CN107805989A - Temporary road rolling compacted concrete pavement reconstruction structure and its construction method - Google Patents

Temporary road rolling compacted concrete pavement reconstruction structure and its construction method Download PDF

Info

Publication number
CN107805989A
CN107805989A CN201710861405.8A CN201710861405A CN107805989A CN 107805989 A CN107805989 A CN 107805989A CN 201710861405 A CN201710861405 A CN 201710861405A CN 107805989 A CN107805989 A CN 107805989A
Authority
CN
China
Prior art keywords
concrete
roadbed
rolling
temporary road
reconstruction structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710861405.8A
Other languages
Chinese (zh)
Inventor
王登银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201710861405.8A priority Critical patent/CN107805989A/en
Publication of CN107805989A publication Critical patent/CN107805989A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/4806Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with solely rollers for consolidating or finishing
    • E01C19/4813Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with solely rollers for consolidating or finishing the materials being simultaneously but separately applied binders and granular or pulverulent material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of temporary road rolling compacted concrete pavement reconstruction structure and its construction method.It is an object of the invention to provide a kind of temporary road rolling compacted concrete pavement reconstruction structure easy for construction, cost is relatively low, service time is shorter and its construction method.The technical scheme is that:A kind of temporary road rolling compacted concrete pavement reconstruction structure, it is characterised in that:Even out and filling-in compacting after roadbed on be provided with concrete flag, the concrete flag is formed by the grinding coagulation soil to pave on roadbed after rolling, and concrete flag surface saw has some transverse contraction joints, using the pitch horseshoe fat cementation of fissures in contracting seam;The grinding coagulation soil is formed by cement, water, GQ202 types retardation water reducing agent, sand, 5~20mm rubbles and 20~40mm rubble mixs.The present invention is applied to the engineerings such as temporary road Pavement Improvement.

Description

Temporary road rolling compacted concrete pavement reconstruction structure and its construction method
Technical field
The present invention relates to a kind of temporary road rolling compacted concrete pavement reconstruction structure and its construction method.Suitable for temporary road The engineerings such as road Pavement Improvement.
Background technology
The temporary road, rainy day ponding, miriness etc. that construction or personnel pass through is tacky, has a strong impact on current;In engineering Job site, above-mentioned condition of road surface security civilization image is poor, influences the overall looks of engineering.But conventional concreting into This height, complicated construction technique, service time length, it is not suitable as the temporary road at engineering construction scene.
The content of the invention
The technical problem to be solved in the present invention is:For above-mentioned problem, there is provided a kind of easy for construction, cost compared with The temporary road rolling compacted concrete pavement reconstruction structure low, service time is shorter and its construction method.
The technical solution adopted in the present invention is:A kind of temporary road rolling compacted concrete pavement reconstruction structure, its feature exist In:Even out and filling-in compacting after roadbed on be provided with concrete flag, the concrete flag is by paving on roadbed Grinding coagulation soil is formed after rolling, and concrete flag surface saw has some transverse contraction joints, and pitch horseshoe fat is used in contracting seam The cementation of fissures;
The grinding coagulation soil is broken by cement, water, GQ202 types retardation water reducing agent, sand, 5~20mm rubbles and 20~40mm Stone mix forms;
Wherein cement consumption is 277kg/m3
Weight ratio between cement, water, GQ202 types retardation water reducing agent, sand, 5~20mm rubbles and 20~40mm rubbles is Cement:Water:GQ202 type retardation water reducing agents:Sand:5~20mm rubbles:20~40mm rubble=1:0.30:0.015:2.60: 2.45:2.45.
The flatness of the roadbed is less than or equal to 10mm.
The grinding coagulation soil paving thickness is 30~35cm.
The transverse contraction joint is set every 10~15m, transverse contraction joint slit width 1cm, transverse contraction joint depth 6cm.
The concrete flag both sides are provided with gutter.
A kind of construction method of temporary road rolling compacted concrete pavement reconstruction structure, it is characterised in that:
A, preparation of construction;
A1, surveying and locating:Center line of road and sideline, the piecemeal line of road deck are released according to drawing, set up when being easy to construction The temporary bench mark of check;
A2, roadbed treatment:Smooth roadbed, makes grading degree be less than or equal to 10mm, and road bed is cleaned up and sprinkled water Moistening;The method of grading is evened out for eminence, and lower is using cement stabilized macadam or lean concrete filling-in and is compacted;
B, grinding coagulation soil is closed a position and paved, and paving thickness is 30~35cm;
C, roll:Using 10m as the construction section that paves, rolled after the completion of paving by vibrating roller, rolling speed 1.0 ~1.5km/h, vibrating roller are rolled against spreading direction from lower to being higher by, and form concrete flag;
D, concrete is cut:After concrete rolls, the concrete flag outside highway sideline is cut using hand-held cutting machine Remove;
E, conserve:Concrete is spaced after concrete road surface plate surface covering curing material, 4~6h in time after rolling end Certain time watering maintenance;
F, joint-cutting:Every 10~15m after the concrete strength of concrete flag reaches more than the 70% of design strength Transverse contraction joint is sawed, and uses the pitch horseshoe fat cementation of fissures.
Rapid c number of rolling is 5 times.
The beneficial effects of the invention are as follows:The present invention is simple in construction, easy for construction, cost is relatively low, is adapted to temporary concrete road The Pavement Improvement construction on road.
Brief description of the drawings
Fig. 1 is the profile of embodiment.
Embodiment
As shown in figure 1, a kind of temporary road rolling compacted concrete pavement reconstruction structure, through even out and filling-in compaction treatment after Roadbed 1 of the flatness no more than 10mm is provided with concrete flag 2, and the both sides of concrete flag 2 are provided with gutter 3.Wherein Concrete flag 2 is formed by the grinding coagulation soil to pave on roadbed 1 after rolling, and paving thickness is 30~35cm.Coagulation There is transverse contraction joint on the surface of dirt road panel 2 every 10~15m saws, contracting seam slit width 1cm, deep 6cm, contracts and is filled in stitching using pitch horseshoe fat Seam.
In the present embodiment the grinding coagulation soil of casting concrete road deck 2 by cement, water, GQ202 types retardation water reducing agent, Sand, 5~20mm rubbles and 20~40mm rubble mixs form, and wherein cement consumption is 277kg/m3, grinding coagulation soil each component Between weight ratio be cement:Water:GQ202 type retardation water reducing agents:Sand:5~20mm rubbles:20~40mm rubble=1:0.30: 0.015:2.60:2.45:2.45.
The concrete construction method of the present embodiment is as follows:
A, preparation of construction:Preparation of construction includes surveying and locating and roadbed treatment.
A1, surveying and locating:Center line of road and sideline are released according to drawing, the piecemeal line of road deck, set up temporary bench mark, Checked during to construct.
A2, roadbed treatment:In order to ensure concrete road surface normal use, it is desirable to which roadbed 1 has enough structural thicknesses, solid It is stable, uniformity.Such as roadbed 1 finds pit, loose disrepair phenomenon should carry out repairing makes its surfacing, and elevation, thickness Degree, vertical and horizontal gradient is consistent with design, and its error amount should be in allowed band.Roadbed is answered closely knit smooth, and flatness is not more than 10mm, Absolute altitude should be gone through, eminence (>It should 10mm) even out, lower (>10mm) using cement stabilized macadam or the filling-in of lean concrete 4 simultaneously Compacting.The surface of roadbed 1 is cleaned up, and in order to prevent absorbing the moisture in grinding coagulation soil, roadbed 1 should be sprinkled water before paving Wetting.
B, grinding coagulation soil is closed a position and paved:Transport to job site and closed a position after each component mix of grinding coagulation soil And pave.
To ensure the mixing quality of concrete mix, construction is stirred using the forced action type with computer automatic control system Mixing equipment is mixed and stirred;Because C30 graduation two concrete water amounts are few, it is longer to mix and stir for 6 times, determines to mix and stir by trial mix during construction Control time, generally often disk 180s or so.The transport of concrete preferably uses dump truck, in order to reduce transportation reclaimed water Denseness is lost caused by dividing evaporation, and wagon box planted agent keeps moistening, and transportation range should be advisable with the accessible distances of 30min, simultaneously Take necessary covering methods.
Automobile storehouse face discharging using moving back laid process discharging successively, free fall cannot be greater than 1.5m during discharging, and windrow is high Degree requires to be less than 80cm, and to reduce aggregate separated, dumper is transported to the direct discharging of position in storehouse and put in storage, and should try one's best during warehouse entry guarantee wheel It is clean, prevent secondary pollution, and there are special personnel to carry out commander's discharging;Closed a position using the MG185 machines of closing a position, if finding There is local aggregate to concentrate, make all to remove depending on its concrete condition or artificial paving is spilt fine aggregate and handled.Paving thickness be 30~ 35cm, and maintaining item band front portion is lower slightly, to reduce automobile discharging drop, reaches the purpose for reducing aggregate separated, after storehouse face is closed a position It is required that accomplish it is substantially smooth, without notable hollow.
C, roll:Field control after the completion of paving, is rolled using 10m as the construction section that paves by 20t vibrating rollers, Paving thickness and number of rolling are adjusted according to actual conditions, is notified mixing building to adjust VC values in time according to the situation of rolling.Roll secondary Number generally 5 times, is first low frequency, rear high frequency, rolling speed is 1.0~1.5km/h.Vibrating roller is against spreading direction from lower to height Place is rolled, and each position rolling layer is identical, does not leak pressure, and road width both sides suitably increase number of rolling, and number of rolling is generally 5 Time.Must at the uniform velocity be kept straight on when rolling, must not speed change or parking, meet special circumstances when must stop, move backward, the first failure of oscillation of palpus.Applying Workshop section's termination 4~5m scopes, road roller laterally roll along road surface horizontal slope is appropriate from low to high, slumping crack occur to prevent junction Or loose phenomenon.
D, concrete is cut:After concrete rolls, any excess concrete beyond highway sideline must be cut away, with the row of guarantee The design structure sideline in ditch 3 is not destroyed.After the completion for the treatment of that concrete rolls, two sidelines of pavement concrete are drawn, and are marked Chu is remembered, is cut away concrete unnecessary outside the scope of road surface along by two sidelines using hand-held cutting machine.
E, conserve:Concrete rolls terminate after answer timely covering curing material (gunnysack of wetting, straw mat etc.), after 4~6h Separated in time watering maintenance, can open to traffic after conserving three days.
F, joint-cutting:After grinding coagulation soil intensity reaches more than the 70% of design strength laterally contracting is sawed every 10m~15m Seam, slit width 1cm, deep 6cm, and use the pitch horseshoe fat cementation of fissures.

Claims (7)

  1. A kind of 1. temporary road rolling compacted concrete pavement plate reconstruction structure, it is characterised in that:Even out and filling-in compacting after road Base (1) is provided with concrete flag (2), and the concrete flag is by the grinding coagulation soil that paves on roadbed (1) through rolling After formed, concrete flag (2) surface saw has some transverse contraction joints, and the pitch horseshoe fat cementation of fissures is used in contracting seam;
    The grinding coagulation soil is mixed by cement, water, GQ202 types retardation water reducing agent, sand, 5~20mm rubbles and 20~40mm rubbles Conjunction forms;
    Wherein cement consumption is 277kg/m3
    Weight ratio between cement, water, GQ202 types retardation water reducing agent, sand, 5~20mm rubbles and 20~40mm rubbles is cement: Water:GQ202 type retardation water reducing agents:Sand:5~20mm rubbles:20~40mm rubble=1:0.30:0.015:2.60:2.45: 2.45。
  2. 2. temporary road rolling compacted concrete pavement plate reconstruction structure according to claim 1, it is characterised in that:The roadbed (1) flatness is less than or equal to 10mm.
  3. 3. temporary road rolling compacted concrete pavement plate reconstruction structure according to claim 1, it is characterised in that:It is described to roll Concrete speading thickness is 30~35cm.
  4. 4. temporary road rolling compacted concrete pavement plate reconstruction structure according to claim 1, it is characterised in that:The transverse direction Contracting seam is set every 10~15m, transverse contraction joint slit width 1cm, transverse contraction joint depth 6cm.
  5. 5. temporary road rolling compacted concrete pavement plate reconstruction structure according to claim 1, it is characterised in that:The coagulation Dirt road panel (2) both sides are provided with gutter (3).
  6. 6. the construction method of temporary road rolling compacted concrete pavement plate reconstruction structure described in a kind of Claims 1 to 5 any one, It is characterized in that:
    A, preparation of construction;
    A1, surveying and locating:Center line of road and sideline, the piecemeal line of road deck are released according to drawing, sets up and is easy to check during construction Temporary bench mark;
    A2, roadbed (1) processing:Smooth roadbed (1), makes roadbed (1) flatness be less than or equal to 10mm, and roadbed (1) surface cleans dry Net and moistening of sprinkling water;The smooth method of roadbed (1) is evened out for eminence, and lower is mended using cement stabilized macadam or lean concrete (4) Put down and be compacted;
    B, grinding coagulation soil is closed a position and paved, and paving thickness is 30~35cm;
    C, roll:Using 10m as the construction section that paves, rolled after the completion of paving by vibrating roller, rolling speed be 1.0~ 1.5km/h, vibrating roller are rolled against spreading direction from lower to being higher by, and form concrete flag (2);
    D, concrete is cut:After concrete rolls, the concrete flag (2) outside highway sideline is cut using hand-held cutting machine Remove;
    E, conserve:Concrete is spaced after concrete flag (2) surface covering curing material, 4~6h in time after rolling end Certain time watering maintenance;
    F, joint-cutting:Sawed after the concrete strength of concrete flag (2) reaches more than the 70% of design strength every 10~15m Transverse contraction joint, and use the pitch horseshoe fat cementation of fissures.
  7. 7. according to the method for claim 6, it is characterised in that:Step c number of rolling is 5 times.
CN201710861405.8A 2017-09-21 2017-09-21 Temporary road rolling compacted concrete pavement reconstruction structure and its construction method Pending CN107805989A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710861405.8A CN107805989A (en) 2017-09-21 2017-09-21 Temporary road rolling compacted concrete pavement reconstruction structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710861405.8A CN107805989A (en) 2017-09-21 2017-09-21 Temporary road rolling compacted concrete pavement reconstruction structure and its construction method

Publications (1)

Publication Number Publication Date
CN107805989A true CN107805989A (en) 2018-03-16

Family

ID=61584452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710861405.8A Pending CN107805989A (en) 2017-09-21 2017-09-21 Temporary road rolling compacted concrete pavement reconstruction structure and its construction method

Country Status (1)

Country Link
CN (1) CN107805989A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677643A (en) * 2018-06-22 2018-10-19 杜宇 A kind of grinding coagulation soil composite pavement and preparation method thereof for not cracking, being not required to setting expansion or contraction joints
CN108978391A (en) * 2018-06-13 2018-12-11 中国水利水电第九工程局有限公司 A kind of concrete pavement construction method
CN108978390A (en) * 2018-06-13 2018-12-11 中国水利水电第九工程局有限公司 A kind of pavement construction method on the road Tong Cun
CN113529531A (en) * 2021-07-26 2021-10-22 中电建十一局工程有限公司 Rolling type dry and hard lean concrete temporary road construction method
CN113718583A (en) * 2021-07-23 2021-11-30 中铁十局集团第三建设有限公司 Novel temporary road construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202688817U (en) * 2012-08-05 2013-01-23 江苏建筑职业技术学院 Roller compaction rubber concrete road structure
CN203684027U (en) * 2013-12-24 2014-07-02 深圳市建工集团股份有限公司 Prefabricated assembled temporary road for building operations
CN203700898U (en) * 2013-11-12 2014-07-09 中建三局建设工程股份有限公司 Assembled road device
CN204212023U (en) * 2014-11-04 2015-03-18 中建四局第三建筑工程有限公司 A kind of spliced steel concrete temporary pavement
CN106758649A (en) * 2016-12-06 2017-05-31 福建省土地开发整理中心 A kind of field concrete road surface, process for constructing and concrete

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202688817U (en) * 2012-08-05 2013-01-23 江苏建筑职业技术学院 Roller compaction rubber concrete road structure
CN203700898U (en) * 2013-11-12 2014-07-09 中建三局建设工程股份有限公司 Assembled road device
CN203684027U (en) * 2013-12-24 2014-07-02 深圳市建工集团股份有限公司 Prefabricated assembled temporary road for building operations
CN204212023U (en) * 2014-11-04 2015-03-18 中建四局第三建筑工程有限公司 A kind of spliced steel concrete temporary pavement
CN106758649A (en) * 2016-12-06 2017-05-31 福建省土地开发整理中心 A kind of field concrete road surface, process for constructing and concrete

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978391A (en) * 2018-06-13 2018-12-11 中国水利水电第九工程局有限公司 A kind of concrete pavement construction method
CN108978390A (en) * 2018-06-13 2018-12-11 中国水利水电第九工程局有限公司 A kind of pavement construction method on the road Tong Cun
CN108677643A (en) * 2018-06-22 2018-10-19 杜宇 A kind of grinding coagulation soil composite pavement and preparation method thereof for not cracking, being not required to setting expansion or contraction joints
CN113718583A (en) * 2021-07-23 2021-11-30 中铁十局集团第三建设有限公司 Novel temporary road construction process
CN113529531A (en) * 2021-07-26 2021-10-22 中电建十一局工程有限公司 Rolling type dry and hard lean concrete temporary road construction method

Similar Documents

Publication Publication Date Title
CN107805989A (en) Temporary road rolling compacted concrete pavement reconstruction structure and its construction method
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN110258236A (en) A kind of high-performance steel slag road surface and its construction method
CN107338686A (en) A kind of Subgrade Filled Soil in High Speed Railway construction method
CN104831598A (en) Construction method for reconstruction of old cement pavement into asphalt concrete pavement
WO2023020630A1 (en) Construction method for upper surface course made of steel slag-asphalt mixture
CN109680586A (en) A kind of pavement asphalt laying method
CN108570897A (en) A kind of paving method of pavement of road base
CN110273337A (en) Asphalt roads construction method
CN107386111B (en) Composite high-modulus asphalt concrete bridge deck structure and setting method
CN211472012U (en) Signal lamp crossing filling type composite pavement
CN102635047B (en) Large-span bridge deck composite structure layer construction technology
CN107447617A (en) A kind of dust-proof curing process of temporary construction road
CN111827033A (en) Construction method for widening and filling solidified soil of expressway intercommunicating ramp roadbed
CN111719371A (en) Road base layer component and road paving method
CN114908630A (en) Factory road structure and secondary permanent-temporary combined layered construction method
CN110273340B (en) Construction method of municipal road
CN211171471U (en) High-performance steel slag pavement
CN114016430A (en) Asphalt concrete bridge deck pavement method
CN107675685A (en) Asphaltic concrete core wall pours roller compaction construction method in water retaining structure
CN211446437U (en) Hot recycled asphalt road structure of plantmix
CN111455766B (en) Regenerated asphalt concrete structure for road and construction process thereof
CN111576125B (en) Construction method for transverse automatic feeding base layer
CN108951372B (en) Construction method for paving supporting layer of roadbed of ballastless track of high-speed railway
CN117107577A (en) Plant-mixing construction process of cement stabilized sand-doped laterite granules

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316