel bridge deck pavement interface handling structure layer and construction process
CN108468325A (en) * 2018-03-23 2018-08-31 葛洲坝中固科技股份有限公司 A kind of large area borders on the sea beach ooze rapid curing construction method
CN108589688A (en) * 2018-05-14 2018-09-28 中国科学院武汉岩土力学研究所 A kind of coral sand ground deep layer vibroflotation cooperation shallow-layer watering impact-rolling strengthening construction engineering method
CN113005839A (en) * 2021-03-15 2021-06-22 云南省设计院集团工程投资有限公司 Treatment process of bad soil roadbed
CN113123323A (en) * 2021-04-21 2021-07-16 鹏图建设有限公司 Lime soil construction process
CN113213883A (en) * 2021-05-24 2021-08-06 四川交通职业技术学院 Reclaimed water stabilizing material prepared from waste earthwork and construction method thereof

Similar Documents

Publication Publication Date Title
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN109503052A (en) Raw celluar concrete of a plant and preparation method and application
CN112627154A (en) Water network zone lime solidified soil test section filling design method
CN104631274A (en) Temporary road pavement technology
CN113213883A (en) Reclaimed water stabilizing material prepared from waste earthwork and construction method thereof
CN103422407A (en) Construction process using cement diatomite to stabilize desert sand mixture to build Niger desert road
CN113774893A (en) Cemented soil slope filling construction method
CN111424688A (en) Protection method for preventing and controlling shallow landslide of soil slope by using phosphogypsum
CN110184874A (en) A kind of garden landscape road and its construction technology
CN109797621A (en) A kind of high-strength composite road surface and its construction technology
CN106758649B (en) A kind of field concrete road surface, process for constructing and concrete
CN111535323B (en) Full-section quasi-tertiary matching long-age roller compacted concrete construction method
CN109555135A (en) A kind of non-sintered haydite concrete of dredging silt plants raw building block and roadbed slope ecological protection construction method
CN113882211A (en) Environment-friendly water-preserving type pavement structure and construction method
CN113171865A (en) Preparation method of high-quality machine-made sand
CN113818924A (en) Layered backfill compacting method for dolomite tailing pit
CN108585668A (en) Creepage concrete construction technology
CN112279545A (en) Special coagulant for solid waste, production method and use method thereof
CN111155403A (en) Method for constructing surface mine road
CN111188234A (en) Method for enhancing construction quality of red sandstone roadbed
CN110904757A (en) Construction method of lime soil roadbed
CN113622241B (en) Municipal road engineering pavement construction process
CN108755362A (en) Base cures cold regeneration construction method
CN114538872B (en) Mine restoration ecological concrete based on phosphate rock tailings and preparation method and application thereof
SU1366574A1 (en) Method of constructing roadbed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211210