CN113106192A - 炼钢转炉及倾动装置整体推装方法 - Google Patents
炼钢转炉及倾动装置整体推装方法 Download PDFInfo
- Publication number
- CN113106192A CN113106192A CN202110345838.4A CN202110345838A CN113106192A CN 113106192 A CN113106192 A CN 113106192A CN 202110345838 A CN202110345838 A CN 202110345838A CN 113106192 A CN113106192 A CN 113106192A
- Authority
- CN
- China
- Prior art keywords
- tilting device
- converter
- cross
- tilting
- feeding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/42—Constructional features of converters
- C21C5/46—Details or accessories
- C21C5/50—Tilting mechanisms for converters
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Carbon Steel Or Casting Steel Manufacturing (AREA)
Abstract
本发明公开了一种炼钢转炉及倾动装置整体推装方法,涉及炼钢转炉倾动装置安装领域。本发明将转炉及倾动装置通过转炉托圈预先拼装在转炉支架上,转炉支架放置在过跨车上,由耳轴承受倾动装置的主要重量,加料跨天车吊装倾动装置使其保持水平;在倾动装置下方设置有水平支架,水平支架通过滑片与倾动装置接触,保证安全性的同时减少倾动装置的磨损。利用卷扬机带动过跨车移动,同时加料跨天车带动倾动装置同步跟进,将转炉和倾动装置整体推装到安装位置,无需对倾动装置进行再次定位。退租航过程时间段,既保证工人施工过程中的安全,又节省大量时间,缩短工期提高安装效率。
Description
技术领域
本发明涉及炼钢转炉倾动装置安装领域,尤其涉及一种炼钢转炉及倾动装置整体推装方法。
背景技术
转炉作为炼钢工艺中关键设备之一,在钢厂的设备使用率非常高,转炉的安装是必不可少的环节。转炉需要配合倾动装置同时使用。传统转炉倾动安装系统采用分体安装,倾动装置在现场拼装起吊需要消耗大量人工,拖延工期。并且转炉和倾动装置均属于重型设备,倾动装置与转炉的跨耳轴连接配合间隙很小,安装精度要求高,分体吊装过程中倾动装置的水平度很难控制,安装过程耗时长。
发明内容
为了解决上述技术问题,本发明提供了一种炼钢转炉及倾动装置整体推装方法,提高施工效率,缩短工期。
为实现此技术目的,本发明采用如下方案:炼钢转炉及倾动装置整体推装方法,按如下步骤进行:
步骤一、预制承载转炉本体的转炉支架,转炉支架放置在过跨车上,利用加料跨天车将转炉本体吊装至转炉支架上,在转炉本体上安装托圈,继续利用加料跨天车将倾动装置提起并与托圈倾动侧耳轴插接;
步骤二、加料跨天车保持悬吊倾动装置使倾动装置水平放置,倾动装置的主要重量由耳轴承受,加料跨天车起到辅助平衡作用;倾动装置下方设置有水平支架,水平支架上设置有滑片,滑片与倾动装置下端接触;
步骤三、过跨车前方设置有两台卷扬机,卷扬机钩锁与过跨车连接,卷扬机拉动过跨车匀速移动,同时加料跨天车带动倾动装置同速跟进,滑片跟随倾动装置移动,起到辅助倾动装置在水平支架上滑动行走作用,实现转炉本体及倾动装置整体推装到位;
步骤四、待施工人员确定转炉本体及倾动装置均已安装到位后,安装固定转炉本体及倾动装置,安装完毕后,将加料跨天车吊钩由倾动装置上摘除,卷扬机钩锁由过跨车上摘除,完成转炉本体和倾动装置整体推装施工。
与现有技术相比,本发明的有益效果在于:本发明提供的推装方法节省了传统倾动装置分体安装所需要的工期,减少了施工成本,提高了工作效率,既保证工人施工过程中的安全,又保证了设备安装质量。
优选地,转炉支架为等腰梯形框架结构,分散重力,支架结构更加稳定。
优选地,水平支架为工字钢结构架,滑片为打磨后的光滑铁片。
附图说明
图1为本发明实施例提供的推装方法示意图;
图2为本发明实施例提供的转炉支架的结构示意图;
图中标记为:1、转炉支架;2、过跨车;3、转炉本体;4、倾动装置;5、水平支架;6、吊钩。
具体实施方式
为充分了解本发明之目的、特征及功效,借由下述具体的实施方式,对本发明做详细说明,但本发明并不仅仅限于此。
如图1所示,本发明提供的一种炼钢转炉及倾动装置整体推装方法,按如下步骤进行:
步骤一、根据转炉本体3及倾动装置4的吨位,设计转炉支架1,转炉支架1优选为等腰梯形结构,如图2所示。并利用迈达斯软件计算转炉支架1是否能够达到安全系数,能否达到预期承载力。现场将转炉支架1在过跨车2上组装完成,将转炉本体3吊装至转炉支架1上,并将转炉托圈安装在转炉本体3上,转炉托圈两侧设置有耳轴,其中一侧耳轴与倾动装置4连接。利用加料跨天车将倾动装置4提起并与转炉托圈倾动侧耳轴插接拼装,转炉本体3和耳轴承担倾动装置的主要重量,后续整体推进安装无需再进行倾动装置4的定位,在转炉本体3到位前就将倾动装置4安装好。
步骤二、拼装完成后加料跨天车继续保持吊装倾动装置4的状态,使倾动装置4保持水平。为了提高安全性同时避免施工过程中对倾动装置4的磨损,在倾动装置4下方设置水平支架5,水平支架5为工字钢结构架,水平支架5限制倾动装置4的高度和水平移动方向,保证倾动装置4在移动过程中不会发生超误差位移。水平支架5的上端面设置有滑片,滑片为打磨后的光滑铁片,减小与水平支架5的摩擦作用。滑片与倾动装置4下端接触,但不承担倾动装置4的主要重量,滑片与倾动装置4相对静止,滑片与水平支架5相对运动,滑片仅起到辅助倾动装置4在水平支架5上滑动行走的作用,防止倾动装置4底部在推装过程中过度磨损。
步骤三、过跨车2的前方设置有两台卷扬机,两台卷扬机分别固定在过跨车2轨道的两侧,卷扬机上的锁钩分别固定在过跨车2两侧,准备就绪。在推装前,通知并清空所有该区域内的施工人员,清理现场可能影响施工的杂物,在所有条件均已具备的情况下,同时启动两台卷扬机拉动过跨车2向前移动,同时加料跨天车带动倾动装置4同步跟进,将转炉本体3及倾动装置4推装至安装位置,停止卷扬机和加料跨天车,钳工、力工进行剩余设备安装工作。
步骤四、待施工人员确定转炉本体3及倾动装置4均已安装到位后,安装固定转炉本体3及倾动装置4,安装完毕后,将加料跨天车吊钩6由倾动装置4上摘除,卷扬机钩锁由过跨车2上摘除,完成转炉本体3和倾动装置4整体推装施工。整个推装过程不需要过长时间,既保证工人施工过程中的安全,又能够节省大量时间,缩短工期提高效率。
最后,需要注意的是:以上列举的仅是本发明的优选实施例,当然本领域的技术人员可以对本发明进行改动和变型,倘若这些修改和变型属于本发明权利要求及其等同技术的范围之内,均应认为是本发明的保护范围。
Claims (3)
1.一种炼钢转炉及倾动装置整体推装方法,其特征在于,按如下步骤进行:
步骤一、预制承载转炉本体的转炉支架,转炉支架放置在过跨车上,利用加料跨天车将转炉本体吊装至转炉支架上,在转炉本体上安装托圈,继续利用加料跨天车将倾动装置提起并与托圈倾动侧耳轴插接;
步骤二、加料跨天车保持悬吊倾动装置使倾动装置水平放置,倾动装置的主要重量由耳轴承受,加料跨天车起到辅助平衡作用;倾动装置下方设置有水平支架,水平支架上设置有滑片,滑片与倾动装置下端接触;
步骤三、过跨车前方设置有两台卷扬机,卷扬机钩锁与过跨车连接,卷扬机拉动过跨车匀速移动,同时加料跨天车带动倾动装置同速跟进,滑片跟随倾动装置移动,起到辅助倾动装置在水平支架上滑动行走作用,实现转炉本体及倾动装置整体推装到位;
步骤四、待施工人员确定转炉本体及倾动装置均已安装到位后,安装固定转炉本体及倾动装置,安装完毕后,将加料跨天车吊钩由倾动装置上摘除,卷扬机钩锁由过跨车上摘除,完成转炉本体和倾动装置整体推装施工。
2.根据权利要求1所述的炼钢转炉及倾动装置整体推装方法,其特征在于,转炉支架为等腰梯形框架结构。
3.根据权利要求1所述的炼钢转炉及倾动装置整体推装方法,其特征在于,水平支架为工字钢结构架,滑片为打磨后的光滑铁片。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110345838.4A CN113106192A (zh) | 2021-03-31 | 2021-03-31 | 炼钢转炉及倾动装置整体推装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110345838.4A CN113106192A (zh) | 2021-03-31 | 2021-03-31 | 炼钢转炉及倾动装置整体推装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113106192A true CN113106192A (zh) | 2021-07-13 |
Family
ID=76712926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110345838.4A Withdrawn CN113106192A (zh) | 2021-03-31 | 2021-03-31 | 炼钢转炉及倾动装置整体推装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113106192A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114737017A (zh) * | 2022-04-18 | 2022-07-12 | 中国二十二冶集团有限公司 | 转炉整体推装装置及推装方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060122246A (ko) * | 2005-05-26 | 2006-11-30 | 주식회사 포스코 | 전로 경동각 조절장치 |
CN105755205A (zh) * | 2016-04-14 | 2016-07-13 | 中国十七冶集团有限公司 | 一种超大型转炉组合法的安装方法 |
CN108676960A (zh) * | 2018-06-04 | 2018-10-19 | 中国十七冶集团有限公司 | 一种超大型炼钢转炉模块化法安装方法 |
-
2021
- 2021-03-31 CN CN202110345838.4A patent/CN113106192A/zh not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060122246A (ko) * | 2005-05-26 | 2006-11-30 | 주식회사 포스코 | 전로 경동각 조절장치 |
CN105755205A (zh) * | 2016-04-14 | 2016-07-13 | 中国十七冶集团有限公司 | 一种超大型转炉组合法的安装方法 |
CN108676960A (zh) * | 2018-06-04 | 2018-10-19 | 中国十七冶集团有限公司 | 一种超大型炼钢转炉模块化法安装方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114737017A (zh) * | 2022-04-18 | 2022-07-12 | 中国二十二冶集团有限公司 | 转炉整体推装装置及推装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210528272U (zh) | 一种预制构件的吊装设备 | |
CN110093869A (zh) | 一种基于移动支撑的桥梁下放拆除装置和桥梁下放拆除施工方法 | |
CN101976913A (zh) | 一种粗轧机主传动电机吊装方法 | |
CN104762438A (zh) | 一种转炉设备更换安装方法 | |
CN102049335B (zh) | 大型球磨机安装施工方法 | |
CN113106192A (zh) | 炼钢转炉及倾动装置整体推装方法 | |
CN101759108B (zh) | 塔式起重机自拆卸装置 | |
CN204958963U (zh) | 一种转炉托圈更换的顶升装置 | |
CN201347329Y (zh) | 塔式起重机自拆卸装置 | |
WO2022027883A1 (zh) | 一种悬臂式吊机 | |
CN218560878U (zh) | 一种冶金天车车轮组整体更换辅助装置 | |
CN101537983B (zh) | 厂房内大型设备高空就位的吊装方法 | |
CN214141300U (zh) | 一种冶金专用双梁桥式起重机 | |
CN104828688A (zh) | 一种用于辅助移动起重机超起配重的工具及其使用方法 | |
CN211169597U (zh) | 立车随机悬臂吊 | |
CN211619794U (zh) | 一种低空间简易龙门吊装装置 | |
CN210825132U (zh) | 一种具有接水盘的行车 | |
CN218507392U (zh) | 一种轻型钢结构吊装工具 | |
CN215402629U (zh) | 一种桥梁施工用的提梁机 | |
CN104591002A (zh) | 一种低净空双梁桥式起重机 | |
CN205419582U (zh) | 一种楼层起重机 | |
CN205187694U (zh) | 一种新型塔吊设备 | |
CN212222254U (zh) | 一种起重臂自架设自拆卸的装置 | |
CN211813118U (zh) | 一种施工用物料装卸装置 | |
CN218813232U (zh) | 一种预应力箱梁张拉千斤顶辅助安拆、固定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210713 |