CN106758649B - A kind of field concrete road surface, process for constructing and concrete - Google Patents

A kind of field concrete road surface, process for constructing and concrete Download PDF

Info

Publication number
CN106758649B
CN106758649B CN201611108915.XA CN201611108915A CN106758649B CN 106758649 B CN106758649 B CN 106758649B CN 201611108915 A CN201611108915 A CN 201611108915A CN 106758649 B CN106758649 B CN 106758649B
Authority
CN
China
Prior art keywords
concrete
road surface
field
construction
spread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611108915.XA
Other languages
Chinese (zh)
Other versions
CN106758649A (en
Inventor
饶松旺
陈艳华
申琪
黄德华
许自昌
饶秋英
饶斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Geological Remote Sensing And Geographic Information Service Center
Fujian Land Development And Consolidation Center
Original Assignee
Fujian Geological Remote Sensing And Geographic Information Service Center
Fujian Land Development And Consolidation Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Geological Remote Sensing And Geographic Information Service Center, Fujian Land Development And Consolidation Center filed Critical Fujian Geological Remote Sensing And Geographic Information Service Center
Priority to CN201611108915.XA priority Critical patent/CN106758649B/en
Publication of CN106758649A publication Critical patent/CN106758649A/en
Application granted granted Critical
Publication of CN106758649B publication Critical patent/CN106758649B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of field concrete road surface, process for constructing and concrete, wherein method includes the following steps, preparation of construction, spread concrete, rolls at ready-mixed concrete;The preparation of construction includes step, removes soft base soil, flattening foot layer, and the setting measurement control stake in base, the stirring slow setting soil includes step, by 32.5 cement 270-330kg, middle sand 0.43-0.51m3, gravel 0.76-0.92m3, flyash 0.06-0.08m3It is stirred, every tray concrete stirs 160-200s;The spread concrete includes step, base is infiltrated, with land leveller spread concrete;The step that rolls includes vibration first pressing 1-2 times, does not open vibration pressure 1-2 times again, then carries out final pressure using rubber-tyred roller.Foregoing invention solves the problems, such as the build of field concrete road surface.

Description

A kind of field concrete road surface, process for constructing and concrete
Technical field
The present invention relates to field of pavement repair more particularly to a kind of process for constructing of field concrete road surface, road and mix Solidifying soil.
Background technique
Our province Land Consolidation Project is unfolded since 2005 in the whole province, has passed by 11 year, has designed so far before Clay bound macadam damages substantially after having used several years.
Field road clay bound macadam is primarily present the following aspects problem:
(1) ability to resist splash erosion is poor, and anti-natural calamity ability is poor,
(2) after agricultural machinery walking, road surface breakage is serious.
(3) construction quality is difficult to supervise, and construction party is easy to use inferior materials and turn out substandard goods.
(4) it cannot be used in the soft base of field.
Summary of the invention
For this reason, it may be necessary to provide a kind of novel field concrete road surface process for constructing, solve the above problems
To achieve the above object, it inventor provides
A kind of field concrete road surface process for constructing includes the following steps, preparation of construction, ready-mixed concrete, pave coagulation Soil rolls;
The preparation of construction includes step, removes soft base soil, flattening foot layer, and measurement control is arranged every 10m in base Stake processed,
The ready-mixed concrete includes step, by 32.5 cement 270-330kg, middle sand 0.43-0.51m3, gravel 0.76- 0.92m3, flyash 0.06-0.08m3It is stirred, every tray concrete stirs 160-200s;
The spread concrete includes step, infiltrates base, and with land leveller spread concrete, pave coefficient 1.2, and compacting is thick Spend 30cm;
The step that rolls is pressed 1-2 times again including vibrating first pressing 1-2 times, not opening vibration, then uses rubber-tyred roller progress whole Pressure.
Preferably, preparation of construction further includes step, changes and fills out field soft base, rockfills slag or gravel 35-45cm, fills out in dry land section Preceding rolling settlement control is in 9-11cm;In paddy field, section is rockfilled slag or gravel 60-80cm, and rolling settlement control is in 18- before filling out 22cm。
Specifically, it rolls step and section, spreading speed 1.5-2m/min is rolled for one with 30m.
Specifically, the coefficient 1.1-1.3 that paves of spread concrete, compacted thickness 27-33cm.
Preferably, further include seam construction procedure, after grinding coagulation soil intensity reach design strength 70% or more after it is every Transverse contraction joint, slit width 1cm, deep 6cm, using the pitch horseshoe rouge cementation of fissures are sawed every 10m.
Preferably, further include step, after rolling, cover health material, and it is wet to sprinkle water, and periodically sprinkles water after 4-6 days Health, until terminating during health.
A kind of concrete further includes middle sand 0.43-0.51m by 32.5 cement 300kg in terms of3, gravel 0.76-0.92m3、 Flyash 0.06-0.08m3
It preferably, further include middle sand 0.47m by 32.5 cement 300kg in terms of3, gravel 0.84m3, flyash 0.07m3
A kind of concrete road surface, by it includes cement 300kg be in terms of, including middle sand 0.43-0.51m3, gravel 0.76- 0.92m3, flyash 0.06-0.08m3
Preferably, by it includes cement 300kg be in terms of, further include middle sand 0.47m3, gravel 0.84m3, flyash 0.07m3
It is different from the prior art, above-mentioned technical proposal 1 can gather materials on the spot.2, construction speed is fast.3, intensity is high.4, anti-rain Water scouring capability is strong, and road surface freezing tolerance, anti-natural calamity ability are strong.5, after agricultural machinery walking, road surface is without breakage.6, it constructs Quality is easy supervision.7, construction environment pollution is reduced.8, it can be used in soft base.9, Land Consolidation Project field road, production road Road surface can use.10, than every cubic metre of conventional concrete road surface saving cement 50KG or more.
Whether ocean surface field pavement engineering or mountain ridge field produce pavement engineering, not as ordinary cement coagulation when construction Soil surface needs a set of large-scale equipment, can use the paver, vibrated roller and rubber-tyred roller of surfacing.
It is more durable than clay bound macadam ability to resist splash erosion, resistance to compression, wear-resisting and use after rolling compacted concrete pavement is formed Property etc. greatly enhance, significant effect improve.
Rolling compacted concrete pavement realizes that speed of application is fast compared with Common Concrete Pavement, while saving Load materials, often Cubic meter of concrete saves cement 50KG or more.
Rolling compacted concrete pavement can gather materials on the spot compared with Common Concrete Pavement, save the transportation cost that gathers materials, remote mountain Area can use.
It reduces environmental pollution, the dry discharge fly ash that quality is not less than II grades can be used in the construction process.
Detailed description of the invention
Fig. 1 is field concrete road surface process for constructing flow chart described in the specific embodiment of the invention;
Specific embodiment
Technology contents, construction feature, the objects and the effects for detailed description technical solution, below in conjunction with specific reality It applies example and attached drawing is cooperated to be explained in detail.
Referring to Fig. 1, for a kind of field concrete road surface of the invention process for constructing, as shown, method includes following step Suddenly, preparation of construction S100, ready-mixed concrete S102, spread concrete S104, roll S106;
The preparation of construction includes step, removes soft base soil, flattening foot layer, to guarantee that surface evenness is every in base Control stake is measured every 10m left and right settings, measurement control stake is mainly used for controlling elevation.
The ready-mixed concrete includes step, by sand in 32.5R portland cement 270-330kg, 0.25-0.5 millimeter 0.43-0.51m3, 20-40 millimeters of gravel 0.76-0.92m3, flyash 0.06-0.08m3It is stirred, every tray concrete stirring 160-200s;The build demand of field concrete road surface can preferably be adapted to by choosing the portland cement that intensity is 32.5R, by force Du Yuegao base road surface external force resistance damage capability is bigger, and corresponding manufacturing cost is also higher, selects the portland cement of 32.5R The use demand and cost control demand of field concrete road surface can preferably be adapted to.The middle sand of above-mentioned component and making for gravel With, the shear behavior of concrete can be increased, the concrete road surface on the ridge of field is not easy to slide, moisture penetrate into the case where Also it can guarantee performance.Flyash, is the fine ash that catching is got off from the flue gas after coal combustion, and flyash is coal-burning power plant's discharge Primary solids waste.The main oxides of the general flyash in China form are as follows: SiO2, Al2O3, FeO, Fe2O3, CaO, TiO2 Deng.Addition flyash be advantageous in that the workability that can improve concrete batching system, water-retaining property, reduce hydration heat of concrete, Improve concrete durability;Specifically, effect of the flyash in concrete has the following aspects: (1) improve workability, Reduce separation;(2) cementitious material, filler aggregate gap are provided;(3) secondary response for utilizing flyash and cement, increases the later period Intensity reduces cement consumption and reduces heat of hydration temperature rise;(4) it reduces environmental pollution, reduces its danger to water, air and soil Evil;(5) closely knit smooth rolling compacted concrete pavement is provided.
In time for the mixing quality for guaranteeing grinding coagulation soil mixture and supply, in the particular embodiment, construction uses 1 Platform BH300 type forced stirring equipment is produced using automatic blending, can be supplied per hour using 1 zl50 loading machine feeding The grinding coagulation soil mix of 50-80t.Because its water consumption is few, the mixing time will be grown grinding coagulation soil compared with normal concrete.It rolls The concrete mixing time is about 1.5 times of normal concrete.Determine that the control time mixed and stirred is every disk by trial mix when construction 180s or so.The workability of grinding coagulation soil mix, cohesiveness and plasticity can be improved after extending the mixing time.
Specifically, the transport of grinding coagulation soil preferably uses dump truck, causes to reduce moisture evaporation in transportational process Consistency loss, should keep wet in wagon box, transportation range should be advisable with the accessible distance of 30min, while be taken necessary Covering methods.Equipped with 5 12t dump truck transports, transportation range is about 2km for general construction.
The spread concrete includes step, infiltrates base, with land leveller spread concrete, paving for spread concrete is Number 1.1-1.3, compacted thickness 27-33cm.In some preferred embodiments, pave coefficient 1.2, compacted thickness 30cm;Infiltration Base can prevent base from absorbing the moisture in concrete, improve the quality of concrete, and grinding coagulation soil design thickness is 30cm, Paving thickness is up to 36cm after considering coefficient of loose laying, the paving thickness beyond general paver, therefore level land is used in construction Machine paves.Coefficient of loose laying is the ratio of paving thickness and compacted thickness, it is the important parameter for controlling construction quality, formally It should be determined by examination paving before construction.Coefficient of loose laying when this paves is 1.2.Rolling compacted concrete pavement designs compacted thickness 30cm, too thin to cannot withstand agricultural machinery walking, resistance to compression, shear resistance are poor, too thick and uneconomical, high expensive of building the road.
The step that rolls is pressed 1-2 times again including vibrating first pressing 1-2 times, not opening vibration, then uses rubber-tyred roller progress whole Pressure.Specifically in some embodiments, step is rolled with 30m and rolls section, spreading speed 1.5-2m/min for one.
The key of rolling compacted concrete pavement is exactly to roll work, and the quality for rolling work directly determines the quality on road surface.
The factor for influencing consolidation effect mainly rolls length of work segment, rolls order, rolling speed, number of rolling and ring Border condition etc..
(1) roll segment length: with the evaporation of moisture, concrete consistence is increasing, and compressibility worse and worse, rolls not It will cause compactness deficiency in time, influence grinding coagulation soil intensity.On the other hand, it is got over since mixing and stirring to molding time interval Long, the loss of strength of maturing is bigger.It therefore, is guarantee pavement strength, it is necessary to keep the road surface after paving as early as possible It is compacted.Wish to shorten and rolls length of work segment.But it rolls too short, necessarily road roller is caused frequently to commutate, increase, which rolls, to be connect Head, to influence the uniformity and surface evenness of compacting.According to the yield of stirring field 100t/h, 1.5-2m/min's paves Speed and every linear meter(lin.m.) be long to be reached the theoretical density 7t that must pave and mixes and stirs the actual conditions of material.This is constructed the length that paves every time 30m is one and rolls section, and in 30min, the rolling operation time was controlled within 1.5 hours for the time control that paves.(2) it rolls secondary Sequence: it rolls requirement and reaches complete thick closely knit and shaping surface, Ying Caiyong vibrated roller carries out.Roller compaction processes generally have first pressing (quiet Pressure), several sub- processes such as multiple pressure and final pressure.First pressing main function is to improve dense surface degree, will not be generated in vibroroller cmpacting The damaged surfaces phenomenons such as passage occur, and provide basis for vibrating compacting.The vibrated roller that multiple pressure can be used is not opened vibration and is carried out, It rolls 2 times.Multiple pressure is to keep road surface through thickness closely knit, reaches regulation compactness, need to open vibration and carry out, and muller overlapping is preferably to take turns wide 1/ 3~1/2, impression is eliminated with benefit, improves flatness.Compressed times and road roller performance, Roller Compacted Concrete Dam mix proportion, road surface thickness And to roll lap related, and generally 5 times, suitable vibration frequency and amplitude are selected in roller compaction process, it is rear high for first low frequency Frequently.Final pressure is a kind of indispensable roller compaction processes, preferably uses rubber-tyred roller, and kneading action can disappear when rubber-tyred roller rolls Except steel wheel impression and fine cracks, and while rolling, can be formed with the surface macro texture for being conducive to improve pavement skid resistance condition, and one As roll 2 times, rubber-tyred roller is the rolling apparatus used of most having ready conditions in final pressure process.This construction first pressing, multiple pressure use Ca25 road roller carries out, and final pressure produces rubber-tyred roller using Dezhou of large-tonnage and carries out.Compressed times reach regulation pressure by detection Solidity is controlled (generally 3~6 times), and the rolling speed of first pressing, multiple pressure and final pressure is 1.0~l.5km/h.(3) pay attention to Item: vibrated roller should inverse spreading direction hoist and rolled from lower, each position rolling layer is answered identical, must not be leaked Pressure, road width both sides should suitably increase number of rolling.Must at the uniform velocity keep straight on when rolling, must not speed change or parking, meet special circumstances must It, must first failure of oscillation when must stop, move backward.In construction section end 4~5m range, road roller should be appropriate horizontal from low to high along road surface horizontal slope To rolling, there is slumping crack or loose to prevent junction.
Preferably, preparation of construction further includes step, changes and fills out field soft base, rockfills slag or gravel 35-45cm, fills out in dry land section Preceding rolling settlement control is in 9-11cm;In paddy field, section is rockfilled slag or gravel 60-80cm, and rolling settlement control is in 18- before filling out 22cm.It changes and fills out field soft base and enable to base more solid.The problem of field road is built is better solved.
It preferably, in the embodiment shown in fig. 1, further include seam construction procedure after rolling, it is strong to grinding coagulation soil Degree every 10m saws transverse contraction joint after reaching 70% of design strength or more, and slit width 1cm, deep 6cm is dedicated using expansion joint joint filling The pitch horseshoe rouge cementation of fissures, asphalt flame-retardant matizhi is to use asphalt for base-material, using chemical adhesive, film forming agent, thickening The bitumastic of agent fiber stabilizer, emery dust and a small amount of fine aggregate composition, fills the coarse aggregate skeleton gap of gap grading The integral asphalt of group.With high-content coarse aggregate, high-content miberal powder, larger asphalt content, low content median diameter The compositing characteristic of particle.
Preferably, further include step S108, after rolling, cover health material, and it is wet to sprinkle water, timing after 4-6 days Watering health, until terminating during health.
Health is the grinding coagulation soil of the necessary process that cement concrete strength is formed, especially ultra-dry stiff, due to this Body moisture is few, if carrying out health well not in time, it will causes moisture loss, seriously affects the intensity hair of grinding coagulation soil Exhibition, therefore, keeps the skin wet during health, is the important measures for guaranteeing cement aquation.Grinding coagulation earth forming Fang Houli Later period health can be carried out, after rolling, health material is covered immediately, and it is wet to sprinkle water, in our preferred implementation Start in example, after 4-6 days every certain time watering health.Until defined conditioned time, generally 14 days.
Through the above scheme, the problem of field road concreting can be well solved, material can be saved, is drawn materials Simplicity, the concrete road surface poured out have very high service life.
A kind of concrete further includes middle sand 0.43-0.51m by 32.5 cement 300kg in terms of3, gravel 0.76-0.92m3、 Flyash 0.06-0.08m3
It preferably, further include middle sand 0.47m by 32.5 cement 300kg in terms of3, gravel 0.84m3, flyash 0.07m3
A kind of concrete road surface, by it includes cement 300kg be in terms of, including middle sand 0.43-0.51m3, gravel 0.76- 0.92m3, flyash 0.06-0.08m3
Preferably, by it includes cement 300kg be in terms of, further include middle sand 0.47m3, gravel 0.84m3, flyash 0.07m3
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or the terminal device that include a series of elements not only include those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or end The intrinsic element of end equipment.In the absence of more restrictions, being limited by sentence " including ... " or " including ... " Element, it is not excluded that there is also other elements in process, method, article or the terminal device for including the element.This Outside, herein, " being greater than ", " being less than ", " being more than " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand Being includes this number.
It should be understood by those skilled in the art that, the various embodiments described above can provide as method, apparatus or computer program production Product.Complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in these embodiments Form.The all or part of the steps in method that the various embodiments described above are related to can be instructed by program relevant hardware come It completes, the program can store in the storage medium that computer equipment can be read, for executing the various embodiments described above side All or part of the steps described in method.The computer equipment, including but not limited to: personal computer, server, general-purpose computations It is machine, special purpose computer, the network equipment, embedded device, programmable device, intelligent mobile terminal, smart home device, wearable Smart machine, vehicle intelligent equipment etc.;The storage medium, including but not limited to: RAM, ROM, magnetic disk, tape, CD, sudden strain of a muscle It deposits, USB flash disk, mobile hard disk, storage card, memory stick, webserver storage, network cloud storage etc..
The various embodiments described above are referring to the method according to embodiment, equipment (system) and computer program product Flowchart and/or the block diagram describes.It should be understood that can be realized by computer program instructions every in flowchart and/or the block diagram The combination of process and/or box in one process and/or box and flowchart and/or the block diagram.It can provide these computers Program instruction generates a machine to the processor of computer equipment, so that the finger executed by the processor of computer equipment It enables and generates to specify in one or more flows of the flowchart and/or one or more blocks of the block diagram The device of function.
These computer program instructions, which may also be stored in, to be able to guide computer equipment computer operate in a specific manner and sets In standby readable memory, so that the instruction being stored in the computer equipment readable memory generates the manufacture including command device Product, command device realization refer in one or more flows of the flowchart and/or one or more blocks of the block diagram Fixed function.
These computer program instructions can also be loaded into computer equipment, so that executing on a computing device a series of Operating procedure is to generate computer implemented processing, so that the instruction executed on a computing device is provided for realizing in process The step of function of being specified in figure one process or multiple processes and/or block diagrams one box or multiple boxes.
Although the various embodiments described above are described, once a person skilled in the art knows basic wounds The property made concept, then additional changes and modifications can be made to these embodiments, so the above description is only an embodiment of the present invention, It is not intended to limit scope of patent protection of the invention, it is all to utilize equivalent structure made by description of the invention and accompanying drawing content Or equivalent process transformation, being applied directly or indirectly in other relevant technical fields, similarly includes in patent of the invention Within protection scope.

Claims (3)

1. a kind of field concrete road surface process for constructing, which is characterized in that include the following steps, preparation of construction, ready-mixed concrete, Spread concrete rolls;
The preparation of construction includes step, removes soft base soil, flattening foot layer, the setting measurement control stake in base,
The ready-mixed concrete includes step, by cement 270-330kg, middle sand 0.43-0.51m3, gravel 0.76-0.92m3, powder Coal ash 0.06-0.08m3It is stirred, every tray concrete stirs 160-200s;
The spread concrete includes step, base is infiltrated, with land leveller spread concrete;
The step that rolls includes vibration first pressing 1-2 times, does not open vibration pressure 1-2 times again, then carries out final pressure using rubber-tyred roller;
Preparation of construction further includes step, changes and fills out field soft base, rockfills slag or gravel 35-45cm in dry land section, sedimentation is rolled before filling out Amount control is in 9-11cm;In paddy field, section is rockfilled slag or gravel 60-80cm, before filling out rolling settlement control in 18-22cm,
The coefficient 1.1-1.3 that paves, the compacted thickness 27-33cm of the spread concrete,
It is described roll step with 30m be one roll section, spreading speed 1.5-2m/min.
2. field concrete road surface according to claim 1 process for constructing, which is characterized in that further include seam construction step Suddenly, after grinding coagulation soil intensity reach design strength 70% or more after every 10m saw transverse contraction joint, slit width 1cm, deep 6cm are adopted With the pitch horseshoe rouge cementation of fissures.
3. field concrete road surface according to claim 2 process for constructing, which is characterized in that further include step, roll knot Shu Hou covers health material, and it is wet to sprinkle water, health of periodically sprinkling water after 4-6 days, until terminating during health.
CN201611108915.XA 2016-12-06 2016-12-06 A kind of field concrete road surface, process for constructing and concrete Expired - Fee Related CN106758649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611108915.XA CN106758649B (en) 2016-12-06 2016-12-06 A kind of field concrete road surface, process for constructing and concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611108915.XA CN106758649B (en) 2016-12-06 2016-12-06 A kind of field concrete road surface, process for constructing and concrete

Publications (2)

Publication Number Publication Date
CN106758649A CN106758649A (en) 2017-05-31
CN106758649B true CN106758649B (en) 2019-06-28

Family

ID=58879138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611108915.XA Expired - Fee Related CN106758649B (en) 2016-12-06 2016-12-06 A kind of field concrete road surface, process for constructing and concrete

Country Status (1)

Country Link
CN (1) CN106758649B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107805989A (en) * 2017-09-21 2018-03-16 中国电建集团华东勘测设计研究院有限公司 Temporary road rolling compacted concrete pavement reconstruction structure and its construction method
CN108677643B (en) * 2018-06-22 2023-03-17 杜宇 Roller compacted concrete composite pavement without cracks and expansion and contraction joints and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999889A (en) * 2006-12-30 2007-07-18 易志坚 Road surface structure of rolling flexiable fibre cement concrete and construction method thereof
CN101082199A (en) * 2007-07-05 2007-12-05 吴永芳 Road surface structure and construction method therefor
KR100924765B1 (en) * 2009-07-22 2009-11-05 (주) 지오시스 Road pavement composition of enhanced retentiveness and drainage, and constructing method using the composition
CN104446207A (en) * 2014-12-01 2015-03-25 中国电建集团贵阳勘测设计研究院有限公司 Fly ash concrete and mix proportion design method thereof
CN105776996A (en) * 2016-02-16 2016-07-20 河海大学 Ecological concrete with low manufacturing cost and preparing method of ecological concrete

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999889A (en) * 2006-12-30 2007-07-18 易志坚 Road surface structure of rolling flexiable fibre cement concrete and construction method thereof
CN101082199A (en) * 2007-07-05 2007-12-05 吴永芳 Road surface structure and construction method therefor
KR100924765B1 (en) * 2009-07-22 2009-11-05 (주) 지오시스 Road pavement composition of enhanced retentiveness and drainage, and constructing method using the composition
CN104446207A (en) * 2014-12-01 2015-03-25 中国电建集团贵阳勘测设计研究院有限公司 Fly ash concrete and mix proportion design method thereof
CN105776996A (en) * 2016-02-16 2016-07-20 河海大学 Ecological concrete with low manufacturing cost and preparing method of ecological concrete

Also Published As

Publication number Publication date
CN106758649A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN110130278B (en) Construction method of cemented dam
CN1315752C (en) High-strength water-permeable concrete floor brick and its production method
CN101293763B (en) Water permeable concrete and pavement construction method
CN108842557B (en) Temporary road pavement structure and road building method
CN104556887B (en) Cement stabilized base course material, prepare, apply and the preparation method of roadbase
CN109853310A (en) A kind of dredging silt industrial residue composite curing light soil and roadbed placement in layers construction method
CN105298133A (en) Construction method to strengthen crack resistance of large-volume concrete baseplate
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
CN106192907A (en) Set up the construction method of 150m~the 300m level high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN107032696A (en) A kind of big particle diameter regenerated coarse aggregate concrete wave resistance block and preparation method
CN106587835A (en) Cold-mixed cement-emulsified asphalt concrete and pavement method thereof
CN105439508A (en) Desulfurization ash-fly ash self-activated pavement base coarse material
CN106758649B (en) A kind of field concrete road surface, process for constructing and concrete
CN110482945A (en) A kind of Machine-made Sand regeneration concrete and preparation method thereof for high speed base course
CN207244376U (en) A kind of creepage concrete compression-resistance pavement structure
CN110054462A (en) A kind of premixing proportion of porous concrete mixture and preparation method thereof
CN113213883A (en) Reclaimed water stabilizing material prepared from waste earthwork and construction method thereof
CN101863638A (en) Calcium silicate slag reinforced asphalt mixture
CN104911971B (en) A kind of preparation method of artificial permeable volcanic rock ground pavement work stone
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN213115347U (en) Dampproof ground
CN114751708A (en) Phosphogypsum embankment filler, application thereof and preparation method of highway pavement base course
CN107032706A (en) A kind of sub-surface forming method for using drift-sand for raw material
CN111535323A (en) Full-section quasi-tertiary matching long-age roller compacted concrete construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Rao Songwang

Inventor after: Chen Yanhua

Inventor after: Shen Qi

Inventor after: Huang Dehua

Inventor after: Xu Zichang

Inventor after: Rao Qiuying

Inventor after: Rao Bin

Inventor before: Rao Songwang

Inventor before: Chen Yanhua

Inventor before: Shen Qi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180730

Address after: 350001 Kimcheon Road, Gulou District, Fuzhou, Fujian 38

Applicant after: Fujian land development and Consolidation Center

Applicant after: Fujian geological remote sensing and Geographic Information Service Center

Address before: 350001 Kimcheon Road, Gulou District, Fuzhou, Fujian 38

Applicant before: Fujian land development and Consolidation Center

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628