CN111080364A - Engineering cost data center management system and device - Google Patents

Engineering cost data center management system and device Download PDF

Info

Publication number
CN111080364A
CN111080364A CN201911316938.3A CN201911316938A CN111080364A CN 111080364 A CN111080364 A CN 111080364A CN 201911316938 A CN201911316938 A CN 201911316938A CN 111080364 A CN111080364 A CN 111080364A
Authority
CN
China
Prior art keywords
budget
unit
module
price
basic data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911316938.3A
Other languages
Chinese (zh)
Inventor
杨柳
苏丹娜
李帆
王大帅
杜玲霞
卞家胜
冯申申
张帆
王兰兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Railway Vocational and Technical College
Original Assignee
Zhengzhou Railway Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Railway Vocational and Technical College filed Critical Zhengzhou Railway Vocational and Technical College
Priority to CN201911316938.3A priority Critical patent/CN111080364A/en
Publication of CN111080364A publication Critical patent/CN111080364A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a project cost data center management system and a device, comprising: the basic data collection module is used for acquiring basic data for project construction cost and carrying out rationality analysis on the acquired basic data; the budget management module is used for generating budget tables in a period of time before the current moment and in a prediction construction period by inputting budget parameter values and automatically calling budget prices corresponding to the budget parameters; and the monitoring management module is used for monitoring and changing the record of the basic data in real time through a reminding notice sent by the link website. The invention generates the budget table by selecting the budget parameters participating in the budget and correspondingly inputting the budget parameter values and automatically calling the budget prices corresponding to the budget parameters, namely, the budget parameters and the budget prices are managed, so that the efficiency of project cost budget is improved; and finally forming a reliable budget table in the construction period by analyzing the variation trend of each parameter in the plurality of budget tables and predicting the variation trend of each parameter in the industry.

Description

Engineering cost data center management system and device
Technical Field
The invention relates to the technical field of engineering cost information management, in particular to an engineering cost data center management system and device.
Background
Along with the informatization management of the construction cost data, the construction cost data volume is large, only the data are classified and stored, when the construction cost is budgeted, the prior art searches related data records to form a budget statistical table and then carries out the construction cost budget, and the searching of the related data in the process needs more time and energy, and the data are complicated, so that the final budget result is not accurate enough, namely the data cannot be accurately and quickly used for the construction cost budget.
Disclosure of Invention
The embodiment of the invention provides a project cost data center management system and a project cost data center management device, which are used for solving the problems in the background technology.
The embodiment of the invention provides a project cost data center management system, which comprises: the system comprises a basic data collection module, a budget management module, a monitoring management module and a data storage module, wherein the basic data collection module, the budget management module and the monitoring management module are all electrically connected with the data storage module;
the basic data collection module is used for acquiring basic data for project construction cost and carrying out rationality analysis on the acquired basic data; wherein the base data comprises: building material type, building material consumption, manual work efficiency index and contract work efficiency index;
the budget management module is used for generating budget tables in a period of time before the current moment and in a prediction construction period by inputting budget parameter values and automatically calling budget prices corresponding to the budget parameters; wherein the budget parameters include: material type, building material consumption, manual type, manual quantity, contract work type and contract work amount;
and the monitoring management module is used for monitoring and changing the record of the basic data in real time through a reminding notice sent by the link website.
Further, the data storage module is used for storing the material type, the material price, the material supplier, the manual work efficiency index, the contract work efficiency index and the budget table for the construction cost.
Further, the basic data collection module comprises: a data collection unit and a data analysis unit;
the data collection unit is used for acquiring basic data for construction cost from the building BIM information platform; and the data analysis unit is used for verifying the rationality of the acquired basic data by comparing and analyzing the acquired basic data with the basic data for historical construction cost.
Further, the budget management module includes: the system comprises a budget parameter setting unit, a budget price acquiring unit, a budget price evaluating unit, a budget price associating unit, a budget price calling unit, a prophase budget table forming unit and a construction period budget table forming unit;
the budget parameter setting unit is used for selecting the type of budget parameters from budget parameter options; the budget price acquisition unit is used for forming a budget price table from the real-time budget prices; the budget price evaluation unit is used for carrying out average value processing on prices in a natural month by taking the natural month as a unit according to a budget table time period; the budget price association unit is used for associating the budget parameters in the budget parameter options with the budget prices corresponding to the budget parameters; the budget price calling unit is used for calling the budget price at the corresponding time according to the budget table time period and the corresponding relation between the budget parameter and the budget price; the early budget table forming unit is used for forming a plurality of budget tables which take a natural month as a unit in a period of time before the current moment according to the budget table time period; and the construction period budget table forming unit is used for adjusting the budget parameters and the budget table after the budget price according to the prediction information and estimating the budget table in the construction period.
Further, the previous period of time of the current time is 1 year, 2 years and 3 years; the prediction period is 1 year, 2 years, 3 years and 5 years.
Further, the monitoring management module comprises: the system comprises a website association unit, a smart phone binding unit, a website change notification unit, a website change evaluation unit, a website change recording unit and an internal change recording unit;
the website association unit is used for associating the monitored change information with the corresponding website; the smart phone binding unit is used for binding the smart phone with the website corresponding to the change information; the website change notification unit is used for sending notification information that the change information changes to the smart phone by the website when the monitored change information changes; the website change evaluation unit is used for comprehensively evaluating the notification information of different websites corresponding to the same change information type to determine an evaluation result; the website change recording unit is used for recording the change information of different websites corresponding to the same change information type and the change corresponding to different change information types; and the internal change recording unit is used for adjusting and recording the change information in a manual input mode.
Further, the change information type includes: building material condition, building material price, manual work efficiency and contract work efficiency.
Further, the monitoring management module further includes: and the supervision authority setting unit is used for setting the access authority of the supervision personnel who accept the change notification and process the change record.
The embodiment of the invention provides a project cost data center management device, which comprises: the input and output device, the data processing module, the data exchange module, the display and the memory are all electrically connected with the data processing module;
the data processing module is used for acquiring basic data for project construction cost and performing rationality analysis on the acquired basic data; the system comprises a budget parameter value input module, a budget price module and a budget price module, wherein the budget parameter value input module is used for inputting a budget parameter value and automatically calling the budget price corresponding to the budget parameter to generate a budget table in a period before the current moment and in a prediction construction period; the system is used for monitoring and changing the records of the basic data in real time through the reminding notice sent by the link website.
The embodiment of the invention provides a project cost data center management system and a device, compared with the prior art, the project cost data center management system has the following beneficial effects:
the invention generates the budget table by selecting the budget parameters participating in budget and correspondingly inputting the budget parameter values and automatically calling the budget prices corresponding to the budget parameters, and the process does not need to spend excessive time and energy to search the budget parameters and the budget prices from a large amount of data, namely, the budget parameters and the budget prices are managed, so that the efficiency of project cost budget is improved; the invention has comprehensive budget parameters, forms a plurality of budget tables taking natural months as units in a certain period of time, and finally forms a reliable budget table in a construction period by analyzing the variation trend of each parameter in the plurality of budget tables and predicting the variation trend of each parameter in the industry, and the project cost budget is accurate and reliable. Furthermore, the information which is possibly changed is monitored in real time, so that the reliability and accuracy of the data participating in the project cost budget are ensured.
Drawings
FIG. 1 is a schematic block diagram of a construction cost data center management system according to an embodiment of the present invention;
FIG. 2 is a block diagram of the internal components of the basic data collection module according to an embodiment of the present invention;
FIG. 3 is a schematic block diagram of the budget management module according to an embodiment of the present invention;
fig. 4 is an internal schematic block diagram of a monitoring management module according to an embodiment of the present invention;
fig. 5 is a connection diagram of a construction cost data center management device according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, an embodiment of the present invention provides a project cost data center management system, including: the system comprises a basic data collection module 1, a budget management module 2, a monitoring management module 3 and a data storage module 4, wherein the basic data collection module 1, the budget management module 2 and the monitoring management module 3 are all electrically connected with the data storage module 4.
Specifically, the basic data collection module 1 is used for acquiring basic data for project construction cost and performing rationality analysis on the acquired basic data; wherein the basic data includes: building material type, building material consumption, manual work efficiency index and contract work efficiency index; the budget management module 2 is used for generating budget tables in a period of time before the current moment and in a prediction construction period by inputting budget parameter values and automatically calling budget prices corresponding to the budget parameters; wherein, the budget parameter includes: material type, building material consumption, manual type, manual quantity, contract work type and contract work amount; and the monitoring management module 3 is used for monitoring and changing the record of the basic data in real time through a reminding notice sent by the link website.
According to the technical characteristics, the embodiment of the invention generates the budget table by selecting the budget parameters participating in the budget and correspondingly inputting the values of the budget parameters and automatically calling the budget prices corresponding to the budget parameters, and the process does not need to spend excessive time and energy to search the budget parameters and the budget prices from a large amount of data, namely the budget parameters and the budget prices are managed, so that the efficiency of project cost budget is improved; the embodiment of the invention has comprehensive budget parameters, forms a plurality of budget tables taking natural months as units in a certain period of time, and finally forms a reliable budget table in a construction period by analyzing the variation trend of each parameter in the plurality of budget tables and predicting the variation trend of each parameter in the industry, and the engineering cost budget is accurate and reliable.
Further, the data storage module 4 is used for storing the material type, the material price, the material supplier, the manual work efficiency index, the contract work efficiency index, the budget table and the like for the construction cost.
Further, referring to fig. 1, the basic data collection module 1 includes: a data collection unit 11 and a data analysis unit 12. In order to obtain comprehensive and accurate basic data, building BIM information modeling is firstly carried out, and then basic data is obtained on a BIM information modeling platform, so that the data collection unit 11 provided in the embodiment of the invention is used for obtaining basic data for engineering cost from the building BIM information platform. In order to obtain reliable basic data, the data analysis unit 12 provided in the embodiment of the present invention is configured to verify the rationality of the obtained basic data by performing comparative analysis on the obtained basic data and the historical construction cost basic data.
Further, referring to fig. 2, the budget management module 2 includes: a budget parameter setting unit 21, a budget price acquiring unit 22, a budget price evaluating unit 23, a budget price associating unit 24, a budget price calling unit 25, a previous budget sheet forming unit 26, and a construction period budget sheet forming unit 27.
Specifically, the budget parameter setting unit 21 is configured to select a kind of budget parameter from the budget parameter options, that is, the parameter participating in the budget can be simply selected. And the budget price acquiring unit 22 is used for forming a budget price table by the real-time budget prices, namely, the acquired prices are real-time, and the reliability of the prices is ensured. The budget price evaluation unit 23 is configured to perform average processing on prices in the natural month in units of the natural month according to the budget table time period, that is, perform average processing on the prices in the natural month as the prices in the current month, so that the price accuracy is high. The budget price associating unit 24 is configured to associate the budget parameter in the budget parameter option with the budget price corresponding to the budget parameter, that is, associate the budget price for quickly and accurately obtaining the budget price. And the budget price calling unit 25 is configured to call the budget price at the corresponding time according to the budget table time period and the corresponding relationship between the budget parameter and the budget price, that is, the called budget price is the evaluated budget price. The early-stage budget table forming unit 26 is configured to form a plurality of budget tables in units of natural months in a period of time before the current time according to the budget table time period, that is, a plurality of budget tables in units of natural months in a period of time. And a construction period budget table forming unit 27, configured to adjust the budget parameters and the budget table after the budget price is estimated according to the prediction information, and estimate the budget table in the construction period, that is, a reliable construction period budget table is finally formed through analysis of variation trends of each parameter in the plurality of budget tables and prediction of variation trends of each parameter in the industry.
Further, for example, the previous period of time is 1 year, 2 years, 3 years; the prediction period is 1 year, 2 years, 3 years and 5 years.
Further, referring to fig. 3, the monitoring management module 3 includes: website association unit 31, smartphone binding unit 32, website change notification unit 33, website change evaluation unit 34, website change recording unit 35, and internal change recording unit 36.
Specifically, the website associating unit 31 is configured to associate the monitored change information with the corresponding website, that is, monitor information that may be changed by a website information change. The smartphone binding unit 32 is configured to bind the smartphone and the website corresponding to the change information, that is, perform mobile phone binding by registering a mobile phone number on the website. The website change notification unit 33 is configured to, when the monitored change information changes, send notification information indicating that the change information has changed, that is, to notify the smart phone of the change information that has changed. The website change evaluation unit 34 is configured to comprehensively evaluate the notification information of different websites corresponding to the same change information type, and determine an evaluation result, that is, comprehensively analyze changes of multiple websites to remove the highest and lowest average processes. The website change recording unit 35 is configured to record change information corresponding to different websites with the same change information type and change corresponding to different change information types, that is, record both the process and the result. The internal change recording unit 36 is used for performing adjustment recording on the change information by a manual input method, namely, the internal personnel manually adjust the change information.
Further, changing the information type includes: building material condition, building material price, manual work efficiency, contract work efficiency and the like.
Further, in order to perform security management on the monitoring data, the monitoring management module 3 according to the embodiment of the present invention further includes: and the supervision authority setting unit 37, is used for setting the access authority of the supervision personnel who accept the change notification and process the change record.
Referring to fig. 4, based on the same inventive concept, an embodiment of the present invention further provides a device for managing a project cost data center, including: the input and output device 100, the data processing module 200, the data exchange module 300, the display 400 and the memory 500 are all electrically connected with the data processing module 200. The data processing module 200 is used for acquiring basic data for project construction cost and performing rationality analysis on the acquired basic data; the system comprises a budget parameter value input module, a budget price module and a budget price module, wherein the budget parameter value input module is used for inputting a budget parameter value and automatically calling the budget price corresponding to the budget parameter to generate a budget table in a period before the current moment and in a prediction construction period; the system is used for monitoring and changing the records of the basic data in real time through the reminding notice sent by the link website. It should be noted that, in the embodiment of the present invention, the memory 500 is an external memory, and the data storage module 4 is a sum of the internal memory and the external memory.
The above disclosure is only a few specific embodiments of the present invention, and those skilled in the art can make various modifications and variations of the present invention without departing from the spirit and scope of the present invention, and it is intended that the present invention encompass these modifications and variations as well as others within the scope of the appended claims and their equivalents.

Claims (9)

1. A project cost data center management system, comprising: the system comprises a basic data collection module (1), a budget management module (2), a monitoring management module (3) and a data storage module (4), wherein the basic data collection module (1), the budget management module (2) and the monitoring management module (3) are all electrically connected with the data storage module (4);
the basic data collection module (1) is used for acquiring basic data for project construction cost and carrying out rationality analysis on the acquired basic data; wherein the base data comprises: building material type, building material consumption, manual work efficiency index and contract work efficiency index;
the budget management module (2) is used for generating budget tables in a period of time before the current moment and in a prediction construction period by inputting budget parameter values and automatically calling budget prices corresponding to the budget parameters; wherein the budget parameters include: material type, building material consumption, manual type, manual quantity, contract work type and contract work amount;
and the monitoring management module (3) is used for monitoring and changing the record of the basic data in real time through a reminding notice sent by a link website.
2. The project cost data center management system according to claim 1, wherein the data storage module (4) is configured to store material types, material prices, material suppliers, ergonomic indicators, contract ergonomic indicators, budget tables for project costs.
3. The project cost data center management system according to claim 1, wherein the basic data collection module (1) comprises: a data collection unit (11) and a data analysis unit (12);
the data collection unit (11) is used for acquiring basic data for construction cost from the building BIM information platform; and the data analysis unit (12) is used for verifying the rationality of the acquired basic data by comparing and analyzing the acquired basic data with the historical construction cost basic data.
4. The project cost data center management system according to claim 1, wherein the budget management module (2) comprises: a budget parameter setting unit (21), a budget price acquiring unit (22), a budget price evaluating unit (23), a budget price associating unit (24), a budget price calling unit (25), an early budget table forming unit (26) and a construction period budget table forming unit (27);
the budget parameter setting unit (21) is used for selecting the type of budget parameter from budget parameter options; the budget price acquisition unit (22) is used for forming a budget price table from the real-time budget prices; the budget price evaluation unit (23) is used for carrying out average value processing on prices in a natural month by taking the natural month as a unit according to a budget table time period; the budget price associating unit (24) is used for associating the budget parameters in the budget parameter options with the budget prices corresponding to the budget parameters; the budget price calling unit (25) is used for calling the budget price at the corresponding time according to the budget table time period and the corresponding relation between the budget parameter and the budget price; the early budget table forming unit (26) is used for forming a plurality of budget tables which take natural months as units in a period of time before the current moment according to the budget table time period; and the construction period budget table forming unit (27) is used for adjusting the budget parameters and the budget table after the budget price according to the prediction information and estimating the budget table in the construction period.
5. The project cost data center management system according to claim 1 or 4, wherein a period of time before the present time is 1 year, 2 years, 3 years; the prediction period is 1 year, 2 years, 3 years and 5 years.
6. The project cost data center management system according to claim 1, wherein the monitoring management module (3) comprises: a website association unit (31), a smartphone binding unit (32), a website change notification unit (33), a website change evaluation unit (34), a website change recording unit (35) and an internal change recording unit (36);
the website association unit (31) is used for associating the monitored change information with the corresponding website; the smart phone binding unit (32) is used for binding the smart phone with the website corresponding to the change information; the website change notification unit (33) is used for sending notification information of change information change to the smart phone by the website when the monitored change information changes; the website change evaluation unit (34) is used for comprehensively evaluating the notification information of different websites corresponding to the same change information type to determine an evaluation result; the website change recording unit (35) is used for recording the change information of different websites corresponding to the same change information type and the change corresponding to different change information types; and the internal change recording unit (36) is used for adjusting and recording the change information in a manual input mode.
7. The project cost data center management system according to claim 6, wherein the change information type includes: building material condition, building material price, manual work efficiency and contract work efficiency.
8. The project cost data center management system according to claim 6, wherein the monitoring management module (3) further comprises: and the supervision authority setting unit (37) is used for setting the access authority of the supervision personnel who accept the change notification and process the change record.
9. A project cost data center management apparatus, comprising: the device comprises an input and output device (100), a data processing module (200), a data exchange module (300), a display (400) and a memory (500), wherein the input and output device (100), the data exchange module (300), the display (400) and the memory (500) are all electrically connected with the data processing module (200);
the data processing module (200) is used for acquiring basic data for project construction cost and carrying out rationality analysis on the acquired basic data; the system comprises a budget parameter value input module, a budget price module and a budget price module, wherein the budget parameter value input module is used for inputting a budget parameter value and automatically calling the budget price corresponding to the budget parameter to generate a budget table in a period before the current moment and in a prediction construction period; the system is used for monitoring and changing the records of the basic data in real time through the reminding notice sent by the link website.
CN201911316938.3A 2019-12-19 2019-12-19 Engineering cost data center management system and device Pending CN111080364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911316938.3A CN111080364A (en) 2019-12-19 2019-12-19 Engineering cost data center management system and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911316938.3A CN111080364A (en) 2019-12-19 2019-12-19 Engineering cost data center management system and device

Publications (1)

Publication Number Publication Date
CN111080364A true CN111080364A (en) 2020-04-28

Family

ID=70315642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911316938.3A Pending CN111080364A (en) 2019-12-19 2019-12-19 Engineering cost data center management system and device

Country Status (1)

Country Link
CN (1) CN111080364A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112734379A (en) * 2021-01-11 2021-04-30 湖北沭坤工程咨询有限公司 Engineering cost management system based on BIM technology
CN112766654A (en) * 2020-12-31 2021-05-07 大为国际工程咨询有限公司 Engineering cost data center management system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018124703A (en) * 2017-01-31 2018-08-09 株式会社ソネット Business management system
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN109919416A (en) * 2019-01-17 2019-06-21 上海申元工程投资咨询有限公司 A kind of efficient and convenient project cost budget editing system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018124703A (en) * 2017-01-31 2018-08-09 株式会社ソネット Business management system
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN109919416A (en) * 2019-01-17 2019-06-21 上海申元工程投资咨询有限公司 A kind of efficient and convenient project cost budget editing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112766654A (en) * 2020-12-31 2021-05-07 大为国际工程咨询有限公司 Engineering cost data center management system
CN112766654B (en) * 2020-12-31 2023-11-24 大为国际工程咨询有限公司 Engineering cost data center management system
CN112734379A (en) * 2021-01-11 2021-04-30 湖北沭坤工程咨询有限公司 Engineering cost management system based on BIM technology

Similar Documents

Publication Publication Date Title
CN105868373B (en) Method and device for processing key data of power business information system
CN105354616A (en) Processing device and on-line processing method for electric power measurement asset data
CN110414838A (en) A kind of tobacco process quality management-control method, system, equipment and storage medium
CN111104589B (en) Decoration enterprise evaluation method, device, computer equipment and storage medium
CN110728422A (en) Building information model, method, device and settlement system for construction project
CN111080364A (en) Engineering cost data center management system and device
CN115879706A (en) Metering asset checking method and device, electronic equipment and readable storage medium
CN110795324A (en) Data processing method and device
CN114493249A (en) Road construction full-period management method, system, terminal and storage medium for road engineering supervision
CN113554357A (en) Informatization project cost evaluation method based on big data and electronic equipment
Li et al. On dynamically monitoring aggregate warranty claims for early detection of reliability problems
CN111222757A (en) Statistical method and device for use condition of charging pile
Kim et al. Reliability acceptance sampling plans for the Weibull distribution under accelerated Type-I censoring
CN111160681A (en) Method, device and storage medium for evaluating user income level based on user income and expenditure data
CN111212434A (en) WIFI module quality prediction method, device, equipment and storage medium
KR101927273B1 (en) Risk value evaluating system for unclaimed construction and risk value evaluating apparatus for unclaimed construction
CN115660546A (en) Electric power measurement asset warehousing management method and system
CN114819487A (en) Method and device for evaluating continuous and stable supply capacity of supplier and computer equipment
CN114254857A (en) Power equipment inventory condition evaluation method and server
CN113987015A (en) Equipment asset state management method, system, equipment and storage medium
Doganaksoy et al. Getting the right data up front: A key challenge
JP2022068612A (en) Information processing method and information processing apparatus
CN110688424A (en) Production monitoring method and device
CN115204717B (en) Security level classification method, device, equipment and readable storage medium
CN114968744B (en) Implementation method and system based on financial industry capacity management prediction analysis AI algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination