CN112922361A - Bracket positioning and mounting method - Google Patents

Bracket positioning and mounting method Download PDF

Info

Publication number
CN112922361A
CN112922361A CN202110090489.6A CN202110090489A CN112922361A CN 112922361 A CN112922361 A CN 112922361A CN 202110090489 A CN202110090489 A CN 202110090489A CN 112922361 A CN112922361 A CN 112922361A
Authority
CN
China
Prior art keywords
plate
bracket
positioning
climbing
cone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110090489.6A
Other languages
Chinese (zh)
Inventor
温东昌
沈倩
袁锋
周海波
刘茂运
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge South China Engineering Co Ltd
Priority to CN202110090489.6A priority Critical patent/CN112922361A/en
Publication of CN112922361A publication Critical patent/CN112922361A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention relates to a bracket positioning and mounting method, which comprises the following steps: respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate; connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device; pre-embedding the bracket pre-embedding device at a design position in concrete; opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device. The awl built-in fitting that climbs among a plurality of awl devices that bracket anchor slab connects is connected with same awl locating plate that climbs, and then when guaranteeing to climb the awl device pre-buried, a plurality of awl devices that climb all can keep the same interval, relative movement or slope can not take place. The anchor plate positioning plate and the climbing cone positioning plate are provided with corresponding holes at the same positions, so that the hole positions on the bracket anchor plate can be ensured to be in one-to-one correspondence with the positions of the climbing cones, and the mounting precision of the bracket anchor plate is ensured.

Description

Bracket positioning and mounting method
Technical Field
The invention relates to the technical field of building construction, in particular to a bracket positioning and mounting method.
Background
At present, the bracket can be used as a supporting stress point for the large bracket, and under the conventional condition, the bracket is formed by adopting a pre-embedded sleeve or a pre-embedded steel plate. When the form of pre-buried steel plates is adopted, the appearance of concrete can be seriously influenced, and the later-period concrete repair is troublesome; when the form of pre-buried sleeve is adopted, the stress area of the whole bracket structure is small, large load can not be borne, and if large load needs to be borne, more supporting rods need to be added, so that material waste is caused. In addition, when anchoring is carried out, the situation of contrast deviation easily occurs in the hole opening positions of the anchor rod and the pre-buried plate, so that the pre-buried precision and the welding quality of the bracket structure cannot be guaranteed.
Disclosure of Invention
In order to overcome the technical problems, particularly the problem that the pre-buried precision and the welding quality of a bracket structure cannot be guaranteed due to the fact that the hole positions of the anchor rod and the pre-buried plate are prone to contrast deviation, the following technical scheme is specially provided:
the bracket positioning and mounting method provided by the embodiment of the application comprises the following steps:
respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate;
connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device;
pre-embedding the bracket pre-embedding device at a design position in concrete;
opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device.
Optionally, connect a plurality of awl devices and the pre-buried device of bracket of same group locating plate subassembly formation with climbing, include:
a screw rod in the cone climbing device penetrates through an opening on the cone climbing positioning plate;
and a limiting part connected with the screw rod is arranged on the climbing cone positioning plate.
Optionally, connect a plurality of awl devices and the pre-buried device of bracket of formation with same group locating plate subassembly, still include:
and the anchor plate positioning plate and the cone climbing device are connected through a positioning bolt to form the bracket embedding device.
Optionally, before the pre-burying of the bracket pre-burying device at a design position in concrete, the method includes:
and arranging the anchor plate positioning plate on the surface of concrete.
Optionally, said connecting the bracket anchor plate with the cone climbing device includes:
after the concrete is solidified, the concrete template is dismantled, and the positioning bolt and the anchor plate positioning plate are taken down;
and connecting the bracket anchor plate with the cone climbing device.
Optionally, said connecting the bracket anchor plate with the cone climbing device includes:
and welding the bracket on the bracket anchor plate.
Optionally, before the pre-burying of the bracket pre-burying device at a design position in concrete, the method includes:
and fixing a plurality of cone climbing devices on the main ribs at the designed positions.
Optionally, the anchor plate positioning plate and the awl positioning plate are consistent in size and shape.
Optionally, the anchor plate positioning plate and the bracket anchor plate are identical in size and shape.
Compared with the prior art, the invention has the following beneficial effects:
the bracket positioning and mounting method provided by the embodiment of the application comprises the following steps: respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate; connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device; pre-embedding the bracket pre-embedding device at a design position in concrete; opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device. The awl built-in fitting that climbs among a plurality of awl devices that bracket anchor slab connects is connected with same awl locating plate that climbs, and then when guaranteeing to climb the awl device pre-buried, a plurality of awl devices that climb all can keep the same interval, relative movement or slope can not take place. The anchor plate positioning plate and the climbing cone positioning plate are provided with corresponding holes at the same positions, so that the hole positions on the bracket anchor plate can be ensured to be in one-to-one correspondence with the positions of the climbing cones, and the mounting precision of the bracket anchor plate is ensured.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The foregoing and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic flow chart of a corbel positioning and mounting method according to the present invention;
fig. 2 is a schematic structural view of a corbel positioning and mounting system in the corbel positioning and mounting method of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative only and should not be construed as limiting the invention.
As used herein, the singular forms "a", "an", "the" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, and/or operations, but do not preclude the presence or addition of one or more other features, integers, steps, operations, and/or groups thereof.
It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
The corbel positioning and mounting method provided by the embodiment of the application is shown in fig. 1 and comprises the following steps: s110, S120, S130, S140.
S110: respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate;
s120: connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device;
s130: pre-embedding a bracket pre-embedding device at a design position in concrete;
s140: opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device.
Optionally, be connected a plurality of awl devices of climbing with same group locating plate subassembly and form the pre-buried device of bracket, include:
a screw rod in the cone climbing device penetrates through an opening on a cone climbing positioning plate;
and a limiting part connected with the screw is arranged on the climbing cone positioning plate.
In the corbel positioning and mounting method provided by the embodiment of the application, before corbels are mounted, a set of positioning plate assembly with corresponding holes is prepared at the same position, namely an anchor plate positioning plate and a climbing cone positioning plate, and then when the corbel pre-embedding device is pre-embedded, the position of a climbing cone in the corbel pre-embedding device can be limited by the positioning plate set through the positioning plate set, holes are formed in the corbel anchor plate according to the holes in the anchor plate positioning plate, so that the positions of the holes in the corbel anchor plate correspond to the positions of the climbing cones, and the mounting precision is guaranteed. As shown in fig. 2, the bracket anchor plate 1 is connected with the cone climbing device 3, and then the bracket 2 is welded with the bracket anchor plate 1, thereby realizing the installation of the bracket 2. Wherein climb awl device 3 and climb awl locating plate 31 including climbing awl embedded part, climb the awl embedded part and constitute including climbing awl, high strength screw rod 33, embedded plate, high strength positioning bolt 35. In order to guarantee that the installation position of the climbing cone device 3 is accurate, a plurality of climbing cone embedded parts in the climbing cone device connected with the bracket anchor plate 1 are connected with the same climbing cone positioning plate 4, so that when the climbing cone device is pre-embedded, the plurality of climbing cone devices 3 can keep the same interval, and relative movement or inclination cannot occur.
In order to ensure that the climbing cone embedded part keeps the same distance in the embedding process, as shown in fig. 2, a hole is formed in the climbing cone positioning plate 4, a screw 33 in the climbing cone embedded part penetrates through the climbing cone positioning plate 4 to realize connection, in order to ensure the stability after connection, a limiting part 36 is respectively arranged on the screw 33 and at two sides of the climbing cone positioning plate 4, the limiting part 36 is a connecting part with threads, and the two limiting parts 36 clamp the climbing cone positioning plate 4 at fixed positions on the screw 33. When the screw rod in a plurality of pre-buried awl devices 3 and awl locating plate 4 of climbing are connected, climb awl locating plate 4 and be connected with a plurality of screw rods 33 are perpendicular, and lie in and climb awl locating plate 4 and equal to the distance of climbing awl locating plate 4 with the tip of all screw rods 33 of one side, and all screw rods 33 thereof with climb awl locating plate 4 and be connected, and then guarantee that every climbs the stress that awl device 3 received the same, avoid single climbing awl device 3 atress too big, and the situation of structural damage appears.
Optionally, be connected a plurality of awl devices of climbing with same group locating plate subassembly and form the pre-buried device of bracket, still include:
the anchor plate positioning plate and the cone climbing device are connected through the positioning bolt to form a bracket embedding device.
Optionally, the pre-burying device for bracket is pre-buried in the concrete before the design position, including:
and arranging the anchor plate positioning plate on the surface of the concrete.
Optionally, the pre-burying device for bracket is pre-buried in the concrete before the design position, including:
and fixing a plurality of cone climbing devices on the main ribs at the designed positions.
In the embodiment that this application provided, as shown in fig. 2, in order to guarantee that bracket anchor slab 1 can accurate location, will be connected with same bracket climb the awl device and fix on the main muscle of design position, when the bracket bears the force, pre-buried awl device of climbing provides counter-tension and will power transmission to concrete structure on, the counter-tension that the awl device provided is climbed in the main muscle further increase simultaneously. After the cone climbing device is fixed on the main rib at the designed position, the anchor plate positioning plate 5 is connected with the climbing cone in the cone climbing device 3 through the positioning bolt 35. And further ensuring that the two ends of the cone climbing device 3 do not move relatively in the pre-embedding process, and the anchor plate positioning plate 5 and the cone climbing positioning plate 4 are provided with corresponding holes at the same position, and optionally, the anchor plate positioning plate 5 and the cone climbing positioning plate 4 are consistent in size and shape. When climbing awl device 3 pre-buried, set up anchor slab locating plate 5 in the concrete surface to anchor slab locating plate 5 can be taken off, and be connected bracket anchor slab 1 with climb the awl device.
As shown in fig. 2, in order to ensure the installation accuracy of the bracket anchor plate 1, the bracket anchor plate 1 is perforated according to the perforation on the anchor plate positioning plate 5, and the anchor plate positioning plate 5 is installed on the cone climbing device when the cone climbing device is embedded, so that each perforation on the bracket anchor plate 1 can correspond to the position of the cone climbing device. Optionally, the size and the shape of anchor plate locating plate 5 and bracket anchor plate 1 are unanimous, and anchor plate locating plate 5 is unanimous with the shape and the size of climbing awl locating plate 4, and all has the trompil of equidimension on corresponding position, and then can guarantee that the trompil on bracket anchor plate 1 can with climb the position one-to-one of awl for guarantee bracket anchor plate 1's installation accuracy, and the deviation can not appear in bracket anchor plate 1's trompil position.
Optionally, be connected bracket anchor slab with climb awl device, include:
after the concrete is solidified, the concrete template is dismantled, and the positioning bolt and the anchor plate positioning plate are taken down;
and connecting the bracket anchor plate with the cone climbing device.
Optionally, be connected bracket anchor slab with climb awl device, include:
and welding the bracket on the bracket anchor plate.
In the embodiment provided by the application, as shown in fig. 2, after the climbing cone device is pre-buried in the concrete and the concrete is solidified, the concrete formwork is removed, the positioning bolt 35 and the anchor plate positioning plate 5 are taken down, then the bracket anchor plate 1 is installed on the climbing cone, and the climbing cone device 3 is bolted with the bracket anchor plate 1 through the positioning bolt 35. As before, because the size and the shape of anchor slab locating plate 5 and bracket anchor slab 1 are unanimous, and anchor slab locating plate 5 is unanimous with the size of climbing awl locating plate 4 shape, and all has the trompil of equidimension on corresponding position, and then can guarantee that the trompil on bracket anchor slab 1 can with climb the position one-to-one of awl, and then can guarantee that bracket anchor slab 1's trompil position can be corresponding with the awl position of climbing the awl device, has guaranteed bracket anchor slab 1's installation accuracy. And then, welding the bracket 2 on the bracket anchor plate 1 to complete the whole positioning and mounting process of the bracket 2.
In conclusion, the bracket positioning and mounting method provided by the application comprises the following beneficial effects:
the bracket positioning and mounting method provided by the embodiment of the application comprises the following steps: respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate; connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device; pre-embedding the bracket pre-embedding device at a design position in concrete; opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device. The awl built-in fitting that climbs among a plurality of awl devices that bracket anchor slab connects is connected with same awl locating plate that climbs, and then when guaranteeing to climb the awl device pre-buried, a plurality of awl devices that climb all can keep the same interval, relative movement or slope can not take place. The anchor plate positioning plate and the climbing cone positioning plate are provided with corresponding holes at the same positions, so that the hole positions on the bracket anchor plate can be ensured to be in one-to-one correspondence with the positions of the climbing cones, and the mounting precision of the bracket anchor plate is ensured.
The foregoing is only a partial embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (9)

1. A method for positioning and installing a bracket is characterized by comprising the following steps:
respectively preparing a positioning plate component which is provided with corresponding openings at the same position and comprises an anchor plate positioning plate and a climbing cone positioning plate;
connecting a plurality of cone climbing devices with the same group of positioning plate assemblies to form a bracket embedded device;
pre-embedding the bracket pre-embedding device at a design position in concrete;
opening holes in the bracket anchor plate according to the opening holes in the anchor plate positioning plate; and connecting the bracket anchor plate with the cone climbing device.
2. The corbel positioning and mounting method according to claim 1, wherein the step of connecting the plurality of climbing cone devices with the same group of positioning plate assemblies to form a corbel pre-embedding device comprises the following steps:
a screw rod in the cone climbing device penetrates through an opening on the cone climbing positioning plate;
and a limiting part connected with the screw rod is arranged on the climbing cone positioning plate.
3. The corbel positioning and mounting method according to claim 2, wherein the plurality of climbing cone devices are connected with the same group of positioning plate assemblies to form a corbel pre-embedding device, and the method further comprises the following steps:
and the anchor plate positioning plate and the cone climbing device are connected through a positioning bolt to form the bracket embedding device.
4. The corbel positioning and installing method according to claim 3, wherein the embedding of the corbel embedding device in the concrete before the design position comprises:
and arranging the anchor plate positioning plate on the surface of concrete.
5. The corbel positioning and mounting method according to claim 3, wherein the connecting the corbel anchor plate to the awl apparatus includes:
after the concrete is solidified, the concrete template is dismantled, and the positioning bolt and the anchor plate positioning plate are taken down;
and connecting the bracket anchor plate with the cone climbing device.
6. The corbel positioning and mounting method according to claim 1, wherein the connecting the corbel anchor plate to the awl apparatus includes:
and welding the bracket on the bracket anchor plate.
7. The method for positioning and installing the bracket according to claim 1, wherein the pre-embedding of the bracket pre-embedding device in the concrete before the design position comprises the following steps:
and fixing a plurality of cone climbing devices on the main ribs at the designed positions.
8. The corbel locating and mounting method according to claim 1, wherein the anchor plate locating plate and the creeper cone locating plate are identical in size and shape.
9. The corbel locating and mounting method according to claim 1, wherein the anchor plate locating plate and the corbel anchor plate are of identical size and shape.
CN202110090489.6A 2021-01-22 2021-01-22 Bracket positioning and mounting method Pending CN112922361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110090489.6A CN112922361A (en) 2021-01-22 2021-01-22 Bracket positioning and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110090489.6A CN112922361A (en) 2021-01-22 2021-01-22 Bracket positioning and mounting method

Publications (1)

Publication Number Publication Date
CN112922361A true CN112922361A (en) 2021-06-08

Family

ID=76165078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110090489.6A Pending CN112922361A (en) 2021-01-22 2021-01-22 Bracket positioning and mounting method

Country Status (1)

Country Link
CN (1) CN112922361A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585081A (en) * 2021-07-31 2021-11-02 山东上冶钢构股份有限公司 Assembling and positioning method for multi-angle inclined bracket of tubular column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100031805A (en) * 2008-09-16 2010-03-25 김재옥 Stone corbel
CN103132494A (en) * 2011-11-25 2013-06-05 中国葛洲坝集团股份有限公司 Embedded anchor cone accurate positioning method
CN204664623U (en) * 2015-06-11 2015-09-23 中国葛洲坝集团股份有限公司 A kind of vertical pump line fixing device
CN206858019U (en) * 2017-06-14 2018-01-09 福建开辉机械工程有限公司 A kind of new attached wall embedded parts structure of derrick crane
CN207646887U (en) * 2017-12-04 2018-07-24 中国路桥工程有限责任公司 One kind climbing cone embedded system
CN208899517U (en) * 2018-10-17 2019-05-24 中国十七冶集团有限公司 A kind of bracket of accurate adjustment combined type pre-embedded bolt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100031805A (en) * 2008-09-16 2010-03-25 김재옥 Stone corbel
CN103132494A (en) * 2011-11-25 2013-06-05 中国葛洲坝集团股份有限公司 Embedded anchor cone accurate positioning method
CN204664623U (en) * 2015-06-11 2015-09-23 中国葛洲坝集团股份有限公司 A kind of vertical pump line fixing device
CN206858019U (en) * 2017-06-14 2018-01-09 福建开辉机械工程有限公司 A kind of new attached wall embedded parts structure of derrick crane
CN207646887U (en) * 2017-12-04 2018-07-24 中国路桥工程有限责任公司 One kind climbing cone embedded system
CN208899517U (en) * 2018-10-17 2019-05-24 中国十七冶集团有限公司 A kind of bracket of accurate adjustment combined type pre-embedded bolt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585081A (en) * 2021-07-31 2021-11-02 山东上冶钢构股份有限公司 Assembling and positioning method for multi-angle inclined bracket of tubular column
CN113585081B (en) * 2021-07-31 2023-03-10 山东上冶钢构股份有限公司 Assembling and positioning method for multi-angle inclined bracket of tubular column

Similar Documents

Publication Publication Date Title
CN214461240U (en) Bracket positioning and mounting system
CA2655712A1 (en) A tower construction
JP4499006B2 (en) Seismic isolation device mounting structure, construction method thereof, and base plate for seismic isolation device mounting
US5819487A (en) Prestressed concrete poles with internal bolting and leveling structures
CN112922361A (en) Bracket positioning and mounting method
CN215594016U (en) Mounting structure of shock insulation support
KR101101941B1 (en) Apparatus for prevent fall and for maintening for fulling level of gang form
JP5334635B2 (en) Bearing fixing structure
KR101916158B1 (en) Concrete slab and insulation integral type bolt insert plate for installation of ceiling facilities and it's construction method
CN207597754U (en) A kind of assembled stair attachment device
EP1153172A1 (en) A method and an assembly for casting a tower foundation
CN216839539U (en) Roofing photovoltaic support installation basis
CN217580582U (en) Building shock insulation support mounting structure
CN111910917A (en) Formwork structure and construction method thereof
KR101886015B1 (en) Post for rail and constructing method of it
CN210800482U (en) Base for rapidly installing subway electromechanical equipment
CN220768972U (en) Reverse-acting installation support system for foundation shock insulation support of existing masonry structure
CN216999814U (en) Platform side slope pile foundation supporting construction in air
CN216973759U (en) Foundation bolt fixing structure
CN218757969U (en) A anti-wind support that is used for adjustable easy change of shock insulation building
CN219654225U (en) Tool type scaffold structure
CN211735027U (en) Conical socket bracket and pier body provided with same
KR102223810B1 (en) Bracket connection structure
CN221118780U (en) Concrete embedded part
CN212452742U (en) Embedded part for large-scale unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210608