CN106570569A - Measuring and collecting work intelligent management system and measuring and collecting method thereof - Google Patents

Measuring and collecting work intelligent management system and measuring and collecting method thereof Download PDF

Info

Publication number
CN106570569A
CN106570569A CN201610998326.7A CN201610998326A CN106570569A CN 106570569 A CN106570569 A CN 106570569A CN 201610998326 A CN201610998326 A CN 201610998326A CN 106570569 A CN106570569 A CN 106570569A
Authority
CN
China
Prior art keywords
module
management system
data
intelligent management
login
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610998326.7A
Other languages
Chinese (zh)
Inventor
殷玉朋
邱茂光
李长进
孔苗苗
殷昕羽
李林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610998326.7A priority Critical patent/CN106570569A/en
Publication of CN106570569A publication Critical patent/CN106570569A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Abstract

The invention provides a measuring and collecting work intelligent management system comprising a system login module, a field data collecting module, a field data upload module, a field problem input module, a field problem analysis module, a dispatch list generation module, a dispatch list output module, a field problem feedback module, a data statistical analysis module, a report statistics module and a data inquiring module. The invention also comprises a measuring and collecting method of the measuring and collecting work intelligent management system. The historical records can be inquired through keywords, and inquiring can be specified to the responsible person so as to solve the inconvenience caused by a paper work record sheet.

Description

Metering collecting work intelligent management system and its metering acquisition method
Technical field
The present invention relates to measure acquisition technique field, specifically a kind of metering collecting work intelligent management system and its Metering acquisition method.
Background technology
Metering (collection) device scene defect elimination workload is big, wide, and some cell (unit) metering (collection) problems are frequent Appearance is difficult to count, finds, regularly all kinds of working reports, data statistics excessively repeat, loaded down with trivial details, papery work on the spot record It is not easy to preserve, searches, and system is unable to self-perfection.
The content of the invention
It is an object of the invention to provide a kind of metering collecting work intelligent management system and its metering acquisition method, are used for Solve data statistics in existing metering collecting work excessively repeat, it is loaded down with trivial details, responsibility confirms trouble, system cannot self-perfection ask Topic.
The present invention solves its technical problem and is adopted the technical scheme that:Metering collecting work intelligent management system, it is special Levying is, including
For logging in the system login module of gage work intelligent management system;With,
For the on-site data gathering module of collection site data;With,
For to transmission module in the field data of field data typing management system;With,
For the site problems input module to site problems input system;With,
For the site problems analysis module being analyzed to the site problems of typing;With,
For generating the job order generation module of job order;With,
For job order to be printed the job order output module to be checked with scene;With,
For site problems to be fed back the site problems feedback module so as to sophisticated systems data bank;With,
For statistic analysis record, and judge certain problem in certain place data statistic analysis mould that Jing often occurs Block;With,
For screening and derive the report form statistics module of the quantity of a certain work and details in certain period;With,
For checking, retrieving the data inquiry module of the content of history work sheet.
Further, described system login module is provided with logon rights, including level login and general login;It is senior Log in and logged in by job number and password for administrative staff, typically log in for common staff by job number and password Logged in;Level login is different with the general authority for logging in, and the authority of level login is more than the general authority for logging in.
Further, the condition of described job order generation module work is under the system of level login.
Further, described field data includes field image or scene photograph.
Further, described site problems input module is input into by keyword;
Described site problems analysis module is analyzed by keyword to site problems, and staff is confirmed.
Further, the content of work sheet includes working time, job site, action, staff, work Outfit, change card or change the situation of table.
Further, described data inquiry module inquiry data are inquired about using keyword.
The metering acquisition method of metering collecting work intelligent management system, using metering collecting work intelligent management system, It is characterized in that, specifically include following steps:
Step 1), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 2), by transmission module in on-site data gathering module, field data and site problems input module by scene The image data and key to the issue word for going wrong is entered into management system;
Step 3), metering collecting work intelligent management system is logged in by the level login of system login module;
Step 4), system the image data of problem and key to the issue word are analyzed by site problems analysis module, Confirmed after confirmation;
Step 5), by job order generation module confirm generate job order;
Step 6), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 7), site problems are carried out being entered into management system by site problems feedback module, management system will be existing The result that the result of field case study module analysis is fed back with site problems feedback module is compared, anti-with live feedback module The result of feedback is defined, and carries out sophisticated systems data bank;
Step 8), the content of data statistic analysis module statistical analysis job order, and judge what which area easily occurs The problem of kind, and the number of times for going wrong;
Step 9), if desired for query history logging, inquired about by keyword by data inquiry module.
The invention has the beneficial effects as follows:Metering collecting work intelligent management system and its metering collection side that the present invention is provided Method, using having logon rights system login module, different grades of staff has different logon rights, and higher grade Logon rights are more.
The present invention carries out site problems by the collection of field data to be entered into management system first, again asks at scene Topic is analyzed, and is confirmed after relevant staff's confirmation, generates job order.Staff rescues to scene Afterwards, problem is fed back to again management system, management system is contrasted the result of analysis with the result of feedback, and to feed back Result be defined, progressively voluntarily improve data bank, whole system realizes problem analysis, solve problem and self-perfection data bank One systematized operation.
The present invention can carry out query history record by keyword, can solve papery logging specific to person liable The inconvenience that single tape is come.
Description of the drawings
Fig. 1 is the functions of modules figure of the present invention.
Specific embodiment
As shown in figure 1, metering collecting work intelligent management system, including
For logging in the system login module of gage work intelligent management system;With,
For the on-site data gathering module of collection site data;With,
For to transmission module in the field data of field data typing management system;With,
For the site problems input module to site problems input system;With,
For the site problems analysis module being analyzed to the site problems of typing;With,
For generating the job order generation module of job order;With,
For job order to be printed the job order output module to be checked with scene;With,
For site problems to be fed back the site problems feedback module so as to sophisticated systems data bank;With,
For statistic analysis record, and judge certain problem in certain place data statistic analysis mould that Jing often occurs Block;With,
For screening and derive the report form statistics module of the quantity of a certain work and details in certain period;With,
For checking, retrieving the data inquiry module of the content of history work sheet.
System login module is provided with logon rights, including level login and general login;Level login is used for custodian Member is logged in by job number and password, is typically logged in and is logged in by job number and password for common staff;It is senior Login is different with the general authority for logging in, and the authority of level login is more than the authority of general login.
The condition of job order generation module work is under the system of level login.
Field data includes field image or scene photograph.
Site problems input module is input into by keyword;
Described site problems analysis module is analyzed by keyword to site problems, and staff is confirmed.
The content of work sheet include the working time, job site, action, staff, work outfit, Change card or change the situation of table.
Data inquiry module inquiry data are inquired about using keyword.
The metering acquisition method of metering collecting work intelligent management system, using metering collecting work intelligent management system, Specifically include following steps:
Step 1), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 2), by transmission module in on-site data gathering module, field data and site problems input module by scene The image data and key to the issue word for going wrong is entered into management system;
Step 3), metering collecting work intelligent management system is logged in by the level login of system login module;
Step 4), system the image data of problem and key to the issue word are analyzed by site problems analysis module, Confirmed after confirmation;
Step 5), by job order generation module confirm generate job order;
Step 6), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 7), site problems are carried out being entered into management system by site problems feedback module, management system will be existing The result that the result of field case study module analysis is fed back with site problems feedback module is compared, anti-with live feedback module The result of feedback is defined, and carries out sophisticated systems data bank;
Step 8), the content of data statistic analysis module statistical analysis job order, and judge what which area easily occurs The problem of kind, and the number of times for going wrong;
Step 9), if desired for query history logging, inquired about by keyword by data inquiry module.
The present invention is not limited only to above-mentioned steps flow process, above-mentioned simply one of embodiments of the invention.
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not to present invention protection model The restriction enclosed, on the basis of technical scheme, those skilled in the art do by need not paying creative work The various modifications for going out or deformation are still within protection scope of the present invention.

Claims (8)

1. collecting work intelligent management system is measured, be it is characterized in that, including
For logging in the system login module of gage work intelligent management system;With,
For the on-site data gathering module of collection site data;With,
For to transmission module in the field data of field data typing management system;With,
For the site problems input module to site problems input system;With,
For the site problems analysis module being analyzed to the site problems of typing;With,
For generating the job order generation module of job order;With,
For job order to be printed the job order output module to be checked with scene;With,
For site problems to be fed back the site problems feedback module so as to sophisticated systems data bank;With,
For statistic analysis record, and judge certain problem in certain place data statistic analysis module that Jing often occurs; With,
For screening and derive the report form statistics module of the quantity of a certain work and details in certain period;With for checking, retrieving The data inquiry module of the content of history work sheet.
2. metering collecting work intelligent management system according to claim 1, is characterized in that, described system login module It is provided with logon rights, including level login and general login;Level login is carried out for administrative staff by job number and password Log in, typically log in and logged in by job number and password for common staff;Level login and the general authority for logging in Difference, the authority of level login is more than the general authority for logging in.
3. metering collecting work intelligent management system according to claim 2, is characterized in that, described job order generates mould The condition of block work is under the system of level login.
4. metering collecting work intelligent management system according to claim 1, is characterized in that, described field data includes Field image or scene photograph.
5. metering collecting work intelligent management system according to claim 1, is characterized in that, described site problems input Module is input into by keyword;
Described site problems analysis module is analyzed by keyword to site problems, and staff is confirmed.
6. metering collecting work intelligent management system according to claim 1, is characterized in that, the content bag of work sheet Include the working time, job site, action, staff, work outfit, change card or change the situation of table.
7. metering collecting work intelligent management system according to claim 1, is characterized in that, described data inquiry module Inquiry data are inquired about using keyword.
8. the metering acquisition method of collecting work intelligent management system is measured, using the meter described in claim 1-6 any one Amount collecting work intelligent management system, is characterized in that, specifically include following steps:
Step 1), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 2), by transmission module in on-site data gathering module, field data and site problems input module by scene appearance The image data and key to the issue word of problem is entered into management system;
Step 3), metering collecting work intelligent management system is logged in by the level login of system login module;
Step 4), system the image data of problem and key to the issue word are analyzed by site problems analysis module, check Confirmed after errorless;
Step 5), by job order generation module confirm generate job order;
Step 6), metering collecting work intelligent management system is logged in by the general login of system login module;
Step 7), site problems are carried out by site problems feedback module be entered into management system, management system asks at scene The result that the result of topic analysis module analysis is fed back with site problems feedback module is compared, and is fed back with live feedback module As a result it is defined, carries out sophisticated systems data bank;
Step 8), the content of data statistic analysis module statistical analysis job order, and judge which kind of which area easily occurs and ask Topic, and the number of times for going wrong;
Step 9), if desired for query history logging, inquired about by keyword by data inquiry module.
CN201610998326.7A 2016-11-11 2016-11-11 Measuring and collecting work intelligent management system and measuring and collecting method thereof Pending CN106570569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610998326.7A CN106570569A (en) 2016-11-11 2016-11-11 Measuring and collecting work intelligent management system and measuring and collecting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610998326.7A CN106570569A (en) 2016-11-11 2016-11-11 Measuring and collecting work intelligent management system and measuring and collecting method thereof

Publications (1)

Publication Number Publication Date
CN106570569A true CN106570569A (en) 2017-04-19

Family

ID=58541791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610998326.7A Pending CN106570569A (en) 2016-11-11 2016-11-11 Measuring and collecting work intelligent management system and measuring and collecting method thereof

Country Status (1)

Country Link
CN (1) CN106570569A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109849527A (en) * 2019-01-22 2019-06-07 广东铭钰科技股份有限公司 A kind of automatic signaling method and system of laser machine
CN110096421A (en) * 2019-04-30 2019-08-06 中国人民解放军海军大连舰艇学院 A kind of acquisition and management system of communication data
CN110689259A (en) * 2019-09-25 2020-01-14 云南电力技术有限责任公司 Power system statistic digital detection management system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN104377817A (en) * 2014-11-11 2015-02-25 国家电网公司 Operation and maintenance integrated on-site work information collecting system of transformer substation
CN104517194A (en) * 2014-12-30 2015-04-15 国家电网公司 Power operation-maintenance dispatching list generating method based on dynamic planning
CN105260841A (en) * 2015-10-16 2016-01-20 国网甘肃省电力公司天水供电公司 Auditing system for power distribution network fault emergency repair receipt
CN105373870A (en) * 2014-08-26 2016-03-02 国家电网公司 Power check mobile application system for power marketing and working method thereof
CN105825337A (en) * 2016-03-17 2016-08-03 国网安徽省电力公司信息通信分公司 Intelligent inspection system for 500KV substation communication device
CN106504117A (en) * 2016-10-31 2017-03-15 国家电网公司 Electric power outdoor operation system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN105373870A (en) * 2014-08-26 2016-03-02 国家电网公司 Power check mobile application system for power marketing and working method thereof
CN104377817A (en) * 2014-11-11 2015-02-25 国家电网公司 Operation and maintenance integrated on-site work information collecting system of transformer substation
CN104517194A (en) * 2014-12-30 2015-04-15 国家电网公司 Power operation-maintenance dispatching list generating method based on dynamic planning
CN105260841A (en) * 2015-10-16 2016-01-20 国网甘肃省电力公司天水供电公司 Auditing system for power distribution network fault emergency repair receipt
CN105825337A (en) * 2016-03-17 2016-08-03 国网安徽省电力公司信息通信分公司 Intelligent inspection system for 500KV substation communication device
CN106504117A (en) * 2016-10-31 2017-03-15 国家电网公司 Electric power outdoor operation system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109849527A (en) * 2019-01-22 2019-06-07 广东铭钰科技股份有限公司 A kind of automatic signaling method and system of laser machine
CN110096421A (en) * 2019-04-30 2019-08-06 中国人民解放军海军大连舰艇学院 A kind of acquisition and management system of communication data
CN110689259A (en) * 2019-09-25 2020-01-14 云南电力技术有限责任公司 Power system statistic digital detection management system

Similar Documents

Publication Publication Date Title
CN100437514C (en) Bank main machine pressure testing method and tester
CN110505102B (en) Power information communication fusion monitoring and service standardization management platform system and method
CN1894652B (en) Automatic monitoring and statistical analysis of dynamic process metrics to expose meaningful changes
CN107330080B (en) Data processing method and device and computer equipment applying same
CN106570569A (en) Measuring and collecting work intelligent management system and measuring and collecting method thereof
CN105260841A (en) Auditing system for power distribution network fault emergency repair receipt
CN105069178A (en) Experimental data acquisition and analysis system and method
CN104104734A (en) Log analysis method and device
CN105137215B (en) Medical equipment cost-benefit wireless monitoring analysis system and medical equipment cost-benefit wireless monitoring analysis method
CN101996364A (en) Method for modifying labor time standard and labor time standard management system
CN108171421A (en) A kind of road surface O&M disposal efficiency and method for evaluating quality towards urban transportation smart machine system O&M
CN102650875A (en) Inspection system, management server, inspection apparatus and method for managing inspection data
CN106484059A (en) A kind of server radiating regulation and control method, apparatus and system
CN109522318A (en) A kind of data quality management method and system
CN101840545A (en) Integrated system and method for test detection, management and monitoring
CN112561289A (en) Energy performance integrated verification method in energy management system authentication
CN104714429A (en) Coal sample experiment data acquisition and analysis system and method
CN104281523A (en) Demand testability analysis method and system
CN109032904A (en) Monitored, management server and data acquisition, analysis method and management system
CN105427030B (en) A kind of differentiation processing method of early warning information and system
CN103268329A (en) Plasma display screen manufacturing process data mining system
CN206931114U (en) A kind of architecture engineering material Stores Management System
CN106559262A (en) A kind of area fault alarm method and system
CN110175196A (en) A kind of bill of materials problem statistical method and device
CN109508966A (en) A kind of archives of city construction business integrated management method Internet-based and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419

RJ01 Rejection of invention patent application after publication