CN212801616U - Supporting template for foundation bearing platform under column - Google Patents

Supporting template for foundation bearing platform under column Download PDF

Info

Publication number
CN212801616U
CN212801616U CN201922496497.1U CN201922496497U CN212801616U CN 212801616 U CN212801616 U CN 212801616U CN 201922496497 U CN201922496497 U CN 201922496497U CN 212801616 U CN212801616 U CN 212801616U
Authority
CN
China
Prior art keywords
board unit
board
bearing plate
template
countersunk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922496497.1U
Other languages
Chinese (zh)
Inventor
黄尚克
黄鼎龙
梁杰南
杨馥菀
吴建化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201922496497.1U priority Critical patent/CN212801616U/en
Application granted granted Critical
Publication of CN212801616U publication Critical patent/CN212801616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a supporting template for foundation cushion cap under post, including a plurality of PC board units, the perpendicular fixed connection of head and the tail mutually forms rectangular frame supporting template structure each other for the PC board unit, and the PC board unit is the composite bed plate structure, and one of them tip indent of PC board unit is pre-buried to be equipped with the countersunk screw, and another tip is equipped with the fixed orifices parallel with the tip cross-section, and the countersunk screw that the PC board unit runs through another PC board unit of fixed orifices embedding through fixing bolt realizes the perpendicular connection of head and the tail of different PC board units. The utility model discloses a support template for foundation cushion cap under post has simple structure, suitability strong, bearing capacity is strong and construction convenience's characteristics.

Description

Supporting template for foundation bearing platform under column
Technical Field
The utility model relates to a construction technical field specifically indicates a supporting template that is used for foundation cushion cap under post.
Background
In the present building engineering, high-rise or super high-rise building, no matter be independent foundation, bar basis, still raft foundation, the foundation portion under the post often need dig out the local deeper foundation ditch, carries out concrete placement and forms cushion cap basis to promote basic bearing capacity. In the traditional construction process, the foundations are often constructed by using brick moulding beds, bricks are built around a foundation pit bearing platform to position and shape the foundations, the reinforcement and support effects of the bearing platform foundation during concrete pouring are achieved, and the brick moulding beds have the following problems:
1. the brick bed film has poor waterproof function, needs waterproof materials and cement mortar painting for matching to prevent water, and has complex process;
2. the brick moulding bed consumes a large amount of labor, and a large amount of manpower and material resources are required for carrying and building bricks during the construction of the brick moulding bed, so that the time is long;
3. the precision of the brick moulding bed is not easy to control, the brick moulding bed has technical and proficiency requirements on masonry workers, and a construction manager needs to use an instrument to carry out dynamic monitoring and control;
4. the anti-bending and anti-shearing capacity of the brick moulding bed is small, when the height of the section is more than 500mm, the backfill depth is deeper, and the backfill ramming is real-time, so that the brick moulding bed is easy to damage and deform;
5. the cement mortar used for the brick moulding bed needs a certain time for setting and hardening, which is not beneficial to construction in a construction period.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a supporting template for foundation cushion cap under post has simple structure, suitability strong, bearing capacity is strong and construction convenience's characteristics.
The utility model discloses can realize through following technical scheme:
the utility model discloses a supporting template for foundation cushion cap under post, including a plurality of PC board units, the perpendicular fixed connection of head and the tail mutually forms rectangular frame supporting template structure each other for the PC board unit, and the PC board unit is the composite bed plate structure, and one of them tip indent of PC board unit is pre-buried to be equipped with the countersunk screw, and another tip is equipped with the fixed orifices parallel with the tip cross-section, and the countersunk screw that the PC board unit runs through another PC board unit of fixed orifices embedding through fixing bolt realizes the perpendicular connection of head and the tail of different PC board units.
Furthermore, the PC board unit is a three-layer composite board structure and comprises an outer bearing plate and an inner bearing plate, and the inner wall of the inner bearing plate is compounded with an inner shaping plate.
Furthermore, the outer wall of interior bearing plate is equipped with a plurality of hoistingholes, and the even interval in hoistinghole sets up, effectively guarantees that every PC board unit has 2 hoistingholes at least, reduces the operation degree of difficulty of hoist and mount.
Furthermore, the end parts of the outer bearing plate and the outer bearing plate are all pre-buried and provided with countersunk screws, and the other end parts of the outer bearing plate and the inner bearing plate are provided with fixing holes corresponding to the countersunk screws. The corresponding relation between the two is based on the consideration of ensuring that components are matched and lapped when the PC board units are connected, reducing the stress of the components caused by system errors, ensuring that the PC board cannot be broken when being driven to pass through a poplar, and meeting the requirements of the positions of the prefabricated reserved fixing holes and the embedded countersunk head screws of the PC board units, wherein the error value is less than or equal to 5 mm. In the butt joint installation, when finding that because of the bed course roughness, component production error leads to its overlap joint not counterpoint, the accessible chisels out bed course surface or increases the cushion for a short time and adjusts.
Furthermore, the fixing bolt is M10 or M14, and the length of the fixing bolt is 3-5 cm larger than the thickness of the PC board unit. In practical applications, the length of the fixing screw can be determined according to the size of the PC board unit, and M14 bolt is used when the size of the PC board unit is larger. The countersunk head screw corresponds to the type of the adopted bolt.
Furthermore, the countersunk head screws are arranged at the positions 1/4-3/4 of the section height of the end part of the PC board unit, so that the stress is more uniform; the depth of the inner recess of the countersunk head screw is 5-10 cm, so that the fixing effect is ensured; the aperture of the countersunk head screw is 1-2 mm larger than the diameter of the fixing screw, so that the assembly and the fixation are convenient.
Further, the thickness of the PC board unit is 80-150 mm. The thickness of the PC board unit is considered based on the strength of concrete, C25 or C30 concrete is generally adopted, so that 80-150 mm is selected to be proper, the tensile performance of the PC board unit is limited due to the fact that the strength of the concrete is improved, and when the calculation bearing bending does not meet the conditions, the bearing performance of the PC board unit is improved through reinforcing bars.
The utility model discloses an on the other hand lies in protecting above-mentioned construction method that is used for the support template of foundation cushion cap under the post, and it includes following step: prefabricating a PC plate unit → transporting and hoisting the PC plate unit → measuring and positioning a bearing platform foundation → excavating earthwork → pouring a cushion layer → positioning a template elastic line → hoisting and fixing a supporting template → fine tuning for a secondary experiment → backfilling a foundation.
Further, the construction method of the support template for the foundation bearing platform under the column comprises the following steps:
s1, preparation phase
Prefabrication and hoisting of PC board unit components: manufacturing a PC board unit according to the size of a bearing platform of a design drawing, reserving a hoisting hole and a fixing hole, embedding a countersunk head screw, and enabling the fixing hole to correspond to the countersunk head screw; after the PC board unit is processed, the PC board unit is transported through the hoisting hole;
excavation of a foundation pit and foundation treatment: excavating foundation earthwork of the bearing platform by adopting a manual cooperation machine, pouring a concrete cushion layer after the excavation is finished, controlling the flatness of the cushion layer, and performing positioning elastic line and surface cleaning;
s2, PC board splicing and mounting
The PC board units are transported to a bearing platform foundation pit through a hoisting and transporting hole, fixing holes of the transversely placed PC board units are butted with countersunk screws of the vertically placed PC board units according to positioning pins, the positions of the fixing holes are matched and correspond to those of the countersunk screws, the fixing holes are screwed and connected by using the fixing screws, a rectangular frame template pattern is assembled, and the positions of the rectangular frame template pattern are rechecked and adjusted;
s3, backfilling the foundation pit
And backfilling and compacting the multi-excavation part at the periphery of the supporting template by using benign soil, wherein the backfilling and compacting are carried out at the same time symmetrically, and the displacement caused by uneven stress on two sides of the template is avoided.
The utility model relates to a supporting template for foundation cushion cap under post has following beneficial effect:
the structure is simple, the assembly and the forming are carried out at one time, the installation is convenient, the construction is convenient, and the manpower and material resources are saved;
secondly, the applicability is strong, the position is convenient to adjust, the positioning accuracy of the bearing platform foundation is high, the product size is fixed, the accuracy is high, and the quality of the concrete bearing platform finished product is good;
thirdly, the bearing capacity is strong, the strength and the application range of the bearing platform basic template are improved through the supporting template, and for some foundation pits with large depth, the inner support can be eliminated through reinforcement so as to meet the strength requirement;
and fourthly, construction is convenient, and each board surface of the PC board unit is a whole, so that waterproof construction is convenient in regions with bad underground water environments.
Drawings
Fig. 1 is a schematic diagram of the general structure of a supporting template for an underpinning foundation bearing platform of the present invention;
FIG. 2 is a schematic view of a partially enlarged structure of a supporting template A for an under-column foundation bearing platform according to the present invention;
FIG. 3 is a schematic structural view of the front side of a PC board unit of a support template for a foundation bearing platform under a column according to the present invention;
FIG. 4 is a schematic side view of a PC board unit of a support template for a foundation bearing platform under a column according to the present invention;
the reference numbers in the drawings include: 1. a PC board unit; 2. hoisting holes; 3. a fixing hole; 4. countersunk screws; 5. And (5) fixing the bolt.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the following provides a detailed description of the product of the present invention with reference to the embodiments and the accompanying drawings.
Example 1
As shown in fig. 1 ~ 4, the utility model discloses a supporting template for foundation cushion cap under post, including a plurality of PC board unit 1, the perpendicular fixed connection of head and the tail mutually forms rectangular frame supporting template structure each other for PC board unit 1, PC board unit 1 is the composite bed plate structure, pre-buried countersunk screw 4 that is equipped with of one of them tip indent of PC board unit 1, another tip is equipped with the fixed orifices 3 parallel with the tip cross-section, PC board unit 1 runs through countersunk screw 4 that fixed orifices 3 imbed another PC board unit 1 through fixing bolt 5 and realizes the perpendicular connection of head and the tail of different PC board units 1.
As shown in fig. 3, the PC board unit 1 is a three-layer composite board structure, and includes an outer bearing plate and an inner bearing plate, wherein an inner shaping plate is combined with an inner wall of the inner bearing plate.
As shown in fig. 3, the outer wall of the inner bearing plate is provided with a plurality of lifting holes 2, and the lifting holes 2 are uniformly spaced.
As shown in fig. 3, countersunk screws 4 are embedded in the end portions of the outer bearing plate and the outer bearing plate, and fixing holes 3 corresponding to the countersunk screws 4 are formed in the other end portions of the outer bearing plate and the inner bearing plate.
In the present embodiment, the fixing bolt 5 is M10 or M14, and the length of the fixing bolt 5 is 3-5 cm greater than the thickness of the PC board unit 1.
As shown in fig. 2 and 3, the position of the countersunk head screw 4 is set at the height 1/4-3/4 of the cross section of the end of the PC board unit 1, and the depth of the indent of the countersunk head screw 4 is 5-10 cm; the aperture of the countersunk head screw 4 is 1-2 mm larger than the diameter of the fixing screw.
As shown in FIG. 3, the thickness of the PC board unit 1 is 80 to 150 mm.
The utility model discloses in, the atress principle of supporting the template does: the supporting template of the rectangular frame bears the horizontal load action: foundation ditch backfill side direction soil pressure, the horizontal effort that groundwater produced gives the side cotton for the PC board unit, and the PC board unit bears the bending action and converts the load into line application through both ends with the surface stress and transmits for adjacent both ends PC board unit, and the effort converts pressure into, and mutual effect each other is for supporting, forms good atress system each other.
When the size of the bearing platform is not very large and the span and the height of the PC plate are small, the bearing requirement is completely met by utilizing the characteristic of the strength of concrete. When the bearing platform with overlarge size appears, the PC board has large span and the backfill soil is deeper, the PC board can be reinforced by checking the bearing capacity to bear larger bending moment load without damaging
Example 2
The utility model discloses an on the other hand lies in protecting above-mentioned construction method that is used for the support template of foundation cushion cap under the post, and it includes following step: prefabricating a PC plate unit → transporting and hoisting the PC plate unit → measuring and positioning a bearing platform foundation → excavating earthwork → pouring a cushion layer → positioning a template elastic line → hoisting and fixing a supporting template → fine tuning for a secondary inspection → backfilling a foundation; the method comprises the following specific steps:
s1, preparation phase
Prefabrication and hoisting of PC board unit components: manufacturing a PC board unit according to the size of a bearing platform of a design drawing, reserving a hoisting hole and a fixing hole, embedding a countersunk head screw, and enabling the fixing hole to correspond to the countersunk head screw; after the PC board unit is processed, the PC board unit is transported through the hoisting hole;
excavation of a foundation pit and foundation treatment: excavating foundation earthwork of the bearing platform by adopting a manual cooperation machine, pouring a concrete cushion layer after the excavation is finished, controlling the flatness of the cushion layer, and performing positioning elastic line and surface cleaning;
s2, PC board splicing and mounting
The PC board units are transported to a bearing platform foundation pit through a hoisting and transporting hole, fixing holes of the transversely placed PC board units are butted with countersunk screws of the vertically placed PC board units according to positioning pins, the positions of the fixing holes are matched and correspond to those of the countersunk screws, the fixing holes are screwed and connected by using the fixing screws, a rectangular frame template pattern is assembled, and the positions of the rectangular frame template pattern are rechecked and adjusted;
s3, backfilling the foundation pit
And backfilling and compacting the multi-excavation part at the periphery of the supporting template by using benign soil, wherein the backfilling and compacting are carried out at the same time symmetrically, and the displacement caused by uneven stress on two sides of the template is avoided.
In the description of the present invention, it is to be understood that the terms such as "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The above embodiments are only specific embodiments of the present invention, and the description thereof is specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, many variations and modifications are possible without departing from the inventive concept, and such obvious alternatives fall within the scope of the invention.

Claims (7)

1. The utility model provides a support template for foundation cushion cap under post, includes a plurality of PC board units, its characterized in that: the PC board units are mutually vertically and fixedly connected end to form a rectangular frame supporting template structure, the PC board units are of a composite laminate structure, one end of each PC board unit is provided with a countersunk screw in a concave embedded mode, the other end of each PC board unit is provided with a fixing hole parallel to the section of the end, and the PC board units penetrate through the fixing holes through fixing bolts to be embedded into the countersunk screws of the other PC board unit to achieve the purpose of vertically connecting the end to the end of different PC board units.
2. A support template for an underpinning foundation cap as claimed in claim 1, wherein: the PC board unit is a three-layer composite board structure and comprises an outer bearing plate and an inner bearing plate, wherein an inner shaping plate is compounded on the inner wall of the inner bearing plate.
3. A support template for an underpinning foundation cap as claimed in claim 2, wherein: the outer wall of interior bearing plate is equipped with a plurality of hoistingholes, the even interval in hoistinghole sets up.
4. A support template for an underpinning foundation cap as claimed in claim 3, wherein: the tip of outer bearing plate, outer bearing plate is all pre-buried to be equipped with the countersunk screw, another tip of outer bearing plate, interior bearing plate is equipped with the fixed orifices that corresponds with the countersunk screw.
5. A support template for an underpinning foundation cap as claimed in claim 4, wherein: the fixing bolt is M10 or M14, and the length of the fixing bolt is 3-5 cm greater than the thickness of the PC board unit.
6. A support template for an underpinning foundation cap as claimed in claim 5, wherein: the countersunk head screw is arranged at the position of 1/4-3/4 of the section height of the end part of the PC board unit, and the concave depth of the countersunk head screw is 5-10 cm; the aperture of the countersunk head screw is 1-2 mm larger than the diameter of the fixing screw.
7. The support template for an underpinning foundation cap of claim 6, wherein: the thickness of the PC board unit is 80-150 mm.
CN201922496497.1U 2019-12-31 2019-12-31 Supporting template for foundation bearing platform under column Active CN212801616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922496497.1U CN212801616U (en) 2019-12-31 2019-12-31 Supporting template for foundation bearing platform under column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922496497.1U CN212801616U (en) 2019-12-31 2019-12-31 Supporting template for foundation bearing platform under column

Publications (1)

Publication Number Publication Date
CN212801616U true CN212801616U (en) 2021-03-26

Family

ID=75079719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922496497.1U Active CN212801616U (en) 2019-12-31 2019-12-31 Supporting template for foundation bearing platform under column

Country Status (1)

Country Link
CN (1) CN212801616U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074924A (en) * 2019-12-31 2020-04-28 广西建工集团第五建筑工程有限责任公司 Supporting template for foundation bearing platform under column and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074924A (en) * 2019-12-31 2020-04-28 广西建工集团第五建筑工程有限责任公司 Supporting template for foundation bearing platform under column and construction method thereof

Similar Documents

Publication Publication Date Title
CN105155551A (en) Pressure compensation type foundation pit supporting structure and construction method
CN112127356A (en) Assembled grid underground continuous wall of dry-type connection
CN110629769A (en) Cutting slope prismatic anchor rod frame beam rapid construction method
CN112854197A (en) Construction method of underground continuous wall
CN212801616U (en) Supporting template for foundation bearing platform under column
CN106988319A (en) A kind of rapid constructing method of large deep foundation pit agent structure side wall
CN113482007B (en) Waist beam supporting structure and construction method thereof
CN111236208A (en) Underground diaphragm wall foundation pit construction method
CN114215114A (en) Cantilever plate peripheral water distribution construction structure and construction method
CN111074924A (en) Supporting template for foundation bearing platform under column and construction method thereof
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN210117716U (en) Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN103132494A (en) Embedded anchor cone accurate positioning method
CN113235645B (en) Tower crane foundation reserved joint bar assembly type forming die construction method
CN215630069U (en) Waterproof integrated prefabricated component for independent basement foundation
CN216664087U (en) Chain prefabricated underground continuous wall
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN211057843U (en) Semi-prefabricated counterfort retaining wall
CN113026801A (en) Construction method for reinforcing steel pipe pile of construction elevator foundation
CN216839287U (en) Concrete lining board simple to mount
CN110387938A (en) Indoor drainage ditch construction technology
CN219100118U (en) Basic prefabricated PC template
CN214245755U (en) Assembled deep basal pit supporting construction
CN115467321B (en) Two-wall-in-one multi-cavity type steel reinforced concrete composite structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: 545006 No. 167, east ring Avenue, Liuzhou City, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240314

Granted publication date: 20210326