CN113338276A - 一种预应力管桩施工工艺 - Google Patents
一种预应力管桩施工工艺 Download PDFInfo
- Publication number
- CN113338276A CN113338276A CN202110744740.6A CN202110744740A CN113338276A CN 113338276 A CN113338276 A CN 113338276A CN 202110744740 A CN202110744740 A CN 202110744740A CN 113338276 A CN113338276 A CN 113338276A
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- machine
- pile
- construction process
- coordinate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种预应力管桩施工工艺,包括:在管桩机安装测量放线系统;通过已知点测量并建立坐标系;调平管桩机;校核管桩机桩位;输入需要施工的管桩坐标;按照指示移机到与管桩坐标对应的位置;开始管桩施工。本发明的预应力管桩施工工艺通过在管桩机上安装测量放线系统,并通过已知点测量并建立坐标系,调平管桩机后校核管桩机桩位,输入需要施工的管桩坐标后按照指示移机到与管桩坐标对应的位置,从而开始管桩施工,该施工工艺简单,操作方便,能够保证桩位的准确性,有利于项目的进度和质量的控制。
Description
技术领域
本发明涉及建筑施工领域,特别是涉及一种预应力管桩施工工艺。
背景技术
在现有的管桩施工现场过程中,测量放线经常使用全站仪测量放线,这种施工方法需要大量人力,影响施工进度;管桩在施工过程中,释放对土的侧向挤压力,导致放的点位移动,造成桩位偏差较大。
上述现有技术存在的问题亟待解决。
发明内容
基于此,本发明的目的在于,提供一种工艺简单、操作方便、准确性高的预应力管桩施工工艺。
本发明的预应力管桩施工工艺,包括:
在管桩机安装测量放线系统;
通过已知点测量并建立坐标系;
调平管桩机;
校核管桩机桩位;
输入需要施工的管桩坐标;
按照指示移机到与管桩坐标对应的位置;
开始管桩施工。
上述技术方案在一种实施方式中,所述测量放线系统为北斗测量放线系统。
相对于现有技术,本发明的预应力管桩施工工艺通过在管桩机上安装测量放线系统,并通过已知点测量并建立坐标系,调平管桩机后校核管桩机桩位,输入需要施工的管桩坐标后按照指示移机到与管桩坐标对应的位置,从而开始管桩施工,该施工工艺简单,操作方便,能够保证桩位的准确性,有利于项目的进度和质量的控制。本发明的预应力管桩施工工艺具有工艺简单、操作方便、准确性高等特点。
为了更好地理解和实施,下面结合附图详细说明本发明。
附图说明
图1是本发明的预应力管桩施工工艺的示意图。
图2是管桩机的操作示意图。
图3是本发明的预应力管桩施工工艺的示例性流程框图。
其中,图2中的尺寸单位为mm,“边角”为管桩机边角。
具体实施方式
在本说明书中提到或者可能提到的上、下、左、右、前、后、正面、背面、顶部、底部等方位用语是相对于其构造进行定义的,它们是相对的概念。因此,有可能会根据其所处不同位置、不同使用状态而进行相应地变化。所以,也不应当将这些或者其他的方位用语解释为限制性用语。
以下示例性实施例中所描述的实施方式并不代表与本公开相一致的所有实施方式。相反,它们仅是与如所附权利要求书中所详述的、本公开的一些方面相一致的方法的例子。
在本公开使用的术语是仅仅出于描述特定实施例的目的,而非旨在限制本公开。在本公开和所附权利要求书中所使用的单数形式的“一种”、“所述”和“该”也旨在包括多数形式,除非上下文清楚地表示其他含义。还应当理解,本文中使用的术语“和/或”是指并包含一个或多个相关联的列出项目的任何或所有可能组合。
请参阅图1-图3。图1是本发明的预应力管桩施工工艺的示意图。图2是管桩机的操作示意图。图3是本发明的预应力管桩施工工艺的示例性流程框图。
本发明的预应力管桩施工工艺,包括:
步骤101,在管桩机安装测量放线系统。
优选地,所述测量放线系统为北斗测量放线系统。
具体实施时,可以将北斗测量放线系统的定位模块设置在管桩机的顶部,并通过电线将操作设备1与定位模块连接,利用操作设备1实现显示和操作。
所述操作设备1可以包括接收器11和坐标显示屏12,接收器11可以接收坐标等相关信息,坐标显示屏12可以显示坐标信息。
操作时,可以将操作设备1设置在操作台2上,并将操作台2安装在操作室3内。
步骤102,通过已知点测量并建立坐标系。
具体实施时,选定某个已获得其精确坐标信息的已知点作为基准,在该已知点的基础上建立坐标系,相关定位或移机、管桩施工操作均在建立的坐标系的基础上实现精确定位。
步骤103,调平管桩机。
将管桩机调平,避免因灌装机位置不平稳而带来的定位偏差,防止出现桩位不准确的问题。
步骤104,校核管桩机桩位。
在调平管桩机之后,进一步校核管桩机桩位,进行桩位坐标的进一步确认,提高准确性。
步骤105,输入需要施工的管桩坐标。
将需要施工的管桩坐标通过上述操作设备1输入,操作设备1会根据定位模块的定位及已建立的坐标系,自动给出需要移机到的位置,这样,使整个移机坐标的生成智能化,且提高管桩坐标的准确度。
步骤106,按照指示移机到与管桩坐标对应的位置。
按照步骤105给出的移机位置的指示,将管桩机移机到与生成的管桩坐标对应的位置,实现管桩机的位置与管桩坐标位置统一。
步骤107,开始管桩施工。
在经过上述步骤101-106的步骤后,即可开始管桩操作。并且,通过上述步骤101-106的准备,可以精确定位管桩机的位置,保证桩位的准确性,有利于项目的进度和质量的控制。
需要说明的是,上述步骤101-步骤107仅为一示例性步骤,并不对各步骤的时序进行限定,可以根据施工的具体情况对相应步骤的先后顺序进行调整,或者,可以同时或交叉进行某些步骤。
相对于现有技术,本发明的预应力管桩施工工艺通过在管桩机上安装测量放线系统,并通过已知点测量并建立坐标系,调平管桩机后校核管桩机桩位,输入需要施工的管桩坐标后按照指示移机到与管桩坐标对应的位置,从而开始管桩施工,该施工工艺简单,操作方便,能够保证桩位的准确性,有利于项目的进度和质量的控制。本发明的预应力管桩施工工艺具有工艺简单、操作方便、准确性高等特点。
以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。
Claims (2)
1.一种预应力管桩施工工艺,其特征在于,包括:
在管桩机安装测量放线系统;
通过已知点测量并建立坐标系;
调平管桩机;
校核管桩机桩位;
输入需要施工的管桩坐标;
按照指示移机到与管桩坐标对应的位置;
开始管桩施工。
2.根据权利要求1所述的预应力管桩施工工艺,其特征在于:所述测量放线系统为北斗测量放线系统。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110744740.6A CN113338276A (zh) | 2021-07-01 | 2021-07-01 | 一种预应力管桩施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110744740.6A CN113338276A (zh) | 2021-07-01 | 2021-07-01 | 一种预应力管桩施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113338276A true CN113338276A (zh) | 2021-09-03 |
Family
ID=77482061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110744740.6A Pending CN113338276A (zh) | 2021-07-01 | 2021-07-01 | 一种预应力管桩施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113338276A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001040648A (ja) * | 1999-08-03 | 2001-02-13 | Fudo Constr Co Ltd | Gpsを用いた地盤改良施工機の位置決め、誘導システム |
CN109681119A (zh) * | 2019-01-31 | 2019-04-26 | 中国电建集团江西省电力建设有限公司 | 一种全叶片螺旋钻机及phc管桩基施工方法 |
CN209248023U (zh) * | 2018-12-21 | 2019-08-13 | 广西建工集团基础建设有限公司 | 一种静力压桩机自动定位桩位系统 |
CN110258556A (zh) * | 2019-06-21 | 2019-09-20 | 中国水利水电第四工程局有限公司 | 一种工程管桩施工的接桩方法 |
CN110552349A (zh) * | 2019-09-12 | 2019-12-10 | 中交二公局第五工程有限公司 | 一种在公路桥梁及软基特殊处理中基于物联网精确控制的施工方法 |
-
2021
- 2021-07-01 CN CN202110744740.6A patent/CN113338276A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001040648A (ja) * | 1999-08-03 | 2001-02-13 | Fudo Constr Co Ltd | Gpsを用いた地盤改良施工機の位置決め、誘導システム |
CN209248023U (zh) * | 2018-12-21 | 2019-08-13 | 广西建工集团基础建设有限公司 | 一种静力压桩机自动定位桩位系统 |
CN109681119A (zh) * | 2019-01-31 | 2019-04-26 | 中国电建集团江西省电力建设有限公司 | 一种全叶片螺旋钻机及phc管桩基施工方法 |
CN110258556A (zh) * | 2019-06-21 | 2019-09-20 | 中国水利水电第四工程局有限公司 | 一种工程管桩施工的接桩方法 |
CN110552349A (zh) * | 2019-09-12 | 2019-12-10 | 中交二公局第五工程有限公司 | 一种在公路桥梁及软基特殊处理中基于物联网精确控制的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104499714B (zh) | 基于bim平台及测量机器人的机电安装工程施工方法 | |
CN104835141B (zh) | 一种激光测距建立立体模型的移动终端及方法 | |
CN108051835A (zh) | 一种基于双天线的倾斜测量装置及测量与放样方法 | |
CN111324923A (zh) | 桥梁顶推结构实时监控方法、装置及系统 | |
EP2002290B1 (en) | Calibration method and calibration apparatus for a hand-held locating device | |
CN106443578B (zh) | 一种室内定位基站坐标标定方法 | |
KR20120051981A (ko) | Gnss를 이용한 건물의 수직도 측정 방법 및 시스템 | |
CN101825662B (zh) | 短距测量接地网接地电阻的测量方法及其测量结构 | |
CN106304163A (zh) | 一种wifi天线性能异常的确定方法及终端 | |
CN110552349A (zh) | 一种在公路桥梁及软基特殊处理中基于物联网精确控制的施工方法 | |
CN107101578B (zh) | 一种井下测点坐标测量方法 | |
CN109696160B (zh) | 一种隧道加工的激光定位方法 | |
CN109556581B (zh) | 一种基于全站仪在浮动平台上的测量方法 | |
CN107654074B (zh) | 一种多管多角度弯管组装空间定位方法 | |
CN108917711A (zh) | 一种隧道工程三维激光扫描分段测量方法及系统 | |
CN113338276A (zh) | 一种预应力管桩施工工艺 | |
CN204613405U (zh) | 一种建筑施工用测距仪 | |
CN103711127B (zh) | 振捣机实时监测定位系统及方法 | |
JP2014029113A (ja) | テールクリアランスを特定するための装置、方法、プログラムおよび記録媒体 | |
CN205642311U (zh) | 一种发电机定子铁芯垂直度在线监测装置 | |
CN207717986U (zh) | 一种基于双天线的倾斜测量装置 | |
CN103438992B (zh) | 一种带有自动定位功能的照度计 | |
CN109581454B (zh) | 对偶式双复合定位仪测量方法 | |
CN203729303U (zh) | 振捣机实时监测定位系统 | |
CN114776045B (zh) | 一种预制梁的安装方法、装置、设备及可读存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210903 |
|
RJ01 | Rejection of invention patent application after publication |