CN212105033U - Assembled steel construction scaffold for high-rise building - Google Patents

Assembled steel construction scaffold for high-rise building Download PDF

Info

Publication number
CN212105033U
CN212105033U CN202020625298.6U CN202020625298U CN212105033U CN 212105033 U CN212105033 U CN 212105033U CN 202020625298 U CN202020625298 U CN 202020625298U CN 212105033 U CN212105033 U CN 212105033U
Authority
CN
China
Prior art keywords
gear
support frame
horizontal support
working platform
assembled steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020625298.6U
Other languages
Chinese (zh)
Inventor
黄杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020625298.6U priority Critical patent/CN212105033U/en
Application granted granted Critical
Publication of CN212105033U publication Critical patent/CN212105033U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a high-rise building assembled steel structure scaffold, which structurally comprises a vertical support frame, a horizontal support frame, a working platform, a guardrail, a control box and a sliding device; a first gear, a second gear and a rotating rod are arranged at the bottom of the working platform, the second gear is arranged above the first gear, and the rotating rod is fixedly connected with the second gear in an embedded manner; the sliding device is provided with two supporting blocks, an upper roller and a lower roller, the upper end of each supporting block is provided with the upper roller, and the lower roller is arranged at the lower end of the upper roller; the utility model discloses utilize first gear and second gear clearance fit, let and can drive the gyro wheel with the bull stick that the second gear inlayed mutually and rotate, let slider can drive work platform and remove on the horizontal support frame, so control first gear and carry out corotation and reversal and just can let work platform go forward and retreat, the staff need not go up on the scaffold and walk to move and also can remove the position of wanting the fitment, has promoted the security of staff's work.

Description

Assembled steel construction scaffold for high-rise building
Technical Field
The utility model belongs to the technical field of the construction and specifically relates to a high-rise building assembled steel construction scaffold.
Background
When carrying out outdoor fitment to high-rise building, need with the scaffold of setting up the steel construction, let the staff stand above, decorate the building, and current scaffold needs the staff to walk about at the upper end, just can decorate the different positions of building, and walk about on the scaffold and want to be relatively dangerous for the degree of difficulty of fitment increases.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art, the utility model discloses a realize through following technical scheme: a high-rise building assembly type steel structure scaffold structurally comprises a vertical support frame, a horizontal support frame, a working platform, a guardrail, a control box and a sliding device, wherein the horizontal support frame is arranged at the horizontal position of the vertical support frame, the working platform is arranged above the horizontal support frame, and the sliding device is arranged at the bottom of the working platform; a first gear, a second gear and a rotating rod are arranged at the bottom of the working platform, a second gear is arranged above the first gear, and the rotating rod is fixedly connected with the second gear in an embedded manner; the sliding device is provided with two supporting blocks, an upper roller and a lower roller, the upper end of each supporting block is provided with the upper roller, and the lower roller is arranged at the lower end of the upper roller.
As a further optimization of the technical scheme, two ends of the rotating rod are fixedly connected with the two upper rollers respectively.
As a further optimization of the technical scheme, the first gear is movably matched with the second gear.
As a further optimization of the technical scheme, the upper roller is movably clamped with the lower roller and the horizontal support frame.
As a further optimization of the technical scheme, the guardrail is welded right above the working platform, and the control box is arranged at the side end of the working platform.
Advantageous effects
The utility model relates to a high-rise building assembled steel construction scaffold compares with prior art and has following advantage:
1. the utility model discloses utilize first gear and second gear clearance fit, let and can drive the gyro wheel with the bull stick that the second gear inlayed mutually and rotate, let slider can drive work platform and remove on the horizontal support frame, so control first gear and carry out corotation and reversal and just can let work platform go forward and retreat, the staff need not go up on the scaffold and walk to move and also can remove the position of wanting the fitment, has promoted the security of staff's work.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is the utility model relates to a main view structure schematic diagram of high-rise building assembled steel construction scaffold.
Fig. 2 is the utility model relates to a sectional structure schematic diagram of high-rise building assembled steel construction scaffold.
Fig. 3 is the utility model relates to a slider owner of high-rise building assembled steel construction scaffold looks structural schematic.
In the figure: the device comprises a vertical support frame 1, a horizontal support frame 2, a working platform 3, a guardrail 4, a control box 5, a sliding device 6, a first gear a, a second gear b, a rotating rod c, a supporting block d1, an upper roller d2 and a lower roller d 3.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the following description is combined with the detailed description and the accompanying drawings to further explain the preferred embodiments of the present invention.
Examples
Referring to fig. 1-3, the utility model provides a high-rise building fabricated steel construction scaffold, the structure of which comprises a vertical support frame 1, a horizontal support frame 2, a working platform 3, a guardrail 4, a control box 5 and a sliding device 6, wherein the horizontal position of the vertical support frame 1 is provided with the horizontal support frame 2, the working platform 3 is arranged above the horizontal support frame 2, and the sliding device 6 is arranged at the bottom of the working platform 3; a first gear a, a second gear b and a rotating rod c are arranged at the bottom of the working platform 3, the second gear b is arranged above the first gear a, and the rotating rod c is fixedly connected with the second gear b in an embedded manner; the sliding device 6 is provided with two support blocks d1, an upper roller d2 and a lower roller d3, the number of the support blocks d1 is two, the upper end of the support block d1 is provided with an upper roller d2, and the lower roller d3 is arranged at the lower end of the upper roller d 2.
The first gear a is movably matched with the second gear b.
And two ends of the rotating rod c are fixedly connected with the two upper rollers d2 respectively.
The upper roller d2 is movably clamped with the lower roller d3 and the horizontal support frame 2.
Guardrail 4 welds directly over work platform 3, work platform 3's side is located to control box 5.
The working principle is as follows: the upper end of a vertical support frame 1 is provided with a horizontal support frame 2, then a working platform 3 is arranged above the horizontal support frame 2, so that an upper roller d2 and a lower roller d3 in the bottom of a sliding device 6 are movably clamped with the horizontal support frame 2, the sliding device 6 cannot be separated from the horizontal support frame 2, the sliding device 6 can drive the working platform 3 to move on the horizontal support frame 2, then a first gear a rotates to drive a second gear b to rotate, a rotating rod c fixedly connected with the second gear b rotates, the rotating rod c drives upper rollers d2 on two sides to rotate, the working platform 3 can move on the horizontal support frame 2, a guardrail 4 arranged on the working platform 3 protects the safety of workers, the control box 5 is used for controlling the working platform 3 to move, and the workers do not need to walk on a construction frame, the safety factor of the high-altitude work of the workers is improved.
The foregoing shows and describes the general principles of the present invention, its essential features and advantages, and it will be understood by those skilled in the art that it is not limited by the details of the foregoing embodiments, which description includes illustrations of the principles of the invention, but rather is embodied in other specific forms without departing from the spirit or essential characteristics of the invention, and various changes and modifications may be made therein without departing from the spirit and scope of the invention as defined by the appended claims and their equivalents.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a high-rise building assembled steel construction scaffold which characterized in that: the structure of the device comprises a vertical support frame (1), a horizontal support frame (2), a working platform (3), a guardrail (4), a control box (5) and a sliding device (6), wherein the horizontal support frame (2) is arranged at the horizontal position of the vertical support frame (1), the working platform (3) is arranged above the horizontal support frame (2), and the sliding device (6) is arranged at the bottom of the working platform (3); a first gear (a), a second gear (b) and a rotating rod (c) are arranged at the bottom of the working platform (3), the second gear (b) is arranged above the first gear (a), and the rotating rod (c) is fixedly connected with the second gear (b) in an embedded manner; be equipped with supporting shoe (d 1), last gyro wheel (d 2), lower gyro wheel (d 3) in slider (6), supporting shoe (d 1) are equipped with two, last gyro wheel (d 2) are installed to supporting shoe (d 1) upper end, the lower extreme of last gyro wheel (d 2) is located to lower gyro wheel (d 3).
2. The assembled steel structural scaffold for high-rise buildings according to claim 1, wherein: the first gear (a) is movably matched with the second gear (b).
3. The assembled steel structural scaffold for high-rise buildings according to claim 1, wherein: two ends of the rotating rod (c) are respectively fixedly connected with the two upper rollers (d 2).
4. The assembled steel structural scaffold for high-rise buildings according to claim 1, wherein: the upper roller (d 2) is movably clamped with the lower roller (d 3) and the horizontal support frame (2).
5. The assembled steel structural scaffold for high-rise buildings according to claim 1, wherein: guardrail (4) welding is directly over work platform (3), work platform (3)'s side is located in control box (5).
CN202020625298.6U 2020-04-23 2020-04-23 Assembled steel construction scaffold for high-rise building Expired - Fee Related CN212105033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020625298.6U CN212105033U (en) 2020-04-23 2020-04-23 Assembled steel construction scaffold for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020625298.6U CN212105033U (en) 2020-04-23 2020-04-23 Assembled steel construction scaffold for high-rise building

Publications (1)

Publication Number Publication Date
CN212105033U true CN212105033U (en) 2020-12-08

Family

ID=73613260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020625298.6U Expired - Fee Related CN212105033U (en) 2020-04-23 2020-04-23 Assembled steel construction scaffold for high-rise building

Country Status (1)

Country Link
CN (1) CN212105033U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439207A (en) * 2022-02-16 2022-05-06 中国建筑第八工程局有限公司 Multifunctional scaffold and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439207A (en) * 2022-02-16 2022-05-06 中国建筑第八工程局有限公司 Multifunctional scaffold and construction method thereof

Similar Documents

Publication Publication Date Title
CN104150370B (en) A kind of frame-type hanging device
CN212105033U (en) Assembled steel construction scaffold for high-rise building
CN107237488A (en) A kind of rotary type crane span structure
CN206448820U (en) A kind of tunnel construction trolley
CN212802441U (en) Civil engineering construction mounting frame
CN211524021U (en) Climbing frame with good safety
CN202611340U (en) Self-propelled road bed protective barrier transportation and installation all-in-one machine
CN210855191U (en) Guide rail scissor type aerial work platform
CN208056816U (en) A kind of building construction guardrail
CN104190027B (en) The barrier clearing device and fire fighting truck of fire fighting truck
CN202787721U (en) Folding-type movable roof
CN215479531U (en) Special objective table jacking device of ore deposit way construction
CN210684435U (en) Expansion device for building highway bridge guardrail
CN205114981U (en) Gardens riser
CN210855137U (en) High efficiency jack that auto repair was used
CN209468987U (en) A kind of portable operating platform for assembled main cable and girder
CN203321304U (en) Auxiliary ladder of steel tube tower
CN210336479U (en) But remote control formula diamond string bead wire saw is broken to tear open and is equipped for fire control
CN209621341U (en) Splash guard installs trolley
CN208717747U (en) A kind of outer hanging wire installation of crash-proof guardrail and flange plate finishing use construction tool
CN206189278U (en) Special frame of road and bridge construction
CN109537868A (en) A kind of portable operating platform for assembled main cable and girder
CN218562973U (en) Attached movable concrete guardrail construction operation platform
CN217581117U (en) Rapid moving aerial work platform based on rail device
CN217353481U (en) Movable simple operation hangs basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208

Termination date: 20210423

CF01 Termination of patent right due to non-payment of annual fee