CN113431057A - Loess slope ecological protection method - Google Patents

Loess slope ecological protection method Download PDF

Info

Publication number
CN113431057A
CN113431057A CN202110500863.5A CN202110500863A CN113431057A CN 113431057 A CN113431057 A CN 113431057A CN 202110500863 A CN202110500863 A CN 202110500863A CN 113431057 A CN113431057 A CN 113431057A
Authority
CN
China
Prior art keywords
planting
loess
pits
slope
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110500863.5A
Other languages
Chinese (zh)
Inventor
张云周
张晓军
宁蕾
杨华强
柴尚云
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Hengtong Road And Bridge Engineering Co ltd
Original Assignee
Gansu Hengtong Road And Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Hengtong Road And Bridge Engineering Co ltd filed Critical Gansu Hengtong Road And Bridge Engineering Co ltd
Priority to CN202110500863.5A priority Critical patent/CN113431057A/en
Publication of CN113431057A publication Critical patent/CN113431057A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental Sciences (AREA)
  • Botany (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a loess slope ecological protection method, in particular to the technical field of loess slope ecological protection methods, which comprises the following steps: firstly, drilling a pit on a loess slope and pouring a positioning pit; secondly, reclaiming planting pits on the positioning pits, wherein the planting pits are reclaimed on the loess slope from top to bottom, the transverse distance between every two adjacent planting pits is set to be 1m, and the longitudinal depth of each planting pit is set to be 60 cm; and step three, pouring cement and paving backfill at the bottom of the planting pit. According to the invention, the gauze is laid on the loess slope, the filter screen is installed in the planting pit, and the cement is sprayed and poured, so that the loess slope can be prevented from being directly washed by rainwater, the rainwater can be blocked, the impact force of the rainwater is gradually buffered, the impact force of the rainwater is reduced, the washing of the loess slope by the rainwater can be effectively reduced, the protection strength of the loess slope is improved, and the irretrievable water and soil loss condition of the loess slope caused by the impact force of the rainwater is avoided.

Description

Loess slope ecological protection method
Technical Field
The invention relates to the technical field of loess slope ecological protection methods, in particular to a loess slope ecological protection method.
Background
Landslide and slumping are the main modes of sand production by neutral erosion in loess. The yellow river silt is input into the loess plateau for 16t each year, so that the lower reaches of the yellow river become a famous ground hanging river. In addition, the landslide also provides a large amount of material sources for the occurrence of debris flow which is another natural disaster in the mountainous area. Therefore, it is important to fully recognize the characteristics of the loess slope and perform stability analysis on the loess slope.
Loess is a quaternary sediment, develops a vertical joint and has strong structurality; the reinforcing cohesion of the cementitious substance is a major component of its strength. Under the influence of drought, loess slopes with low natural water content, high strength and high steepness are very common. Due to the poor water resistance of the cementitious material between the loess particles. The increase of the water content of the land weakens the effect of strengthening cohesion, and the strength of the loess is reduced, and even a plurality of engineering damages occur. Loess valley highland limit topography is precipitous, and is more than 30, and valley depth of cut is often tens meters, and the slope foot of loess valley is because of being corroded by the rivers in addition, and the bank forms scarp slope, poor stability. These properties of loess lithology and topography determine the characteristics of the loess slope: firstly, the method comprises the following steps: the manually excavated side slope is high and steep, the vegetation condition is poor, the side slope is often severely washed by rainwater, and the waistcoat is influenced by rainwater infiltration; II, secondly: under the washing of surface runoff, the loess slope is mostly provided with gullies, caves and the like; thirdly, the method comprises the following steps: cracks in the soil layer develop, so that the integral strength of the loess side slope is poor; fourthly, the method comprises the following steps: the loess slope is easy to peel off along with the change of natural conditions; fifthly: the loess landslide has large scale and kinetic energy, strong destructive power and heavy disaster loss.
The existing treatment method for the high and steep loess slope mainly adopts stabilized loess slope such as anti-slide piles, anchor cables, slope cutting and the like to form a comprehensive slope protection system consisting of engineering so as to realize the purposes of slope fixation and slope protection, but the anti-mud flow effect is insufficient, the use function is simple, and the functions of rainwater diversion and greening planting and installation are lacked. Therefore, a loess slope ecological protection method is urgently needed to be found, so that some natural and historical landscapes can be reserved for a long time.
Disclosure of Invention
Therefore, the loess slope ecological protection method provided by the invention can prevent rainwater from directly scouring the loess slope, can obstruct the rainwater and gradually buffer the impact force of the rainwater by paving the gauze on the loess slope, installing the filter screen in the planting pit and spraying and pouring cement, so that the impact force of the rainwater is reduced, the scouring of the rainwater on the loess slope can be effectively reduced, the protection strength on the loess slope is improved, and the irretrievable water and soil loss condition of the loess slope caused by the impact force of the rainwater is avoided.
A loess slope ecological protection method comprises the following steps:
drilling a pit on a loess slope and pouring a positioning pit, wherein the diameter of the positioning pit is set to be 40cm, and the diameter depth of the positioning hole is set to be 6 m;
secondly, reclaiming the planting pits on the positioning pits, reclaiming the planting pits on the loess slope from top to bottom, setting the transverse spacing between adjacent planting pits to be 1m, setting the vertical spacing between adjacent planting pits to be 1m, setting the longitudinal depth of each planting pit to be 60cm, setting the diameter of each planting pit to be 60cm, and then installing the filter screen on the inner wall of each planting pit through an anchor bolt to stabilize the planting pits;
thirdly, pouring cement and paving backfill soil at the bottom of the planting pit;
planting grass and spreading fertilizer on the backfill soil;
laying a gauze on the loess slope surface, and forming an opening which is generally large than the planting pit on the gauze, wherein the diameter of the opening is set to be 60 cm;
and sixthly, spraying covering cement on the gauze.
Further, at first clear up the loess side slope in step one, later carry out the drilling location of vertical direction to the loess side slope through full bushing drill, bore and establish the positioning hole, and bore again between adjacent positioning hole and establish a slope setting and carry out the connecting channel who connects, then pour into cement through the slip casting machine toward positioning hole and connecting channel in, make the concrete connection in the positioning hole be a whole.
Furthermore, in the second step, planting green plants are planted by digging planting pits at the top ends of the positioning pits through a spiral earth boring machine, and the planting pits are reclaimed on loess slopes in rows from top to bottom.
Further, grouting the bottom of the planting pit through a grouting machine in the third step, and then paving a layer of 25-40cm planting soil at the bottom of the inner cavity of the planting pit, wherein the planting soil comprises 20-40% of loam, 80-60% of animal excrement and plant ash.
Furthermore, one or more grass seeds of ryegrass, bluegrass, chaste tree twigs, caragana microphylla, silktree albizzia, bermuda grass, trifolium repens and festuca arundinacea can be planted in the planting soil in the fourth step, then the filter screen plate is installed and fixed through the anchor bolt at the opening at the top of the planting pit, and then the grass planting fertilizer and the irrigation in the planting soil are carried out for 20-25 days manually and periodically.
Further, lay the gauze on the loess side slope through the manual work in step five to cut out on the gauze and plant the opening that the hole is generally big, the opening diameter sets up to 60cm, so that the user plants in planting the hole, then bore the crab-bolt inside to the loess side slope, thereby fix the gauze.
Further, in the sixth step, mortar is sprayed on the top of the gauze by a mortar sand blasting machine, the mortar is made to form a transverse and longitudinal grid shape, and the planting pits are surrounded inside the grid.
The invention has the technical effects and advantages that:
1. according to the invention, the gauze is laid on the loess slope, the filter screen is installed in the planting pit, and the cement is sprayed and poured, so that the loess slope can be prevented from being directly washed away by rainwater, the rainwater can be blocked, the impact force of the rainwater is gradually buffered, the impact force of the rainwater is reduced, the washing of the loess slope by the rainwater can be effectively reduced, the protection strength of the loess slope is improved, and the condition that the loess slope is subjected to irretrievable water and soil loss caused by the impact force of the rainwater is avoided;
2. according to the method, the planting pits are dug in the loess side slope to collect rainwater, so that the rainwater is prevented from directly carrying away soil erosion on the loess side slope, the rainwater is collected in the planting pits and stored, planting soil is laid in the planting pits to cultivate and grow slope protection grass, the soil fertility of the loess side slope is enhanced by the growth of the grass, the tensile strength of the loess side slope is improved, and water and soil loss of the loess side slope is avoided.
Drawings
FIG. 1 is a schematic view of the present invention showing the location wells, planting wells and connecting channels.
Detailed Description
The present invention is described in terms of particular embodiments, other advantages and features of the invention will become apparent to those skilled in the art from the following disclosure, and it is to be understood that the described embodiments are merely exemplary of the invention and that it is not intended to limit the invention to the particular embodiments disclosed. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
the invention provides a loess slope ecological protection method, which comprises the following steps:
drilling pits on the loess slope to fill positioning pits, setting the diameter of each positioning pit to be 40cm, setting the diameter depth of each positioning hole to be 6m, drilling and positioning the loess slope in the vertical direction through a full casing pipe drilling machine, drilling the positioning pits, drilling a connecting channel which is obliquely arranged and connected between every two adjacent positioning pits, and then filling cement into the positioning pits and the connecting channel through a grouting machine to enable the positioning pits to be connected into a whole, so that the stability between the positioning pits is kept;
secondly, reclaiming the planting pits on the positioning pits, reclaiming the planting pits on the loess slope from top to bottom, setting the transverse spacing between the adjacent planting pits to be 1m, setting the vertical spacing between the adjacent planting pits to be 1m, setting the longitudinal depth of the planting pits to be 60cm, setting the diameter of the planting pits to be 60cm, mounting a filter screen on the inner wall of the planting pits through anchor bolts, stabilizing the planting pits, digging a planting pit larger than the positioning pit outside the top end of the positioning pit through a spiral pit digging machine for planting green plants, reclaiming the planting pits on the loess slope from top to bottom in rows, storing rainwater through digging of the planting pits, and creating suitable conditions and spaces for the growth and development of subsequent vegetation;
thirdly, cement is poured and backfill soil is laid at the bottom of the planting pit, the bottom of the planting pit is grouted through a grouting machine, when an external water source is stored in the planting pit, the water source penetrates into the loess side slope through the bottom of the planting pit, the soil layer structure in the loess side slope is broken, then a layer of 25cm planting soil is laid at the bottom of the inner cavity of the planting pit, and the planting soil comprises 20% of loam and 80% of animal excrement;
planting grass plants and sowing fertilizers on the backfilled soil, planting white clover seeds, wherein the grass plants have the advantages of high growth speed and developed root systems, can prevent water and soil loss, conserve water sources, enhance soil fertility, fix soil, protect slope, well protect ecological environment, and then manually and periodically fertilizing and irrigating the grass plants in the planting soil for 20 days;
laying a gauze on the slope surface of the loess slope, forming an opening with the diameter of 60cm, manually laying the gauze on the loess slope, cutting the opening with the diameter of 60cm, so that a user can plant in the planting pit, and drilling an anchor bolt into the loess slope, thereby fixing the gauze, and fixing the soil on the loess slope through the arrangement of the gauze, so as to avoid the soil loss along with the erosion of rainwater;
and sixthly, spraying covering cement on the gauze, spraying mortar on the top of the gauze through a mortar sand blasting machine, enabling the mortar to form a transverse and longitudinal grid shape, surrounding the planting pits in the grid, fixing the loess slope through the mortar in the gauze, and avoiding loss of the loess slope along with the erosion of rainwater.
Example 2:
the invention provides a loess slope ecological protection method, which comprises the following steps:
drilling pits on the loess slope to fill positioning pits, setting the diameter of each positioning pit to be 40cm, setting the diameter depth of each positioning hole to be 6m, drilling and positioning the loess slope in the vertical direction through a full casing pipe drilling machine, drilling the positioning pits, drilling a connecting channel which is obliquely arranged and connected between every two adjacent positioning pits, and then filling cement into the positioning pits and the connecting channel through a grouting machine to enable the positioning pits to be connected into a whole, so that the stability between the positioning pits is kept;
secondly, reclaiming the planting pits on the positioning pits, reclaiming the planting pits on the loess slope from top to bottom, setting the transverse spacing between the adjacent planting pits to be 1m, setting the vertical spacing between the adjacent planting pits to be 1m, setting the longitudinal depth of the planting pits to be 60cm, setting the diameter of the planting pits to be 60cm, mounting a filter screen on the inner wall of the planting pits through anchor bolts, stabilizing the planting pits, digging a planting pit larger than the positioning pit outside the top end of the positioning pit through a spiral pit digging machine for planting green plants, reclaiming the planting pits on the loess slope from top to bottom in rows, storing rainwater through digging of the planting pits, and creating suitable conditions and spaces for the growth and development of subsequent vegetation;
thirdly, cement is poured and backfilled soil is laid at the bottom of the planting pit, the bottom of the planting pit is grouted through a grouting machine, when an external water source is stored in the planting pit, the water source penetrates into the loess side slope through the bottom of the planting pit, the soil layer structure in the loess side slope is broken, then a layer of 30cm planting soil is laid at the bottom of the inner cavity of the planting pit, and the planting soil comprises 30% of loam and 70% of animal excrement;
planting grass plants and sowing fertilizers on the backfilled soil, planting bermudagrass grass seeds, wherein the grass plants have the advantages of high growth speed and developed root systems, can prevent water and soil loss, conserve water sources, enhance soil fertility, fix soil, protect slope, well protect ecological environment, and then manually and periodically fertilizing and irrigating the grass plants in the planting soil for 25 days;
laying a gauze on the slope surface of the loess slope, forming an opening with the diameter of 60cm, manually laying the gauze on the loess slope, cutting the opening with the diameter of 60cm, so that a user can plant in the planting pit, and drilling an anchor bolt into the loess slope, thereby fixing the gauze, and fixing the soil on the loess slope through the arrangement of the gauze, so as to avoid the soil loss along with the erosion of rainwater;
and sixthly, spraying covering cement on the gauze, spraying mortar on the top of the gauze through a mortar sand blasting machine, enabling the mortar to form a transverse and longitudinal grid shape, surrounding the planting pits in the grid, fixing the loess slope through the mortar in the gauze, and avoiding loss of the loess slope along with the erosion of rainwater.
Example 3:
the invention provides a loess slope ecological protection method, which comprises the following steps:
drilling pits on the loess slope to fill positioning pits, setting the diameter of each positioning pit to be 40cm, setting the diameter depth of each positioning hole to be 6m, drilling and positioning the loess slope in the vertical direction through a full casing pipe drilling machine, drilling the positioning pits, drilling a connecting channel which is obliquely arranged and connected between every two adjacent positioning pits, and then filling cement into the positioning pits and the connecting channel through a grouting machine to enable the positioning pits to be connected into a whole, so that the stability between the positioning pits is kept;
secondly, reclaiming the planting pits on the positioning pits, reclaiming the planting pits on the loess slope from top to bottom, setting the transverse spacing between the adjacent planting pits to be 1m, setting the vertical spacing between the adjacent planting pits to be 1m, setting the longitudinal depth of the planting pits to be 60cm, setting the diameter of the planting pits to be 60cm, mounting a filter screen on the inner wall of the planting pits through anchor bolts, stabilizing the planting pits, digging a planting pit larger than the positioning pit outside the top end of the positioning pit through a spiral pit digging machine for planting green plants, reclaiming the planting pits on the loess slope from top to bottom in rows, storing rainwater through digging of the planting pits, and creating suitable conditions and spaces for the growth and development of subsequent vegetation;
thirdly, cement is poured and backfilled soil is laid at the bottom of the planting pit, the bottom of the planting pit is grouted through a grouting machine, when an external water source is stored in the planting pit, the water source penetrates into the loess side slope through the bottom of the planting pit, the soil layer structure in the loess side slope is broken, then a layer of 40cm planting soil is laid at the bottom of the inner cavity of the planting pit, and the planting soil comprises 40% of loam and 60% of animal excrement;
planting grass plants and sowing fertilizers on the backfilled soil, planting chaste tree grass seeds, wherein the grass plants have the advantages of high growth speed and developed root systems, can prevent water and soil loss, conserve water sources, enhance soil fertility, fix soil and protect slope, can well protect ecological environment, and then manually and periodically fertilizing and irrigating the grass plants in the planting soil for 20 days;
laying a gauze on the slope surface of the loess slope, forming an opening with the diameter of 60cm, manually laying the gauze on the loess slope, cutting the opening with the diameter of 60cm, so that a user can plant in the planting pit, and drilling an anchor bolt into the loess slope, thereby fixing the gauze, and fixing the soil on the loess slope through the arrangement of the gauze, so as to avoid the soil loss along with the erosion of rainwater;
and sixthly, spraying covering cement on the gauze, spraying mortar on the top of the gauze through a mortar sand blasting machine, enabling the mortar to form a transverse and longitudinal grid shape, surrounding the planting pits in the grid, and fixing the loess slope through the quota sum of the mortar on the gauze to avoid loss along with the erosion of rainwater.
Example 4:
the loess side slopes protected by the embodiments 1-3 are respectively taken, the length and the width are set to be 20m and divided into a region, three regions are selected as analysis objects in total, the slopes which are not protected and have the same specification are selected as a comparison example, the soil thickness and the slope stability of the loess side slopes are observed and recorded, then the soil thickness and the slope stability of the loess side slopes in 4 regions after being washed by rainwater in the same field are respectively observed, the soil thickness is measured by vertically installing a measuring rod in each region and inserting the measuring rod into the loess side slopes by 40cm, then the soil thickness in each region is measured after the same rain, and the stability of the side slopes is calculated by a simple distribution method, so that the following data can be obtained from the measured internal friction angle, cohesive force, slope angle and volume weight:
Figure BDA0003056185170000071
Figure BDA0003056185170000081
as can be seen from the above table, the stability coefficients measured in examples 1-3 and comparative example are all in the range of 1.05-1.15, which indicates that the slopes in the three examples are stable, and that examples 1-3 can protect the loess slope, and the data in the comparative example exceed the range of 1.05-1.15, which indicates that the slope is poor in stability, so the comparative example has poor protection effect on the loess slope, and it can be seen from the buried depth of the measuring rod tip that the values of the buried depth of the measuring rod tip in examples 1, 2 and 3 are all greater than the buried depth of the measuring rod tip in the comparative example, which indicates that the regions of examples 1, 2 and 3 have less water and soil loss and the comparative example has more water and soil loss, in addition, in the three embodiments, the stability coefficient value in embodiment 2 is the smallest, which indicates that the slope stability in this embodiment is the highest, and the buried depth value of the tip of the measuring rod in embodiment 2 is the largest, which indicates that the soil erosion situation in this embodiment is less, so that it can be seen that the scheme in embodiment 2 is most suitable for the loess slope.
Although the invention has been described in detail above with reference to a general description and specific examples, it will be apparent to one skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (7)

1. A loess slope ecological protection method is characterized in that: the method comprises the following steps:
drilling a pit on a loess slope and pouring a positioning pit, wherein the diameter of the positioning pit is set to be 40cm, and the diameter depth of the positioning hole is set to be 6 m;
secondly, reclaiming the planting pits on the positioning pits, reclaiming the planting pits on the loess slope from top to bottom, setting the transverse spacing between adjacent planting pits to be 1m, setting the vertical spacing between adjacent planting pits to be 1m, setting the longitudinal depth of each planting pit to be 60cm, setting the diameter of each planting pit to be 60cm, and then installing the filter screen on the inner wall of each planting pit through an anchor bolt to stabilize the planting pits;
thirdly, pouring cement and paving backfill soil at the bottom of the planting pit;
planting grass and spreading fertilizer on the backfill soil;
laying a gauze on the loess slope surface, and forming an opening which is generally large than the planting pit on the gauze, wherein the diameter of the opening is set to be 60 cm;
and sixthly, spraying covering cement on the gauze.
2. The ecological protection method of loess slope according to claim 1, wherein: in the first step, the loess side slope is firstly cleaned, then the loess side slope is drilled and positioned in the vertical direction through the full casing pipe drilling machine, the positioning pits are drilled, a connecting channel which is obliquely arranged and connected is drilled between the adjacent positioning pits, and then cement is poured into the positioning pits and the connecting channel through the grouting machine, so that the concrete in the positioning pits is connected into a whole.
3. The ecological protection method of loess slope according to claim 1, wherein: and in the second step, planting green plants are planted by excavating planting pits at the top ends of the positioning pits through the spiral earth boring machine, and the planting pits are reclaimed on the loess slope from top to bottom in rows.
4. The ecological protection method of loess slope according to claim 1, wherein: grouting the bottom of the planting pit through a grouting machine in the third step, and then paving a layer of 25-40cm planting soil at the bottom of the inner cavity of the planting pit, wherein the planting soil comprises 20-40% of loam and 80-60% of animal manure or plant ash.
5. The ecological protection method of loess slope according to claim 1, wherein: in the fourth step, one or more grass seeds of ryegrass, bluegrass, chaste tree twig, caragana microphylla, silktree albizzia, bermuda grass, white clover and tall fescue can be planted in the planting soil, then the filter screen plate is installed and fixed through the anchor bolt at the opening at the top of the planting pit, and then the grass in the planting soil is artificially and periodically fertilized and irrigated for 20-25 days.
6. The ecological protection method of loess slope according to claim 1, wherein: lay the gauze on the loess side slope through the manual work in step five to cut out on the gauze and plant the general big opening in hole, the opening diameter sets up to 60cm, so that the user plants in planting the hole, then with the crab-bolt bore to loess side slope inside, thereby fix the gauze.
7. The ecological protection method of loess slope according to claim 1, wherein: and sixthly, spraying mortar on the top of the gauze by using a mortar sand blasting machine, forming the mortar into a transverse and longitudinal grid shape, and surrounding the planting pits in the grid.
CN202110500863.5A 2021-05-08 2021-05-08 Loess slope ecological protection method Pending CN113431057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110500863.5A CN113431057A (en) 2021-05-08 2021-05-08 Loess slope ecological protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110500863.5A CN113431057A (en) 2021-05-08 2021-05-08 Loess slope ecological protection method

Publications (1)

Publication Number Publication Date
CN113431057A true CN113431057A (en) 2021-09-24

Family

ID=77753041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110500863.5A Pending CN113431057A (en) 2021-05-08 2021-05-08 Loess slope ecological protection method

Country Status (1)

Country Link
CN (1) CN113431057A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302667A (en) * 1996-05-16 1997-11-25 Soil & Lock Eng Kk Slope face construction method and slope face structure of natural ecology self-restoration type
CN105113518A (en) * 2015-08-20 2015-12-02 三峡大学 Construction method for ecological slope protecting base material by arranging slot pits in slope surface
CN106498952A (en) * 2016-11-18 2017-03-15 中国电建集团成都勘测设计研究院有限公司 The high steep spray in arid area mixes slope ecological protective slope structure
CN110374054A (en) * 2019-07-23 2019-10-25 重庆大学 A kind of ecological slope protection consolidates soil structure and method
CN111809565A (en) * 2020-06-18 2020-10-23 上海河道建设有限公司 Ecological bank protection of hydraulic engineering
CN212612526U (en) * 2020-01-02 2021-02-26 新昌县沃意科技有限公司 Be used for steep slope grid beam to plant grass supporting construction in

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302667A (en) * 1996-05-16 1997-11-25 Soil & Lock Eng Kk Slope face construction method and slope face structure of natural ecology self-restoration type
CN105113518A (en) * 2015-08-20 2015-12-02 三峡大学 Construction method for ecological slope protecting base material by arranging slot pits in slope surface
CN106498952A (en) * 2016-11-18 2017-03-15 中国电建集团成都勘测设计研究院有限公司 The high steep spray in arid area mixes slope ecological protective slope structure
CN110374054A (en) * 2019-07-23 2019-10-25 重庆大学 A kind of ecological slope protection consolidates soil structure and method
CN212612526U (en) * 2020-01-02 2021-02-26 新昌县沃意科技有限公司 Be used for steep slope grid beam to plant grass supporting construction in
CN111809565A (en) * 2020-06-18 2020-10-23 上海河道建设有限公司 Ecological bank protection of hydraulic engineering

Similar Documents

Publication Publication Date Title
CN103410159B (en) Expansive soil cut slope support structure and construction method thereof
CN104818721B (en) Geological environment treatment method suitable for steep wall and deep pit type abandoned mine
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN111005393B (en) Slope protection structure for repairing landslide body by using live tree piles and construction method
CN111248053A (en) Ecological restoration method for high and steep step slope of open-pit quarry
CN111663513B (en) Shallow-buried thick coal seam mining surface subsidence crack treatment method based on check dam group
CN110593281A (en) High-steep rock slope ecological protection system and construction method thereof
CN113250213A (en) Slope protection structure with irrigation function for soil-rock mixed side slope and construction method
CN113216223A (en) Ecological restoration method for mine side slope
CN103993606B (en) A kind of stereoscopic protective method of soft side slope
CN107165176A (en) A kind of method for strengthening the native check dam in the slope collapse exit or entrance of a clitch or check dam sediment trapping retaining
CN104164883B (en) A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence
CN113529753A (en) Construction method for quickly treating collapse hillock by fast-setting high polymer grouting
CN210797594U (en) Ecological reinforced structure of side slope
CN218540731U (en) Side slope hidden danger disaster management and ecological protection structure
CN113502825B (en) Water conservation method for mountain power transmission line tower position mechanized construction
CN113718711B (en) Anti-scouring water and soil conservation slope protection structure and construction method thereof
CN113431057A (en) Loess slope ecological protection method
CN215441730U (en) Gabion anti-impact wall structure
CN109853461A (en) The ecological restoring method and system of plateau mire wetland erosion ditch
CN114606961A (en) Water and soil conservation method for hilly land
CN112627245B (en) Abandoned dreg site surveying and ecological restoration method based on in-situ recognition
CN211037008U (en) Comprehensive treatment system for slope slag-adhering under plateau area road
CN210621724U (en) Water-retaining slope protection structure for arid area
CN114086507A (en) Ecological revetment process with high water and soil retention

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210924