CN113098130A - Analysis system for monitoring line loss abnormity problem of low-voltage transformer area - Google Patents

Analysis system for monitoring line loss abnormity problem of low-voltage transformer area Download PDF

Info

Publication number
CN113098130A
CN113098130A CN202110231826.9A CN202110231826A CN113098130A CN 113098130 A CN113098130 A CN 113098130A CN 202110231826 A CN202110231826 A CN 202110231826A CN 113098130 A CN113098130 A CN 113098130A
Authority
CN
China
Prior art keywords
line loss
data
checking
abnormal
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110231826.9A
Other languages
Chinese (zh)
Inventor
靳伟
陈岩
李征
李泽卿
景凤攀
王仁
王利新
邸瑞雨
谷小叶
兰伟亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Haoyuan Electric Technology Co ltd
Xingtai Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Baoding Haoyuan Electric Technology Co ltd
Xingtai Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Haoyuan Electric Technology Co ltd, Xingtai Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Baoding Haoyuan Electric Technology Co ltd
Priority to CN202110231826.9A priority Critical patent/CN113098130A/en
Publication of CN113098130A publication Critical patent/CN113098130A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Abstract

The invention discloses an analysis system for monitoring the abnormal line loss problem of a low-voltage transformer area, which comprises an electricity consumption information acquisition terminal, a master station and a remote monitoring terminal, wherein the electricity consumption information acquisition terminal is connected with the master station which is connected with the remote monitoring terminal; the power utilization information acquisition terminal acquires power utilization information of low-voltage users in the distribution transformer area; the master station comprises a data processing module and an operation management module, wherein the data processing module processes and analyzes the electricity utilization information, judges whether the monitored node has a line loss abnormal phenomenon or not and classifies and arranges the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result; the remote monitoring terminal carries out remote monitoring on the electricity consumption information, the line loss abnormal condition of the main station and the solution. The invention reduces the workload of line loss managers, greatly improves the working efficiency, and solves the technical problems that the line loss rate of a large number of low-voltage transformer areas cannot be judged at present.

Description

Analysis system for monitoring line loss abnormity problem of low-voltage transformer area
Technical Field
The invention belongs to the technical field of distribution room line loss management, and particularly relates to an analysis system for monitoring the problem of low-voltage distribution room line loss abnormity.
Background
The loss that the unusual line loss in platform district caused accounts for the most of platform district loss, so to the unusual problem analysis work of low-voltage platform district line loss be the important way of effectively reducing the platform district loss, the platform district is as the end of whole power supply network, and its loss reduction work is heavy, and inefficiency is the difficult problem that can't solve always put before all power consumption inspection personnel: (1) the personnel allocation is insufficient: the number of the transformer areas is huge, the distribution range of the transformer areas is large, and the number of the current electricity utilization inspection personnel is seriously insufficient. (2) The customers increase year by year: in recent years, with the increasing living standard of people, the number of electricity customers increases year by year, and the electricity consumption of low-voltage customers increases at a speed of more than ten percent every year. (3) Behind the loss reduction technology: at present, loss reduction can only adopt a mode of people-sea tactics and household-by-household investigation, a large amount of manpower, material resources and financial resources are consumed, the efficiency is low, the electricity utilization inspection work is just like a sea fishing needle, and the difficulty is very high.
Therefore, how to provide an analysis system for monitoring the abnormal line loss problem of the low-voltage transformer area is a problem that needs to be solved urgently by those skilled in the art.
Disclosure of Invention
In view of this, the invention provides an analysis system for monitoring the problem of abnormal line loss of a low-voltage distribution room, which reduces the workload of line loss managers, greatly improves the working efficiency, and solves the technical problems that the line loss rate of a large number of low-voltage distribution rooms is difficult to analyze, and the abnormal line loss rate of the distribution rooms cannot be judged at present.
In order to achieve the purpose, the invention adopts the following technical scheme:
an analytic system of unusual problem of low pressure platform district line loss of monitoring includes: the system comprises a power consumption information acquisition terminal, a master station and a remote monitoring terminal, wherein the power consumption information acquisition terminal is connected with the master station through a wireless communication module, and the master station is connected with the remote monitoring terminal through the wireless communication module;
the power utilization information acquisition terminal is used for acquiring power utilization information of low-voltage users in the distribution transformer area;
the master station comprises a data processing module and an operation management module, wherein the data processing module is used for processing and analyzing the electricity utilization information, judging whether the monitored node has a line loss abnormal phenomenon or not and classifying and sorting the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result of the data processing module;
and the remote monitoring terminal is used for remotely monitoring the electricity consumption information, the line loss abnormal condition of the main station and the solution.
Preferably, the power consumption information collecting terminal includes: the collector sends collected power consumption information of low-voltage users in the distribution transformer area to the concentrator, and the concentrator collects the power consumption information of the collector and transmits the power consumption information to the master station through the GPRS device through the wireless communication module.
Preferably, the data processing module comprises a data processor, a data memory, a data calling unit, a data comparing unit and a judging unit, wherein the data memory receives the electricity utilization information sent by the data processor and stores the electricity utilization information in a database; the data calling unit is used for calling the standard electricity utilization data in the database and sending the standard electricity utilization data to the data comparison unit; the data comparison unit is used for comparing the power utilization information sent by the data processor with standard power utilization data and sending a comparison result to the judgment unit; the judging unit is used for judging whether the monitored node has the line loss abnormal phenomenon or not according to the comparison result and feeding back the judgment result to the data processor; and the data processor positions the users with abnormal line loss according to the judgment result of the monitored node.
Preferably, the operation management module comprises a statistical unit, a report generation unit, a line loss abnormity classification unit and a scheme making unit; the statistical unit is used for performing statistical analysis on key links in the power supply and utilization process and processing and analyzing results of the data processing module; the report generation unit generates a modular report according to the statistical result of the statistical unit; the line loss abnormity classification unit classifies and arranges abnormal line loss conditions according to the processing and analyzing result of the data processing module; and the scheme making unit is used for providing corresponding solutions for different types of line loss abnormal conditions.
Preferably, the line loss abnormal conditions are divided into two categories: high line loss problem and negative line loss problem, wherein high line loss problem includes: the problems of wrong household transformation relation, faults of metering devices and the like, electricity stealing and acquisition; the negative line loss problem includes: the problem of the error of the household variable relationship, the fault of the metering device and the acquisition problem.
Preferably, a line loss abnormal analytic hierarchy process, a high line loss analytic process, a negative line loss analytic process, and a small-power or slight negative line loss analytic process are adopted to analyze the line loss abnormal condition, so as to obtain a solution.
Preferably, a line loss abnormal analytic hierarchy process is adopted to perform dynamic analysis of the electric load of the user in different time periods, and the analysis comprises the following steps:
troubleshooting acquisition abnormity, troubleshooting household variable relation abnormity, troubleshooting metering device abnormity, troubleshooting electricity stealing/abnormal electricity utilization; wherein the troubleshooting metrology device anomalies comprises:
checking an examination table clock, checking examination table alarm information, checking an examination table junction box, checking an examination table current transformer and checking an examination table phase relation.
Preferably, a high line loss analysis method is adopted to perform dynamic analysis of the electrical load of the user in different time periods, and the dynamic analysis comprises the following steps:
the first step is as follows: the meter is fully accessed, and the acquisition success rate is ensured;
the second step is that: checking whether the multiplying power of the electricity information acquisition terminal is consistent with that of the marketing system, and checking whether the multiplying power of the check meter is consistent with that of the mutual inductor; if the multiplying power is different, the master station modifies the flow;
the third step: checking the corresponding relation between the electricity consumption information acquisition terminal and the marketing system and users, and synchronizing acquisition point flows if the electricity consumption information acquisition terminal and the marketing system are inconsistent;
the fourth step: the master station thoroughly reads the electric quantity of the check meter and checks, and if the thoroughly read data is inconsistent with the frozen data, the terminal is replaced;
the fifth step: the master station analyzes the zero-degree user, thoroughly reads the data, and replaces the frozen data if the frozen data is inconsistent with the thoroughly read data; if the power consumption is consistent, the power consumption condition and wiring are verified on site;
and a sixth step: the master station exports the frozen data, and checks whether the frozen data exist or not, and the running of the electric meter is zero;
the seventh step: checking whether a management user which is not included exists or not on site, and checking through a line;
eighth step: verifying whether the user table file is complete on site;
the ninth step: and (4) exporting the frozen data, checking the zero-degree user with large electric quantity change, and checking whether the electricity stealing condition exists or not. .
Preferably, a negative line loss analysis method is adopted to perform dynamic analysis of the electrical load of the user in different time periods, and the analysis comprises the following steps:
(1) the meter is fully connected, and the integration power is ensured;
(2) checking whether the multiplying power of the electricity utilization information acquisition terminal is consistent with that of the marketing system, and checking the multiplying power of the examination table and the multiplying power of the mutual inductor; if the multiplying powers are not consistent, the master station modifies the flow;
(3) checking whether the current value of the check meter is normal or not and whether the reverse or current loss condition exists or not;
(4) checking the situation of the household meter, selecting a user with larger daily actual power consumption for checking, checking whether the power consumption information acquisition terminal is consistent with the multiplying power of the marketing system or not, modifying the inconsistent master station, and checking the multiplying power method in the same step (2);
(5) the master station thoroughly reads the electric quantity of the check meter and checks, and if the thoroughly read data is inconsistent with the frozen data, the terminal carries out replacement processing;
(6) the master station leads out frozen data through meter reading data query, checks users with or without electric quantity sudden increase, thoroughly reads by the master station, and carries out replacement processing if inconsistency proves that the acquisition terminal has problems; if the user mutual inductor and the meter are consistent, checking the user mutual inductor and the meter on site for processing;
(7) and the master station checks that no problem exists, and verifies the wiring problem of the checking meter and the condition of the mutual inductor on site.
Preferably, a small electric quantity or slight negative line loss analysis method is adopted to perform dynamic analysis of the electric load of the user in different time periods, and the analysis method comprises the following steps:
1) the meter is fully accessed, and the acquisition success rate is ensured;
2) checking the precision of the examination and checking meter by checking the examination and checking meter on site, and determining whether the measurement is accurate or not;
3) and verifying the station area user-to-user relationship, judging whether a station fleeing area condition occurs, and if so, adjusting the flow.
The invention has the beneficial effects that:
the power consumption information of low-voltage users in the distribution transformer area is acquired through the power consumption information acquisition terminal; the data processing module processes and analyzes the electricity utilization information, judges whether the monitored node has a line loss abnormal phenomenon, and classifies and arranges the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result of the data processing module; the remote monitoring terminal is used for remotely monitoring the power consumption information and the processing and analyzing result of the main station, can quickly and accurately analyze the abnormal condition of the line loss in a short time, obtains the line loss type, provides a corresponding solution, saves a large amount of manpower, material resources and financial resources, and greatly improves the working efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
FIG. 1 is a schematic diagram of the present invention.
Fig. 2 is a schematic structural diagram of the electricity consumption information acquisition terminal according to the present invention.
FIG. 3 is a schematic diagram of a data processing module according to the present invention.
Fig. 4 is a schematic structural diagram of the operation management module according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides an analysis system for monitoring abnormal line loss in a low voltage transformer area, including: the system comprises a power consumption information acquisition terminal, a master station and a remote monitoring terminal, wherein the power consumption information acquisition terminal is connected with the master station through a wireless communication module;
the power utilization information acquisition terminal is used for acquiring power utilization information of low-voltage users in the distribution transformer area;
the master station comprises a data processing module and an operation management module, wherein the data processing module is used for processing and analyzing the electricity utilization information, judging whether the monitored node has a line loss abnormal phenomenon or not and classifying and sorting the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result of the data processing module;
and the remote monitoring terminal is used for remotely monitoring the electricity consumption information, the line loss abnormal condition of the main station and the solution.
Referring to fig. 2, in this embodiment, the power consumption information acquiring terminal includes: collector, concentrator and GPRS device, wherein, the collector with the distribution transformer district low pressure user's that gathers power consumption information transmission to the concentrator, the concentrator concentrates the collection back with the ammeter data that a plurality of collectors gathered, adopts the GPRS device to pass through radio communication module and sends the main website to, receives the data monitoring instruction that the main website was issued to with power consumption information upload to the main website.
Referring to fig. 3, in this embodiment, the data processing module includes a data processor, a data memory, a data retrieving unit, a data comparing unit, and a determining unit, where the data memory receives the power consumption information sent by the data processor and stores the power consumption information in a database, and the database stores standard power consumption data in advance; the data calling unit is used for calling the standard electricity utilization data in the database and sending the standard electricity utilization data to the data comparison unit; the data comparison unit is used for comparing the power utilization information sent by the data processor with the standard power utilization data and sending a comparison result to the judgment unit; the judging unit is used for judging whether the monitored node has the line loss abnormal phenomenon or not according to the comparison result and feeding back the judgment result to the data processor; and the data processor is used for respectively carrying out line loss accounting on the whole distribution area, each branch and each node according to the judgment result of the monitored node, automatically identifying the branch or line with abnormal line loss, and addressing and positioning the nodes through the station table information addressing device, so that the positioning of users with abnormal line loss is realized.
Referring to fig. 4, the operation management module includes a statistical unit, a report generation unit, a line loss abnormality classification unit, and a scheme formulation unit; the statistical unit is used for performing statistical analysis on key links in the power supply and utilization process and processing and analyzing results of the data processing module; the report generation unit generates a modular report according to the statistical result of the statistical unit, and the information which needs to be known can be accurately mastered through the remote monitoring terminal; the line loss abnormity classification unit classifies and arranges abnormal line loss conditions according to the processing and analyzing result of the data processing module; and the scheme making unit is used for providing corresponding solutions for different types of line loss abnormal conditions.
In this embodiment, the line loss abnormal conditions are divided into two types: high line loss problem and negative line loss problem, wherein high line loss problem includes: the problem of wrong household transformation relation, the problem of faults of metering devices and the like, the problem of electricity stealing and the problem of collection.
(1) Error of user-variant relationship: the number of the system archive users is inconsistent with the number of the actual field users, and is mainly caused by power consumption counting errors or meter reading failures due to the fact that cross-distribution areas exist in the user electric energy meter (the field users use power in the distribution area A, and the system archives are hung in the distribution area B, so that the distribution area A consumes less power). The system file is inconsistent with the site (commonly called black household), the marketing or electricity consumption information acquisition terminal file is asynchronous with the site, and the file information lags behind the conditions of site meter changing and household establishment, so that the metering of less electric quantity is caused.
The solution measures are as follows: a, a big data fuzzy algorithm is used for carrying out unified analysis on a plurality of power distribution areas in the same power supply area (the power consumption of a suspicious user can be calculated through analysis of system archive information, data in a concentrator, acquisition conditions and the like, and finally field check is carried out), so that the complete consistency of the power distribution areas must be ensured. And B, automatically identifying the relationship of the platform users by installing the platform area intelligent diagnosis robot. And C, checking the users who cannot determine the relationship of the station by the station area identifier. And D, for users with system files inconsistent with the site, the purposes of table loading on the same day and filing on the same day are achieved.
(2) One type of failure of the metering device: multiplying power of the electric energy meter under the transformer area (a master meter and a user electric energy meter), and system files are not consistent with actual multiplying power on site: the equipment in the transformer area is aged (the reactive compensation is insufficient), so that the power factor is low, and the loss of the transformer area is increased; the internal faults, burning and electricity selling quantity of the user electric energy meter under the platform area are different; when a mutual inductor of the user electric energy meter is damaged and no current exists for the second time or the current is small, the power consumption in a transformer area is small; the meter under the transformer district sends out the ultra-capacity electricity consumption, so that the actually generated electricity quantity is not counted (the calculation mode is that the electricity consumption exceeds the threshold value of 'transformer (user) capacity 24 x 2 x days'); the old and damaged power supply circuit causes the leakage of the circuit and the loss of the power supply quantity; the three-phase load distribution of the transformer area is unbalanced, and the power distribution loss is increased.
The solution measures are as follows: examination table magnification: generally, the multiplying power of a transformer to be configured is estimated through the capacity of the transformer in a system file, and then a CT ratio check instrument used on site is verified to determine whether the multiplying power is wrong or the power load is not matched on site. User table multiplying power: and estimating whether the power consumption of the transformer is larger than the power consumption counted by the meter according to the type and the power consumption condition of the user, and checking whether the multiplying power is correct and whether the transformer is damaged on site. The mutual inductor must be verified before being installed, and the situation that the actual multiplying power of the mutual inductor is inconsistent with the nameplate label is avoided. And B, finding users with possible problems in meter metering in the operation and reading process, timely checking whether the meter has faults or is burnt out on site, if so, timely replacing the electric energy meter, and synchronizing operation and acquisition system files. C, calling and testing the meter in the background through the acquisition system, checking whether the meter under the platform area has clock deviation, and requesting an electric energy meter manufacturer to correct or replace a new electric energy meter if the meter under the platform area has the clock deviation. And D, carrying out background calling and testing through the acquisition system, and checking whether the three-phase load of the transformer area is balanced. And E, the old and damaged conditions of the field power supply line exist, the old and damaged conditions are timely rectified, and a new line is replaced. And F, calculating whether the meter has the over-capacity condition or not according to the capacity of the transformer (user).
(3) Electricity stealing: the power utilization is mainly realized by private wiring of users under the distribution area on a distribution line or bypassing a metering device. The electricity stealing in the urban network platform area is generally concentrated on users with larger electricity consumption, such as temporary electricity consumption in shops, hotels, residential property, entertainment places, construction sites and the like along streets, and a small part of the users steal electricity for residents. The electricity stealing in the rural power grid area is mainly temporary electricity utilization such as private wiring of residents, house covering, irrigation and the like.
The solution measures are as follows: whether wiring of the intelligent electric energy meter under the platform area is correct or not and whether current and voltage are normal or not can be automatically identified by installing the platform area data checking instrument or the intelligent diagnosis robot (the embodiment of the disclosure does not limit the data checking instrument or the intelligent diagnosis robot, and the existing data checking instrument or the existing intelligent diagnosis robot in the market can be adopted); whether the resident opens the meter cover site privately, and the like. For the electricity utilization condition of a user or a mechanical meter bypassing the metering device, a checker needs to go to the site for checking.
(4) The collection problem is as follows: if the data of the user electric energy meter in the lower part of the power distribution area fails to be collected for a long time, the power utilization information collection terminal can adopt the full electric quantity or incomplete data for statistics; the parameter setting of the electric energy meter in the electricity consumption information acquisition terminal is wrong, so that the electric quantity is deviated from the actual electric quantity.
The solution measures are as follows: and (3) carrying out system analysis on the users who fail to collect the electricity, judging whether the concentrator is hung wrongly, the electric energy meter module is damaged and the system parameter setting is correct, and then checking whether the correct collection rate of the users who use the electricity under the distribution area is up to 100% or not on site.
The negative line loss problem includes: the problem of the error of the household variable relationship, the fault of the metering device and the acquisition problem.
Firstly, error of user variable relation: the number of the system archive users is inconsistent with the number of the actual field users, and is mainly caused by power consumption counting errors or meter reading failures due to the fact that cross-distribution areas exist in the user electric energy meter (the field users use power in the distribution area A, and the system archives are hung in the distribution area B, so that the distribution area A consumes less power). The system file is inconsistent with the site (commonly called black household), the marketing or electricity consumption information acquisition terminal file is asynchronous with the site, and the file information lags behind the conditions of site meter changing and household establishment, so that the metering of less electric quantity is caused.
The solution measures are as follows: a, a big data fuzzy algorithm is used for carrying out unified analysis on a plurality of power distribution areas in the same power supply area (the power consumption of a suspicious user can be calculated through analysis of system archive information, data in a concentrator, acquisition conditions and the like, and finally field check is carried out), so that the complete consistency of the power distribution areas must be ensured. And B, automatically identifying the relationship of the platform users by installing the platform area intelligent diagnosis robot. And C, checking the users who cannot determine the relationship of the station by the station area identifier. And D, for users with system files inconsistent with the site, the purposes of table loading on the same day and filing on the same day are achieved.
The second type of faults of the metering device mainly comprise:
and A, the multiplying power of a general meter or a user electric energy meter of the marketing and electricity information acquisition terminal is inconsistent with the site (mainly, the multiplying power of a system of a general meter transformer is smaller than the actual multiplying power of the site, or the multiplying power of a file of the user transformer is larger than the actual multiplying power of the site). And B, wiring error of a station area general table: common zero line sharing, current outgoing line interconnection, three-phase mutual inductor interconnection, three-phase outgoing line interconnection of the electric energy meter and reverse connection of current polarity. And the secondary voltage is virtually connected. And C, the current connection of the junction box is wrong or the junction box is damaged, so that the current short circuit and virtual connection are caused. And D, the clock deviation of the electric energy meter (the clock of the user meter is later than the clock of the general meter) causes the general meter to freeze data with the user electric energy meter. And E, connecting the electricity utilization of the user before the table area general table, so that part of the electricity utilization amount is not counted in the table area general table. The F transformer is unreasonable in configuration (the field operation load cannot meet the configuration requirement), and a small negative line loss situation of a transformer area is usually caused. G three-phase load imbalance (one of the currents in the summary table exceeds the rated value or three-phase imbalance is much larger than the standard value (15%), which causes small negative line loss in the transformer area.
The solution measures are as follows: the problem processing mode of the total meter multiplying power and the user electric energy meter multiplying power is consistent with the high line loss method. And B, the voltage, the current, the power factor and the phase angle of the summary table can be summoned and measured in the acquisition system for analysis, and whether the wiring of the summary table has problems or not can be judged. Abnormal data are recalled and detected, which mainly shows the conditions of voltage phase loss, current loss or identity, low power factor, phase angle error and the like, and then the wiring condition of the general table is checked on site. And C, the electric energy meter clock is required to be associated with a manufacturer to correct or replace a new electric energy meter when the clock is deviated. And D, for wiring before the summary table for the electricity consumption of the user, the line needs to be rectified and changed. And E, calling a summary sheet current curve and a load condition from the acquisition system, calculating whether the conditions of unreasonable transformer configuration and three-phase load balance exist, and if so, replacing and configuring a reasonable transformer and adjusting the three-phase load condition.
Problem collection: corresponding to the user who fails in collection, the power consumption information collection terminal can carry out system completion on the user electric energy meter base codes which are not collected, and the situation that the completion data are larger than the actual field data can occur in the completion process.
The solution measures are as follows: the users who fail to collect are firstly analyzed by the system, whether the concentrator is hung wrongly or not and whether the system parameter setting is correct or not are checked on site, and the correct collection rate of the users who use electricity under the distribution area is ensured to reach 100%.
In this embodiment, a line loss abnormal analytic hierarchy process, a high line loss analytic process, a negative line loss analytic process, and a small-power or slight negative line loss analytic process are used to analyze the line loss abnormal condition, so as to obtain a solution.
Line loss anomaly analytic hierarchy process:
the management power utilization information acquisition terminal station area line loss is mainly managed layer by layer in a mode from easy to go and from appearance to essence, and the station area line loss is managed layer by layer in a matching worksheet mode in a targeted mode, and the whole technical scheme is called as a line loss abnormity management analytic hierarchy process.
The first step is as follows: and checking and collecting abnormity. The acquisition success rate of the user meter is a necessary condition for guaranteeing real and effective synchronous line loss of the transformer area. The problem appearance is that the coverage rate and the acquisition integrated power of the subscriber list in the station area do not reach the standard, and the station area cannot realize daily online monitoring. Firstly, the coverage rate and the acquisition success rate of the intelligent meter are improved, meters which are continuously failed to read the meter for 7 days are checked on site, and the wiring condition of the meters is checked or the meters are replaced. The acquisition success rate is ensured, and the electricity selling quantity in the same period is more real and has more reference value.
The second step is that: and checking the abnormal user change relationship. On the premise of ensuring the acquisition success rate of the household table and the examination table, after the data of the synchronous line loss of the transformer area is ensured to be real and effective, if the line loss is still abnormal, whether the household variation relation of the transformer area is correct is considered at first.
The problem expression is that the line loss of the transformer area is abnormal, the online monitoring condition is met, and the problem does not exist in the examination table. The processing method is that whether the user variable relationship in the GS186 system and the electricity consumption information acquisition terminal is consistent needs to be verified firstly. Under the condition that the consistency of the two systems is ensured, the line loss is still abnormal, the accuracy of the user variable relation needs to be verified on site, and whether the line loss is abnormal due to the error of the user variable relation is judged.
The third step: and (5) checking the abnormality of the metering device. The metering exception comprises a station area assessment total table and a user table exception. The successful acquisition of the examination table is a necessary condition for ensuring the power supply quantity of the transformer area, and for many negative line loss transformer areas, the examination table is caused by abnormal summary tables. The summary table exception comprises pressure loss, flow loss, low power factor, inconsistent multiplying power and the like. For the negative line loss distribution area, the factors on the side of the summary table can be preferably considered, and all index data of the summary table need to be comprehensively checked when the summary table is checked. The problem that the metering device of a user with large electric quantity in the station area is abnormal is mainly solved, and the common problems of the metering device are as follows: the voltage loss, the undervoltage, the clock abnormality, the battery undervoltage, the current loss, the reverse phase sequence and the like can be guided to eliminate the defects on site according to the metering abnormal meter information pushed by the metering device intelligent diagnosis and online monitoring system.
3.1) checking the clock of the test table. And browsing the electric meter panel to find out whether the clock and date items are correct or not. Clock errors can cause that freezing time of the bottom of the freezing table and the sub-table hanging under the platform area are not uniform, so that system line loss calculation errors are caused.
And 3.2) checking the alarm information of the examination table. Whether the warning signal lamp on the electric meter panel is lighted or not is checked, if the warning signal lamp is lighted, an error code on a liquid crystal screen is searched: typical errors such as ERR-08 time error, ERR-56 active direction change (except for bidirectional metering) can cause line loss calculation error.
3.3) checking the junction box of the examination table. Firstly checking whether the voltage and the current connecting sheet of the junction box are correct or not, and then checking whether the wiring with the concentrator is correct or not, wherein the voltage is connected in parallel, for example, a current line of a current loop connected with the concentrator is connected in series with a current line of an ammeter.
And 3.4) checking the current transformer of the checking meter. The primary side of the current transformer, the wire inlet side of the junction box and the wire outlet side of the junction box are clamped simultaneously through two clamp meters in sequence, and whether the transformation ratio of the transformer is correct or not and whether the internal wiring of the junction box is in virtual connection or not are checked by combining and simultaneously browsing corresponding items of a liquid crystal screen of the ammeter. Because of the measurement error caused by the load fluctuation, the two clamp meters are required to be simultaneously measured, the corresponding difference is required, the measuring range of the current secondary side clamp meter is shifted to a proper gear (2/20A) according to the actual condition, and the consistency is checked with the system file after the CT transformation ratio is checked.
And 3.5) checking the phase relation of the table. If the current displayed on the screen of the ammeter is a negative value or the total power is not the sum of three phase power components, the real phase relation needs to be checked through the phase volt-ampere meter.
The fourth step: and other problems such as electricity stealing/abnormal electricity utilization are eliminated. For the high-line-loss transformer area, the reasons of electricity stealing, whether the power supply radius of the actual line is too long and the like can be considered; the negative line loss station zone can consider the slight negative line loss problem of the station zone caused by the photovoltaic meter acquisition, the file problem and the meter comprehensive error, and the problem that the station zone U still shows abnormality if the line loss is still shown after the analysis and determination of the front three layers and above are not wrong and the treatment is finished can be treated from the following two aspects: firstly hang the ammeter down in the platform district and have the line loss that the action of stealing electricity or wrong wiring lead to unusual, mainly show for three-phase small power user voltage decompression is undervoltage, current shunting, single-phase table user zero live wire current unbalance, single-phase and three-phase user have uncapping record etc. and the wrong report information of ammeter should still be selected to the record of uncapping, has many times to uncap the warning and can judge for the wrong report if in the short time. The method can be used for on-site inspection by households or screening and reducing the inspection range by using a platform area diagnostic instrument, and then purposeful search can be carried out. And secondly, the phenomenon of no meter power utilization in private pull disorderly connection exists in the power supply range of the distribution area. After the inspection is completed and no abnormality is confirmed, the line loss is still higher than the theoretical value, and the sequential inspection of private branch and random connection or the gradual reduction of the inspection range by means of a portable low-voltage branch gateway meter can be considered.
The "line loss abnormality treatment analytic hierarchy process" needs to pay special attention to the treatment sequence during treatment. According to the principle of easiness before difficulty and difficulty after difficulty, the power supply station can be used as a unit to treat the power supply station layer by layer, the problem of line loss of most of the transformer areas can be basically solved by the first three layers, the transformer areas related to the fourth step are difficult to treat, and the transformer areas need to be treated one by one in combination with the site.
The high line loss analysis method comprises the following steps:
the first step is as follows: the meter is fully accessed, and the acquisition success rate is ensured.
The second step is that: and checking whether the multiplying power of the electricity information acquisition terminal is consistent with that of the marketing system, and checking whether the multiplying power of the check meter is consistent with that of the mutual inductor. And if the multiplying power is different, the master station modifies the flow.
The third step: and checking the corresponding relation between the electricity consumption information acquisition terminal and the marketing system and the user, and if the electricity consumption information acquisition terminal and the marketing system are inconsistent, synchronizing the acquisition point flow.
The fourth step: and the master station checks the electric quantity of the check meter through reading, and if the data through reading is inconsistent with the frozen data, the terminal inquires about the data, and the terminal is replaced.
The fifth step: the master station analyzes the zero-degree user, thoroughly reads the data, if the frozen data is inconsistent with the thoroughly read data, the problem of the acquisition terminal is solved, the acquisition terminal is replaced, and if the frozen data is consistent with the thoroughly read data, the problems of power utilization condition, wiring and the like are verified on site.
And a sixth step: and the master station derives the frozen data, checks whether the meter problems exist, such as that the meter runs to zero suddenly, checks the meter problems on site and processes the meter problems in time.
The seventh step: whether non-incorporated management users (actual power utilization) exist or not is verified on site, and troubleshooting can be performed through line verification (mainly for troubleshooting public facilities and the like) or through a Dingxin meter searching technology.
Eighth step: and (4) verifying whether the user table file is complete or not on site, and determining the user variable relationship by using a station area identifier if the user table file is not contained in the adjacent station area table meter.
The ninth step: and (4) exporting the frozen data, checking the zero-degree user with large electric quantity change, checking whether the electricity stealing condition exists or not, and processing in time.
A negative line loss analysis method;
the first step is as follows: the meter is fully connected, and the integrated power is ensured.
The second step is that: and checking whether the power utilization information acquisition terminal is consistent with the multiplying power of the marketing system, and checking the multiplying power of the examination table and the multiplying power of the mutual inductor.
And if the multiplying powers are not consistent, the master station modifies the flow.
The third step: and checking whether the current value of the check meter is normal or not and whether the reverse or current loss condition exists or not.
The fourth step: and checking the household meter condition, selecting the user with larger daily actual power consumption for checking, checking the user with large power consumption, judging whether the power consumption information acquisition terminal is consistent with the multiplying power of the marketing system, modifying the inconsistent master station, and checking the multiplying power.
The fifth step: and the master station thoroughly reads the electric quantity of the check meter to check, and if the thoroughly read data is inconsistent with the frozen data, the problem of the terminal is indicated, and the terminal is replaced.
And a sixth step: the main station exports frozen data through meter reading data query, checks users (electric meters run away) with or without electric quantity sudden increase, thoroughly reads by the main station, and if inconsistency proves that the acquisition terminal has problems, carries out replacement processing. And if the conditions of the user mutual inductor, the meter and the like are checked on site consistently, processing is carried out.
The seventh step: the master station checks that no problem exists, and the on-site checking checks the wiring problems (current loss, reverse connection, black and white screen of the check meter and the like) of the check meter and the condition of the mutual inductor.
A small-electric-quantity and slight negative line loss analysis method comprises the following steps:
the first step is as follows: the meter is fully accessed, and the acquisition success rate is ensured.
The second step is that: and (5) checking the checking meter on site to check the precision of the checking meter and determine whether the measurement is accurate or not.
The third step: and verifying the station area user-to-user relationship, judging whether a station fleeing area condition occurs, and if so, adjusting the flow.
The embodiment of the invention provides a method for analyzing power consumption of users with abnormal line loss in a distribution transformer area, which comprises the following specific processes:
(1) and the low-voltage transformer area line loss abnormal full-problem monitoring and analyzing equipment is installed in the line loss abnormal transformer area, and the low-voltage transformer area line loss abnormal full-problem monitoring and analyzing equipment is installed in the high-voltage transformer area general meter box, so that the electricity stealing conditions of all users can be diagnosed and analyzed in batches.
(2) Starting the low-voltage transformer area line loss abnormity all-problem monitoring and analyzing equipment, actively diagnosing the electricity utilization condition of all users hung under the 24-hour diagnosis transformer area, locking suspected electricity stealing users, pre-judging electricity stealing positions and electricity stealing modes.
(3) Checking diagnosis result, processing electricity stealing user
After the equipment is installed for 1 day, electricity inspection personnel operate a platform area basic data analysis APP on a handheld intelligent terminal to check a diagnosis result on site, and an anti-electricity-stealing action is deployed.
(4) Purposeful to check electricity stealing and quickly reduce line loss rate
According to the diagnosis result, the electricity stealing can be checked on site, the time is saved by 90 percent compared with the prior art, and the work efficiency is greatly improved compared with the prior equipment without waiting on site.
The power consumption information of low-voltage users in the distribution transformer area is acquired through the power consumption information acquisition terminal; the data processing module processes and analyzes the electricity utilization information, judges whether the monitored node has a line loss abnormal phenomenon, and classifies and arranges the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result of the data processing module; the remote monitoring terminal is used for remotely monitoring the power consumption information and the processing and analyzing result of the main station, can quickly and accurately analyze the abnormal condition of the line loss in a short time, obtains the line loss type, provides a corresponding solution, saves a large amount of manpower, material resources and financial resources, and greatly improves the working efficiency. The system has obvious loss reduction effect, can greatly improve the existing working mode, obtains great economic benefit, obviously improves the working efficiency and brings good economic benefit for a power grid company; the reasonable and legal power utilization of users is standardized to a certain extent, the power supply order of a power grid company is guaranteed for maintaining social environment, a green power grid is built, the social influence is profound, and the effect of driving the propulsion of the stability of the society is achieved; the problems of complex operation, high difficulty in location, easy error and the like can be solved, the frequency of the staff of the power supply department going to the site is reduced, the operation and maintenance cost is saved, the location time of a high-line damage area is shortened, and the technical level of electricity utilization inspectors is improved.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides an analytic system of unusual problem of low pressure platform district line loss which characterized in that includes: the system comprises a power consumption information acquisition terminal, a master station and a remote monitoring terminal, wherein the power consumption information acquisition terminal is connected with the master station through a wireless communication module, and the master station is connected with the remote monitoring terminal through the wireless communication module;
the power utilization information acquisition terminal is used for acquiring power utilization information of low-voltage users in the distribution transformer area;
the master station comprises a data processing module and an operation management module, wherein the data processing module is used for processing and analyzing the electricity utilization information, judging whether the monitored node has a line loss abnormal phenomenon or not and classifying and sorting the line loss abnormal condition; the operation management module provides a corresponding solution according to the processing and analyzing result of the data processing module;
and the remote monitoring terminal is used for remotely monitoring the electricity consumption information, the line loss abnormal condition of the main station and the solution.
2. The analysis system for monitoring the abnormal line loss problem of the low-voltage transformer area according to claim 1, wherein the electricity utilization information acquisition terminal comprises: the collector sends collected power consumption information of low-voltage users in the distribution transformer area to the concentrator, and the concentrator collects the power consumption information of the collector and transmits the power consumption information to the master station through the GPRS device through the wireless communication module.
3. The analysis system for monitoring the line loss abnormal problem of the low-voltage transformer area according to claim 1, wherein the data processing module comprises a data processor, a data memory, a data calling unit, a data comparing unit and a judging unit, wherein the data memory receives the electricity utilization information sent by the data processor and stores the electricity utilization information in a database; the data calling unit is used for calling the standard electricity utilization data in the database and sending the standard electricity utilization data to the data comparison unit; the data comparison unit is used for comparing the power utilization information sent by the data processor with standard power utilization data and sending a comparison result to the judgment unit; the judging unit is used for judging whether the monitored node has the line loss abnormal phenomenon or not according to the comparison result and feeding back the judgment result to the data processor; and the data processor positions the users with abnormal line loss according to the judgment result of the monitored node.
4. The analysis system for monitoring the line loss abnormal problem of the low-voltage transformer area according to claim 3, wherein the operation management module comprises a statistical unit, a report generation unit, a line loss abnormal classification unit and a scheme making unit; the statistical unit is used for performing statistical analysis on key links in the power supply and utilization process and processing and analyzing results of the data processing module; the report generation unit generates a modular report according to the statistical result of the statistical unit; the line loss abnormity classification unit classifies and arranges abnormal line loss conditions according to the processing and analyzing result of the data processing module; and the scheme making unit is used for providing corresponding solutions for different types of line loss abnormal conditions.
5. The analysis system for monitoring the line loss abnormal problem of the low-voltage transformer area as claimed in claim 4, wherein the line loss abnormal conditions are divided into two types: high line loss problem and negative line loss problem, wherein high line loss problem includes: the problems of wrong household transformation relation, faults of metering devices and the like, electricity stealing and acquisition; the negative line loss problem includes: the problem of the error of the household variable relationship, the fault of the metering device and the acquisition problem.
6. The analysis system for monitoring the line loss abnormal problem of the low-voltage transformer area according to claim 4 or 5, wherein a solution is obtained by analyzing the line loss abnormal condition by adopting a line loss abnormal analytic hierarchy method, a high line loss analytic method, a negative line loss analytic method, a small-power or slight negative line loss analytic method.
7. The analysis system for monitoring the abnormal problem of the line loss of the low-voltage transformer area as claimed in claim 6, wherein the dynamic analysis of the user's power consumption load by time intervals is performed by a line loss abnormal analytic hierarchy process, which comprises:
troubleshooting acquisition abnormity, troubleshooting household variable relation abnormity, troubleshooting metering device abnormity, troubleshooting electricity stealing/abnormal electricity utilization; wherein the troubleshooting metrology device anomalies comprises:
checking an examination table clock, checking examination table alarm information, checking an examination table junction box, checking an examination table current transformer and checking an examination table phase relation.
8. The analysis system for monitoring the abnormal problem of the line loss of the low-voltage transformer area as claimed in claim 6, wherein the dynamic analysis of the user's electrical load by time intervals is performed by using a high line loss analysis method, which comprises:
the first step is as follows: the meter is fully accessed, and the acquisition success rate is ensured;
the second step is that: checking whether the multiplying power of the electricity information acquisition terminal is consistent with that of the marketing system, and checking whether the multiplying power of the check meter is consistent with that of the mutual inductor; if the multiplying power is different, the master station modifies the flow;
the third step: checking the corresponding relation between the electricity consumption information acquisition terminal and the marketing system and users, and synchronizing acquisition point flows if the electricity consumption information acquisition terminal and the marketing system are inconsistent;
the fourth step: the master station thoroughly reads the electric quantity of the check meter and checks, and if the thoroughly read data is inconsistent with the frozen data, the terminal is replaced;
the fifth step: the master station analyzes the zero-degree user, thoroughly reads the data, and replaces the frozen data if the frozen data is inconsistent with the thoroughly read data; if the power consumption is consistent, the power consumption condition and wiring are verified on site;
and a sixth step: the master station exports the frozen data, and checks whether the frozen data exist or not, and the running of the electric meter is zero;
the seventh step: checking whether a management user which is not included exists or not on site, and checking through a line;
eighth step: verifying whether the user table file is complete on site;
the ninth step: and (4) exporting the frozen data, checking the zero-degree user with large electric quantity change, and checking whether the electricity stealing condition exists or not.
9. The analysis system for monitoring the abnormal problem of the line loss of the low-voltage transformer area as claimed in claim 6, wherein a negative line loss analysis method is adopted to perform dynamic analysis of the electric load of the user in different time periods, and the analysis system comprises:
(1) the meter is fully connected, and the integration power is ensured;
(2) checking whether the multiplying power of the electricity utilization information acquisition terminal is consistent with that of the marketing system, and checking the multiplying power of the examination table and the multiplying power of the mutual inductor; if the multiplying powers are not consistent, the master station modifies the flow;
(3) checking whether the current value of the check meter is normal or not and whether the reverse or current loss condition exists or not;
(4) checking the situation of the household meter, selecting a user with larger daily actual power consumption for checking, checking whether the power consumption information acquisition terminal is consistent with the multiplying power of the marketing system or not, modifying the inconsistent master station, and checking the multiplying power method in the same step (2);
(5) the master station thoroughly reads the electric quantity of the check meter and checks, and if the thoroughly read data is inconsistent with the frozen data, the terminal carries out replacement processing;
(6) the master station leads out frozen data through meter reading data query, checks users with or without electric quantity sudden increase, thoroughly reads by the master station, and carries out replacement processing if inconsistency proves that the acquisition terminal has problems; if the user mutual inductor and the meter are consistent, checking the user mutual inductor and the meter on site for processing;
(7) and the master station checks that no problem exists, and verifies the wiring problem of the checking meter and the condition of the mutual inductor on site.
10. The analysis system for monitoring the abnormal problem of the line loss of the low-voltage transformer area as claimed in claim 6, wherein the dynamic analysis of the electric load of the user in different time periods is performed by using a small electric quantity or slight negative line loss analysis method, and the analysis system comprises:
1) the meter is fully accessed, and the acquisition success rate is ensured;
2) checking the precision of the examination and checking meter by checking the examination and checking meter on site, and determining whether the measurement is accurate or not;
3) and verifying the station area user-to-user relationship, judging whether a station fleeing area condition occurs, and if so, adjusting the flow.
CN202110231826.9A 2021-03-02 2021-03-02 Analysis system for monitoring line loss abnormity problem of low-voltage transformer area Pending CN113098130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110231826.9A CN113098130A (en) 2021-03-02 2021-03-02 Analysis system for monitoring line loss abnormity problem of low-voltage transformer area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110231826.9A CN113098130A (en) 2021-03-02 2021-03-02 Analysis system for monitoring line loss abnormity problem of low-voltage transformer area

Publications (1)

Publication Number Publication Date
CN113098130A true CN113098130A (en) 2021-07-09

Family

ID=76666214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110231826.9A Pending CN113098130A (en) 2021-03-02 2021-03-02 Analysis system for monitoring line loss abnormity problem of low-voltage transformer area

Country Status (1)

Country Link
CN (1) CN113098130A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113708500A (en) * 2021-09-10 2021-11-26 深圳供电局有限公司 Low-voltage electricity utilization abnormity monitoring system and method
CN113837725A (en) * 2021-09-29 2021-12-24 国网辽宁省电力有限公司沈阳供电公司 Automatic line loss work order circulation system and method
CN113872320A (en) * 2021-08-26 2021-12-31 国网山西省电力公司晋城供电公司 Photovoltaic platform district equilibrium degree statistical system
CN114152896A (en) * 2021-11-29 2022-03-08 国网江苏省电力有限公司营销服务中心 Misalignment replacing system based on acquisition platform
CN114236283A (en) * 2021-12-15 2022-03-25 广东电网有限责任公司 Method and device for determining line loss reason of power supply network
CN114285162A (en) * 2021-12-21 2022-04-05 青岛鼎信通讯股份有限公司 Metering anomaly analysis method based on low-voltage distribution room collected data
CN115267323A (en) * 2022-08-01 2022-11-01 合肥顺帆信息科技有限公司 Line loss analysis and management system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113872320A (en) * 2021-08-26 2021-12-31 国网山西省电力公司晋城供电公司 Photovoltaic platform district equilibrium degree statistical system
CN113708500A (en) * 2021-09-10 2021-11-26 深圳供电局有限公司 Low-voltage electricity utilization abnormity monitoring system and method
CN113837725A (en) * 2021-09-29 2021-12-24 国网辽宁省电力有限公司沈阳供电公司 Automatic line loss work order circulation system and method
CN114152896A (en) * 2021-11-29 2022-03-08 国网江苏省电力有限公司营销服务中心 Misalignment replacing system based on acquisition platform
CN114236283A (en) * 2021-12-15 2022-03-25 广东电网有限责任公司 Method and device for determining line loss reason of power supply network
CN114236283B (en) * 2021-12-15 2024-02-13 广东电网有限责任公司 Method and device for determining line loss reason of power supply network
CN114285162A (en) * 2021-12-21 2022-04-05 青岛鼎信通讯股份有限公司 Metering anomaly analysis method based on low-voltage distribution room collected data
CN114285162B (en) * 2021-12-21 2023-08-08 青岛鼎信通讯股份有限公司 Metering anomaly analysis method based on low-voltage transformer area acquisition data
CN115267323A (en) * 2022-08-01 2022-11-01 合肥顺帆信息科技有限公司 Line loss analysis and management system
CN115267323B (en) * 2022-08-01 2023-11-03 合肥顺帆信息科技有限公司 Line loss analysis management system

Similar Documents

Publication Publication Date Title
CN113098130A (en) Analysis system for monitoring line loss abnormity problem of low-voltage transformer area
CN111026927B (en) Low-voltage transformer area running state intelligent monitoring system
CN110806518B (en) Transformer area line loss abnormal motion analysis module and operation method thereof
CN109683059B (en) Method and device for determining line loss abnormity, storage medium and processor
CN104796082A (en) System and method for diagnosing faults of photovoltaic power generation systems in online manner
CN102928809A (en) Electric energy metering device remote monitoring diagnostic system and working method thereof
CN109298379A (en) A kind of recognition methods of the intelligent electric meter site error exception based on data monitoring
CN104635198B (en) Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function
CN105915398A (en) Rapid fault detection and power recovery system based on rural power network, and concentrator detection method thereof
CN110703009B (en) Abnormal analysis and processing method for line loss rate of transformer area
CN111724060A (en) Integrated analysis monitoring system and analysis method for transformer area line loss
CN102928808A (en) Power consumer on-site electric energy meter fault remote judging method
CN104297616A (en) 10kV distribution line breaking detection method based on multi-system information interaction
CN202939301U (en) Remote monitoring diagnosis system of electric energy metering device
CN112865321A (en) Distribution transformer area line loss abnormity user positioning analysis system
CN113848420A (en) Low-voltage transformer area energy network state sensing method, device and equipment
CN111027026A (en) Meter reading data abnormity intelligent diagnosis system
CN104714206B (en) Remote monitoring and diagnosing method for electric energy metering device capable of finding faults timely
CN205792639U (en) Quickly detect based on rural power grids fault and telegram in reply system
CN113063997A (en) Distribution transformer area line loss abnormity problem monitoring method
CN213072726U (en) Power distribution network architecture system based on intelligent concentrator
CN109120064A (en) Transforming plant DC power-supply management system
CN109840646A (en) Voltage monitoring method based on big data processing
CN116593926A (en) Portable information system power supply comprehensive performance detection method and platform
CN112886583A (en) Power utilization analysis method for users with abnormal line loss in distribution transformer area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination