CN103132494A CN2011103807080A CN201110380708A CN103132494A CN 103132494 A CN103132494 A CN 103132494A CN 2011103807080 A CN2011103807080 A CN 2011103807080A CN 201110380708 A CN201110380708 A CN 201110380708A CN 103132494 A CN103132494 A CN 103132494A
Authority
CN
China
Prior art keywords
anchor cone
embedded anchor
plate
location
reinforcing bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103807080A
Other languages
Chinese (zh)
Other versions
CN103132494B (en
Inventor
滕东海
詹剑霞
杨志书
王文亮
周雄
黄家权
朱四龙
冯欣茹
朱俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201110380708.0A priority Critical patent/CN103132494B/en
Publication of CN103132494A publication Critical patent/CN103132494A/en
Application granted granted Critical
Publication of CN103132494B publication Critical patent/CN103132494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an embedded anchor cone accurate positioning method which comprises that structural reinforcing bars inside a concrete bin are bound according to design requirements, after the binding of the structural steel bars is checked to be qualified, an embedded position of a embedded anchor cone is measured by applying of a measuring instrument, marks are made on the structural steel bars, a positioning plate and the embedded anchor cone are fixed, waterproof cloth is applied to protect a positioning hole exposed externally in the positioning plate and a cone head plugging, moldboards are erected, concrete is poured and the moldboards are dismounted. The embedded anchor cone accurate positioning method has the advantages that due to the fact that lofting is carried out on a positioning panel before construction according to a designed embedded anchor cone position, then the positioning hole is formed in the panel, the installation position of the positioning hole is accurately rectified by the measuring instrument and the positioning plate is connected on the structural steel bars inside the bin in a welding mode, after the position of the positioning plate is fixed, the purpose that the embedded anchor cone position is accurately positioned is achieved, construction difficulty is reduced, construction speed is accelerated, and production efficiency is improved.

Description

The embedded anchor cone accurate positioning method
Technical field
The present invention relates to a kind of accurate positioning method of embedded anchor cone, particularly a kind of job practices that is embedded in concrete that anchor cone is accurately located.
Background technology
In the ship lift king-post tubular construction concrete construction of power station, usually use the hydraulic self-lifting template to carry out formwork erection construction, the support system of template is fixed on a plurality of embedded anchor cones in concrete by steel corbel.Large due to the concrete height of ship lift king-post tubular construction, design accuracy is high especially, therefore to the required precision of embedded anchor cone also high especially (allowable variations such as burial place, spacing all must not greater than 2mm).In traditional embedded anchor cone construction, take after direct perforate on form surfacing, penetrate anchor cone in the hole and be fixed on form surfacing, this job practices has not only been damaged the integrity of template, and needs the long time of cost repeatedly just can reach the requirement of design accuracy in the position of adjustment embedded anchor cone.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of embedded anchor cone accurate positioning method, can solve in existing work progress the technical barrier that anchor cone embedding precision in concrete is not high, destroy form surfacing.
The technical solution used in the present invention:
A kind of embedded anchor cone accurate positioning method comprises the following steps:
A, according to the structure reinforcing bars in designing requirement colligation concrete storehouse, through after the assay was approved, adopt measuring instrument to emit the burial place of embedded anchor cone, and make mark on structure reinforcing bars;
B, stationary positioned plate, with the center of the locating hole on location-plate and the mark preliminary coincidence on structure reinforcing bars, accurately check and approve the center of locating hole by measuring apparatus after, bearing bar on location-plate is welded on structure reinforcing bars, thereby location-plate and structure reinforcing bars are connected and fixed, and the diameter of described locating hole is slightly larger than the conehead external diameter of embedded anchor cone;
C, fixing embedded anchor cone penetrate the embedded anchor cone that is connected with dowel in locating hole on location-plate, keep the conehead of embedded anchor cone to flush with the lateral surface of location-plate;
D, adopt canvas cloth with the locating hole that exposes on location-plate and the conehead shutoff protection of embedded anchor cone, cement grout stops up the anchor cone taper hole when avoiding concreting;
E, frame shuttering, and keep the lateral surface of location-plate to overlap with the medial surface of template;
F, concreting notice that in casting process reinforcement is to the protection of location-plate and embedded anchor cone;
G, when concrete reaches some strength, stripping cleans out the location-plate that is cast in concrete and the conehead of embedded anchor cone, can use pre-buried anchor cone.
In above-mentioned step D, also include according to the position of being close on location-plate, make mark at the another side of template, according to the mark on template, determine the position of location-plate when being convenient to form removal.
In above-mentioned step C, also comprise and adopt the bearing diagonal reinforcing bar with dowel and structure reinforcing bars welding, thereby embedded anchor cone and structure reinforcing bars are connected and fixed.
Above-mentioned bearing bar is distributed in four jiaos of location-plate, and the bearing bar other end and structure reinforcing bars are welded to connect.
Above-mentioned location-plate adopts the thick steel plate materials of 5mm to make.
Above-mentioned canvas cloth is the cloth that plastic colloidal cloth or other waterproofing materials are made.
The technique effect that the present invention obtains:
1. carry out setting-out according to the embedded anchor cone position of design before the construction on the location-plate face, then drive locating hole on the plate face, be welded on structure reinforcing bars in the storehouse by its installation site of measuring apparatus precise calibration and with location-plate, after thereby the position that makes location-plate is fixing, reach the purpose of embedded anchor cone position, accurate location, both reduce difficulty of construction, also accelerated construction speed, improved production efficiency;
2. adopt many bearing bars that location-plate and embedded anchor cone are weldingly fixed on structure reinforcing bars in the storehouse, fastness and the stability of embedded anchor cone have been strengthened, embedded anchor cone can be interfered in concreting process and be subjected to displacement, having guaranteed the construction quality of embedded anchor cone;
3. by the fixing anchor cone of the locating hole offered on location-plate, do not need perforate on template, kept the integrity of template, extended the application life of template, reduced cost of production.
Description of drawings
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is this location-plate schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the present invention are described further.
Referring to Fig. 1-2, a kind of embedded anchor cone accurate positioning method comprises the following steps:
A, according to the structure reinforcing bars 6 in designing requirement colligation concrete storehouse, qualified by inspection after, adopt measuring instrument to emit the burial place of embedded anchor cone 1, and make mark on structure reinforcing bars 6;
B, stationary positioned plate 2, with the center of the locating hole 3 on location-plate 2 and the mark preliminary coincidence on structure reinforcing bars 6, accurately check and approve the center of locating hole 3 by measuring apparatus after, bearing bar 4 on location-plate 2 is welded on structure reinforcing bars 6, thereby location-plate 2 and structure reinforcing bars 6 are connected and fixed;
C, fixing embedded anchor cone 1, the embedded anchor cone 1 that is connected with dowel 5 is penetrated in locating hole 3 on location-plate 2, keep the conehead of embedded anchor cone 1 to flush with the lateral surface of location-plate 2, then adopt bearing bar 4' with dowel 5 and structure reinforcing bars 6 welding, thereby embedded anchor cone 1 and structure reinforcing bars 6 are connected and fixed, the diameter of described locating hole 3 is slightly larger than the conehead external diameter of embedded anchor cone 1, gets final product with the conehead that can pass embedded anchor cone 1;
D, adopt plastic colloidal cloth with the locating hole 3 that exposes on location-plate 2 and the conehead shutoff protection of embedded anchor cone 1, cement grout stops up the anchor cone taper hole when avoiding concreting;
E, frame shuttering 7 keep the lateral surface of location-plate 2 to overlap with the medial surface of template;
F, concreting, concreting method is identical with conventional concrete construction, notes reinforcement to the protection of location-plate 2 and embedded anchor cone 1 in casting process, must not disturbance be shifted;
G, when concrete reaches some strength, stripping 7 cleans out the location-plate 2 that is cast in concrete and the conehead of embedded anchor cone 1, can use pre-buried anchor cone.
Realize that by above-mentioned steps in concrete, embedded anchor cone is accurately located construction.Then supporting bolt special 8 and the nut 9 of use and embedded anchor cone 1 can be installed steel corbel on the fixing concrete wall.
In described step D, according to the position of being close on location-plate 2, make mark at the another side of template 7, according to the mark on template 7, determine the position of location-plate 2 when being convenient to form removal.The purpose that makes marks is, when building, cement paste smash shake and concrete self pressure under, might enter into the position, space between location-plate 2 and template 7, thereby location-plate 2 is hidden, can find fast the position of location-plate 2 by mark, be conducive to increase work efficiency.
Location-plate 2 adopts the thick steel plate materials of 5mm to make, has higher planeness, spacing dimension according to design embedded anchor cone 1 on location-plate 2 has locating hole 3, be welded with the bearing bar 4 of diameter 20mm on four angles of location-plate 2 one sides, bearing bar 4 other ends and structure reinforcing bars 6 are welded to connect.

Claims (6)

1. embedded anchor cone accurate positioning method is characterized in that comprising the following steps:
A, according to the structure reinforcing bars (6) in designing requirement colligation concrete storehouse, through after the assay was approved, adopt measuring instrument to emit the burial place of embedded anchor cone (1), and make mark on structure reinforcing bars (6);
B, stationary positioned plate (2), with the center of the locating hole on location-plate (3) and the mark preliminary coincidence on structure reinforcing bars (6), accurately check and approve the center of locating hole (3) by measuring apparatus after, bearing bar (4) on location-plate (2) is welded on structure reinforcing bars (6), thereby location-plate (2) and structure reinforcing bars (6) are connected and fixed, and the diameter of described locating hole (3) is slightly larger than the conehead external diameter of embedded anchor cone (1);
C, fixing embedded anchor cone (1), the embedded anchor cone (1) that will be connected with dowel (5) penetrate in locating hole (3) on location-plate (2), keep the conehead of embedded anchor cone (1) to flush with the lateral surface of location-plate (2);
D, adopt canvas cloth with the locating hole (3) that exposes on location-plate (2) and the conehead shutoff protection of embedded anchor cone (1), cement grout obstruction anchor cone taper hole when avoiding concreting;
E, frame shuttering (7), and keep the lateral surface of location-plate (2) to overlap with the medial surface of template;
F, concreting notice that in casting process reinforcement is to the protection of location-plate (2) and embedded anchor cone (1);
G, when concrete reaches some strength, stripping (7) cleans out the location-plate (2) that is cast in concrete and the conehead of embedded anchor cone (1), can use pre-buried anchor cone.
2. embedded anchor cone accurate positioning method according to claim 1, it is characterized in that: in described step D, also include the position of being close to according on location-plate (2), make mark at the another side of template (7), according to the mark on template, determine the position of location-plate when being convenient to form removal.
3. embedded anchor cone accurate positioning method according to claim 1, it is characterized in that: in described step C, also comprise and adopt bearing diagonal reinforcing bar (4') with dowel (5) and structure reinforcing bars (6) welding, thereby embedded anchor cone (1) and structure reinforcing bars are connected and fixed.
4. according to claim 1-3 described embedded anchor cone accurate positioning method of arbitrary claim, it is characterized in that: described bearing bar (4) is distributed in four jiaos of location-plate, and bearing bar (4) other end and structure reinforcing bars (6) are welded to connect.
5. according to claim 1-3 described embedded anchor cone accurate positioning method of arbitrary claim is characterized in that: described location-plate adopts the thick steel plate materials of 5mm to make.
6. according to claim 1-3 described embedded anchor cone accurate positioning method of arbitrary claim, it is characterized in that: described canvas cloth is the cloth that plastic colloidal cloth or other waterproofing materials are made.
CN201110380708.0A 2011-11-25 2011-11-25 Embedded anchor cone accurate positioning method Active CN103132494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110380708.0A CN103132494B (en) 2011-11-25 2011-11-25 Embedded anchor cone accurate positioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110380708.0A CN103132494B (en) 2011-11-25 2011-11-25 Embedded anchor cone accurate positioning method

Publications (2)

Publication Number Publication Date
CN103132494A true CN103132494A (en) 2013-06-05
CN103132494B CN103132494B (en) 2015-07-08

Family

ID=48492901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110380708.0A Active CN103132494B (en) 2011-11-25 2011-11-25 Embedded anchor cone accurate positioning method

Country Status (1)

Country Link
CN (1) CN103132494B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105392604A (en) * 2013-07-17 2016-03-09 乌本产权有限公司 Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
CN111119233A (en) * 2019-12-14 2020-05-08 中冶天工集团有限公司 Concrete side wall embedded iron part fixing mechanism and using method thereof
CN112922361A (en) * 2021-01-22 2021-06-08 中交路桥华南工程有限公司 Bracket positioning and mounting method
CN114961260A (en) * 2022-06-30 2022-08-30 中冶建工集团有限公司 Construction method for positioning stressed steel beam on steel frame bearing platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002105967A (en) * 2000-10-02 2002-04-10 Yuuki Oguri Setting method of anchor bolt corresponding to inclined ground and fixing device of anchor bolt
CN2705512Y (en) * 2004-04-28 2005-06-22 润弘精密工程事业股份有限公司 Foundation pole rib positioning device
CN201756803U (en) * 2010-05-31 2011-03-09 中建钢构有限公司 Sill anchor pre-embedded positioning cover die
CN201785875U (en) * 2010-09-28 2011-04-06 中国十五冶金建设有限公司 Adjustable type built-in fitting for fixed screw bolt

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002105967A (en) * 2000-10-02 2002-04-10 Yuuki Oguri Setting method of anchor bolt corresponding to inclined ground and fixing device of anchor bolt
CN2705512Y (en) * 2004-04-28 2005-06-22 润弘精密工程事业股份有限公司 Foundation pole rib positioning device
CN201756803U (en) * 2010-05-31 2011-03-09 中建钢构有限公司 Sill anchor pre-embedded positioning cover die
CN201785875U (en) * 2010-09-28 2011-04-06 中国十五冶金建设有限公司 Adjustable type built-in fitting for fixed screw bolt

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李爱华等: "基于对某水利工程悬臂大模板施工及注意事项的分析", 《黑龙江水利科技》 *
王锦启等: "火电厂汽轮机基础预埋螺栓定位技术", 《河南建材》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105392604A (en) * 2013-07-17 2016-03-09 乌本产权有限公司 Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
US9707699B2 (en) 2013-07-17 2017-07-18 Wobben Properties Gmbh Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
CN105392604B (en) * 2013-07-17 2018-01-19 乌本产权有限公司 For the method and prefabricated concrete elements tower section formwork of the precast concrete section for manufacturing wind energy plant pylon
CN111119233A (en) * 2019-12-14 2020-05-08 中冶天工集团有限公司 Concrete side wall embedded iron part fixing mechanism and using method thereof
CN111119233B (en) * 2019-12-14 2022-02-11 中冶天工集团有限公司 Concrete side wall embedded iron part fixing mechanism and using method thereof
CN112922361A (en) * 2021-01-22 2021-06-08 中交路桥华南工程有限公司 Bracket positioning and mounting method
CN114961260A (en) * 2022-06-30 2022-08-30 中冶建工集团有限公司 Construction method for positioning stressed steel beam on steel frame bearing platform

Also Published As

Publication number Publication date
CN103132494B (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN112049146A (en) Steel structure foundation embedded part and technological process thereof
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN104141318A (en) Installation and construction method of column base of large-diameter steel pipe column
CN111005387A (en) Deep foundation pit prestress support replacement support construction method
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN202117341U (en) Template for embedding foundation bolts of steel structures of buildings
CN103132494B (en) Embedded anchor cone accurate positioning method
CN113202222A (en) Construction method for assembled type superposed beam slab
CN104060617A (en) Prefabricated internal support system and construction method for foundation pit support system
CN110565676B (en) Cantilever type tower crane foundation structure and construction method thereof
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN110158951A (en) A kind of frame structure wooden template construction method entirely
CN202323896U (en) Accurate positioning device for embedded anchor cone
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN216787893U (en) Prefabricated shear wall positioner
CN107586068B (en) Upright column concrete and construction method of concrete upright column
CN115262778A (en) Novel connection construction method for box steel column and reinforced concrete beam
CN211736514U (en) Interior landing stage board construction system that supports
CN115126254A (en) Construction method of assembled composite floor slab support
CN212801616U (en) Supporting template for foundation bearing platform under column
CN114753259A (en) Alignment leveling method for precast beam erection construction
CN114352002A (en) Handling method for placing scaffold cantilever beam on shear wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENG

Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP CO., LTD.;SANXIA UNIVERSITY

Effective date: 20140604

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 443002 YICHANG, HUBEI PROVINCE TO: 443000 YICHANG, HUBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140604

Address after: 443000 Dongshan Avenue, Hubei, Yichang, No. 11

Applicant after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD.

Address before: 443002 Hubei province Yichang City Road No. 1

Applicant before: China Gezhouba Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant