CN112700173A - Building weak current system operation management and construction method - Google Patents
Building weak current system operation management and construction method Download PDFInfo
- Publication number
- CN112700173A CN112700173A CN202110060968.3A CN202110060968A CN112700173A CN 112700173 A CN112700173 A CN 112700173A CN 202110060968 A CN202110060968 A CN 202110060968A CN 112700173 A CN112700173 A CN 112700173A
- Authority
- CN
- China
- Prior art keywords
- module
- acceptance
- information
- data
- current system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 64
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000001514 detection method Methods 0.000 claims abstract description 50
- 238000005070 sampling Methods 0.000 claims abstract description 27
- 238000012795 verification Methods 0.000 claims abstract description 25
- 230000002457 bidirectional effect Effects 0.000 claims abstract description 10
- 238000012360 testing method Methods 0.000 claims description 27
- 238000000034 method Methods 0.000 claims description 20
- 230000010354 integration Effects 0.000 claims description 17
- 238000004458 analytical method Methods 0.000 claims description 16
- 238000012545 processing Methods 0.000 claims description 14
- 238000004364 calculation method Methods 0.000 claims description 10
- 230000008676 import Effects 0.000 claims description 10
- 230000008569 process Effects 0.000 claims description 10
- 238000012216 screening Methods 0.000 claims description 6
- 230000003044 adaptive effect Effects 0.000 claims description 3
- 230000006855 networking Effects 0.000 claims 1
- 230000009897 systematic effect Effects 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 239000004035 construction material Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000013475 authorization Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/64—Protecting data integrity, e.g. using checksums, certificates or signatures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- General Health & Medical Sciences (AREA)
- Computer Security & Cryptography (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Bioethics (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a building weak current system operation management and construction method, which comprises a client, a server and an operation management system, wherein the client is in bidirectional connection with the server through an Ethernet. The operation management and construction method of the building weak current system comprises the steps of constructing an operation management system, utilizing the system to carry out systematic distribution management on personnel, carrying out data acquisition by means of data scanning and photographing evidence obtaining through the arrangement of a sampling detection unit, effectively avoiding the personnel to falsify data, further ensuring the accuracy of a sampling result, utilizing a model construction module to manufacture a building drawing into a simple detection verification frame for filling detection contents, further being matched with a completion degree display unit to visually show whether detection is complete or not, carrying out secondary acceptance, and effectively improving the accuracy of an acceptance result, thereby ensuring that the weak current system can work durably and effectively after being built.
Description
Technical Field
The invention relates to the technical field of building operation, in particular to a building weak current system operation management and construction method.
Background
The weak current system mainly aims at buildings including buildings, districts, airports, docks, railways, expressways and the like, and the common weak current system comprises: closed circuit television monitoring system, anti-theft alarm system, entrance guard system, electronic patrol system, parking lot management system, visual intercom system, home intelligent system and security system, background music system, LED display system, plasma splicing screen system, DLP large screen system, three meter reading system, building automatic control system, lightning protection and grounding system, paging and professional intercom system, weak current pipeline system, UPS uninterrupted power supply system, machine room system, comprehensive wiring system, computer local area network system, property management system, multifunctional conference room system, cable television system, satellite communication system, fire fighting system, telephone communication system, hotel management system, video on demand system, human resource management system and the like.
The weak current system has high integration level, so that related management and maintenance are performed according to a traditional management and maintenance scheme, and workers manage and maintain the system according to related experiences, generally, the weak current system is cut and divided into independent systems for independent management and maintenance, generally, construction materials and equipment are important factors for ensuring that the weak current system can meet engineering requirements, and once the quality of the construction materials and the equipment is unqualified, the construction effect of the system is directly influenced. Specifically, two main aspects are presented: firstly, in order to obtain more profits, construction enterprises can apply illegal means when selecting construction materials and equipment so as to be good, and serious influence is generated on the progress of the project and the overall construction quality of the project; secondly, corresponding inspection work is not performed on construction materials and equipment before the construction materials and the equipment enter a site, so that products with poor quality can enter the site at will, the requirements of system design standards cannot be met, system management and maintenance personnel are lacked, and large-scale weak electric systems cannot be effectively managed and maintained, so that the normal operation of a weak point system is seriously influenced, meanwhile, when organization and debugging are performed on the construction weak electric system engineering, the condition that the inspection is not in place is often met, so that the construction engineering still has the problems or the problems after the construction engineering is put into use, the acceptance of the intelligent construction weak electric system engineering is insufficient, and certain limitation is generated on the exertion of the construction functions.
Based on the above data, it can be seen that the existing vulnerability system operation management has the following defects: the construction material and equipment quality can not be guaranteed, the management of a system is lacked, and the acceptance is not in place.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a building weak current system operation management and construction method, which solves the problems that the quality of construction materials and equipment cannot be ensured, the system management is lacked, and the acceptance check is not in place.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a building light current system operation management, includes customer end, server and operation management system, the customer end passes through ethernet and server and realizes the both way junction, the server passes through ethernet and operation management system and realizes the both way junction, operation management system realizes the both way junction with central processing module, central processing module realizes the both way junction with information authentication module, sample detection unit, the leading-in module of data, model construction module and information storage unit respectively, central processing module's output is connected with the input of accomplishment degree show unit, the leading-in module of data realizes the both way junction with sample detection unit, unusual alarm unit, acceptance test unit and secondary acceptance test unit respectively, the output of secondary acceptance test unit is connected with the input of acceptance test unit.
Preferably, the sampling detection unit comprises a data calculation module, a data scanning module, an information uploading module and a photographing evidence obtaining module, wherein the output end of the data calculation module is connected with the input end of the data scanning module, and the output ends of the data scanning module and the photographing evidence obtaining module are connected with the input end of the information uploading module.
Preferably, the information storage unit comprises an authentication classification module, an information storage module and a secondary verification module, and the output ends of the authentication classification module and the secondary verification module are connected with the input end of the information storage module.
Preferably, the client comprises a handheld network-enabled mobile device such as a mobile phone, a notebook, a tablet computer and the like.
Preferably, the secondary acceptance unit comprises a primary acceptance module, a distinguishing authentication module, a secondary acceptance module and a personnel information integration analysis module, the output end of the primary acceptance module is connected with the input end of the distinguishing authentication module, the output end of the distinguishing authentication module is connected with the input end of the secondary acceptance module, and the distinguishing authentication module is in bidirectional connection with the personnel information integration analysis module.
Preferably, the distinguishing authentication module is used for identifying the responsible person responsible for acceptance in the primary acceptance module, and screening the person responsible for acceptance most suitable for the secondary acceptance module by using the personnel information integration analysis module.
Preferably, the acceptance test unit comprises a recording module, a data recording module and a result judgment module, wherein the output end of the recording module is connected with the input end of the data recording module, and the output end of the data recording module is connected with the input end of the result judgment module.
Preferably, the abnormity warning unit comprises a safety value setting module, a data comparison module and a warning module, wherein the output end of the safety value setting module is connected with the input end of the data comparison module, and the output end of the data comparison module is connected with the input end of the warning module.
Preferably, the safety value setting module is configured to input a maximum difference value between two acceptance results, and perform screening detection on the two acceptance results.
The invention also discloses a construction method for the operation management of the building weak current system, which comprises the following steps:
step one, information authentication: the method comprises the steps that related personnel log in an operation management system through a client side connection server, identification verification is carried out on the information of the related personnel through an information authentication module, the information is directly recorded in an information storage unit after the verification is passed, a weak current system drawing to be verified is directly led into a model construction module through a data leading-in module, a detection verification frame is generated, and the weak current system drawing is directly displayed in a completion degree display unit;
step two, sampling detection: the method comprises the steps that personnel who verify identity information sample and verify different positions in a weak current system through a data calculation module, start a camera directly through client authorization, scan and record verification information into an information uploading module through a data scanning module, simultaneously perform photographing and screenshot on detection sampling positions through a photographing and evidence obtaining module, synchronously transmit the photographing and evidence obtaining module to the information uploading module, transmit the photographing and evidence obtaining module to a completion degree display unit through a data importing module, and complete sampling detection when the completion degree reaches 100%;
step three, acceptance testing: when a detection instrument adaptive to a weak current system is used for detection, instrument data are recorded through a data recording module, in the process, a recording and video recording module is used for recording the whole process, the acceptance result is input into a result judging module, after one group of acceptance personnel completes acceptance, the information of the group of acceptance personnel is identified through a distinguishing authentication module, another group of acceptance personnel is directly screened out through a personnel information integration analysis module, the operation is repeated for secondary acceptance, and meanwhile, the information is led into a secondary acceptance module;
step four, alarming for abnormity: the maximum difference value of the two acceptance results is input through the safety value setting module and is input into the data comparison module as an alarm threshold value, when the two acceptance results in the third step exceed or are lower than the alarm threshold value, the alarm module directly gives an alarm, related personnel are enabled to strengthen management, and an acceptance team is newly formed for acceptance.
(III) advantageous effects
The invention provides a building weak current system operation management and construction method. The method has the following beneficial effects:
(1) this building weak current system operation management and construction method, through the structure of operation management system, utilize the system to carry out systematic distribution management to personnel, and through the setting of sampling test unit, data acquisition is carried out to the mode that utilizes data scanning and take a picture to collect evidence, personnel's tampering to data has effectively been avoided, and then guarantee the accuracy of sampling result, and utilize the model to construct the module and make simple and easy detection verification frame with the construction drawing preparation, be used for the packing of detection content, and then whether the audio-visual detection that shows of cooperation completion degree display unit is comprehensive, and carry out the secondary and accept, can improve the precision of accepting the result effectively, thereby guarantee that weak current system can lasting effectual work after establishing.
(2) This building weak current system operation management and construction method, through the setting of information storage unit, utilize authentication classification module directly to carry out classified storage to the information of different acceptance charge persons, when conveniently seeking, make the storage have orderliness more to the setting of cooperation second grade verification module can protect historical information, thereby avoids the malicious data of falsifying of personnel, and then guarantees that the permanent of filing data is effective.
(3) According to the building weak current system operation management and construction method, through the arrangement of the distinguishing authentication module, after a group of acceptance personnel is manually selected, the system can be directly utilized to change the information of the acceptance personnel, another group of acceptance personnel is selected through the personnel information integration analysis module, and then the big data characteristic of the internet is fully utilized to carry out optimal matching.
Drawings
FIG. 1 is a schematic block diagram of the system of the present invention;
FIG. 2 is a schematic block diagram of a system of a sampling detection unit according to the present invention;
FIG. 3 is a system schematic block diagram of an information storage unit of the present invention;
FIG. 4 is a system schematic block diagram of an exception alert unit of the present invention;
FIG. 5 is a schematic block diagram of a system for an acceptance test unit according to the present invention;
fig. 6 is a system schematic block diagram of the secondary acceptance unit of the present invention.
In the figure, 1, client; 2. a server; 3. an operation management system; 4. a central processing module; 5. an information authentication module; 6. a sampling detection unit; 7. a data import module; 8. a model building module; 9. an information storage unit; 10. a completeness display unit; 11. an abnormality alarm unit; 12. a acceptance test unit; 13. a secondary acceptance unit; 14. a data calculation module; 15. a data scanning module; 16. an information uploading module; 17. a photographing and evidence obtaining module; 18. an authentication classification module; 19. an information storage module; 20. a secondary verification module; 21. a first acceptance module; 22. a differential authentication module; 23. a secondary acceptance module; 24. a personnel information integration analysis module; 25. a recording and videotaping module; 26. a data recording module; 27. a result determination module; 28. a security value setting module; 29. a data comparison module; 30. and an alarm module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the embodiment of the present invention provides the following two technical solutions:
the first embodiment,
The building weak current system operation management system comprises a client 1, a server 2 and an operation management system 3, wherein the client 1 is in bidirectional connection with the server 2 through an Ethernet, and the server 2 is in bidirectional connection with the operation management system 3 through the Ethernet.
As a preferred scheme, the operation management system 3 is bidirectionally connected with the central processing module 4, the central processing module 4 is an ARM9 series processor, the central processing module 4 is respectively bidirectionally connected with the information authentication module 5, the sampling detection unit 6, the data import module 7, the model construction module 8 and the information storage unit 9, the output end of the central processing module 4 is connected with the input end of the completeness display unit 10, the data import module 7 is respectively bidirectionally connected with the sampling detection unit 6, the abnormity alarm unit 11, the acceptance test unit 12 and the secondary acceptance test unit 13, the output end of the secondary acceptance test unit 13 is connected with the input end of the acceptance test unit 12, further, through the construction of the operation management system 3, the system is used for carrying out the distribution management of the system to personnel, and through the arrangement of the sampling detection unit 6, the data acquisition is carried out in a data scanning and evidence obtaining manner, the data tampering of personnel is effectively avoided, the sampling result is accurate, a simple detection verification frame is manufactured by 8 construction drawings through a model building module and is used for filling detection contents, the detection is overall visually displayed by the matching completion degree display unit 10, secondary acceptance is carried out, the accuracy of the acceptance result can be effectively improved, and the weak current system can be guaranteed to work effectively and persistently after being built.
Example II,
The present embodiment is an improvement of the previous embodiment, and a building weak current system job management system includes a client 1, a server 2 and a job management system 3, where the client 1 is in bidirectional connection with the server 2 through an ethernet, and the server 2 is in bidirectional connection with the job management system 3 through the ethernet.
As a preferred scheme, the operation management system 3 is in bidirectional connection with the central processing module 4, the central processing module 4 is in bidirectional connection with the information authentication module 5, the sampling detection unit 6, the data import module 7, the model construction module 8 and the information storage unit 9 respectively, the output end of the central processing module 4 is connected with the input end of the completion degree display unit 10, the data import module 7 is in bidirectional connection with the sampling detection unit 6, the abnormity alarm unit 11, the acceptance test unit 12 and the secondary acceptance test unit 13 respectively, the output end of the secondary acceptance test unit 13 is connected with the input end of the acceptance test unit 12, further, the operation management system 3 is constructed, the system is used for carrying out systematic distribution management on personnel, and the data is acquired by the modes of data scanning and shooting evidence obtaining through the arrangement of the sampling detection unit 6, the data tampering of personnel is effectively avoided, the sampling result is accurate, a simple detection verification frame is manufactured by 8 construction drawings through a model building module and is used for filling detection contents, the detection is overall visually displayed by the matching completion degree display unit 10, secondary acceptance is carried out, the accuracy of the acceptance result can be effectively improved, and the weak current system can be guaranteed to work effectively and persistently after being built.
As a preferred scheme, the sampling detection unit 6 includes a data calculation module 14, a data scanning module 15, an information uploading module 16 and a photographing evidence obtaining module 17, an output end of the data calculation module 14 is connected with an input end of the data scanning module 15, and output ends of the data scanning module 15 and the photographing evidence obtaining module 17 are both connected with an input end of the information uploading module 16.
As a preferred scheme, the information storage unit 9 includes an authentication classification module 18, an information storage module 19 and a secondary verification module 20, the output ends of the authentication classification module 18 and the secondary verification module 20 are connected to the input end of the information storage module 19, further, the setting of the information storage unit 9 is used for directly classifying and storing information of different acceptance principals by using the authentication classification module 18, which is convenient for searching and makes the storage more organized, and the setting of the secondary verification module 20 is matched to protect historical information, thereby avoiding malicious tampering of data by personnel, and further ensuring long-term effectiveness of archived data.
Preferably, the client 1 includes a handheld network-enabled mobile device such as a mobile phone, a notebook, a tablet computer, and the like.
As a preferred scheme, the secondary acceptance unit 13 includes a primary acceptance module 21, a distinguishing authentication module 22, a secondary acceptance module 23 and a personnel information integration analysis module 24, an output end of the primary acceptance module 21 is connected with an input end of the distinguishing authentication module 22, an output end of the distinguishing authentication module 22 is connected with an input end of the secondary acceptance module 23, the distinguishing authentication module 22 is bidirectionally connected with the personnel information integration analysis module 24, the distinguishing authentication module 22 is used for identifying a responsible person responsible for acceptance in the primary acceptance module 21, and the personnel information integration analysis module 24 is used for screening an acceptance responsible person most suitable for the secondary acceptance module 23, further, through the setting of the distinguishing authentication module 22, after a group of acceptance persons is manually selected, the system can be directly used for information of the changed group of acceptance persons, another group of acceptance persons is selected through the personnel information integration analysis module 24, and then make full use of the big data characteristic of internet, carry out the best matching.
As the preferred scheme, acceptance test unit 12 includes recording module 25, data recording module 26 and result decision module 27, and the output of recording module 25 is connected with the input of data recording module 26, and the output of data recording module 26 is connected with the input of result decision module 27, and further says, utilize recording module 25 to carry out the whole recording of acceptance process, provide work audio-video data, can also guarantee the safety of the personnel of acceptance.
As a preferred scheme, the anomaly alarm unit 11 includes a safety value setting module 28, a data comparison module 29 and an alarm module 30, an output end of the safety value setting module 28 is connected to an input end of the data comparison module 29, an output end of the data comparison module 29 is connected to an input end of the alarm module 30, the safety value setting module 28 is configured to input a maximum difference value between two acceptance results, and perform screening detection on the two acceptance results, further, the data comparison module 29 is an LM239 model data comparator.
The advantages of the second embodiment over the first embodiment are: utilize authentication classification module 18 directly to carry out classified storage to different inspection and acceptance responsible person's information, when conveniently seeking, make the storage have orderliness more, and cooperate the setting of second grade verification module 20, can protect historical information, thereby avoid the malicious data of falsifying of personnel, and then guarantee the permanent validity of filing data, through the setting of distinguishing authentication module 22, after a set of inspection and acceptance personnel of manual selection, can directly utilize the system to the information of reorganization inspection and acceptance personnel, select another set of inspection and acceptance personnel through personnel information integration analysis module 24, and then make full use of the big data characteristic of internet, carry out the best matching.
The construction method for the building weak current system operation management is characterized by comprising the following steps: the method specifically comprises the following steps:
step one, information authentication: the method comprises the steps that related personnel log in an operation management system 3 through a client 1 and a server 2, identification verification is carried out on the information of the related personnel through an information authentication module 5, after the verification is passed, the information is directly recorded in an information storage unit 9, a weak current system drawing to be verified is directly led into a model construction module 8 through a data leading-in module 7, a detection verification frame is generated, and the weak current system drawing is directly displayed in a completion degree display unit 10;
step two, sampling detection: the personnel who verify the identity information sample and verify different positions in the weak current system through the data calculation module 14, start the camera through the authorization of the client 1 directly, utilize the data scanning module 15 to scan and record the verification information to the information uploading module 16, utilize the module 17 of taking a picture to take a picture and intercept the detection sampling position at the same time, transmit to the information uploading module 16 synchronously, then transmit to the display unit 10 of the degree of completion through the data import module 7, when the degree of completion reaches 100%, finish the sampling detection;
step three, acceptance testing: when a detection instrument adaptive to a weak current system is used for detection test, instrument data is recorded through the data recording module 26, in the process, the recording and video recording module 25 is used for recording the whole process, the acceptance result is input into the result judging module 27, after one group of acceptance personnel completes acceptance, the information of the group of acceptance personnel is identified through the distinguishing and authenticating module 22, another group of acceptance personnel is directly screened out through the personnel information integration and analysis module 24, the operation is repeated for secondary acceptance, and meanwhile, the information is led into the secondary acceptance module 23;
step four, alarming for abnormity: the maximum difference value of the two acceptance results is input through the safety value setting module 28 and is input into the data comparison module 29 as an alarm threshold value, when the two acceptance results in the third step exceed or are lower than the alarm threshold value, the alarm module 30 directly gives an alarm to strengthen the management of related personnel, and the relevant personnel are newly assembled into an acceptance team for acceptance.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. The utility model provides a building light current system operation management, includes client (1), server (2) and operation management system (3), client (1) realizes two-way connection through ethernet and server (2), server (2) realize two-way connection through ethernet and operation management system (3), its characterized in that: job management system (3) and central processing module (4) realize the both way junction, central processing module (4) realizes the both way junction with information authentication module (5), sample detection unit (6), data import module (7), model construction module (8) and information storage unit (9) respectively, the output and the input of accomplishment degree show unit (10) of central processing module (4) are connected, data import module (7) realize the both way junction with sample detection unit (6), unusual alarm unit (11), acceptance test unit (12) and secondary acceptance test unit (13) respectively, the output of secondary acceptance test unit (13) is connected with the input of acceptance test unit (12).
2. The building light current system work management of claim 1, characterized by: the sampling detection unit (6) comprises a data calculation module (14), a data scanning module (15), an information uploading module (16) and a photographing evidence obtaining module (17), the output end of the data calculation module (14) is connected with the input end of the data scanning module (15), and the output ends of the data scanning module (15) and the photographing evidence obtaining module (17) are connected with the input end of the information uploading module (16).
3. The building light current system work management of claim 1, characterized by: the information storage unit (9) comprises an authentication classification module (18), an information storage module (19) and a secondary verification module (20), and the output ends of the authentication classification module (18) and the secondary verification module (20) are connected with the input end of the information storage module (19).
4. The building light current system work management of claim 1, characterized by: the client (1) comprises handheld networking mobile equipment such as a mobile phone, a notebook computer and a tablet computer.
5. The building light current system work management of claim 1, characterized by: the secondary acceptance unit (13) comprises a primary acceptance module (21), a distinguishing authentication module (22), a secondary acceptance module (23) and a personnel information integration analysis module (24), the output end of the primary acceptance module (21) is connected with the input end of the distinguishing authentication module (22), the output end of the distinguishing authentication module (22) is connected with the input end of the secondary acceptance module (23), and the distinguishing authentication module (22) and the personnel information integration analysis module (24) are connected in a bidirectional mode.
6. The building light current system operation management of claim 5, wherein: the distinguishing authentication module (22) is used for identifying the responsible person responsible for acceptance in the primary acceptance module (21), and screening out the person responsible for acceptance most suitable for the secondary acceptance module (23) by utilizing the personnel information integration analysis module (24).
7. The building light current system work management of claim 1, characterized by: acceptance test unit (12) are including recording audio module (25), data record module (26) and result judge module (27), the output of recording audio module (25) is connected with the input of data record module (26), the output of data record module (26) is connected with the input of result judge module (27).
8. The building light current system work management of claim 1, characterized by: the abnormity warning unit (11) comprises a safety value setting module (28), a data comparison module (29) and a warning module (30), wherein the output end of the safety value setting module (28) is connected with the input end of the data comparison module (29), and the output end of the data comparison module (29) is connected with the input end of the warning module (30).
9. The building light current system work management of claim 8, wherein: and the safety value setting module (28) is used for inputting the maximum difference value of the two acceptance results and screening and detecting the two acceptance results.
10. A construction method for building weak current system operation management is characterized in that: the method specifically comprises the following steps:
step one, information authentication: related personnel log in the operation management system (3) through a client (1) and a server (2), identify and verify the information of the related personnel through an information authentication module (5), directly record the information into an information storage unit (9) after the information is verified, directly import a weak current system drawing to be verified into a model construction module (8) through a data import module (7), generate a detection verification frame, and directly display the detection verification frame in a completion degree display unit (10);
step two, sampling detection: the method comprises the steps that personnel who verify identity information sample and verify different positions in a weak current system through a data calculation module (14), start a camera is authorized through a client (1), the verification information is scanned and recorded into an information uploading module (16) through a data scanning module (15), meanwhile, a photographing and evidence obtaining module (17) is used for photographing and screenshot detection sampling positions, the photographing and screenshot detection sampling positions are synchronously transmitted into the information uploading module (16), then the photographing and evidence obtaining module is transmitted into a completion degree display unit (10) through a data importing module (7), and when the completion degree reaches 100%, sampling detection is completed;
step three, acceptance testing: when a detection instrument adaptive to a weak current system is used for detection test, instrument data is recorded through a data recording module (26), in the process, a recording and video recording module (25) is used for recording the whole process, the acceptance result is input into a result judging module (27), after a group of acceptance personnel completes the acceptance, the information of the group of acceptance personnel is identified through a distinguishing authentication module (22), another group of acceptance personnel is directly screened out through a personnel information integration and analysis module (24), the operation is repeated for secondary acceptance, and meanwhile, the information is led into a secondary acceptance module (23);
step four, alarming for abnormity: the maximum difference value of the two acceptance results is input through the safety value setting module (28) and is input into the data comparison module (29) as an alarm threshold value, when the two acceptance results in the third step exceed or are lower than the alarm threshold value, the alarm module (30) directly gives an alarm, related personnel are enabled to strengthen management, and an acceptance team is newly formed for acceptance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110060968.3A CN112700173A (en) | 2021-01-18 | 2021-01-18 | Building weak current system operation management and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110060968.3A CN112700173A (en) | 2021-01-18 | 2021-01-18 | Building weak current system operation management and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112700173A true CN112700173A (en) | 2021-04-23 |
Family
ID=75515526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110060968.3A Pending CN112700173A (en) | 2021-01-18 | 2021-01-18 | Building weak current system operation management and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112700173A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002351960A (en) * | 2001-03-19 | 2002-12-06 | Ehomes Inc | Building evaluation/certification system and building evaluation/certification program |
CN104680322A (en) * | 2015-02-13 | 2015-06-03 | 上海同筑信息科技有限公司 | Project acceptance system and method based on BIM |
CN106357460A (en) * | 2016-10-27 | 2017-01-25 | 华北理工大学 | Computer network management system capable of checking identity |
CN107330634A (en) * | 2017-07-20 | 2017-11-07 | 浙江之江工程项目管理有限公司 | A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system |
CN107748951A (en) * | 2017-09-26 | 2018-03-02 | 中国建筑第八工程局有限公司 | Building engineering construction inspection of quality method and system based on BIM |
CN108876174A (en) * | 2018-06-28 | 2018-11-23 | 湖南城市学院 | A kind of supervisory systems and method of construction engineering quality detection |
CN109472477A (en) * | 2018-10-30 | 2019-03-15 | 滁州市易搜信息技术有限公司 | A kind of enterprise management information system compositive platform |
CN109726576A (en) * | 2019-01-04 | 2019-05-07 | 莱芜职业技术学院 | A kind of computer encryption system using RFID identification system |
CN111105167A (en) * | 2019-12-24 | 2020-05-05 | 河南祥辰工程管理有限公司 | Steel structure engineering visual testing and accepting method based on BIM technology |
CN111400067A (en) * | 2020-03-17 | 2020-07-10 | 金钱猫科技股份有限公司 | Remote detection method and terminal |
CN111833016A (en) * | 2020-07-08 | 2020-10-27 | 惠州市筑成工程管理有限公司 | Infrastructure building supervision method based on BIM |
CN112052745A (en) * | 2020-08-13 | 2020-12-08 | 飞亚达精密科技股份有限公司 | Visual test method and system for judging whether watch time-travelling precision is qualified or not |
-
2021
- 2021-01-18 CN CN202110060968.3A patent/CN112700173A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002351960A (en) * | 2001-03-19 | 2002-12-06 | Ehomes Inc | Building evaluation/certification system and building evaluation/certification program |
CN104680322A (en) * | 2015-02-13 | 2015-06-03 | 上海同筑信息科技有限公司 | Project acceptance system and method based on BIM |
CN106357460A (en) * | 2016-10-27 | 2017-01-25 | 华北理工大学 | Computer network management system capable of checking identity |
CN107330634A (en) * | 2017-07-20 | 2017-11-07 | 浙江之江工程项目管理有限公司 | A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system |
CN107748951A (en) * | 2017-09-26 | 2018-03-02 | 中国建筑第八工程局有限公司 | Building engineering construction inspection of quality method and system based on BIM |
CN108876174A (en) * | 2018-06-28 | 2018-11-23 | 湖南城市学院 | A kind of supervisory systems and method of construction engineering quality detection |
CN109472477A (en) * | 2018-10-30 | 2019-03-15 | 滁州市易搜信息技术有限公司 | A kind of enterprise management information system compositive platform |
CN109726576A (en) * | 2019-01-04 | 2019-05-07 | 莱芜职业技术学院 | A kind of computer encryption system using RFID identification system |
CN111105167A (en) * | 2019-12-24 | 2020-05-05 | 河南祥辰工程管理有限公司 | Steel structure engineering visual testing and accepting method based on BIM technology |
CN111400067A (en) * | 2020-03-17 | 2020-07-10 | 金钱猫科技股份有限公司 | Remote detection method and terminal |
CN111833016A (en) * | 2020-07-08 | 2020-10-27 | 惠州市筑成工程管理有限公司 | Infrastructure building supervision method based on BIM |
CN112052745A (en) * | 2020-08-13 | 2020-12-08 | 飞亚达精密科技股份有限公司 | Visual test method and system for judging whether watch time-travelling precision is qualified or not |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110707823B (en) | Multi-dimensional intelligent remote inspection system for transformer substation | |
CN103544739B (en) | Based on the method for inspecting of the visual subway equipment routing inspection management system of B/S framework | |
CN106056347A (en) | Engineering project management cloud platform system based on video monitoring | |
CN106097223B (en) | Certificate declaration management system and certificate declaration management method | |
KR101403465B1 (en) | Switchboard Integration Management system based mobile app. | |
CN112003372B (en) | Remote intelligent monitoring method for preventing electricity theft | |
CN103051494A (en) | Method and system for comprehensive charged detection of power equipment | |
CN203054575U (en) | Pollution source on-line monitoring system | |
CN109982037A (en) | Intelligent patrol detection device | |
CN107730647A (en) | A kind of smart mobile phone cruising inspection system and its method for inspecting based on SCADA | |
CN112258365A (en) | Public safety and sanitation intelligent quick checking system | |
CN113538825A (en) | Campus wall-turning event alarm method and system | |
CN117977813B (en) | Remote intelligent inspection system for transformer substation | |
CN107693997B (en) | Fire fighting equipment detection and maintenance management system and management method | |
CN112348306A (en) | TitanOS artificial intelligence development method and device for power distribution operation inspection | |
CN110910288A (en) | Intelligent safe bottom-crossing system | |
CN112700173A (en) | Building weak current system operation management and construction method | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
CN107610261A (en) | The system of management of withdrawing from the arena is entered in a kind of building site that can carry out | |
CN107506944A (en) | A kind of method and system for being evaluated video monitoring system performance | |
CN116246445A (en) | Knowledge-graph-based warehouse safety multi-source Internet-of-things data early warning method | |
CN213241275U (en) | Video door access linkage control system | |
CN114548420A (en) | Wisdom fire control system of accepting | |
CN114554141A (en) | Intelligent park security system and management method | |
CN205507896U (en) | Subway hidden danger investigation management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210423 |
|
RJ01 | Rejection of invention patent application after publication |