CN110689259A - Power system statistic digital detection management system - Google Patents

Power system statistic digital detection management system Download PDF

Info

Publication number
CN110689259A
CN110689259A CN201910908928.2A CN201910908928A CN110689259A CN 110689259 A CN110689259 A CN 110689259A CN 201910908928 A CN201910908928 A CN 201910908928A CN 110689259 A CN110689259 A CN 110689259A
Authority
CN
China
Prior art keywords
management module
detection
unit
uploading
account
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910908928.2A
Other languages
Chinese (zh)
Inventor
周迁
计光荣
马敏军
黄祖祥
魏少敏
段吉春
李红仙
张皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN ELECTRIC TECHNOLOGIES Co Ltd
Original Assignee
YUNNAN ELECTRIC TECHNOLOGIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ELECTRIC TECHNOLOGIES Co Ltd filed Critical YUNNAN ELECTRIC TECHNOLOGIES Co Ltd
Priority to CN201910908928.2A priority Critical patent/CN110689259A/en
Publication of CN110689259A publication Critical patent/CN110689259A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides a digital detection management system for metering of an electric power system, which comprises a login management module, a work order management module, an operation management module and a database management module. The login management module is used for respectively setting the authority of the first account, the second account and the management account, and performing authority authentication when the first account, the second account and the management account log in; the work order management module comprises a work order distributing unit, a work order query unit and a work order confirmation unit; the operation management module comprises a laboratory detection submodule and a field detection submodule, wherein the field detection submodule comprises a safety measure unit, a first detection working unit and a working termination unit; the database management module is connected with other modules and used for storing and managing the uploading data of the modules and the personnel authority of logging in the management module. The automation level of the operation management of the power system is improved.

Description

Power system statistic digital detection management system
Technical Field
The application relates to the technical field of computer software, in particular to a digital measurement detection management system for an electric power system.
Background
In order to ensure the normal operation of the power system, various devices in the power system, such as a voltage transformer, a current transformer, an electric energy meter, an electric measuring instrument, a thermal instrument and the like, need to be regularly detected according to national or industrial standards to ensure that the performance of the devices meets the standard requirements.
In the related technology, a detection unit assigns a detection task to an operator for processing after receiving the detection task, at present, most of the detection tasks are field detection, the operator is required to manually fill in related detection content in the field detection process, and then the detection content is input into a computer to form a detection report, however, with the continuous increase of detection items, the number of meters of various metering devices is huge, the detection tasks assigned by the upper-level personnel of the operator are more and more, the work rhythm of the operator is more and more compact, in the existing work mode, the operator needs to spend a lot of time and effort on writing of an original record and checking and arranging in the later period, the labor cost is large, the overall efficiency of the work process is low, the error rate is high, the later-period data statistics and analysis are not facilitated, in addition, whether the operator executes related safety measures before working is difficult to determine, it is not beneficial to strengthen the safety supervision.
Disclosure of Invention
The application provides a digital detection management system for electric power system metering, which aims to solve the problems that safety measures are not tight to control and the operation efficiency is low in the detection operation.
The application provides a digital detection management system for metering of an electric power system, which comprises a login management module, a work order management module, an operation management module and a database management module, wherein,
the login management module is used for respectively setting the authority of a first account and the authority of a second account, and performing authority authentication when the first account and the second account log in;
the work order management module comprises a work order distributing unit, a work order query unit and a work order confirmation unit, wherein the work order distributing unit displays the first account after logging in, and the work order query unit and the work order confirmation unit display the first account or the second account after logging in;
the operation management module comprises a field detection submodule, the field detection submodule comprises a safety measure unit, a first detection working unit and a work termination unit, the first detection working unit is activated after uploading of detection items in the safety measure unit is finished, the work termination unit is activated after uploading of the detection items in the first detection working unit is finished, and the work termination unit generates a detection report according to the uploading contents of the detection items in the safety measure unit and the first detection working unit;
the database management module is respectively connected with the login management module, the work order management module and the operation management module and used for storing the ledger data of the detection equipment and the detected equipment, uploading the detection items of the safety measure unit, the first detection work unit and the work termination unit to form a template, and the personnel permission of the login management module, and the ledger data of the detected equipment is generated according to the detection report.
Optionally, the safety measure unit includes a field survey record uploading subunit, a work ticket uploading subunit, a meeting before work uploading subunit and a secondary measure order uploading subunit, which are connected in sequence, where the field survey record uploading subunit, the work ticket uploading subunit and the secondary measure order uploading subunit all include an uploading option and a skipping option, the uploading option is used to upload corresponding safety measure execution data, and after uploading is completed, the operation jumps to an adjacent next subunit, and the skipping option is used to jump to an adjacent next subunit.
Optionally, the operation management module further includes a laboratory detection sub-module, the laboratory detection sub-module includes a second detection working unit corresponding to the first detection working unit, and the database management module is further configured to store a detection item upload template of the laboratory detection sub-module.
Optionally, the device management module is connected to the database management module, and includes a detection device standing book management module, a device query module, and a detected device standing book management module, where the detection device standing book management module is configured to monitor and update the standing book data of the detection device stored in the database management module, the detected device standing book management module is configured to generate the standing book data of the detected device according to the detection report and store the generated standing book data in the database management module, and the device query module is configured to query the detection device or the standing book data of the detected device from the database management module.
Optionally, the system further comprises an original record management module, connected to the database management module, and configured to query, modify, and download the original record of the ledger data according to the authority authenticated by the login management module.
Optionally, the system further comprises a report management module, connected to the database management module, and configured to query, modify, download, and audit the detection report according to the authority authenticated by the login management module.
The application provides a power system detects digital operation management system of measurement's beneficial effect includes:
the power system statistics digital detection management system provided by the embodiment of the application comprises a login management module, a work order management module, an operation management module, an equipment management module, an original record management module, a report management module and a database management module, and can realize digital management of a professional detection operation process of power system metering, improve the automation level and the operation efficiency of the power system metering detection operation, save labor cost and material cost and achieve environmental protection benefits; the method can automatically generate the detection report to reduce the error rate of the detection report, and really carries out all-round management from production plan, technical management, quality management, cost management, personnel management and the like. Furthermore, the application sets a logic execution sequence of the safety measure unit, the first detection working unit and the work termination unit in the operation management module, so that the operation personnel can execute necessary safety measures before operating the first detection working unit, the operation safety is guaranteed, and the personnel can enter the work termination power supply to generate a detection report after the detection work is finished, and the standardization of the operation process is guaranteed.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
Fig. 1 is a schematic structural diagram of a digital measurement detection management system for an electrical power system according to an embodiment of the present disclosure;
fig. 2 is a schematic structural diagram of a job management module according to an embodiment of the present application;
FIG. 3 is a schematic structural diagram of a security measure unit according to an embodiment of the present application;
fig. 4 is a schematic flowchart of a method for managing a detection work unit according to an embodiment of the present application;
fig. 5 is a schematic flowchart of a method for managing a work termination unit according to an embodiment of the present application.
Detailed Description
In order to make those skilled in the art better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The digital measurement detection management system for the power system is computer software and can be carried on a computer, an intelligent communication terminal such as a smart phone and other hardware. Referring to fig. 1, a schematic structural diagram of a digital measurement detection management system for an electric power system according to an embodiment of the present application is shown in fig. 1, where the digital measurement detection management system for an electric power system according to the embodiment of the present application includes a login management module, a work order management module, an operation management module, an equipment management module, an original record management module, a report management module, and a database management module.
The login management module is used for respectively setting the authority of the first account and the authority of the second account, and performing authority authentication when the first account and the second account log in. The user of the first account may be a superior person of the operator, and the user of the second account may be the operator. The first account and the second account are set with different permissions, the permissions set by the first account and the second account are stored in the database management module, and when the corresponding account logs in, different software operation interfaces can be displayed according to the permissions.
The work order management module comprises a work order distributing unit, a work order query unit and a work order confirmation unit, the work order distributing unit, the work order query unit and the work order confirmation unit are displayed after the first account logs in, and the work order query unit and the work order confirmation unit are displayed after the second account logs in. After the superior personnel of the operating personnel log in the first account, the work order distributing unit is used for generating the work order, and the work order is distributed to the second account corresponding to the operating personnel. After the operator logs in the second account, the work order management module displays a work order query unit and a work order confirmation unit, the work order query unit can query the work order under the second account, the work order confirmation unit can confirm the work order to be processed, the confirmation content comprises confirmation of the operator and confirmation of processing time, and after the confirmation, the operator and the processing time of the work order to be processed are stored in the database management module.
In the embodiment of the present application, the job order includes the following contents: the unit to be detected, the detection project, the scheduled working time and the detection personnel. For example, the detection item 1 is to detect 1 current transformer, and the detection item 2 is to detect 2 voltage transformers.
The work order query unit and the work order confirmation unit are also displayed after the first account is logged in, so that when no operating personnel timely processes the work order, higher-level personnel of the operating personnel can also confirm and execute the work order, and work order delay is effectively avoided.
The operation management module provides operation management function for the operator. Referring to fig. 2, a schematic structural diagram of an operation management module provided in an embodiment of the present application is shown in fig. 2, where the operation management module includes a laboratory detection sub-module and a field detection sub-module. The field detection submodule comprises a safety measure unit, a first detection working unit and a working termination unit.
Referring to fig. 3, a schematic structural diagram of a safety measure unit provided in an embodiment of the present application is shown in fig. 3, where the safety measure unit includes a field survey record uploading subunit, a work ticket uploading subunit, a meeting before class uploading subunit, and a secondary measure order uploading subunit, which are connected in sequence, and the field survey record uploading subunit, the work ticket uploading subunit, and the secondary measure order uploading subunit all include an uploading option and a skipping option. And in a display interface of the safety measure unit, the uploading option of the on-site survey record uploading subunit is an uploading on-site survey function key. After the operation personnel carry out the investigation on the operation site, the investigation records can be handwritten on the paper files, the photographing function on the intelligent communication terminal can be started through the uploading site investigation function key, and the paper files recorded with the investigation records are uploaded to the database management module in the form of photos. The method for selecting the handwritten record and uploading the handwritten record and the electronic file in the field survey is favorable for improving the survey efficiency and effectively storing the survey result. During field inspection, according to the actual requirements of inspection work, situations that field inspection is not needed or cannot be carried out may occur.
After the on-site survey subunit uploads the recorded photos of the on-site survey or skips the on-site survey, the work order uploading subunit can upload the work order. The uploading option of the work ticket uploading subunit is an uploading work ticket function key. After the operation personnel work and manage the work ticket permission procedure, the shooting function on the intelligent communication terminal can be started through the work ticket uploading function key, and the paper work ticket is uploaded to the database management module in a photo mode. During field detection, according to the actual requirement of detection work, a special condition that a work ticket does not need to be handled may occur, the skip option is set in the work ticket uploading subunit, after the skip option is selected, the next item of the work ticket can be directly uploaded, and the next item of the work ticket is uploaded to an antecedent meeting.
The meeting before the shift is a conference before the detection work is carried out, and is generally used for determining main contents, cautions, division of work and the like of the detection work. After the operating personnel finishes the meeting before the shift, the meeting records can be handwritten on the paper files, the photographing function on the intelligent communication terminal can be started through the function key of the meeting before the shift uploading subunit, the paper files recorded with the meeting records of the meeting before the shift are uploaded to the database management module in a photo mode, or the on-site pictures or the on-site video of the meeting can be directly photographed and uploaded to the database management module.
After the office meeting records are uploaded, the secondary measure list can be uploaded. In order to ensure the safety of operators, some safety measures which are not contained in the work ticket need to be executed during field operation, for example, related circuits of the detected equipment are subjected to power failure processing, and the like. After the secondary measure list is filled, the photographing function on the intelligent communication terminal can be started through the uploading secondary measure single-function key of the secondary measure list subunit, and the paper file of the secondary measure list is uploaded to the database management module in a photo form. During field detection, according to the actual requirements of detection work, the situation that a secondary measure list does not need to be filled may occur.
The first detection unit is used for executing and recording detection work, the logic execution sequence of the safety measure unit, the first detection unit and the work termination unit is set in the embodiment of the application, and only after the safety measure unit completes relevant uploading, the execution of relevant contents of the first detection sub-unit can be started, so that the necessary safety measures are executed before an operator operates the first detection unit as much as possible, the operation safety is guaranteed, and after the detection work is completed, the operator can enter the work termination unit to generate a detection report, and the standardization of the operation process is guaranteed.
Referring to fig. 4, a detection work management method of a first detection work unit is a schematic flow chart of a detection work unit management method provided in an embodiment of the present application, and as shown in fig. 4, the detection work management method provided in the embodiment of the present application includes the following steps:
step S101: and selecting a detection item.
In an operation work order, a plurality of detection items may exist, each detection item is provided with a detection item template in the database management module, and an operator can select the detected detection item in the first detection work unit.
Step S102: selection of reference criteria and detection equipment.
The reference standard by which the detection item in step S101 is detected and the detection device used are selected.
Step S103: it is determined whether there is a history report.
Whether a history report containing the detection items of step S101 exists is determined based on the detected unit information and the detected device number in the work order. The history report includes history detection information of the device to be detected, and is used for providing a detection reference and a report writing reference for the operator, for example, if the detection item selected in step S101 is detection item 1, and the detection item 1 is recorded in the job ticket as the current transformer with the detection a unit device number of 101, it is queried whether there is a history report with the a unit device number of 101.
Step S104: if no history report exists, the template is invoked.
If no history report containing the detection item of step S101 is available, the corresponding job item template in the database management module is called.
Step S105: if a history report exists, the history report is invoked.
If there is a history report containing the detection items of step S101, the history report is retrieved.
Step S106: and recording and storing the detection data.
After the tested equipment is detected, the detection data is recorded and stored in a history report or a template obtained according to the step S104 or S105, the correct format and the qualified limit value of the recorded data are set according to the detection standard requirement at each position of the recorded data, and the data which does not meet the correct format or exceed the qualified limit value of the recorded data has a color labeling reminding function; the reference criteria and detection devices selected at step S102 are automatically associated into a history report or template. And after the data entry is finished, automatically judging whether the detected equipment is qualified according to the detection standard.
Step S107: and judging whether all the detection items are finished.
After the detection data of one detection project is uploaded, an operator judges whether the project which is not detected is available according to the actual situation on site, and the software operation interface provides three option keys of detection completion, continuous detection and new project establishment.
Step S108: if the detection items are not completed, judging whether the next detection item is the same as the previous detection item.
If the operator determines that the undetected item exists and the undetected item is the same as the previous detected item, the operator clicks a continue detection button on the software operation interface to return to the step S103 to continue uploading the detection data of the next detected item. If the detection items are different, the step S101 is returned to continue uploading the detection data of the next detection item.
Step S109: if all the test items have been completed, an original record is generated.
And an operator clicks a detection completion key on the software operation interface, an original record is generated in the first detection working unit, and then the operation can enter the working termination unit for processing. Referring to fig. 5, a schematic flow chart of a method for managing a working termination unit according to an embodiment of the present application is shown, and as shown in fig. 5, the schematic flow chart of the method for managing a working termination unit according to the embodiment of the present application includes the following steps:
step S201: and confirming that the detection work is finished.
The operator detects all detection items of one work order and confirms that all the detection items are uploaded to the database management module.
Step S202: and counting the completed workload.
And counting the detection data of all the detection items of one job order, and calculating the quantity and the qualified rate of each detection item.
Step S203: and uploading a secondary measure list and a post-office meeting.
After the detection is finished, the operator restores the lines, equipment and the like changed on the operation site according to the previously uploaded pre-operation secondary measure list, then records the restoration result in the secondary measure list, and shoots and uploads the updated secondary measure list to the database management module.
The post-office meeting is a meeting after the detection work is completed and is generally used for summarizing the detection work. After the meeting of the operator is finished, the operator can write meeting records on paper files by hand, and the paper files recorded with the meeting records after the meeting are uploaded to the database management module in the form of photos, or can directly shoot on-site pictures or on-site meeting videos of the meeting and upload the pictures or videos to the database management module.
Step S204: and generating a detection report.
And (4) acquiring the detection data of each detection item corresponding to one job order and the statistical data completed in the step (S202) from the database management module, respectively generating detection reports according to the detection items, and storing the detection reports in the database management module.
The laboratory detection submodule in the operation management module comprises a second detection working unit, and the working process of the second detection working unit can be set according to the management method of the first detection working unit. The operation project uploading template of the laboratory detection submodule can also be stored in the database management module.
The equipment management module, the original record management module and the report management module realize functional management according to the data in the database management module.
In the embodiment of the application, the device management module is connected with the database management module and comprises a detection device standing book management module, a device query module and a detected device standing book management module. The detection equipment standing book management module is used for monitoring and updating standing book data of the detection equipment stored by the database management module, monitoring content comprises the standing book data of the detection equipment, judging whether the detection equipment is abnormal or not, and determining whether a verification period is out of date or not, and if the detection equipment is abnormal or not, early warning or alarming is carried out to remind an operator, so that the operator is prevented from tracing to the source by using the detection equipment with problems to carry out detection work and damage the magnitude of the detection data. The updating content comprises updating equipment state, verification period, new equipment addition and the like. The equipment account checking management module is used for storing account data of the equipment to be checked generated by the detection report in the database management module, and the equipment inquiry module is used for inquiring the account data of the detection equipment or the equipment to be checked and other related data of the equipment to be checked or the detection equipment from the database management module, for example, an equipment use instruction or an equipment verification certificate uploaded to the database management module by an equipment administrator.
And the original record management module is connected with the database management module and used for inquiring, modifying and downloading the original record generated by uploading the detection data according to the authority of the login management module authentication.
And the report management module is connected with the database management module, users of the first account and the second account can inquire, modify and download the detection report according to the authority authenticated by the login management module, and further, the user of the second account can also audit the detection report according to the authority authenticated by the login management module.
The database management module is respectively connected with other management modules of the electric power system metering digital detection management system and used for storing data generated by or required to be called by each management module, and the management authority of a first account and a second account to different data in the database management module can be set through logging in the management module, so that users of the first account and the second account correspondingly manage the following data in the database management module according to respective management authority: (1) detecting equipment data, and inquiring, inputting and updating equipment related information; (2) original recorded data can be newly added, modified, deleted and data inquired; (3) detecting report data, namely adding, modifying and deleting templates of detection items, and generating a comparison chart for the detection data of the detected equipment in the past year; (4) the operation management and control data can be used for inquiring site survey records, work ticket records, meeting records before work, secondary measure list records, and after-work records, secondary measure list records and workload statistical data in the safety measures under each work order; (5) other relevant data: the detection standard and the operation instruction can be checked, newly added, deleted and modified; (6) and logging in data, and performing addition and deletion of accounts and authority management.
According to the embodiment, the power system statistic digital detection management system provided by the embodiment of the application comprises a login management module, a work order management module, an operation management module, an equipment management module, an original record management module, a report management module and a database management module, can realize digital management of a power system detection operation process, improves the automation level and the operation efficiency of power system metering professional detection operation, saves labor cost and material cost, and achieves environmental protection benefits; the method can automatically generate the detection report to reduce the error rate of the detection report, and really carries out all-round management from production plan, technical management, quality management, cost management, personnel management and the like. Furthermore, the application sets a logic execution sequence of the safety measure unit, the first detection working unit and the work termination unit in the operation management module, so that the operation personnel can execute necessary safety measures before operating the first detection working unit, the operation safety is guaranteed, and the personnel can enter the work termination unit to generate a detection report after the detection work is finished, and the standardization of the operation process is guaranteed.
Since the above embodiments are all described by referring to and combining with other embodiments, the same portions are provided between different embodiments, and the same and similar portions between the various embodiments in this specification may be referred to each other. And will not be described in detail herein.
It is noted that, in this specification, relational terms such as "first" and "second," and the like, are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a circuit structure, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such circuit structure, article, or apparatus. Without further limitation, the presence of an element identified by the phrase "comprising an … …" does not exclude the presence of other like elements in a circuit structure, article or device comprising the element.
Other embodiments of the present application will be apparent to those skilled in the art from consideration of the specification and practice of the disclosure herein. This application is intended to cover any variations, uses, or adaptations of the invention following, in general, the principles of the application and including such departures from the present disclosure as come within known or customary practice within the art to which the invention pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the application being indicated by the following claims.
The above-described embodiments of the present application do not limit the scope of the present application.

Claims (6)

1. A digital measurement detection management system for an electric power system is characterized by comprising a login management module, a work order management module, an operation management module and a database management module, wherein,
the login management module is used for respectively setting the authority of a first account and the authority of a second account, and performing authority authentication when the first account and the second account log in;
the work order management module comprises a work order distributing unit, a work order query unit and a work order confirmation unit, wherein the work order distributing unit displays the first account after logging in, and the work order query unit and the work order confirmation unit display the first account or the second account after logging in;
the operation management module comprises a field detection submodule, the field detection submodule comprises a safety measure unit, a first detection working unit and a work termination unit, the first detection working unit is activated after uploading of detection items in the safety measure unit is finished, the work termination unit is activated after uploading of the detection items in the first detection working unit is finished, and the work termination unit generates a detection report according to the uploading contents of the detection items in the safety measure unit and the first detection working unit;
the database management module is respectively connected with the login management module, the work order management module and the operation management module and used for storing the ledger data of the detection equipment and the detected equipment, uploading the detection items of the safety measure unit, the first detection work unit and the work termination unit to form a template, and the personnel permission of the login management module, and the ledger data of the detected equipment is generated according to the detection report.
2. The electric power system metering digital detection management system according to claim 1, wherein the safety measure unit comprises a field survey record uploading subunit, a work ticket uploading subunit, a meeting before shift uploading subunit and a secondary measure list uploading subunit which are connected in sequence, each of the field survey record uploading subunit, the work ticket uploading subunit and the secondary measure list uploading subunit comprises an uploading option and a skipping option, the uploading option is used for uploading corresponding safety measure execution data, and after uploading is completed, the operation is skipped to an adjacent next subunit, and the skipping option is used for skipping to an adjacent next subunit.
3. The electric power system metering digital detection management system according to claim 1, wherein the operation management module further comprises a laboratory detection submodule including a second detection working unit corresponding to the first detection working unit, and the database management module is further configured to store a detection item upload template of the laboratory detection submodule.
4. The digital detection management system for electric power system metering according to claim 1, further comprising a device management module, connected to the database management module, including a detection device management module, a device query module, and a device under test management module, wherein the detection device management module is configured to perform account checking management on the data of the detection device stored in the database management module, the device under test management module is configured to generate account checking data of the device under test according to the detection report and store the account checking data in the database management module, and the device query module is configured to query the account checking data of the detection device or the device under test from the database management module.
5. The digital detection and management system for electric power system metering of claim 1, further comprising an original record management module, wherein the original record management module is connected with the database management module and is used for inquiring, modifying and downloading the original record according to the authority authenticated by the login management module.
6. The digital detection management system for electric power system metering of claim 1, further comprising a report management module, wherein the report management module is connected with the database management module and is used for inquiring, modifying, downloading and auditing the detection report according to the authority authenticated by the login management module.
CN201910908928.2A 2019-09-25 2019-09-25 Power system statistic digital detection management system Pending CN110689259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910908928.2A CN110689259A (en) 2019-09-25 2019-09-25 Power system statistic digital detection management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910908928.2A CN110689259A (en) 2019-09-25 2019-09-25 Power system statistic digital detection management system

Publications (1)

Publication Number Publication Date
CN110689259A true CN110689259A (en) 2020-01-14

Family

ID=69109994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910908928.2A Pending CN110689259A (en) 2019-09-25 2019-09-25 Power system statistic digital detection management system

Country Status (1)

Country Link
CN (1) CN110689259A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111784112A (en) * 2020-06-08 2020-10-16 国网山东省电力公司烟台供电公司 Power grid operation method, device and system
CN113704720A (en) * 2021-09-01 2021-11-26 佛山市顺德区美的电子科技有限公司 Method, system, device and storage medium for processing household appliance installation information
CN113836864A (en) * 2021-08-26 2021-12-24 广西电网有限责任公司来宾供电局 Development work order content comparison method and system
CN113837598A (en) * 2021-09-18 2021-12-24 北京精密机电控制设备研究所 Information acquisition method based on intelligent manufacturing
CN114035141A (en) * 2021-09-29 2022-02-11 国网河北省电力有限公司营销服务中心 Electric energy metering device inspection control system and control method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103824153A (en) * 2014-02-07 2014-05-28 深圳供电局有限公司 Mobile terminal for processing electric power production field operation
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system
CN106570569A (en) * 2016-11-11 2017-04-19 国网山东省电力公司济南供电公司 Measuring and collecting work intelligent management system and measuring and collecting method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103824153A (en) * 2014-02-07 2014-05-28 深圳供电局有限公司 Mobile terminal for processing electric power production field operation
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system
CN106570569A (en) * 2016-11-11 2017-04-19 国网山东省电力公司济南供电公司 Measuring and collecting work intelligent management system and measuring and collecting method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111784112A (en) * 2020-06-08 2020-10-16 国网山东省电力公司烟台供电公司 Power grid operation method, device and system
CN113836864A (en) * 2021-08-26 2021-12-24 广西电网有限责任公司来宾供电局 Development work order content comparison method and system
CN113704720A (en) * 2021-09-01 2021-11-26 佛山市顺德区美的电子科技有限公司 Method, system, device and storage medium for processing household appliance installation information
CN113837598A (en) * 2021-09-18 2021-12-24 北京精密机电控制设备研究所 Information acquisition method based on intelligent manufacturing
CN113837598B (en) * 2021-09-18 2024-04-16 北京精密机电控制设备研究所 Information acquisition method based on intelligent manufacturing
CN114035141A (en) * 2021-09-29 2022-02-11 国网河北省电力有限公司营销服务中心 Electric energy metering device inspection control system and control method

Similar Documents

Publication Publication Date Title
CN110689259A (en) Power system statistic digital detection management system
US9053237B2 (en) Test script generation
CN108628748B (en) Automatic test management method and automatic test management system
CN111078140B (en) Nuclear power station file uploading management method and device, terminal equipment and medium
CN104376081A (en) Data application processing system, handhold terminal and on-site checking data processing system
CN113157419A (en) Task processing method based on robot process automation
CN106411633A (en) Web application compatibility testing method based on openstack and system thereof
CN109816349A (en) A kind of test verification management platform
CN110309261B (en) Electronic bidding book online generation and signature method and electronic bidding system
CN111444692A (en) Intelligent environment experiment comprehensive control method, system, computer and storage medium
CN115964272A (en) Transaction data automatic testing method, device, equipment and readable storage medium
CN115017484A (en) Access control method and device
CN115841310A (en) Construction method of plan flow model, event processing method and device
JP2017016507A (en) Test management system and program
CN110489329A (en) A kind of output method of test report, device and terminal device
CN109299016A (en) Assessment document structure tree method, system and terminal device
CN114373244A (en) Electrical equipment management method and device based on code scanning technology
CN111045984B (en) Power grid laboratory file management system and method
CN114077540A (en) Interface test system and interface test method
CN111080364A (en) Engineering cost data center management system and device
CN104462116A (en) Data selecting method and device
CN115834625A (en) Operation and maintenance management system and management method based on Internet of things
CN115587041A (en) Mobile application delivery task processing method and device, electronic equipment and storage medium
CN109325564A (en) Device information management system
CN113051165A (en) Method, device, monitoring server and medium for processing test order

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200114

RJ01 Rejection of invention patent application after publication