CN113011855A - Operation ticket intelligent management system - Google Patents

Operation ticket intelligent management system Download PDF

Info

Publication number
CN113011855A
CN113011855A CN202110341228.7A CN202110341228A CN113011855A CN 113011855 A CN113011855 A CN 113011855A CN 202110341228 A CN202110341228 A CN 202110341228A CN 113011855 A CN113011855 A CN 113011855A
Authority
CN
China
Prior art keywords
module
operation ticket
ticket
information
user terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110341228.7A
Other languages
Chinese (zh)
Inventor
尹善耀
卢先锋
陈晓鹏
郑文新
黎舟洋
孙永斌
王文超
纪梓扬
魏昌东
刘延伟
张健
聂楚飞
佘嘉泓
宋荣键
孙瑞
邹纯
王文慧
郑瑶
韩金越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202110341228.7A priority Critical patent/CN113011855A/en
Publication of CN113011855A publication Critical patent/CN113011855A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention provides an intelligent operation ticket management system, which comprises a scheduling and issuing module, a personnel qualification storage module, a production management module and a user terminal module, wherein the scheduling and issuing module is used for issuing a command; the dispatching and issuing module is used for storing the power operation task; the personnel qualification storage module is connected with the production management module and is used for storing information of workers; the production management module is used for acquiring the electric power operation task, generating a first operation ticket according to the electric power operation task, sending the first operation ticket to the staff, acquiring first information and second information filled in the first operation ticket by the staff, and matching the first information with the staff information stored in the staff qualification storage module. The operation ticket intelligent management system provided by the embodiment of the invention can effectively prevent the occurrence of 'invalid operation' violation events, and can also inspect the qualification of auditors to prevent accidents from occurring.

Description

Operation ticket intelligent management system
Technical Field
The invention relates to the field of electric power, in particular to an intelligent operation order management system.
Background
The operation ticket is an important safety measure for preventing electrical misoperation and also an important defense line for guaranteeing the personal safety of operators and the safety of electrical equipment. And an operator writes an operation ticket according to the field operation rule and the switching operation guide rule, and then performs switching operation item by item, orderly and efficiently according to the contents listed in the operation ticket. The operation ticket face content comprises station name, serial number, operation task, order unit, operation step, operator, operation start time and end time and other operation related content.
Some power grid companies require that an operator fills in an operation order according to an operation task to be performed, after the filling is completed, the operator firstly performs self-examination on the filled operation order, and then performs re-examination by a guardian, and a person on duty performs final examination, namely, an operation order three-examination management system.
The operation ticket widely adopted at present is a paper material, printing signature confirmation is carried out after the operation ticket is filled, the operation ticket is usually manually filled by an operator, and the paper operation ticket has the defects of insufficient safety guarantee, limited filling and use environment and the like. In the actual power production process, the power safety accidents caused by 'ticket-free operation' as a main factor occur occasionally, so that great loss is caused to the safety of a human body and a power system, and the current paper operation ticket cannot effectively stop the 'ticket-free operation' violation events. The 'three-check system' (self-check of an operator, reexamination of a guardian and review of a duty responsible person) is a guarantee measure for the correctness of the operation ticket, but the paper operation ticket cannot be used for checking the qualification of the auditor, and a security hole exists.
Disclosure of Invention
The operation ticket intelligent management system provided by the embodiment of the invention can effectively prevent the occurrence of 'invalid operation' violation events, and can also inspect the qualification of auditors to prevent accidents from occurring.
The embodiment of the invention provides an intelligent operation ticket management system, which comprises a scheduling and issuing module, a personnel qualification storage module, a production management module and a user terminal module, wherein the scheduling and issuing module is used for issuing a command;
the dispatching and commanding module is connected with the production management module and used for storing the power operation task;
the personnel qualification storage module is connected with the production management module and is used for storing information of workers;
the production management module is used for acquiring the electric power operation task, generating a first operation ticket according to the electric power operation task, sending the first operation ticket to a worker, acquiring first information and second information filled in by the worker on the first operation ticket, matching the first information with the information of the worker stored in the personnel qualification storage module, and generating a second operation ticket after the matching is passed, wherein the first information comprises a signature of the worker, and the second information comprises operation items filled in by the worker according to the electric power operation task;
the user terminal module is connected with the production management module and used for acquiring the second operation ticket from the production management module, displaying the second operation ticket to a worker, acquiring the second operation ticket after the worker fills in third information, recording the second operation ticket with the third information as the third operation ticket, and sending the third operation ticket to the production management module.
Optionally, the production management module includes a storage unit;
the storage unit is used for storing the first operation ticket, the second operation ticket and the third operation ticket.
Optionally, the production management module further includes a first input unit, a display unit, and a first processing unit;
the first input unit is used for acquiring the first information and the second information filled by the staff;
the display unit is used for displaying the first operation ticket, the second operation ticket, the third operation ticket and the information of the staff stored in the staff qualification storage module;
the first processing unit is connected with the first input unit and the display unit, and is used for matching the first information with the information of the staff stored in the staff qualification storage module, generating a second operation ticket after the matching is passed, and controlling the display unit to display the second operation ticket.
Optionally, the production management module further includes a first warning unit;
the first warning unit is connected with the first processing unit, the first processing unit is used for sending a prompt instruction to the first warning unit when the matching is not passed, and the first warning unit is used for receiving a first prompt signal sent out when the prompt instruction is received.
Optionally, the operation ticket intelligent management system provided by the embodiment of the invention further comprises a microcomputer five-prevention module;
the microcomputer five-prevention module is connected with the user terminal and used for acquiring the second operation ticket from the user terminal module, checking whether the second operation ticket accords with five-prevention logic or not and sending a checking result to the user terminal module.
Optionally, the user terminal module includes a second warning unit;
and the second warning unit is used for sending a second prompt signal when the verification result is that the five-prevention logic is not met.
Optionally, the operation ticket intelligent management system provided by the embodiment of the present invention further includes a camera module;
the camera module is connected with the user terminal module, and is used for shooting an operation image of a key operation step when receiving an instruction of shooting the key operation step sent by the user terminal module, sending the operation image to the user terminal module, and is also used for shooting an operation process video when receiving a camera shooting instruction sent by a worker, and sending the operation process video to the user terminal module.
Optionally, the camera module includes a second input unit and a communication unit;
the second input unit is used for acquiring a camera shooting instruction input by an operator;
the communication unit is used for receiving the instruction of the shooting key operation step sent by the user terminal module.
Optionally, the user terminal module includes a tablet, a computer, or a mobile phone.
Optionally, the user terminal module includes a second processing unit;
the second processing unit is used for analyzing the job risk level according to the second operation ticket.
According to the operation ticket intelligent management system provided by the embodiment of the invention, the production management module is used for generating the first operation ticket after acquiring the electric power operation task from the scheduling command module, so that the defect of 'no ticket' operation is avoided, and the production management module is used for matching the signature of a worker with the personnel information stored in the personnel qualification management module, so that the personnel without qualification can be prevented from filling or examining the first operation ticket. And sending a third operation ticket to the production management module through the user terminal module, so that a worker can check the operation ticket for completing the electric power operation task from the production management module. The operation ticket intelligent management system provided by the embodiment of the invention can effectively prevent the occurrence of ticket-free operation violation events, and can also inspect the qualification of auditors to prevent accidents.
Drawings
Fig. 1 is a schematic structural diagram of an operation ticket intelligent management system according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of another operation ticket intelligent management system according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of an operation ticket according to an embodiment of the present invention;
fig. 4 is a schematic diagram of another operation ticket according to an embodiment of the present invention.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of and not restrictive on the broad invention. It should be further noted that, for convenience of description, only some structures, not all structures, relating to the embodiments of the present invention are shown in the drawings.
Example one
Fig. 1 is a schematic structural diagram of an operation ticket intelligent management system according to an embodiment of the present invention, and referring to fig. 1, the operation ticket intelligent management system according to the embodiment of the present invention includes a scheduling command module 110, a personnel qualification storage module 120, a production management module 130, and a user terminal module 140; the dispatching and commanding module 110 is connected with the production management module 130, and the dispatching and commanding module 110 is used for storing the power operation task; the personnel qualification storage module 120 is connected with the production management module 130, and the personnel qualification storage module 120 is used for storing information of workers; the production management module 130 is configured to acquire an electric power operation task, generate a first operation ticket according to the electric power operation task, send the first operation ticket to a worker, acquire first information and second information that are filled in by the worker on the first operation ticket, match the first information with the information of the worker stored in the personnel qualification storage module 120, and generate a second operation ticket after the matching is passed, where the first information includes a signature of the worker, and the second information includes an operation item that is filled in by the worker according to the electric power operation task; the user terminal module 140 is connected to the production management module 130, and the user terminal module 140 is configured to obtain a second operation ticket from the production management module 130, show the second operation ticket to the staff, obtain the second operation ticket after the staff fills in the third information, mark the second operation ticket with the filled third information as a third operation ticket, and send the third operation ticket to the production management module 130.
Specifically, the first information refers to information of a signature of an operator, a signature of a guardian, and a signature of a person on duty, and the second information refers to information of an operation item, an inspection item, and some remarks filled by the operator, and for example, the inspection item in the second information may be an electrography test, and the electrography test includes an electrography test, and the like. The third information is the completion of the operation items filled by the staff, the completion of the inspection items, some remark information, and the like, and may be, for example, a mark that the staff draws a "√" after each operation item and inspection item. When the substation has the power operation task, the manager inputs the power operation task to be executed to the scheduling command module 110, the scheduling command module 110 receives the power operation task and stores the power operation task, the production management module 130 generates a first operation ticket after acquiring the power operation task from the scheduling command module 110, and records the generation time of the first operation ticket, wherein the generation time of the first operation ticket represents the order issuing time of the power operation task. The production management module 130 firstly sends the first operation ticket to an operator, the operator fills in an operation task on the first operation ticket and carries out self-examination, the operator signs on the first operation ticket after the self-examination is passed, the production management module 130 matches the signature of the operator with the information of the operator stored in the personnel qualification storage module 120, the signature of the operator is recorded on the first operation ticket after the matching is passed, then the first operation ticket with the signature of the operator is sent to a guardian, the guardian carries out rechecking on the information on the first operation ticket and signs after the auditing is correct, the production management module 130 matches the signature of the guardian with the information of the operator stored in the personnel qualification storage module 120, after the matching is passed, the signature of the guardian is recorded on the first operation ticket, then the first operation ticket with the signature of the operator and the signature of the guardian is sent to a person on duty, the on-duty responsible person checks the information on the first operation ticket again, signs after the check is correct, the production management module 130 matches the signature of the on-duty responsible person with the information of the staff stored in the staff qualification storage module 120, records the signature of the on-duty responsible person on the first operation ticket after the matching is passed, records the first operation ticket as a second operation ticket, and records the generation time of the second operation ticket by the production management module 130. Before the staff executes the power operation task, the second operation ticket may be downloaded from the production management module 130 through the user terminal module 140, and the operation is performed according to the work sequence on the second operation ticket, the second operation ticket is filled in during the operation process, the filled second operation ticket is recorded as a third operation ticket, and the third operation ticket is sent to the production management module 130. In the embodiment of the present invention, the production management module 130 generates the first operation ticket after acquiring the power operation task from the scheduling command module 110, so as to prevent the occurrence of a situation that the paper operation ticket randomly fills in the operation ticket without receiving the power operation task, that is, prevent the occurrence of a "ticket-free operation" violation event, and further prevent an accident that some operation items are executed without the power operation task. The personnel qualification storage module 120 in the embodiment of the present invention stores information of personnel having a qualification of the first operation ticket, wherein the information of the personnel having the qualification of the first operation ticket includes information of a name, a sex, a qualification certificate, and the like of the personnel having the qualification of the qualification, the production management module 130 queries whether the personnel having the same name exist in the personnel qualification storage module 120, and the production management module 130 verifies a signature of the worker, so as to prevent the personnel having no qualification of the verification from signing on the first operation ticket, and further prevent the accident caused by the fact that the information on the first operation ticket is incorrect and is not checked by the personnel having no qualification of the verification. In addition, the staff managing the qualification storage module 120 can update the information in the staff qualification storage module 120 in time, and record the staff information with the verified qualification in time, so that the production management module 130 can improve the accuracy of identifying the staff. It should be noted that the first operation ticket, the second operation ticket, and the third operation ticket in the embodiment of the present invention refer to the same operation ticket, and the operation ticket is generally used for the substation switching operation.
According to the operation ticket intelligent management system provided by the embodiment of the invention, the production management module is used for generating the first operation ticket after acquiring the electric power operation task from the scheduling command module, so that the defect of 'no ticket' operation is avoided, and the production management module is used for matching the signature of a worker with the personnel information stored in the personnel qualification management module, so that the personnel without qualification can be prevented from filling or examining the first operation ticket. And sending a third operation ticket to the production management module through the user terminal module, so that a worker can check the operation ticket for completing the electric power operation task from the production management module. The operation ticket intelligent management system provided by the embodiment of the invention can effectively prevent the occurrence of ticket-free operation violation events, and can also inspect the qualification of auditors to prevent accidents.
Optionally, the production management module includes a storage unit; the storage unit is used for storing a first operation ticket, a second operation ticket and a third operation ticket.
Specifically, the storage unit stores the first operation ticket, the second operation ticket and the third operation ticket, so that the follow-up staff can conveniently check the operation tickets, and the defects that paper operation tickets are not easy to keep for a long time and the safety guarantee performance is insufficient are overcome. A large number of electric power operation tasks exist in large-scale power failure environments such as main transformer power outage and transmission, so that a large number of operation tickets need to be generated, a storage unit in a production management module can store a large number of operation tickets, operation ticket filing work does not need to be performed by spending a large amount of manpower after the electric power operation tasks are completed, and the operation ticket filing efficiency is improved.
Optionally, the production management module further includes a first input unit, a display unit, and a first processing unit; the first input unit is used for acquiring first information and second information filled by staff; the display unit is used for displaying the first operation ticket, the second operation ticket, the third operation ticket and the information of the staff stored in the staff qualification storage module; the first processing unit is connected with the first input unit and the display unit, and is used for matching the first information with the information of the staff stored in the staff qualification storage module, and after the matching is passed, a second operation ticket is generated and the display unit is controlled to display the second operation ticket.
Specifically, the first input unit can be a keyboard or a touch display screen, the staff can input the first information and the second information through the first input unit, and compared with the handwritten first information and the handwritten second information of the paper operation ticket, the first input unit can improve filling efficiency. The display unit may be a liquid crystal display or an LED display. The first processing unit identifies the signature of the worker, searches whether a name identical to the signature exists in the personnel qualification storage module, records the signature of the worker on the first operation ticket after the name identical to the signature is found, records the signature of the worker on the first operation ticket when the first processing unit records the signature of the operator, the signature of an auditor and the signature of a person in charge on the first operation ticket, records the first operation ticket at the moment as a second operation ticket, sends the second operation ticket to the display unit, and the display unit displays the second operation ticket.
Optionally, the production management module further includes a first warning unit; the first warning unit is connected with the first processing unit, the first processing unit is used for sending a prompt instruction to the first warning unit when the matching fails, and the first warning unit is used for sending a first prompt signal when receiving the prompt instruction.
Specifically, the first processing unit searches whether a name with the same signature as the signature of the worker exists in the personnel qualification storage module, when the first processing unit does not search the name with the same signature, the first processing unit sends a prompt instruction to the first warning unit, the first warning unit sends a first prompt signal to the worker after receiving the prompt instruction, and the worker receives the first prompt signal and indicates that the signature of the worker does not pass. It should be noted that the first prompt signal has two layers of meanings, namely, the signature of the worker cannot be identified by the first processing unit, the worker needs to re-sign, and the worker does not have the audit qualification and the information of the worker is not in the personnel qualification storage module. The staff can judge whether to refill own signature according to the actual conditions.
Optionally, fig. 2 is a schematic structural diagram of another operation ticket intelligent management system provided in the embodiment of the present invention, and referring to fig. 2, the operation ticket intelligent management system provided in the embodiment of the present invention further includes a microcomputer five-prevention module 150; the microcomputer five-prevention module 150 is connected with the user terminal module 140, and the microcomputer five-prevention module 150 is configured to obtain the second operation ticket from the user terminal module 140, check whether the second operation ticket meets the five-prevention logic, and send a check result to the user terminal module 140.
Specifically, after the operator downloads the second operation ticket from the production management module 130, before the power operation task is executed, the user terminal module 140 may perform online automatic verification on the second operation ticket with the microcomputer five-prevention module 150, the user terminal module 140 sends the second operation ticket to the microcomputer five-prevention module 150, the microcomputer five-prevention module 150 verifies the second operation ticket after receiving the second operation ticket, and sends the verification result to the user terminal module 140, and the operator determines whether to execute the power operation task according to the verification result. The microcomputer five-prevention module 150 can be arranged to verify the second operation ticket, so that the personal safety of operators is further ensured.
Optionally, the user terminal module includes a second warning unit; the second warning unit is used for sending a second prompt signal when the verification result is that the five-prevention logic is not met.
Specifically, when the user terminal module receives that the second operation ticket sent by the microcomputer five-prevention module does not meet the five-prevention standard, the second warning unit in the user terminal module sends a second prompt signal, after receiving the second prompt signal, the worker returns the second operation ticket to the production management module through the user terminal module, and after receiving the second operation ticket, the production management module notifies the worker to modify the content of the second operation ticket. The second prompt signal may be a prompt tone or a "check fail" page may be displayed in the subscriber terminal module.
Optionally, with continuing reference to fig. 2, the operation ticket intelligent management system provided in the embodiment of the present invention further includes a camera module 160; the camera module 160 is connected to the user terminal module 140, and the camera module 160 is configured to shoot an operation image of a key operation step when receiving an instruction for shooting the key operation step sent by the user terminal module 140, and send the operation image to the user terminal module 140, and is further configured to shoot an operation process video when receiving a camera instruction sent by a worker, and send the operation process video to the user terminal module 140.
Specifically, before the staff performs the power operation task, the "start shooting" button on the camera module 160 is touched and pressed, and the camera module 160 starts to record the process of the staff performing the operation, so that the real-time monitoring of the whole operation process is realized through the camera module 160. When the key operation step is executed, the guardian touches the "click to photograph" button on the user terminal module 140, and the camera module 160 receives the instruction of the key operation step sent by the user terminal module 140 and photographs. When an operator executes an operation task, the shooting module 160 performs shooting and key step shooting, and sends the shot video and the key operation step image to the user terminal module 140, and the user terminal module 140 stores the shot video and the key operation step image in the second operation ticket, so that the setting is convenient for the follow-up staff to check the operation process, and the supervisor is also convenient to check whether the operation of the operator meets the standard requirements.
Optionally, the camera module includes a second input unit and a communication unit; the second input unit is used for acquiring a camera shooting instruction input by an operator; the communication unit is used for receiving the instruction of the shooting key operation step sent by the user terminal module.
Specifically, the second input unit may be a button in the camera module, and the operator may send a camera shooting instruction to the camera module by touching and pressing a "start camera shooting" button in the camera module. The user terminal module is connected with the communication unit in the camera module, the communication unit can be Bluetooth, when an operator executes an electric power operation task, a guardian touches and presses a 'click photographing' button in the user terminal module, the user terminal module sends an instruction of photographing a key operation step to the communication unit, and the photographing of the key operation step is finished, so that follow-up review and safety inspection can be facilitated.
Optionally, the user terminal module includes a tablet, a computer or a mobile phone.
Specifically, panel, computer and cell-phone conveniently carry, and have bluetooth communication function and network communication function, make things convenient for better receipt instruction of user terminal module and send instruction, have also overcome the paper operation ticket and have not been wet-proofly, easily dirty and at the dim place inconvenient drawback of use of light.
Optionally, the user terminal module includes a second processing unit; the second processing unit is used for analyzing the job risk level according to the second operation ticket.
Specifically, before the electric power operation task is executed, the operation risk level on the second operation ticket can be judged through the second processing unit in the user terminal module, the operation staff can make adaptive safety protection measures according to the operation risk level, the personal safety of the operation staff is guaranteed, the operation risk level is stored on the second operation ticket by the user terminal module, and the operation risk level is convenient to check the files in the later period and know the operation risk level of the electric power operation task.
Example two
The implementation is based on the above embodiment, this embodiment takes a line to be changed from a cold standby to an overhaul as an example, and explains the operation ticket intelligent management system provided by the embodiment of the present invention, fig. 3 is a schematic diagram of an operation ticket provided by the embodiment of the present invention, referring to fig. 3, the operation ticket includes six areas, wherein the first area 10 is an operation process time node functional area, the process of manually filling time in a paper operation ticket is omitted by clicking a relevant button, after an electric power operation task is completed, by clicking a "return filing" button, a user terminal module sends a third operation ticket to a production management module, the operation ticket can be conveniently filed, the "operation start" button in the first area 10 is clicked, the user terminal module records a time point of starting to execute the electric power operation task on the second operation ticket, and clicks an "operation interruption" button in the first area 10, the user terminal module records the name of the suspended operation item and the time point of suspension on a second operation ticket, clicks an 'operation completion' button in the first area 10, records the time point of completion of the power operation task on the second operation ticket, clicks an 'operation cancel' button in the first area 10, and records the name of the operation item which is not executed on the second operation ticket. The second area 20 is an operation task area, and represents an electric power operation task acquired by the production management module from the scheduling command module. The third area 30 is a pre-operation preparation function area, and each preparation operation before operation is a guarantee for ensuring the orderly operation. By touching and pressing the five-prevention check button, the worker can send a second operation ticket to the microcomputer five-prevention check module, and the worker can acquire a content check result on the second operation ticket through the microcomputer five-prevention check module. The prior paper operation ticket can not monitor and record the implementation situation of the preparation work before the operation, the operation ticket generated by the operation ticket intelligent management system provided by the embodiment of the invention ensures that all the preparation work is orderly and has no omission, and the implementation situation of the preparation work is filed, so that the later-stage review is facilitated. Fig. 4 is a schematic diagram of another operation ticket provided by an embodiment of the present invention, referring to fig. 3 and 4, fig. 4 is a two-level menu of "tool and instrument inspection" in fig. 3, and when a "toolbox inspection" button in the third area 30 is clicked, the schematic diagram shown in fig. 4 appears, taking line switching maintenance as an example, a test pencil needs to be used for power failure operation, and therefore, test pencil inspection items need to be photographed separately. The fourth area 40 is an operation item function area, and compared with a paper operation ticket, the operation ticket produced by the operation ticket intelligent management system provided by the embodiment of the invention can be added with a photographing uploading function in key operation steps of dividing and combining a grounding knife, dismounting and mounting a grounding wire, switching a function handle, throwing and withdrawing a pressing plate and the like, and in the operation process, a guardian can take a picture and store the picture through a photographing module connected with the user terminal module. The fifth area 50 is a page turning scroll bar, and the page turning scroll bar is arranged to avoid the inconvenience that the paper operation ticket needs to be turned over for viewing. The sixth area 60 is an operator selection area, which corresponds to the staff information stored in the staff qualification management module and is convenient to click and select, and which can also be filled with some remark information.
According to the operation ticket intelligent management system provided by the embodiment of the invention, the production management module is connected with the dispatching and commanding module, and the production management module acquires the electric power operation task from the dispatching and commanding module, so that the generation of ticket-free operation violation events can be effectively avoided. The production management module is connected with the personnel qualification management module, and can automatically verify the qualification of the personnel related to the operation ticket, thereby avoiding security holes. The user terminal module and the production management module can automatically record the time of operating the nodes, and click to automatically file after the operation is finished, so that the working efficiency is improved. The user terminal module and the camera module are prepared to carry out photographing and background reservation before operation and photographing and background reservation in key operation steps, so that follow-up review and safety inspection are facilitated. The user terminal module comprises a tablet, a computer or a mobile phone, the tablet, the computer or the mobile phone overcomes the defect that the use environment of the paper operation ticket is limited, and the adaptive capacity of the operation ticket to the environment is improved. The user terminal module is connected with the microcomputer five-prevention checking module, and the five-prevention checking can be automatically carried out. The operation ticket provided by the operation ticket intelligent management system provided by the embodiment of the invention has a secondary interface structure, so that a worker can conveniently check used tools before operating a power task.
It should be noted that the foregoing is only a preferred embodiment of the present invention and the technical principles applied. Those skilled in the art will appreciate that the embodiments of the present invention are not limited to the specific embodiments described herein, and that various obvious changes, adaptations, and substitutions are possible, without departing from the scope of the embodiments of the present invention. Therefore, although the embodiments of the present invention have been described in more detail through the above embodiments, the embodiments of the present invention are not limited to the above embodiments, and many other equivalent embodiments may be included without departing from the concept of the embodiments of the present invention, and the scope of the embodiments of the present invention is determined by the scope of the appended claims.

Claims (10)

1. An intelligent management system for operation tickets is characterized by comprising a scheduling and issuing module, a personnel qualification storage module, a production management module and a user terminal module;
the dispatching and commanding module is connected with the production management module and used for storing the power operation task;
the personnel qualification storage module is connected with the production management module and is used for storing information of workers;
the production management module is used for acquiring the electric power operation task, generating a first operation ticket according to the electric power operation task, sending the first operation ticket to a worker, acquiring first information and second information filled in by the worker on the first operation ticket, matching the first information with the information of the worker stored in the personnel qualification storage module, and generating a second operation ticket after the matching is passed, wherein the first information comprises a signature of the worker, and the second information comprises operation items filled in by the worker according to the electric power operation task;
the user terminal module is connected with the production management module and used for acquiring the second operation ticket from the production management module, displaying the second operation ticket to a worker, acquiring the second operation ticket after the worker fills in third information, recording the second operation ticket with the third information as the third operation ticket, and sending the third operation ticket to the production management module.
2. The intelligent operation ticket management system as claimed in claim 1, wherein the production management module comprises a storage unit;
the storage unit is used for storing the first operation ticket, the second operation ticket and the third operation ticket.
3. The intelligent operation ticket management system as claimed in claim 2, wherein the production management module further comprises a first input unit, a display unit and a first processing unit;
the first input unit is used for acquiring the first information and the second information filled by the staff;
the display unit is used for displaying the first operation ticket, the second operation ticket, the third operation ticket and the information of the staff stored in the staff qualification storage module;
the first processing unit is connected with the first input unit and the display unit, and is used for matching the first information with the information of the staff stored in the staff qualification storage module, generating a second operation ticket after the matching is passed, and controlling the display unit to display the second operation ticket.
4. The intelligent operation ticket management system as claimed in claim 3, wherein the production management module further comprises a first warning unit;
the first warning unit is connected with the first processing unit, the first processing unit is used for sending a prompt instruction to the first warning unit when the matching is not passed, and the first warning unit is used for receiving a first prompt signal sent out when the prompt instruction is received.
5. The intelligent operation ticket management system as claimed in claim 1, further comprising a microcomputer five-prevention module;
the microcomputer five-prevention module is connected with the user terminal and used for acquiring the second operation ticket from the user terminal module, checking whether the second operation ticket accords with five-prevention logic or not and sending a checking result to the user terminal module.
6. The intelligent operation ticket management system as claimed in claim 5, wherein the user terminal module comprises a second warning unit;
and the second warning unit is used for sending a second prompt signal when the verification result is that the five-prevention logic is not met.
7. The intelligent operation ticket management system according to claim 1, further comprising a camera module;
the camera module is connected with the user terminal module, and is used for shooting an operation image of a key operation step when receiving an instruction of shooting the key operation step sent by the user terminal module, sending the operation image to the user terminal module, and is also used for shooting an operation process video when receiving a camera shooting instruction sent by a worker, and sending the operation process video to the user terminal module.
8. The intelligent operation ticket management system according to claim 7, wherein the camera module comprises a second input unit and a communication unit;
the second input unit is used for acquiring a camera shooting instruction input by an operator;
the communication unit is used for receiving the instruction of the shooting key operation step sent by the user terminal module.
9. The intelligent operation ticket management system of claim 1 wherein the user terminal module comprises a tablet, a computer or a mobile phone.
10. The intelligent operation ticket management system as claimed in claim 1, wherein the user terminal module comprises a second processing unit;
the second processing unit is used for analyzing the job risk level according to the second operation ticket.
CN202110341228.7A 2021-03-30 2021-03-30 Operation ticket intelligent management system Pending CN113011855A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110341228.7A CN113011855A (en) 2021-03-30 2021-03-30 Operation ticket intelligent management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110341228.7A CN113011855A (en) 2021-03-30 2021-03-30 Operation ticket intelligent management system

Publications (1)

Publication Number Publication Date
CN113011855A true CN113011855A (en) 2021-06-22

Family

ID=76409351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110341228.7A Pending CN113011855A (en) 2021-03-30 2021-03-30 Operation ticket intelligent management system

Country Status (1)

Country Link
CN (1) CN113011855A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113627899A (en) * 2021-10-12 2021-11-09 广东电网有限责任公司惠州供电局 Matching ticket writing method, device, system and medium based on electronic operation ticket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007079915A (en) * 2005-09-14 2007-03-29 Nec Corp Electronic ticket system
JP2012164069A (en) * 2011-02-04 2012-08-30 Aisin Aw Co Ltd Business and deliverable management system, and business and deliverable management method
CN105374088A (en) * 2014-08-18 2016-03-02 国家电网公司 Control method and control apparatus of substation active misoperation prevention equipment
CN109103985A (en) * 2018-02-24 2018-12-28 国家电投集团重庆合川发电有限公司 The method and apparatus for controlling the execution of operation order
US20190243828A1 (en) * 2014-12-31 2019-08-08 Servicenow, Inc. System independent configuration management database identification system
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007079915A (en) * 2005-09-14 2007-03-29 Nec Corp Electronic ticket system
JP2012164069A (en) * 2011-02-04 2012-08-30 Aisin Aw Co Ltd Business and deliverable management system, and business and deliverable management method
CN105374088A (en) * 2014-08-18 2016-03-02 国家电网公司 Control method and control apparatus of substation active misoperation prevention equipment
US20190243828A1 (en) * 2014-12-31 2019-08-08 Servicenow, Inc. System independent configuration management database identification system
CN109103985A (en) * 2018-02-24 2018-12-28 国家电投集团重庆合川发电有限公司 The method and apparatus for controlling the execution of operation order
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
上海超高压输变电公司 编: "《变电所自动化与监控(第三册)》" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113627899A (en) * 2021-10-12 2021-11-09 广东电网有限责任公司惠州供电局 Matching ticket writing method, device, system and medium based on electronic operation ticket

Similar Documents

Publication Publication Date Title
KR20170137098A (en) Method and system for providing and receiving information for on-site risk management
CN111612646A (en) Networked intelligent secondary operation and maintenance system
CN109784843A (en) A kind of building cost management method and system based on WBS
CN105335828A (en) Operation method of production management
JP2004164615A (en) Work responsible person support method and work responsible person support program
CN109165913A (en) A kind of job group management method, calculates equipment and storage medium at device
CN111241595A (en) Block chain-based food safety supervision method, terminal and storage medium
CN113011855A (en) Operation ticket intelligent management system
KR101620605B1 (en) Apparatus and method for safety diagnosis report
JP2004227307A (en) Progress management device, system, and method, program, and recording medium recording the program
CN110689259A (en) Power system statistic digital detection management system
CN107220290B (en) Method, device, server and terminal for displaying electronic billboard
CN211062086U (en) Novel power transformation inspection platform
CN112184945A (en) Mobile terminal inspection management method and system
JP2005284385A (en) Project management method and project management program
CN115907615A (en) Power test equipment storehouse management system
CN209401045U (en) Equipment Information Management System
CN113438248B (en) Network IP address self-checking management system convenient for master station
CN111062670A (en) Electrical ticket-based tool cabinet control method and device
CN109325564A (en) Equipment Information Management System
CN115456219A (en) Operation and maintenance monitoring method and device of equipment and related equipment
CN114444856A (en) Auxiliary assembly system
CN114881549A (en) Job management method, apparatus, terminal device, and storage medium
CN111133394A (en) Work instruction system and method
CN109559031B (en) Intelligent fire control management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210622

RJ01 Rejection of invention patent application after publication