CN206521935U - Guide-rail attached lifting scaffold - Google Patents
Guide-rail attached lifting scaffold Download PDFInfo
- Publication number
- CN206521935U CN206521935U CN201720169927.7U CN201720169927U CN206521935U CN 206521935 U CN206521935 U CN 206521935U CN 201720169927 U CN201720169927 U CN 201720169927U CN 206521935 U CN206521935 U CN 206521935U
- Authority
- CN
- China
- Prior art keywords
- horizontal truss
- guide
- support body
- strut
- lifting scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a kind of guide-rail attached lifting scaffold, including:Support body, its is parallel to stand in front of building horizontal interval;Support body lower end is provided with bottom horizontal truss, vertical spacing is provided with multiple horizontal truss above bottom horizontal truss, pedal is laid on horizontal truss, both lateral sides vertical direction is provided with triangle-frame between every layer of horizontal truss, its inner side is provided with a strut, strut first end is detachably connected to horizontal truss, and the second end extends upper strata horizontal truss bottom, and bottom horizontal truss both lateral sides are provided with hanger;Multiple vertical main frameworks are provided with above horizontal truss, vertical main framework face wall side is provided with guide rail provided with equidistant hook, its two sides;Support frame is fixed on building masonry wall, and its outside is provided with a circular arc hole, and circular arc hole is provided with a round bar;Lowering or hoisting gear, its one end connecting wall, the other end is connected to support body by hanger.The more economical practicality of the utility model, safety of structure is higher.
Description
Technical field
The utility model is related to a kind of construction scaffold, more particularly to a kind of guide-rail attached lifting scaffold.
Background technology
The construction of high-rise is universal based on the scaffold of overhanging type, compared with traditional overhanging scaffold, it
With taking, material is few, the few advantage of labor intensive, but also has lifting to limit, and the restriction of factor in terms of security, guide rail is attached
The appearance for elevating scaffold solves the problems, such as some existing engineer applieds well, greatly ensure that construction quality and
Process, must be had been widely used in executive information systems construction, but many support bodys applied at present are still suffered from design
Different degrees of safety defect, anti-drop system imperfection, night can not operate etc. also it is a certain degree of have impact on project progress with
And quality.
Utility model content
A purpose of the present utility model is to solve at least the above, and provides the advantage that at least will be described later.
The utility model also has a purpose to be to provide a kind of guide-rail attached lifting scaffold, it is ensured that under dim environment
Visibility, have good skidproof effect, can also avoid workman under rainy weather from drenching with rain.
The utility model also has a purpose to be to provide a kind of guide-rail attached lifting scaffold, and the connection of the support body is more
Plus consolidate, and the support body is difficult inclination and fallen, it is ensured that the safety of workman.
In order to realize that there is provided a kind of guide-rail attached lifting pin according to these purposes of the present utility model and further advantage
Hand cradle, including:
Support body, its is parallel to stand in front of building horizontal interval, and the support body lower end is provided with bottom horizontal truss.
Vertical spacing is provided with multiple horizontal truss, the horizontal truss above horizontal truss, the bottom horizontal truss
Pedal is laid, every layer of horizontal truss two side ends vertical direction is provided with the inside of triangle-frame, the triangle-frame and is provided with a strut, institute
State strut first end and be detachably connected to the horizontal truss, the second end extends horizontal truss bottom described in upper strata,
The bottom horizontal truss two side ends are provided with hanger.
Vertical main framework, it is fixed on above multiple horizontal truss, and the vertical main framework face wall side is provided with equidistant
Hook, the vertical main framework two sides be provided with guide rail.
Support frame, support frame as described above is fixed on the outside of building masonry wall, and support frame as described above front end is provided with a circular arc hole,
The circular arc hole is provided with a round bar, and the round bar is removably connected on support frame as described above, the support
Frame front end connects roller, and the roller is placed in the guide rail of the support body.
Lowering or hoisting gear, its one end connecting wall, the other end is connected to the support body by hanger.
Preferably, the support body top layer is provided with fluorescence coating.
Preferably, the pedal top layer is provided with rubber bumps.
Preferably, the strut is circular arc strut, and the end of strut second is provided between groove, the strut and connected
Waterproof cloth, the waterproof cloth two ends are connected on the strut by link.
Preferably, the guide rail is set to neck, and the roller is rolled in the neck.
Preferably, support frame as described above is the fixed mechanism that two tripods are bolted composition, two triangles
Securing plate is connected between frame.
Preferably, the circular arc hole is from being low inside and high outside by wall side to outside.
The utility model at least includes following beneficial effect:
Fluorescence coating is set by the support body top layer, the light that the fluorescence coating is sent can ensure workman under pale yellow environment
Rubber bumps are set on operation, the pedal, it is possible to increase friction when workman walks, play good skidproof effect, the support
The end of bar second hangs waterproof cloth, and the umbrella cloth tail end link is blocked by the groove, and the umbrella cloth head end link is pulled to described
Strut first end, the awning set up, it is to avoid drenched with rain during overcast and rainy operative.
Triangle-frame is set by the horizontal truss two side ends, the load-bearing of every layer of horizontal truss is further consolidated,
By setting hook on the vertical framework, and pass through the cooperation of the hook and the round bar, it is ensured that the support body falls
When falling, the hook is buckled on the round bar, stop the support body continue fall, by setting the support on exterior wall
The roller connected on frame, support frame as described above is connected with the guide rail on the support body so that the support body is difficult inclination and fallen, it is ensured that
The safety of workman.
Further advantage of the present utility model, target and feature embody part by following explanation, and part will also pass through
Research of the present utility model and practice are understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is guide-rail attached lifting scaffold structural representation described in the utility model;
Fig. 2 is the structural representation of guide rail described in the utility model;
Fig. 3 is the structural representation of support frame described in the utility model;
Fig. 4 is the structural representation of strut described in the utility model.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to explanation
Book word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or many
The presence or addition of individual other elements or its combination.
As shown in figure 1, the utility model provides a kind of guide-rail attached lifting scaffold, including:
Support body 100, its is parallel to stand in front of building horizontal interval, and the lower end of support body 100 is provided with bottom horizontal truss
113。
Horizontal truss 102, the top vertical spacing of bottom horizontal truss 113 is provided with multiple horizontal truss 102, the water
Pedal 111 is laid on plane frame work 102, every layer of two side ends vertical direction of horizontal truss 102 is provided with triangle-frame, the triangle-frame
Inner side is provided with a strut 103, and the first end of strut 103 is detachably connected to the horizontal truss 102, the second end
The bottom of horizontal truss 102 described in upper strata is extended, the both lateral sides of bottom horizontal truss 102 are provided with hanger 107.
Vertical main framework 104, it is fixed on multiple tops of horizontal truss 102, the vertical main framework 104 as shown in Figure 2
Face wall side is provided with guide rail 105 provided with hook 106 at equal intervals, the vertical main framework two sides.
Support frame 200 as shown in Figure 3, support frame as described above 200 is fixed on the outside of building masonry wall 400, the front end of support frame 200
Provided with a circular arc hole 202, the circular arc hole 202 is provided with a round bar 203, and the round bar 203 is with dismountable side
Formula is connected on support frame as described above 200, and the front end of support frame as described above 200 connection roller 204, the roller 204 is placed in the support body
In 100 guide rail 105.
Lowering or hoisting gear 300 as shown in Figure 1, its one end connecting building thing wall 400, the other end is connected to by hanger 107
The support body 100.
In such scheme, the end of strut 103 second hangs waterproof cloth 110, and the umbrella is blocked by the groove 109
110 cloth tail end links 108, the cloth head end link of umbrella 110 is pulled to the first end of strut 103, the awning set up, it is to avoid
Drenched with rain during overcast and rainy operative.Triangle-frame 101 is set by the two side ends of horizontal truss 102, further consolidated every
The load-bearing of the layer horizontal truss 102, by setting hook 106 on the vertical framework 104, and by the hook 106 with
The cooperation of the round bar 203, it is ensured that when the support body 100 falls, the hook 106 is buckled on the round bar 203, is stopped
The continuing of the support body 100 falls, by being set on building masonry wall 400 on support frame as described above 200, support frame as described above 200
The roller 204 of connection is connected with the guide rail 105 on the support body 100 so that the support body 100 is difficult inclination and fallen, it is ensured that
The safety of workman.
In one preferred scheme, the top layer of support body 100 is provided with fluorescence coating.
In such scheme, fluorescence coating is provided with by the top layer of support body 100, the light sent by fluorescence coating is protected
The visibility of the operative under dim environment is demonstrate,proved.
In one preferred scheme, the top layer of pedal 111 is provided with rubber bumps 112.
In such scheme, the design of the rubber convex 112 produces very big friction therewith when workman is walked about, can
Good skidproof effect is played in overcast and rainy wet weather.
In one preferred scheme, the strut 103 is circular arc strut, and the end of strut 103 second is provided with groove 109,
Waterproof cloth 110 is connected between the strut 103, the two ends of waterproof cloth 110 are connected on the strut 103 by link 108.
In such scheme, waterproof cloth 110 is detachably arranged on the strut 103 as described in Figure 4, the groove 109
Design can be used for place the link 108, the link 108 is blocked by the groove 109, prevented and the link 108
The waterproof cloth 110 of connection is come off, and the circular-arc-shaped design of the strut 103 is quite convenient to when the expansion of waterproof cloth 110 is packed up.
In one preferred scheme, the guide rail 105 is set to neck, and the roller 204 is rolled in the neck.
In such scheme, the roller 204 is connected with support frame as described above 200, and the roller 204 is stuck in the neck
It can also prevent the support body from tilting while rolling.
In one preferred scheme, support frame as described above 200 is the fixed mechanism that two tripods 201 are bolted composition,
201 are connected with securing plate 205 between two tripods.
In such scheme, the design of support frame as described above 200 shares load-bearing on each tripod 201 so that described
The connection of support body 100 is more consolidated.
In one preferred scheme, the circular arc hole 202 is from being low inside and high outside by wall side to outside.
In such scheme, when the support body 100 rises, the hook 106 contacts the round bar 203 so that the circle
Bar 203 is rolled from low to high along the circular arc hole 202, and after the completion of this time contacting, the round bar 203 is because under self gravitation
Drop, when if it happens the support body 100 falls, the hook 106 is descending to hang over the round bar 203 that lower is in after decline, now
The support body 100 falls stopping, it is ensured that the safety of workman.
Although embodiment of the present utility model is disclosed as above, it is not restricted in specification and embodiment
Listed to use, it can be applied to various suitable fields of the present utility model completely, for those skilled in the art,
Other modification is easily achieved, therefore under the universal limited without departing substantially from claim and equivalency range, this reality
Specific details is not limited to new and shown here as the legend with description.
Claims (7)
1. a kind of guide-rail attached lifting scaffold, it is characterised in that including:
Support body, its is parallel to stand in front of building horizontal interval, and the support body lower end is provided with bottom horizontal truss;
Vertical spacing is provided with multiple horizontal truss, the horizontal truss and laid above horizontal truss, the bottom horizontal truss
Pedal, every layer of horizontal truss two side ends vertical direction is provided with the inside of triangle-frame, the triangle-frame and is provided with a strut, the support
Bar first end is detachably connected to the horizontal truss, and the second end extends horizontal truss bottom described in upper strata, described
Bottom horizontal truss two side ends are provided with hanger;
Vertical main framework, it is fixed on above multiple horizontal truss, and the vertical main framework face wall side is provided with equidistant extension
Hook, the vertical main framework two sides are provided with guide rail;
Support frame, support frame as described above is fixed on the outside of building masonry wall, and support frame as described above front end is provided with a circular arc hole, described
Circular arc hole is provided with a round bar, and the round bar is removably connected on support frame as described above, before support frame as described above
End connection roller, the roller is placed in the guide rail of the support body;
Lowering or hoisting gear, its one end connecting wall, the other end is connected to the support body by hanger.
2. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that the support body top layer is provided with fluorescence
Layer.
3. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that the pedal top layer is provided with rubber convex
Rise.
4. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that the strut is circular arc strut,
The end of strut second is provided between groove, the strut and connects waterproof cloth, and the waterproof cloth two ends are connected to the support by link
On bar.
5. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that the guide rail is set to neck, institute
Roller is stated to roll in the neck.
6. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that support frame as described above is logical for two tripods
Cross between the fixed mechanism of bolt connection composition, two tripods and be connected with securing plate.
7. guide-rail attached lifting scaffold as claimed in claim 1, it is characterised in that the circular arc hole is from by wall one
Side to outside is low inside and high outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720169927.7U CN206521935U (en) | 2017-02-24 | 2017-02-24 | Guide-rail attached lifting scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720169927.7U CN206521935U (en) | 2017-02-24 | 2017-02-24 | Guide-rail attached lifting scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206521935U true CN206521935U (en) | 2017-09-26 |
Family
ID=59892821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720169927.7U Expired - Fee Related CN206521935U (en) | 2017-02-24 | 2017-02-24 | Guide-rail attached lifting scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206521935U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107180A (en) * | 2021-04-12 | 2021-07-13 | 中国水利水电第九工程局有限公司 | All-steel structure climbing frame |
CN113137049A (en) * | 2021-04-14 | 2021-07-20 | 方远建设集团股份有限公司 | Large-span steel limb cornice construction platform |
-
2017
- 2017-02-24 CN CN201720169927.7U patent/CN206521935U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107180A (en) * | 2021-04-12 | 2021-07-13 | 中国水利水电第九工程局有限公司 | All-steel structure climbing frame |
CN113137049A (en) * | 2021-04-14 | 2021-07-20 | 方远建设集团股份有限公司 | Large-span steel limb cornice construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108545628B (en) | A kind of mobile hanging device of Super High and its hanging method | |
CN206521935U (en) | Guide-rail attached lifting scaffold | |
CN106703264A (en) | Indoor mechanical automation mounting method for super high-rise unit curtain walls | |
CN207406115U (en) | A kind of construction guardrail | |
CN104295080A (en) | External wall hanging basket installing structure | |
CN105803944B (en) | scaffold for road and bridge construction | |
CN102747842A (en) | Turning launching vehicle for curtain wall | |
CN107311032A (en) | A kind of bridge crane suspender automatic coupling/decoupling device | |
CN105350991A (en) | Roadway construction temporary support device and construction method thereof | |
CN205575409U (en) | Unpowered self -propelled of large -span cable crane machine holds all alone ware | |
CN211473327U (en) | Building external climbing type building construction operation platform | |
CN205529912U (en) | Platform is decoratied in continuous beam construction | |
CN206554486U (en) | Double guide rail attachment type raise scaffolds | |
CN204081440U (en) | Semifixed exterior wall hanging basket mounting structure | |
CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
CN207619864U (en) | Frame lookum | |
CN207390864U (en) | A kind of tower crane with stowable falling proof device | |
CN207847045U (en) | A kind of swinging scaffold for building | |
CN205306884U (en) | Window machine is wiped in multi -functional extension of frame -type | |
CN213740602U (en) | Adjustable stay cable construction platform of outer attaches wall of tower | |
CN212105033U (en) | Assembled steel construction scaffold for high-rise building | |
CN207484936U (en) | A kind of nacelle device of Landscape Lighting installation | |
CN205330195U (en) | Safety device of outer wall scaffold | |
CN208856819U (en) | People channel on setting tower crane | |
CN210886923U (en) | Maintenance system of straight pylon of double-cable-plane cable-stayed bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170926 |
|
CF01 | Termination of patent right due to non-payment of annual fee |