CN206858019U - A kind of new attached wall embedded parts structure of derrick crane - Google Patents
A kind of new attached wall embedded parts structure of derrick crane Download PDFInfo
- Publication number
- CN206858019U CN206858019U CN201720691042.3U CN201720691042U CN206858019U CN 206858019 U CN206858019 U CN 206858019U CN 201720691042 U CN201720691042 U CN 201720691042U CN 206858019 U CN206858019 U CN 206858019U
- Authority
- CN
- China
- Prior art keywords
- plate
- anchor plate
- mounting plate
- screw
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型公开了一种塔式起重机新型附墙埋件结构,包括爬锥,所述爬锥包括限位盘、圆杆和安装盘,圆杆的两端均开设有外螺纹,安装盘的外侧安装有锚板,锚板的内侧面接触连接立柱和爬锥,锚板上开设有呈规则分布的螺栓孔,锚板的外侧面活动连接有螺杆,螺杆贯穿螺栓孔,螺杆的一端通过螺纹活动连接安装盘;本塔式起重机新型附墙埋件结构,通过在立柱在浇筑前预埋爬锥,再将锚板通过螺杆拧紧固定在爬锥上,这样减少现场立柱模板开孔工作量,缩短了埋件预埋安装所用的时间,减少了项目完工后后续切割工作,安装工艺简单,相对直接预埋螺杆的成本更低,螺杆还可以重复利用,节约成本。
The utility model discloses a new wall-attached embedded part structure for a tower crane, which includes a climbing cone, the climbing cone includes a limit plate, a round rod and a mounting plate, both ends of the round rod are provided with external threads, and the mounting plate An anchor plate is installed on the outside, and the inner surface of the anchor plate is in contact with the connecting column and the climbing cone. There are regularly distributed bolt holes on the anchor plate, and the outer surface of the anchor plate is movably connected with a screw. The screw runs through the bolt hole, and one end of the screw is threaded Movable connection installation plate; the tower crane's new wall-attached embedded parts structure pre-embeds the climbing cone before the column is poured, and then tightens the anchor plate on the climbing cone through the screw, so as to reduce the workload of opening the column formwork on site. It shortens the time used for the pre-embedded installation of embedded parts, reduces the subsequent cutting work after the project is completed, the installation process is simple, and the cost is lower than that of directly pre-embedded screws, and the screws can be reused to save costs.
Description
技术领域technical field
本实用新型涉及建筑施工技术领域,尤其是一种塔式起重机新型附墙埋件结构。The utility model relates to the technical field of building construction, in particular to a novel wall-embedded structure of a tower crane.
背景技术Background technique
以往塔机附墙往往预埋在住宅建筑剪力墙位置,采用预埋空心圆管,使用穿墙螺杆的埋件结构,达到穿墙螺杆和钢板重复利用的目的。但是较多商用建筑中并无剪力墙,只有立柱,立柱尺寸较大,不适用以上方式,所以需要直接将螺栓预埋进去,预埋进立柱的螺栓不能取出,造成成本增加,立柱模板还需对应螺栓位置开孔,开孔过程耗时较长,同时模板安装过程不方便,项目完工后还需将突出建筑部分进行切割,工序繁琐。In the past, the wall attached to the tower crane was often pre-buried at the shear wall of the residential building. The pre-buried hollow circular tube was used, and the embedded structure of the wall-through screw was used to achieve the purpose of reusing the wall-through screw and the steel plate. However, in many commercial buildings, there are no shear walls, only columns, and the size of the columns is relatively large, so the above method is not applicable, so the bolts need to be embedded directly. Holes need to be drilled corresponding to the positions of the bolts. The drilling process takes a long time. At the same time, the formwork installation process is inconvenient. After the project is completed, the protruding parts of the building need to be cut, and the process is cumbersome.
实用新型内容Utility model content
本实用新型的目的在于提供一种塔式起重机新型附墙埋件结构,具备节约时间,安装工艺简单和节约成本的优点,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a new wall-attached embedded part structure for a tower crane, which has the advantages of saving time, simple installation process and cost saving, so as to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种塔式起重机新型附墙埋件结构,包括爬锥,所述爬锥包括限位盘、圆杆和安装盘,圆杆的两端均开设有外螺纹,圆杆的一端通过螺纹连接限位盘,圆杆的另一端通过螺纹连接安装盘,安装盘的外侧安装有锚板,所述锚板的内侧面接触连接立柱和爬锥,锚板上开设有呈规则分布的螺栓孔,锚板的外侧面活动连接有螺杆,所述螺杆贯穿螺栓孔,螺杆的一端通过螺纹活动连接安装盘。In order to achieve the above purpose, the utility model provides the following technical solutions: a new wall-attached structure for tower cranes, including a climbing cone, the climbing cone includes a limit plate, a round rod and a mounting plate, and the two ends of the round rod are There is an external thread, one end of the round rod is threaded to the limit plate, the other end of the round rod is threaded to the mounting plate, the outer side of the mounting plate is installed with an anchor plate, and the inner surface of the anchor plate contacts the connecting column and the climbing cone. Bolt holes in regular distribution are provided on the anchor plate, and a screw rod is movably connected to the outer surface of the anchor plate.
作为本实用新型进一步的方案:所述限位盘和安装盘均为一种喇叭状的构件。As a further solution of the utility model: both the limiting plate and the mounting plate are trumpet-shaped components.
作为本实用新型进一步的方案:所述安装盘的开口面与立柱的侧面齐平。As a further solution of the present invention: the opening surface of the mounting plate is flush with the side surface of the column.
作为本实用新型进一步的方案:所述螺栓孔位于安装盘的一侧。As a further solution of the present invention: the bolt holes are located on one side of the mounting plate.
与现有技术相比,本实用新型有益效果:本塔式起重机新型附墙埋件结构,通过在立柱在浇筑前预埋有爬锥,再将锚板通过螺杆拧紧固定在爬锥上,这样减少现场立柱模板开孔工作量,缩短了埋件预埋安装所用的时间,减少了项目完工后后续切割工作,安装工艺简单,相对直接预埋螺杆的成本更低,螺杆还可以重复利用,节约成本。Compared with the prior art, the utility model has beneficial effects: the new wall-attached embedded part structure of the tower crane, the climbing cone is pre-buried before the column is poured, and then the anchor plate is tightened and fixed on the climbing cone through the screw, so that Reduce the workload of on-site column formwork opening, shorten the time for pre-embedded installation of embedded parts, reduce the follow-up cutting work after the project is completed, the installation process is simple, and the cost is lower than that of directly pre-embedded screws. cost.
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2为本实用新型安装于立柱的横截面示意图;Fig. 2 is a schematic cross-sectional view of the utility model installed on a column;
图3为本实用新型的锚板示意图。Fig. 3 is a schematic diagram of the anchor plate of the present invention.
图中:1-立柱;2-爬锥;21-限位盘;22-圆杆;23-安装盘;3-锚板;31-螺栓孔;4-螺杆。Among the figure: 1-column; 2-climbing cone; 21-limit plate; 22-round rod; 23-installation plate; 3-anchor plate; 31-bolt hole; 4-screw.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-3,本实用新型实施例中,一种塔式起重机新型附墙埋件结构,包括立柱1,立柱1采用钢筋组件和混凝土浇筑而成,立柱1在浇筑前预埋有爬锥2,爬锥2提前与立柱1内的钢筋件焊接在一起,避免浇筑混凝土时爬锥2移位,爬锥2包括限位盘21、圆杆22和安装盘23,限位盘21和安装盘23均为一种喇叭状的构件,呈喇叭状的限位盘21和安装盘23可以增大接触保证爬锥2的附着力,圆杆22的两端均开设有外螺纹,圆杆22的一端通过螺纹连接限位盘21,圆杆22的另一端通过螺纹连接安装盘23,限位盘21和安装盘23安装过程方便,安装盘23的开口面与立柱1的侧面齐平,这样不仅美观还能保证锚板3与立柱1的连接面平整,安装盘23的外侧安装有锚板3,锚板3的内侧面接触连接立柱1和爬锥2,锚板3上开设有呈规则分布的螺栓孔31,螺栓孔31位于安装盘23的一侧,螺栓孔31的位置与爬锥2的位置对齐,锚板3的外侧面活动连接有螺杆4,螺杆4贯穿螺栓孔31,螺杆4的一端通过螺纹活动连接安装盘23,即螺杆4将锚板3拧紧固定在爬锥2上,这样就可以将附墙其他部件焊接在锚板3上,本新型附墙埋件结构可减少现场立柱1模板开孔工作量,缩短了埋件预埋安装所用的时间,减少了项目完工后后续切割工作,安装工艺简单,相对直接预埋螺杆的成本更低,螺杆4还可以重复利用,节约成本。Please refer to Figures 1-3. In the embodiment of the present utility model, a new wall-attached embedded structure of a tower crane includes a column 1, which is made of steel bar components and concrete pouring. The cone 2 and the climbing cone 2 are welded together with the steel bars in the column 1 in advance to avoid the displacement of the climbing cone 2 when pouring concrete. The climbing cone 2 includes a limit plate 21, a round rod 22 and a mounting plate 23. Mounting disc 23 is a kind of trumpet-shaped member, and horn-shaped limiting disc 21 and mounting disc 23 can increase the contact and ensure the adhesion of climbing cone 2, and the two ends of round rod 22 are all provided with external threads, and the round rod One end of 22 is threaded to the limit plate 21, and the other end of the round rod 22 is threaded to the mounting plate 23. The limit plate 21 and the mounting plate 23 are easy to install, and the opening surface of the mounting plate 23 is flush with the side of the column 1. This is not only beautiful but also ensures that the connection surface between the anchor plate 3 and the column 1 is smooth, the outer side of the mounting plate 23 is equipped with an anchor plate 3, the inner surface of the anchor plate 3 is in contact with the connection column 1 and the climbing cone 2, and the anchor plate 3 is provided with a Regularly distributed bolt holes 31, the bolt holes 31 are located on one side of the mounting plate 23, the position of the bolt holes 31 is aligned with the position of the climbing cone 2, the outer surface of the anchor plate 3 is movably connected with a screw 4, and the screw 4 runs through the bolt holes 31, One end of the screw rod 4 is movably connected to the mounting plate 23 through threads, that is, the screw rod 4 tightens the anchor plate 3 and fixes it on the climbing cone 2, so that other parts of the attached wall can be welded on the anchor plate 3. The structure of the new attached wall embedded parts can be Reduce the workload of opening the formwork of the column 1 on site, shorten the time taken for the pre-embedded installation of the embedded parts, reduce the subsequent cutting work after the project is completed, the installation process is simple, and the cost is lower than that of the direct embedded screw, and the screw 4 can be reused ,save costs.
综上所述:本塔式起重机新型附墙埋件结构,通过在立柱1在浇筑前预埋爬锥2,再将锚板3通过螺杆4拧紧固定在爬锥2上,这样减少现场立柱1模板开孔工作量,缩短了埋件预埋安装所用的时间,减少了项目完工后后续切割工作,安装工艺简单,相对直接预埋螺杆的成本更低,螺杆4还可以重复利用,节约成本To sum up: the new wall-attached embedded parts structure of this tower crane pre-embeds the climbing cone 2 before the column 1 is poured, and then tightens the anchor plate 3 to the climbing cone 2 through the screw 4, thus reducing the number of on-site column 1. The workload of template hole opening shortens the time for pre-embedded installation of embedded parts, reduces the subsequent cutting work after the project is completed, the installation process is simple, and the cost is lower than that of directly pre-embedded screws. Screw 4 can also be reused, saving costs
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720691042.3U CN206858019U (en) | 2017-06-14 | 2017-06-14 | A kind of new attached wall embedded parts structure of derrick crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720691042.3U CN206858019U (en) | 2017-06-14 | 2017-06-14 | A kind of new attached wall embedded parts structure of derrick crane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206858019U true CN206858019U (en) | 2018-01-09 |
Family
ID=60831881
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720691042.3U Expired - Fee Related CN206858019U (en) | 2017-06-14 | 2017-06-14 | A kind of new attached wall embedded parts structure of derrick crane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206858019U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112695897A (en) * | 2020-12-30 | 2021-04-23 | 中交路桥华南工程有限公司 | Embedded part embedding method and embedded part |
| CN112922361A (en) * | 2021-01-22 | 2021-06-08 | 中交路桥华南工程有限公司 | Bracket positioning and mounting method |
| CN114508206A (en) * | 2022-03-31 | 2022-05-17 | 广西建工第一建筑工程集团有限公司 | Installation device and installation method for embedded part of stair railing by aluminum die process |
-
2017
- 2017-06-14 CN CN201720691042.3U patent/CN206858019U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112695897A (en) * | 2020-12-30 | 2021-04-23 | 中交路桥华南工程有限公司 | Embedded part embedding method and embedded part |
| CN112922361A (en) * | 2021-01-22 | 2021-06-08 | 中交路桥华南工程有限公司 | Bracket positioning and mounting method |
| CN114508206A (en) * | 2022-03-31 | 2022-05-17 | 广西建工第一建筑工程集团有限公司 | Installation device and installation method for embedded part of stair railing by aluminum die process |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102808509B (en) | Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel | |
| CN206858019U (en) | A kind of new attached wall embedded parts structure of derrick crane | |
| CN108978889A (en) | The novel prefabricated beam-column connection of one kind and connection method | |
| CN210086553U (en) | Dry-type connected precast concrete wall and foundation connection node | |
| CN209413290U (en) | One kind climbing bevel-type attached wall embedded part | |
| CN204781970U (en) | Template fixing device with adjustable | |
| CN209066848U (en) | A kind of external hanging type hanging basket holder device | |
| CN103741944B (en) | Fixation kit, template system containing this fixation kit and body of wall casting method | |
| CN202007090U (en) | Tower Crane Attached to the Wall Device | |
| CN107740497B (en) | Construction method for embedding foundation bolts on overflow surface of hydraulic building | |
| CN206722139U (en) | A kind of assembled integral shear wall building structure | |
| CN104088453B (en) | A kind of scaffold edge support structure and using method thereof | |
| CN204079316U (en) | A kind of harmless circular steel tube concrete post tower crane attachment anchor ear device | |
| CN219365417U (en) | A device for reserving holes for medium-sized steel penetrations in building shear walls | |
| CN102287050B (en) | Construction method for long-span steel reinforced concrete roof truss | |
| CN207109843U (en) | A kind of goaf transmission line foundation bracing means | |
| CN206800649U (en) | A kind of pre-buried solid bowl assembly for building industry | |
| CN206873924U (en) | Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork | |
| CN206513689U (en) | Embedded bolt assembly | |
| CN206245709U (en) | A kind of outrigger wall-connecting piece | |
| CN211597390U (en) | Reinforcement connection structure of vertical reinforcement in prefabricated shear wall | |
| CN210622270U (en) | Scaffold suitable for shear force wall | |
| CN205804922U (en) | A kind of novel embedded tool formula scaffold wall connecting piece | |
| CN207122132U (en) | A kind of building template | |
| CN208219912U (en) | A kind of precast shear wall L shape Joint's connection fabrication |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 |