CN112709125A - 一种钢结构桥梁及其施工方法 - Google Patents
一种钢结构桥梁及其施工方法 Download PDFInfo
- Publication number
- CN112709125A CN112709125A CN202011546685.1A CN202011546685A CN112709125A CN 112709125 A CN112709125 A CN 112709125A CN 202011546685 A CN202011546685 A CN 202011546685A CN 112709125 A CN112709125 A CN 112709125A
- Authority
- CN
- China
- Prior art keywords
- bridge
- support
- pier
- steel plate
- bridge deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/041—Elastomeric bearings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011546685.1A CN112709125B (zh) | 2020-12-24 | 2020-12-24 | 一种钢结构桥梁及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011546685.1A CN112709125B (zh) | 2020-12-24 | 2020-12-24 | 一种钢结构桥梁及其施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112709125A true CN112709125A (zh) | 2021-04-27 |
| CN112709125B CN112709125B (zh) | 2022-08-16 |
Family
ID=75544123
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202011546685.1A Active CN112709125B (zh) | 2020-12-24 | 2020-12-24 | 一种钢结构桥梁及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112709125B (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113356012A (zh) * | 2021-06-25 | 2021-09-07 | 青海省交通建设管理有限公司 | 一种隧道内装配式桥梁结构及其施工方法 |
| CN114622478A (zh) * | 2022-03-31 | 2022-06-14 | 山西省交通规划勘察设计院有限公司 | 一种加强型钢结构桥梁预制组件 |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004324340A (ja) * | 2003-04-28 | 2004-11-18 | Nishimatsu Constr Co Ltd | フーチング基礎用鋼殻、橋梁の構造、橋梁の構築方法、及び立体交差橋の構築方法 |
| KR20090115637A (ko) * | 2008-05-02 | 2009-11-05 | 민승기 | 교량 보강용 블럭 |
| CN106968163A (zh) * | 2017-04-08 | 2017-07-21 | 郑华 | 一种使用寿命长的桥墩 |
| CN107386097A (zh) * | 2017-09-22 | 2017-11-24 | 沈利丹 | 一种钢结构桥梁建筑减震装置 |
| CN108842597A (zh) * | 2018-08-01 | 2018-11-20 | 四川兴昌建设工程有限公司 | 一种市政施工临时混凝土钢结构桥梁及其安装方法 |
| CN109024311A (zh) * | 2018-07-16 | 2018-12-18 | 张继莹 | 一种桥梁加固装置 |
| CN208668241U (zh) * | 2018-06-12 | 2019-03-29 | 万宝盛建设集团股份有限公司 | 一种钢结构拼接的绿色环保型桥梁 |
| CN210657941U (zh) * | 2019-08-29 | 2020-06-02 | 北京正坤市政工程有限责任公司 | 一种组合钢便桥 |
| CN211818228U (zh) * | 2020-03-02 | 2020-10-30 | 陈云 | 一种楼屋面混凝土梁组合加固结构 |
| CN212103619U (zh) * | 2020-03-19 | 2020-12-08 | 宁夏神聚钢结构安装工程有限公司 | 一种装配式钢结构桥 |
-
2020
- 2020-12-24 CN CN202011546685.1A patent/CN112709125B/zh active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004324340A (ja) * | 2003-04-28 | 2004-11-18 | Nishimatsu Constr Co Ltd | フーチング基礎用鋼殻、橋梁の構造、橋梁の構築方法、及び立体交差橋の構築方法 |
| KR20090115637A (ko) * | 2008-05-02 | 2009-11-05 | 민승기 | 교량 보강용 블럭 |
| CN106968163A (zh) * | 2017-04-08 | 2017-07-21 | 郑华 | 一种使用寿命长的桥墩 |
| CN107386097A (zh) * | 2017-09-22 | 2017-11-24 | 沈利丹 | 一种钢结构桥梁建筑减震装置 |
| CN208668241U (zh) * | 2018-06-12 | 2019-03-29 | 万宝盛建设集团股份有限公司 | 一种钢结构拼接的绿色环保型桥梁 |
| CN109024311A (zh) * | 2018-07-16 | 2018-12-18 | 张继莹 | 一种桥梁加固装置 |
| CN108842597A (zh) * | 2018-08-01 | 2018-11-20 | 四川兴昌建设工程有限公司 | 一种市政施工临时混凝土钢结构桥梁及其安装方法 |
| CN210657941U (zh) * | 2019-08-29 | 2020-06-02 | 北京正坤市政工程有限责任公司 | 一种组合钢便桥 |
| CN211818228U (zh) * | 2020-03-02 | 2020-10-30 | 陈云 | 一种楼屋面混凝土梁组合加固结构 |
| CN212103619U (zh) * | 2020-03-19 | 2020-12-08 | 宁夏神聚钢结构安装工程有限公司 | 一种装配式钢结构桥 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113356012A (zh) * | 2021-06-25 | 2021-09-07 | 青海省交通建设管理有限公司 | 一种隧道内装配式桥梁结构及其施工方法 |
| CN114622478A (zh) * | 2022-03-31 | 2022-06-14 | 山西省交通规划勘察设计院有限公司 | 一种加强型钢结构桥梁预制组件 |
| CN114622478B (zh) * | 2022-03-31 | 2023-09-12 | 山西省交通规划勘察设计院有限公司 | 一种加强型钢结构桥梁预制组件 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112709125B (zh) | 2022-08-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5539554B1 (ja) | 桁橋間の連結構造および桁橋構造 | |
| CN210768050U (zh) | 一种装配式建筑悬臂墙式软钢阻尼器连接结构 | |
| CN112709125B (zh) | 一种钢结构桥梁及其施工方法 | |
| CN110396919B (zh) | 一种装配式钢结构-混凝土组合桥梁及其施工方法 | |
| KR100743832B1 (ko) | 프리플렉스 거더와 일체식교대를 이용한 교량의 시공방법 | |
| JP2020105803A (ja) | 斜張橋、および斜張橋の架設方法 | |
| CN112681331B (zh) | 钢支撑与钢栈桥一体化结构及其施工方法 | |
| CN110777685B (zh) | 一种采用消能减震连接的桥建混合式高架车站结构 | |
| CN215483553U (zh) | 一种钢结构梁柱连接节点 | |
| CN211285316U (zh) | 一种采用消能减震连接的桥建混合式高架车站结构 | |
| CN112609565A (zh) | 一种钢管混凝土预制桥墩 | |
| CN110777999B (zh) | 一种屋面抗震结构及其安装工艺 | |
| KR102751352B1 (ko) | 철골부 연결 보강 시스템 | |
| KR101038013B1 (ko) | 가설교량용 주형보 결합구조 | |
| CN114717961B (zh) | 一种无下横梁的独塔自锚式悬索桥结构及其施工方法 | |
| CN111485487A (zh) | 适用于大变形的无伸缩缝桥梁桥台及其施工方法 | |
| CN111021567A (zh) | 一种小户型住宅的减震结构 | |
| JP2010053643A (ja) | 橋台とその背面に設けられた盛土の補強方法 | |
| CN114164747B (zh) | 一种用于桥梁拼宽的新老结构协同受力构造 | |
| CN205443925U (zh) | 模块化、大转角、多向变位伸缩装置以及桥梁 | |
| CN203583343U (zh) | 支撑式框构桥 | |
| CN107254835A (zh) | 一种整体墩梁嵌固的连接构造及其施工方法 | |
| CN114108813A (zh) | 一种装配式钢连接器梁柱及柱基础拼接结构 | |
| KR102094814B1 (ko) | 교량 내진 보강구조 | |
| KR102408853B1 (ko) | 비틀림 저항성이 우수한 박스 모듈 거더교 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20210427 Assignee: Shanghai Yanyang Materials Co.,Ltd. Assignor: SHANGHAI HONGPU STEEL STRUCTURE ENGINEERING Co.,Ltd. Contract record no.: X2024980011660 Denomination of invention: A steel structure bridge and its construction method Granted publication date: 20220816 License type: Common License Record date: 20240809 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A steel structure bridge and its construction method Granted publication date: 20220816 Pledgee: Fengxian Branch of Shanghai Rural Commercial Bank Co.,Ltd. Pledgor: SHANGHAI HONGPU STEEL STRUCTURE ENGINEERING Co.,Ltd. Registration number: Y2024310000765 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20220816 Pledgee: Fengxian Branch of Shanghai Rural Commercial Bank Co.,Ltd. Pledgor: SHANGHAI HONGPU STEEL STRUCTURE ENGINEERING Co.,Ltd. Registration number: Y2024310000765 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A steel structure bridge and its construction method Granted publication date: 20220816 Pledgee: Fengxian Branch of Shanghai Rural Commercial Bank Co.,Ltd. Pledgor: SHANGHAI HONGPU STEEL STRUCTURE ENGINEERING Co.,Ltd. Registration number: Y2025310000659 |