CN108755362A - Base cures cold regeneration construction method - Google Patents

Base cures cold regeneration construction method Download PDF

Info

Publication number
CN108755362A
CN108755362A CN201810596245.3A CN201810596245A CN108755362A CN 108755362 A CN108755362 A CN 108755362A CN 201810596245 A CN201810596245 A CN 201810596245A CN 108755362 A CN108755362 A CN 108755362A
Authority
CN
China
Prior art keywords
soil
base
agent
solidified
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810596245.3A
Other languages
Chinese (zh)
Inventor
席玉林
柳晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Science Shenglian (Beijing) New Materials Co.,Ltd.
Original Assignee
Zhongke Liansheng (beijing) Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Liansheng (beijing) Environmental Protection Technology Co Ltd filed Critical Zhongke Liansheng (beijing) Environmental Protection Technology Co Ltd
Priority to CN201810596245.3A priority Critical patent/CN108755362A/en
Publication of CN108755362A publication Critical patent/CN108755362A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The invention discloses a kind of bases to cure cold regeneration construction method, including:Pre-cleaning is carried out to pending base;Cold in place recycling is carried out to the base after pre-cleaning, it includes paving filler and milling is mixed and stirred, wherein, soil-solidified-agent is equably mixed during carrying out cold in place recycling, if soil-solidified-agent is solid, then soil-solidified-agent is added in the filler to pave and is stirred evenly, if soil-solidified-agent is liquid, soil-solidified-agent is added into the waterwheel being connected with the progress cold renewal equipment that milling is mixed and stirred on the spot;Cold renewal equipment pushes waterwheel to advance, and adds water while stirring:After milling is mixed and stirred, row pressure is carried out, is struck off using land leveller and shaping;After shaping, static pressure first is carried out with heavy road roller, then vibroroller cmpacting again;Maintenance.This method can ensure that soil-solidified-agent uniformly mixes, and the entire compression intensity to ensure entire base is high, and water stability is good, and operation is mixed and stirred and had bad luck in the strange land that can also reduce bulk material, and short time limit is at low cost.

Description

Base cures cold regeneration construction method
Technical field
The present invention relates to road construction methods.It is more particularly related to which a kind of base cures cold regeneration construction side Method.
Background technology
The highway in China passes through the fast development of more than ten years, when building highway and factory site is hardened, using large-scale machine Toolization is constructed, and mainly with the central mix of material, dispersion transport, the freight volume of material is very big, with the development of soil-solidified-agent, Various soil and solid waste material are more and more used for the construction of base's even steady layer of water, therefore detail design is based on taking on the spot The principle that material and solid waste utilize, also more extensive to the use of curing agent, traditional central mix is at stirring intensity, interval Between, uniformity coefficient etc. all cannot be satisfied curing agent requirement in use, while the development of cold renewal equipment, improves and makees on the spot The efficiency of industry, shortens the activity duration, strengthens the ability of stirring, combines other heavy duty work equipment, has had been provided with and made on the spot The basis of industry.
In addition mileage in highway open to traffic and density raising are very big in recent years in China, and the maintenance and upgrade of highway improves task and follows on sb.'s heels And arrive.Traditional highway upgrading is main due to being restricted by machinery, technology, and much having the limitation of the passage headroom of viaduct If overlaying new high intensity base and road surface on old pavement.This mode primary disadvantage is that, the structure sheaf intensity on old road It is low also uneven, it can only be used as roadbed, waste some quality materials, new road elevation improves, width narrows, and increases road Base and base's quantities waste land resource.
Since common cold in place recycling construction is that the face layer of original path and base are become new roadbase (or bottom Base), cause the steady layer of water of new road at least to start making on the basis of this absolute altitude, moreover in the road reformation of high standard In, sometimes using regeneration zone as underlayment, the base materials such as two-ash broken stones are also overlayed on this basis, this allows for being transformed Grade elevation later is more than the absolute altitude on original road surface, and along road structure, the design structure on road surface will change therewith.Such as Fruit is constructed in urban road using this method, and original drainage system will also be influenced by some therewith.Therefore, for road marking Height has the section more strictly limited, needs to regenerate after excluding using old road part.
With the immediate patent of present inventive concept《It is a kind of to be cured as the construction method of road steady layer of water using the soil body》(Shen Please number:CN201710180391.3) the invention discloses a kind of using soil body solidification as the implementation of road steady layer of water, with It builds based on the soil that spoir is transported to obtained by construction site or the on the spot mechanical scarifying of soil, mixes soil-solidified-agent and cement system It at solidified earth, paves onto roadbed, after roller-compaction health, the water stability for becoming alternative Traditional foundations layer is very outstanding Base, underlayment.The road steady layer of water that this method is implemented is high with intensity, water stability is good, durability is good, frost resistance is strong, cost Low advantage can shorten the construction period, ensure construction quality, improve road structure performance, improve roadbed water stability, and extending road makes Use the service life;Solve the problems, such as that conventional method of high cost, high energy consumption, later period maintenance are costly etc.;The soil body has largely been used simultaneously, Traditional foundations layer is effectively substituted, resources and energy consumption and environmental pollution are reduced, there is significant economic and social profit.But this The content of a patent disclosure of description in to(for) mechanical execution is inadequate, and mechanical work is not retouched for cement or aggregate etc. first It states, curing agent is using water spray operation, all it cannot be guaranteed that the uniform incorporation of cement and curing agent, can not ensure operating efficiency and work Industry quality.
Invention content
For overcome the deficiencies in the prior art, the present invention provides a kind of bases to cure cold regeneration construction method, this method A purpose be that can ensure the uniform incorporation of soil-solidified-agent, the entire compression intensity to ensure entire base is high, water Stability can be good.
A further object of the invention is in this way, creating and being constructed and grasped on the spot using big machineryization when overhauling Make, operation is mixed and stirred and had bad luck in the strange land that can reduce bulk material, and short time limit is at low cost.
In order to realize these purposes and other advantages according to the present invention, the present invention provides a kind of bases to cure cold renewal Construction method includes the following steps:
Step 1: carrying out pre-cleaning to pending base;
Step 2: carrying out cold in place recycling to the base after pre-cleaning comprising pave filler and milling is mixed and stirred, wherein Soil-solidified-agent is equably mixed during carrying out cold in place recycling, if soil-solidified-agent is solid, by soil solidification Agent is added in the filler that paves and stirs evenly, if soil-solidified-agent is liquid, by soil-solidified-agent be added to carry out just In the waterwheel that the cold renewal equipment that ground milling is mixed and stirred is connected;In milling mixing process, the cold renewal equipment pushes the water Chinese herbaceous peony is into while stirring plus water:
Step 3: after milling is mixed and stirred, row pressure is carried out, is struck off using land leveller and shaping;
Step 4: after shaping, static pressure first is carried out with heavy road roller, then vibroroller cmpacting again;
Step 5: maintenance.
Preferably, the base cures cold regeneration construction method, and the step 2 specifically includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader, wherein by soil solids Curing agent is added into cement or flyash, stirs evenly;
Milling is mixed and stirred:The cold renewal equipment pushes the waterwheel to advance, and is carried out in situ milling, is crushed, additive, mixes With;Wherein, automatic sprinkler, the automatic sprinkler are provided in the tooth rolling breaker shell of the cold renewal equipment It is connected with the waterwheel, in order to add water while stirring.
Preferably, the base cures cold regeneration construction method, and the step 2 specifically includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader;
Milling is mixed and stirred:Liquid soil-solidified-agent is added in the waterwheel, the cold renewal equipment pushes the waterwheel, It is carried out in situ milling, broken, additive and mixes and stirs;Wherein, it is provided in the tooth rolling breaker shell of the cold renewal equipment Automatic sprinkler, the automatic sprinkler are connected with the waterwheel, in order to add water while stirring.
Preferably, the base cures cold regeneration construction method, and atomising device is provided on the truck spreader, described The injection direction of atomising device, on the contrary, in truck spreader paving process, opens atomising device with truck spreader headstock direction.
Preferably, the base cures cold regeneration construction method, and there are two the atomising device settings, is respectively set In the subsequent both sides of the truck spreader.
Preferably, the base cures cold regeneration construction method, and in the step 4, compacted thickness is determined as 15~ 30 centimetres.
Preferably, the base cures cold regeneration construction method, which is characterized in that in work progress, soil ratio Be 30~90%, aggregate ratio be 10~30%, cement proportion be 4~8%, liquid soil-solidified-agent ratio be 0.01~ 0.03%.
Preferably, the base cures cold regeneration construction method, which is characterized in that in work progress, soil ratio Be 30~90%, aggregate ratio be 10~30%, cement proportion be 4~8%, soil solids curing agent ratio be 0.1~ 0.2%.
Preferably, the base cures cold regeneration construction method, described in step 1 to pending base into Row pre-cleaning specifically includes:Pending base is cleared up, smooth and unwrapping wire, determine center line and slope foot and drives piles and draw Line marks thickness and elevation.
Preferably, the base cures cold regeneration construction method, and the maintenance of the step 5 specifically includes:Compacting Afterwards, it suspends traffic, geotextiles covering is sprinkled water a health at least week.
The present invention includes at least following advantageous effect:Cold in place recycling is carried out to the base after pre-cleaning, it can also basis Requirement of engineering Direct Regeneration equably mixes soil-solidified-agent, if soil at steady layer of water during carrying out cold in place recycling Curing agent is solid, then soil-solidified-agent is added in the filler to pave and stirs evenly, will if soil-solidified-agent is liquid Soil-solidified-agent is added in a waterwheel, so operates, can ensure the uniform incorporation of soil-solidified-agent, to ensure entire base Entire compression intensity it is high, water stability is good.Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader, institute State and be provided with atomising device on truck spreader, the setting of atomising device can during truck spreader paves, ensure environment not by It influences, Cold Recycling Equipment pushes waterwheel, is carried out in situ milling, is crushed, additive, mixes and stirs, whole process uses mainframe Tool site is constructed and operation is mixed and stirred and had bad luck in operation, the strange land for reducing bulk material, and not only short time limit, at low cost, right The influence of old road roadbed and destruction very little, ensure that the globality of structure, while enhancing the bearing capacity on basis, not only improve Operating efficiency, shortens the construction period, and renovation upgrading can also be carried out to factory site and road and improves bearing capacity.To sum up, with it is traditional Construction method is compared, one, process it is simple, since the material of original old pavement is all by local use, be omitted excavation, outward transport, The a series of activities such as processing and backfill in factory so that working procedure greatly simplifies.Two, cost is relatively low, due to old pavement material Be able to all of, with regeneration layer thickness difference, can substantially reduce cost 20%~46%, thickness is deeper, reduce at This is more.Three, category of roads is improved, the influence due to the construction method to old road roadbed (sub-layer) and destruction very little ensure that The globality of structure, while the bearing capacity on basis is enhanced, it fundamentally ensure that the raising of category of roads, this advantage pair It is particularly important in the transformation of inferior grade road.Four, short time limit, cold in place recycling carries out under field conditions (factors), in addition to individual Serious pit slot needs outside simple pre-cleaning and supplementary material, remaining road surface does not need any processing, in addition disposably The construction characteristic of completion reduces the activity duration, therefore substantially increases production efficiency, shortens the duration.By our reality Ground measures, a Tai Weitegen WR2000 type regenerating devices, rational in tissue, and each work machine-team can be with regenerated road surface The ㎡ of 5000 ㎡~6000.Five, environmental protection and resource reduce the exploitation of new material because old material is able to whole local uses, Also the problem of old material transport is arbitrarily stacked with waste material is not present.Work progress does not have the pollution of dust and exhaust gas, has saved resource, Protect environment.Six, it can be constructed with uninterrupted traffic, since cold in place recycling process is simple, put into the construction equipment at scene very It is few, insensitive is reacted to Coherent traffic noise.So in the case where the volume of traffic is less big, the half range that can be open to traffic with half range construction.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the flow diagram that base of the present invention cures cold regeneration construction method.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or combinations thereof.
As shown in Figure 1, base provided in an embodiment of the present invention cures cold regeneration construction method, include the following steps:
Step 1: carrying out pre-cleaning to pending base;
Step 2: carrying out cold in place recycling to the base after pre-cleaning comprising pave filler and milling is mixed and stirred, wherein Soil-solidified-agent is equably mixed during carrying out cold in place recycling, if soil-solidified-agent is solid, by soil solidification Agent is added in the filler that paves and stirs evenly, if soil-solidified-agent is liquid, by soil-solidified-agent be added to carry out just In the waterwheel that the cold renewal equipment that ground milling is mixed and stirred is connected;In milling mixing process, the cold renewal equipment pushes the water Chinese herbaceous peony is into while stirring plus water:
Step 3: after milling is mixed and stirred, row pressure is carried out, is struck off using land leveller and shaping reaches side by human assistance deburring Angle is neat, is convenient for the processing in sideline and seam;
Step 4: after shaping, static pressure first is carried out with heavy road roller, then vibroroller cmpacting again, to reach design requirement Compactness;
Step 5: maintenance.
Cold in place recycling is carried out to the base after pre-cleaning, soil is equably mixed during carrying out cold in place recycling Soil-solidified-agent is added in the filler to pave and is stirred evenly, if soil solidification if soil-solidified-agent is solid by curing agent Agent is liquid, then soil-solidified-agent is added in a waterwheel, so operates, can ensure the uniform incorporation of soil-solidified-agent, from And ensureing that the entire compression intensity of entire base is high, water stability is good.
In a wherein specific implementation mode, the base cures cold regeneration construction method, and the step 2 is specifically wrapped It includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader, wherein by soil solids Curing agent is added into cement or flyash, and stirs evenly;
Milling is mixed and stirred:The cold renewal equipment pushes the waterwheel to advance, and is carried out in situ milling, is crushed, additive, mixes With;Wherein, automatic sprinkler, the automatic sprinkler are provided in the tooth rolling breaker shell of the cold renewal equipment It is connected with the waterwheel, in order to add water while stirring.The automatic sprinkler can pass through a pipeline phase with the waterwheel Even, the water inside automatic sprinkler is derived from waterwheel.
In a wherein specific implementation mode, the base cures cold regeneration construction method, and the step 2 is specifically wrapped It includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader;
Milling is mixed and stirred:Liquid soil-solidified-agent is added in the waterwheel, the cold renewal equipment pushes the waterwheel, It is carried out in situ milling, broken, additive and mixes and stirs;Wherein, it is provided in the tooth rolling breaker shell of the cold renewal equipment Automatic sprinkler, the automatic sprinkler are connected with the waterwheel, in order to add water while stirring.
It should be noted that in construction operation, if curing agent is cured, can there are two types of adding method, if It is solvable, it can be added in waterwheel, uniform spread after being homogenized can also be added in cement or flyash.
In a wherein specific implementation mode, the base cures cold regeneration construction method, is arranged on the truck spreader Have an atomising device, the injection direction of the atomising device with truck spreader headstock direction on the contrary, in truck spreader paving process, Open atomising device.
The setting of atomising device can ensure that environment is unaffected during truck spreader paves.
In a wherein specific implementation mode, the base cures cold regeneration construction method, the atomising device setting There are two, it is separately positioned on the subsequent both sides of the truck spreader.
In a wherein specific implementation mode, the base cures cold regeneration construction method, in the step 4, compacting Thickness is determined as 15~30 centimetres.If it exceeds this thickness, it is not easy to be compacted.
In a wherein specific implementation mode, the base cures cold regeneration construction method, in work progress, each component Shared ratio is:Soil ratio is 30~90%, and aggregate ratio is 10~30%, and cement proportion is 4~8%, liquid soil Curing agent ratio is 0.01~0.03%.
In a wherein specific implementation mode, the base cures cold regeneration construction method, in work progress, each component Shared ratio is:Soil ratio is 30~90%, and aggregate ratio is 10~30%, and cement proportion is 4~8%, soil solids Curing agent ratio is 0.1~0.2%.
Soil described in the present embodiment is the soil obtained by the mechanical scarifying of soil on the spot.
In a wherein specific implementation mode, the base cures cold regeneration construction method, pair described in step 1 Pending base carries out pre-cleaning and specifically includes:Pending base is cleared up, smooth and unwrapping wire, determines center line and slope Foot simultaneously drives piles and crosses, and marks thickness and elevation.
In a wherein specific implementation mode, the base cures cold regeneration construction method, the maintenance of the step 5 It specifically includes:It after compacting, suspends traffic, geotextiles covering is sprinkled water a health at least week.
The advantageous effect generated to this method with reference to specific embodiment illustrates.
In highway engineering mostly, using gloomy soil body stabilizing agent is easily inspired confidence in, the construction of multiple bid sections is completed.
In the experiment road section construction of Nanyang, henan Xichuan, completes the double-deck steady layer of water and overhaul, first layer cement proportion 5%, soil Earth curing agent 0.018% is directly added by water consumption in waterwheel, second layer cement proportion 6%, and soil-solidified-agent 0.018% is same It is directly added into waterwheel by water consumption, final coring intensity is more than 3MPa.
In Anhui collection section is constructed, underlayment is renovated, rejects bulk, it is directly solid using former base layer gangue and coal slime Change, cement proportion 5%, soil-solidified-agent 0.018% is equally directly added by water in waterwheel, and final coring intensity is more than 2.5MPa。
As described above, according to the present invention, a kind of base's solidification cold regeneration construction method provided by the invention can ensure soil Operation is mixed and stirred and is had bad luck in the uniform incorporation of earth curing agent, the strange land that can reduce bulk material, and short time limit is at low cost.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With.It can be applied to various suitable the field of the invention completely.It for those skilled in the art, can be easily Realize other modification.Therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (10)

1. base cures cold regeneration construction method, which is characterized in that include the following steps:
Step 1: carrying out pre-cleaning to pending base;
Step 2: carrying out cold in place recycling to the base after pre-cleaning comprising pave filler and milling is mixed and stirred, wherein into Soil-solidified-agent is equably mixed during row cold in place recycling, if soil-solidified-agent is solid, soil-solidified-agent is added Enter in the filler to pave and stir evenly, if soil-solidified-agent be liquid, by soil-solidified-agent be added to carry out milling on the spot It digs in the connected waterwheel of the cold renewal equipment mixed and stirred;In milling mixing process, the cold renewal equipment pushes the dragon's tongue Into while stirring plus water:
Step 3: after milling is mixed and stirred, row pressure is carried out, is struck off using land leveller and shaping;
Step 4: after shaping, static pressure first is carried out with heavy road roller, then vibroroller cmpacting again;
Step 5: maintenance.
2. base as described in claim 1 cures cold regeneration construction method, which is characterized in that the step 2 specifically includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader, wherein cures soil solids Agent is added into cement or flyash, stirs evenly;
Milling is mixed and stirred:The cold renewal equipment pushes the waterwheel to advance, and is carried out in situ milling, is crushed, additive, mixes and stirs;Its In, it is provided with automatic sprinkler, the automatic sprinkler and institute in the tooth rolling breaker shell of the cold renewal equipment It states waterwheel to be connected, in order to add water while stirring.
3. base as described in claim 1 cures cold regeneration construction method, which is characterized in that the step 2 specifically includes:
Pave filler:Paved aggregate, cement, lime and the flyash of predetermined amount using truck spreader;
Milling is mixed and stirred:Liquid soil-solidified-agent is added in the waterwheel, the cold renewal equipment pushes the waterwheel, on the spot It carries out milling, broken, additive and mixes and stirs;Wherein, it is provided in the tooth rolling breaker shell of the cold renewal equipment automatic Water injector, the automatic sprinkler are connected with the waterwheel, in order to add water while stirring.
4. base as claimed in claim 2 or claim 3 cures cold regeneration construction method, which is characterized in that be arranged on the truck spreader Have an atomising device, the injection direction of the atomising device with truck spreader headstock direction on the contrary, in truck spreader paving process, Open atomising device.
5. base as claimed in claim 4 cures cold regeneration construction method, which is characterized in that the atomising device is provided with two It is a, it is separately positioned on the subsequent both sides of the truck spreader.
6. base as described in claim 1 cures cold regeneration construction method, which is characterized in that in the step 4, compacting is thick Degree is determined as 10~30 centimetres.
7. base as claimed in claim 2 or claim 3 cures cold regeneration construction method, which is characterized in that in work progress, soil ratio Example be 30~90%, aggregate ratio be 10~30%, cement proportion be 4~8%, liquid soil-solidified-agent ratio be 0.01~ 0.03%.
8. base as claimed in claim 2 or claim 3 cures cold regeneration construction method, which is characterized in that in work progress, soil ratio Example be 30~90%, aggregate ratio be 10~30%, cement proportion be 4~8%, soil solids curing agent ratio be 0.1~ 0.2%.
9. base as described in claim 1 cures cold regeneration construction method, which is characterized in that treat place described in step 1 The base of reason carries out pre-cleaning and specifically includes:Pending base is cleared up, smooth and unwrapping wire, determines center line and slope foot simultaneously Piling and scribing line, mark thickness and elevation.
10. base as described in claim 1 cures cold regeneration construction method, which is characterized in that the maintenance of the step 5 has Body includes:It after compacting, suspends traffic, geotextiles covering is sprinkled water a health at least week.
CN201810596245.3A 2018-06-11 2018-06-11 Base cures cold regeneration construction method Pending CN108755362A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810596245.3A CN108755362A (en) 2018-06-11 2018-06-11 Base cures cold regeneration construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810596245.3A CN108755362A (en) 2018-06-11 2018-06-11 Base cures cold regeneration construction method

Publications (1)

Publication Number Publication Date
CN108755362A true CN108755362A (en) 2018-11-06

Family

ID=64022368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810596245.3A Pending CN108755362A (en) 2018-06-11 2018-06-11 Base cures cold regeneration construction method

Country Status (1)

Country Link
CN (1) CN108755362A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113699852A (en) * 2021-08-13 2021-11-26 北京中德建基路桥工程技术有限公司 Environment-friendly high-strength solidified soil construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1566533A (en) * 2003-06-26 2005-01-19 王涌 Composite material for consolidated soil pavement base course and construction method thereof
RU2365698C1 (en) * 2008-01-17 2009-08-27 Федеральное государственное унитарное предприятие "Российский дорожный научно-исследовательский институт" ФГУП "РОСДОРНИИ" Strengthening method of road pavement
CN101792668A (en) * 2010-01-21 2010-08-04 新乡市公路管理局 Highway base course solidifying agent and method for solidifying highway base course by using same
CN106592387A (en) * 2016-12-22 2017-04-26 江苏四通路桥工程有限公司 Cold in-place recycling construction method
CN107059573A (en) * 2017-03-24 2017-08-18 广东省建筑科学研究院集团股份有限公司 A kind of construction method solidified by the use of the soil body as road steady layer of water
CN107386028A (en) * 2017-08-25 2017-11-24 上海道基环保科技有限公司 Road three-hybrid system cold in place recycling engineering method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1566533A (en) * 2003-06-26 2005-01-19 王涌 Composite material for consolidated soil pavement base course and construction method thereof
RU2365698C1 (en) * 2008-01-17 2009-08-27 Федеральное государственное унитарное предприятие "Российский дорожный научно-исследовательский институт" ФГУП "РОСДОРНИИ" Strengthening method of road pavement
CN101792668A (en) * 2010-01-21 2010-08-04 新乡市公路管理局 Highway base course solidifying agent and method for solidifying highway base course by using same
CN106592387A (en) * 2016-12-22 2017-04-26 江苏四通路桥工程有限公司 Cold in-place recycling construction method
CN107059573A (en) * 2017-03-24 2017-08-18 广东省建筑科学研究院集团股份有限公司 A kind of construction method solidified by the use of the soil body as road steady layer of water
CN107386028A (en) * 2017-08-25 2017-11-24 上海道基环保科技有限公司 Road three-hybrid system cold in place recycling engineering method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113699852A (en) * 2021-08-13 2021-11-26 北京中德建基路桥工程技术有限公司 Environment-friendly high-strength solidified soil construction process

Similar Documents

Publication Publication Date Title
JP6841964B2 (en) Construction method of combined dam
CN109914178B (en) Construction method for integrally paving road by using bio-enzyme curing material
CN107059573A (en) A kind of construction method solidified by the use of the soil body as road steady layer of water
CN104446156B (en) A kind of emulsified bitumen slurry mixture penetration type bituminous paving
CN112627154B (en) Water network zone lime solidified soil test section filling design method
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN107419635A (en) A kind of composite pavement sealing method
CN204753293U (en) Main line cement concrete pavement " bai jiahei " regeneration structure is economized by state
CN108570897A (en) A kind of paving method of pavement of road base
CN207846123U (en) Reinforced structure complex
CN109944125A (en) A kind of asphalt concrete pavement structure and its paving process
CN108755362A (en) Base cures cold regeneration construction method
CN103422407A (en) Construction process using cement diatomite to stabilize desert sand mixture to build Niger desert road
RU121515U1 (en) ROAD CLOTHING
CN107447617A (en) A kind of dust-proof curing process of temporary construction road
CN112301826A (en) Emulsified asphalt cold-recycling pavement structure and rapid curing method for pavement
CN106958177A (en) A kind of construction method of municipal road, pavement structure and highway pavement
CN206784100U (en) A kind of bituminous paving interlayer structure
CN104818659A (en) Cement slab scene granulation regeneration construction process
CN109797621A (en) A kind of high-strength composite road surface and its construction technology
CN109082986A (en) The synthesis improvement method of cold in place recycling Lime-soil subbase
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN204780555U (en) Structure that repaired in bituminous paving hole groove
CN106758649A (en) A kind of field concrete road surface, process for constructing and concrete
CN206916688U (en) A kind of new rammed earth retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200409

Address after: 100070 Floor 1401-2, Building 1, Area 1, 188 South Fourth Ring West Road, Fengtai District, Beijing

Applicant after: China Science Shenglian (Beijing) New Materials Co.,Ltd.

Address before: 100070 Beijing City, Fengtai District, South Fourth Ring Road West, No. 188, building 1401-1, unit 1

Applicant before: ZHONGKE SHENGLIAN (BEIJING) ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106