All-steel structure climbing frame Download PDF

Info

Publication number
CN113107180A
CN113107180A CN202110389366.2A CN202110389366A CN113107180A CN 113107180 A CN113107180 A CN 113107180A CN 202110389366 A CN202110389366 A CN 202110389366A CN 113107180 A CN113107180 A CN 113107180A
Authority
CN
China
Prior art keywords
frame body
climbing frame
creel
scaffold
steel structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110389366.2A
Other languages
Chinese (zh)
Other versions
CN113107180B (en
Inventor
朱方
牟楠
杜革成
杨玉华
邓开军
聂峰云
吴君
陆仕军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202110389366.2A priority Critical patent/CN113107180B/en
Publication of CN113107180A publication Critical patent/CN113107180A/en
Application granted granted Critical
Publication of CN113107180B publication Critical patent/CN113107180B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/12Canopies
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention relates to an all-steel structure climbing frame which comprises a climbing frame body, wherein the left side and the right side of the climbing frame body are respectively lapped between a pair of rail trusses paved along the vertical surfaces of the outer walls of multi-storey buildings through rollers, an electric hoist is installed on the rail trusses, the climbing frame body is hung on the electric hoist, a protective net is wrapped around the climbing frame body, rotatable reels are respectively installed at the upper end and the lower end of the climbing frame body, covering curtains are wound on the reels, the electric hoist comprises a motor, and output shafts of the motor are respectively connected with the reels through chain transmission mechanisms. By adopting the technical scheme, the protective net is covered around the climbing frame body, so that construction tools or construction materials can be prevented from falling from the scaffold, when the scaffold is lifted and moved, the covering curtains at the upper end and the lower end of the climbing frame body are synchronously unfolded or rolled along with the operation of the electric hoist, so that the corresponding floors of a building which is not covered by the scaffold are still covered by the covering curtains, the danger of falling objects from high altitude is avoided, and the construction safety is improved.

Description

All-steel structure climbing frame
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to an all-steel structure climbing frame.
Background
The climbing frame, also called lifting frame, can be divided into several main types such as hydraulic type, electrodynamic type, manual pull type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, and can ascend or descend along buildings. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, namely the scaffold is used until the construction is finished after one-time assembly, and is not limited by the height of a building, so that the manpower and the materials are greatly saved. For example, publication numbers are: the patent document of "CN 203559571U" discloses a climbing frame used in building construction, which comprises a base, a column rail and a main frame outer column, wherein the column rail and the main frame outer column are vertically fixed on the base, and the upper end and the lower end of the column rail are respectively connected through a first connecting piece and a second connecting piece; and a horizontal truss is arranged between the upright post track and the outer upright post of the main frame, and a scaffold board is laid at the corresponding position. The technical scheme of adopting this patent document to describe has simple to operate, advantages such as easy operation, have fine social and economic benefits, however, current scaffold frame is in order to prevent from falling article from the scaffold frame, generally all need set up the protection network to its periphery surface, in order to prevent that construction tool or construction material from falling from the scaffold frame, when scaffold frame lift removal, the protection network moves along with the scaffold frame, the corresponding floor of the building that is sheltered from by the scaffold frame also receives the protection network's cover, therefore the high altitude pendant can not appear, and the corresponding floor of the building that does not have to be sheltered from by the scaffold frame then still communicates with the exterior space, still there is the danger of high altitude pendant, be unfavorable for construction safety.
Disclosure of Invention
In order to solve the technical problem, the invention provides an all-steel structure climbing frame.
The invention provides an all-steel structure climbing frame which comprises a climbing frame body, wherein the left side and the right side of the climbing frame body are respectively lapped between a pair of rail trusses paved along the vertical surfaces of the outer walls of multi-storey buildings through rollers, an electric hoist is installed on the rail trusses, the climbing frame body is hung on the electric hoist, a protective net is wrapped around the climbing frame body, rotatable scroll shafts are respectively installed at the upper end and the lower end of the climbing frame body, covering curtains are wound on the scroll shafts, the electric hoist comprises a motor, and an output shaft of the motor is respectively connected with the scroll shafts through a chain transmission mechanism.
The protective net is made of plastic woven cloth.
The climbing frame body is further wrapped with a hemp rope net, and hemp rope net cloth is arranged between the protective net and the surface of the climbing frame body.
The aperture of the hemp rope net mesh is not more than 50cm multiplied by 50 cm.
The material of the covering curtain is plastic woven cloth.
The tail end of the covering curtain is also hung at the upper end or the lower end of the track truss.
The climbing frame body comprises a plurality of layers of scaffold boards which are arranged at equal intervals along the vertical direction from top to bottom, and the adjacent two layers of scaffold boards are connected together through a plurality of pairs of supporting rods which are mutually crossed and hinged together.
The supporting rod is made of a steel pipe with a nominal diameter not less than 80 mm.
The number of the scaffold boards is 4-5 layers, and the interlayer spacing between two adjacent layers of scaffold boards is consistent with the interlayer spacing of a multi-layer building.
The all-steel structure climbing frame further comprises a containing pit, the containing pit is formed by excavating earth and stone on the ground, and the setting position of the containing pit corresponds to the installation position of the reel up and down in the vertical direction.
The invention has the beneficial effects that: by adopting the technical scheme, the protective net is covered around the climbing frame body, so that construction tools or construction materials can be prevented from falling from the scaffold, when the scaffold moves up and down, the protective net moves along with the scaffold, and corresponding floors of a building shielded by the scaffold are also covered by the protective net, so that high-altitude falling objects cannot occur, and meanwhile, the covering curtains at the upper end and the lower end of the climbing frame body are synchronously unfolded or rolled along with the operation of the electric hoist, so that the corresponding floors of the building not shielded by the scaffold are still shielded by the covering curtains, the danger of high-altitude falling objects is avoided, and the construction safety is improved.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is a left side view of the present invention.
In the figure: 1-climbing frame body, 2-track truss, 3-electric hoist, 4-protective screen, 5-scroll, 6-covering curtain, 7-hemp rope net, 8-scaffold board and 9-supporting rod.
Detailed Description
The technical solution of the present invention is further explained with reference to the accompanying drawings, but the claimed protection scope is not limited thereto;
the invention provides an all-steel structure climbing frame, as shown in figures 1 and 2, the climbing frame comprises a climbing frame body 1, the left side and the right side of the climbing frame body 1 are respectively lapped between a pair of track trusses 2 paved along the vertical surfaces of the outer walls of multi-storey buildings through rollers, an electric hoist 3 is installed on each track truss 2, the climbing frame body 1 is hung on the electric hoist 3, a protective net 4 is wrapped around the climbing frame body 1, rotatable reels 5 are respectively installed at the upper end and the lower end of the climbing frame body 1, covering curtains 6 are wound on the reels 5, the electric hoist 3 comprises a motor, and the output shaft of the motor is respectively connected with the reels 5 through a chain transmission mechanism.
Further, the material of the protection net 4 is preferably woven plastic cloth. The climbing frame body 1 is further wrapped with a hemp rope net 7, and the hemp rope net 7 is arranged between the protective net 4 and the surface of the climbing frame body 1. The aperture of the meshes of the hemp rope net 7 is not more than 50cm multiplied by 50 cm. The material of the covering curtain 6 is plastic woven cloth. The tail end of the covering curtain 6 is also hung at the upper end or the lower end of the track truss 2.
In addition, the climbing frame body 1 comprises a plurality of layers of scaffold boards 8 which are arranged at equal intervals along the vertical direction from top to bottom, and the adjacent two layers of scaffold boards 8 are connected together through a plurality of pairs of supporting rods 9 which are hinged together in a crossed mode. The support rod 9 is made of a steel pipe with a nominal diameter of not less than 80 mm. The number of the scaffold boards 8 is 4-5 layers, and the layer spacing of two adjacent scaffold boards 8 is consistent with the layer spacing of a multi-layer building. The all-steel structure climbing frame further comprises a containing pit, the containing pit is formed by excavating earth and stones on the ground, and the setting position of the containing pit corresponds to the mounting position of the reel 5 up and down in the vertical direction.
By adopting the technical scheme, the protective net is covered around the climbing frame body, so that construction tools or construction materials can be prevented from falling from the scaffold, when the scaffold moves up and down, the protective net moves along with the scaffold, and corresponding floors of a building shielded by the scaffold are also covered by the protective net, so that high-altitude falling objects cannot occur, and meanwhile, the covering curtains at the upper end and the lower end of the climbing frame body are synchronously unfolded or rolled along with the operation of the electric hoist, so that the corresponding floors of the building not shielded by the scaffold are still shielded by the covering curtains, the danger of high-altitude falling objects is avoided, and the construction safety is improved.

Claims (10)

1. The utility model provides a frame is climbed to full steel construction which characterized in that: including climbing frame body (1), climb frame body (1) left and right sides respectively through the gyro wheel overlap joint along the multilayer building outer wall facade between a pair of track truss (2) of mating formation, install electric block (3) on track truss (2), climb frame body (1) and hang on electric block (3), it has protection network (4) to climb frame body (1) cladding all around, climb frame body (1) upper and lower both ends and install rotatable spool (5) respectively, it has covering curtain (6) to coil on spool (5), electric block (3) include the motor, the motor output shaft respectively through chain drive with spool (5) are connected.
2. The all-steel structural creel of claim 1, wherein: the protective net (4) is made of plastic woven cloth.
3. The all-steel structural creel of claim 1, wherein: the climbing frame is characterized in that a hemp rope net (7) is further wrapped around the climbing frame body (1), and the hemp rope net (7) is arranged between the protective net (4) and the surface around the climbing frame body (1).
4. The all-steel structural creel of claim 3, wherein: the aperture of the mesh of the hemp rope net (7) is not more than 50cm multiplied by 50 cm.
5. The all-steel structural creel of claim 1, wherein: the covering curtain (6) is made of plastic woven cloth.
6. The all-steel structural creel of claim 1, wherein: the tail end of the covering curtain (6) is also hung at the upper end or the lower end of the track truss (2).
7. The all-steel structural creel of claim 1, wherein: the climbing frame body (1) comprises a plurality of layers of scaffold boards (8) which are arranged at equal intervals along the vertical direction from top to bottom, and the adjacent two layers of scaffold boards (8) are connected together through a plurality of pairs of supporting rods (9) which are mutually crossed and hinged together.
8. The all-steel structural creel of claim 7, wherein: the supporting rod (9) is made of a steel pipe with a nominal diameter not less than 80 mm.
9. The all-steel structural creel of claim 7, wherein: the number of the scaffold boards (8) is 4-5, and the interlayer spacing between two adjacent layers of scaffold boards (8) is consistent with that of a multi-layer building.
10. The all-steel structural creel of claim 1, wherein: the all-steel structure climbing frame further comprises a containing pit, the containing pit is formed by digging earth and stones on the ground, and the setting position of the containing pit corresponds to the mounting position of the reel (5) up and down in the vertical direction.
CN202110389366.2A 2021-04-12 2021-04-12 All-steel structure climbing frame Active CN113107180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110389366.2A CN113107180B (en) 2021-04-12 2021-04-12 All-steel structure climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110389366.2A CN113107180B (en) 2021-04-12 2021-04-12 All-steel structure climbing frame

Publications (2)

Publication Number Publication Date
CN113107180A true CN113107180A (en) 2021-07-13
CN113107180B CN113107180B (en) 2022-09-20

Family

ID=76715945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110389366.2A Active CN113107180B (en) 2021-04-12 2021-04-12 All-steel structure climbing frame

Country Status (1)

Country Link
CN (1) CN113107180B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370121A (en) * 2022-08-22 2022-11-22 中建四局第一建设有限公司 Movable climbing frame structure convenient and fast to construct external wall

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061386A (en) * 2000-08-22 2002-02-28 Taisei Corp Gondola device with curing net
JP2004217422A (en) * 2002-11-21 2004-08-05 Nihon Bisoh Co Ltd Rope winder, gondola device and curing net lifting device using this winder
GB0822082D0 (en) * 2008-12-04 2009-01-07 Sgb Services Ltd Support frame
KR200444758Y1 (en) * 2008-10-31 2009-06-03 주식회사 국제곤도라 Upper supporter of safety net
CN201486125U (en) * 2009-08-12 2010-05-26 上海美装外墙工程设备有限公司 External wall project net protection device with quickly lifting protective net
CN202248823U (en) * 2011-09-01 2012-05-30 深圳市特辰科技股份有限公司 Attached-type lifting scaffold with net suspended at bottom
CN204163369U (en) * 2014-10-22 2015-02-18 乔霈 A kind of collapsible attaching lifting exterior wall scaffold
CN206521935U (en) * 2017-02-24 2017-09-26 中国有色金属工业第六冶金建设有限公司 Guide-rail attached lifting scaffold
CN206971697U (en) * 2017-05-26 2018-02-06 湖南正鑫机械设备有限公司 A kind of climbing frame with protector
CN211058358U (en) * 2019-10-18 2020-07-21 山东朗冠建筑工程有限公司 Folding protective net
CN211173023U (en) * 2019-11-18 2020-08-04 湖南能祥建筑工程有限公司 Bottom suspended net attached lifting scaffold
CN212129868U (en) * 2020-03-26 2020-12-11 安徽省标诺建筑科技有限公司 Attached lifting scaffold
CN112081366A (en) * 2020-10-21 2020-12-15 徐露露 Winding and laying type building climbing frame net
CN212773394U (en) * 2020-07-28 2021-03-23 济南一建集团绿色建筑产业有限公司 Automatic frame net of climbing for building
CN212897503U (en) * 2020-05-06 2021-04-06 广西贵港建设集团有限公司 Basket is hung with safe construction in room construction

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061386A (en) * 2000-08-22 2002-02-28 Taisei Corp Gondola device with curing net
JP2004217422A (en) * 2002-11-21 2004-08-05 Nihon Bisoh Co Ltd Rope winder, gondola device and curing net lifting device using this winder
KR200444758Y1 (en) * 2008-10-31 2009-06-03 주식회사 국제곤도라 Upper supporter of safety net
GB0822082D0 (en) * 2008-12-04 2009-01-07 Sgb Services Ltd Support frame
CN201486125U (en) * 2009-08-12 2010-05-26 上海美装外墙工程设备有限公司 External wall project net protection device with quickly lifting protective net
CN202248823U (en) * 2011-09-01 2012-05-30 深圳市特辰科技股份有限公司 Attached-type lifting scaffold with net suspended at bottom
CN204163369U (en) * 2014-10-22 2015-02-18 乔霈 A kind of collapsible attaching lifting exterior wall scaffold
CN206521935U (en) * 2017-02-24 2017-09-26 中国有色金属工业第六冶金建设有限公司 Guide-rail attached lifting scaffold
CN206971697U (en) * 2017-05-26 2018-02-06 湖南正鑫机械设备有限公司 A kind of climbing frame with protector
CN211058358U (en) * 2019-10-18 2020-07-21 山东朗冠建筑工程有限公司 Folding protective net
CN211173023U (en) * 2019-11-18 2020-08-04 湖南能祥建筑工程有限公司 Bottom suspended net attached lifting scaffold
CN212129868U (en) * 2020-03-26 2020-12-11 安徽省标诺建筑科技有限公司 Attached lifting scaffold
CN212897503U (en) * 2020-05-06 2021-04-06 广西贵港建设集团有限公司 Basket is hung with safe construction in room construction
CN212773394U (en) * 2020-07-28 2021-03-23 济南一建集团绿色建筑产业有限公司 Automatic frame net of climbing for building
CN112081366A (en) * 2020-10-21 2020-12-15 徐露露 Winding and laying type building climbing frame net

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370121A (en) * 2022-08-22 2022-11-22 中建四局第一建设有限公司 Movable climbing frame structure convenient and fast to construct external wall

Also Published As

Publication number Publication date
CN113107180B (en) 2022-09-20

Similar Documents

Publication Publication Date Title
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
JP3172719B2 (en) Building construction safety fence
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN1028556C (en) Building construction system
KR101923924B1 (en) Rope type elevator of high speed and heavy road and mast structure for constructing high-rise building
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN104358336A (en) Unit type curtain wall installation system and installation method thereof
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
CN113107180B (en) All-steel structure climbing frame
CN102502378A (en) Climbing elevator for building construction
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN112930425A (en) Method for erecting multi-layer structure and vertical surface
CN105839907A (en) Suspension type steel platform scaffold foundation and method for mounting same
CN104131706A (en) Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure
CN207582929U (en) Adhesion type elevating construction platform
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN217000874U (en) Overhanging supporting die steel platform with large overhanging structure
KR200430674Y1 (en) High place working gondola in building
CN214576004U (en) Staircase regularization platform of going up people
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN218479567U (en) Super high-rise building partition plate installation device
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN206844417U (en) A kind of high building top layer curtain wall frame
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
JP5150313B2 (en) Three-dimensional parking device in void and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant