CN107610261A - The system of management of withdrawing from the arena is entered in a kind of building site that can carry out - Google Patents
The system of management of withdrawing from the arena is entered in a kind of building site that can carry out Download PDFInfo
- Publication number
- CN107610261A CN107610261A CN201710916497.5A CN201710916497A CN107610261A CN 107610261 A CN107610261 A CN 107610261A CN 201710916497 A CN201710916497 A CN 201710916497A CN 107610261 A CN107610261 A CN 107610261A
- Authority
- CN
- China
- Prior art keywords
- data
- arena
- module
- withdrawing
- attendance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Time Recorders, Dirve Recorders, Access Control (AREA)
Abstract
The invention discloses a kind of building site that can carry out to enter the system of management of withdrawing from the arena, including Registration Module of marching into the arena, attendance management module, WIFI internet records module, disbursement of payrolls module, judge module of withdrawing from the arena, data processing terminal and user terminal, carry out data transmission each other between modules;The Registration Module of marching into the arena carries out registration typing when workmen marches into the arena, and gathers personal essential information, and the personal essential information of the data after registration typing and collection is sent to data processing terminal and stored;Carry out work attendance of the Time Attendance Device set in the attendance management module to workmen, produces attendance data, and attendance management module is imported data in data processing terminal;The WIFI internet records module is arranged on employee living area, gathers the Internet data of different access terminals, and Internet data is transmitted to data processing terminal.
Description
Technical field
The present invention relates to a kind of advance and retreat course management system, and in particular to it is a kind of can carry out that building site enters management of withdrawing from the arena be
System.
Background technology
With the development of Chinese national economy and the raising of living standards of the people, just at home and abroad various regions are opened for engineering construction
Exhibition, this needs the largely labor service worker from rural area, but migrant workers belong to disadvantaged group, itself schooling
It is low, it is not known that how to protect itself legitimate rights and interests, and mobility is strong, it is difficult to strict payroll system to be established, along with labor service is used
There is illegal subcontracting, subcontract phenomenon in violation of rules and regulations in work market, it is serious that the pay of migrant rural workers is in arrears with problem, although national regulation can not be in arrears with agriculture
Civilian worker's wage, but occurred that a large amount of rural migrant workers ask for salary social event, turn into the destabilizing factor for influenceing social stability.For
This, State Council, the firmly portion of building have put into effect a series of policy texts for realizing labor service real-name management comprehensively in engineering construction field in succession
Part, supervise all kinds of enterprises to sign labour contract with the rural migrant worker employed in accordance with the law and strictly fulfil, establish payroll and handle labor
Work is employed to put on record.Current enters managerial confusion of withdrawing from the arena, and is recorded using manual type, and many workers may
It will not inform that construction management person withdraws from the arena, if now causing industrial accident after he enters next project, be very easy to produce
Whether dispute during operation, can not be supervised, not form management system in industry at present, allow manager realize can
Control, and government department can supervise each construction procedure and paying out wages situation.
The content of the invention
The technical problems to be solved by the invention are the enterprising managerial confusions of withdrawing from the arena in current project building site, and structure of personnel is complicated,
Disbursement of payrolls is not in place, and security control, attendance record etc. fall behind, and withdrawing from the arena for operating worker can not be accomplished effectively to supervise,
Present invention aims at providing a kind of building site that can carry out to enter the system of management of withdrawing from the arena, solve the problems, such as above-mentioned.
The present invention is achieved through the following technical solutions:
A kind of building site that can carry out is entered in the system of management of withdrawing from the arena, including Registration Module of marching into the arena, attendance management module, WIFI
Net logging modle, disbursement of payrolls module, judge module of withdrawing from the arena, data processing terminal and user terminal, between modules each other
Carry out data transmission;The Registration Module of marching into the arena carries out registration typing when workmen marches into the arena, and gathers personal essential information,
The personal essential information of data after registration typing and collection is sent to data processing terminal and stored;The attendance management
Carry out work attendance of the Time Attendance Device set in module to workmen, produces attendance data, and attendance management module imports data to
In data processing terminal;The WIFI internet records module is arranged on employee living area, gathers the online of different access terminals
Data, and Internet data is transmitted to data processing terminal;Number in the disbursement of payrolls module calls data processing terminal
According to, by personal information contrast confirm, wage is sent to individual;Number in the judge module called data processing terminal of withdrawing from the arena
According to, and data are judged, if being judged as withdrawing from the arena, confirmation is sent to user terminal, after receiving confirmation feedback,
Personal information in data processing terminal is removed, and will determine that information of withdrawing from the arena is sent to user terminal.The data processing is whole
End receives the called data instruction of other each modules, and after receiving judge module of withdrawing from the arena and sending confirmation instruction, this is stored
Data are defined as history data store, and by newest data.The user terminal receives the number for judge module transmission of withdrawing from the arena
According to, and send and confirm that confirmation command personnel withdraw from the arena, the user terminal is additionally operable to called data processing terminal.
At present, the management of entering to withdraw from the arena in whole building site is generally registered, arranged using manual record mode, whole place
The human intervention amount of reason flow is very big, and the data gathered are also and inaccurate, and the difficulty being like this managed is very big, and
, can be by the personal essential information of all workers to march into the arena using the advance and retreat course management system of the present invention and influence factor is very big
It is acquired, and the data of collection is detected automatically, detection data comparison is confirmed, ensures the essential information of admission personnel
It is authentic and valid, if without authentic and valid admission personal information and entry time, certain influence is had on carrying out wage clearing in the future,
The order of marching into the arena and withdraw from the arena of building-site so can be strictly monitored, it is convenient that building-site is managed, while also can
Manpower is reduced on management and disbursement of payrolls management is operated to pay.
The system obtains data by the way of multiple spot checking, is checked card information, WIFI by the information for registration of marching into the arena, work attendance
Internet information and wage settlement information carry out comprehensive data acquisition and obtain related data, and are carried out by judge module of withdrawing from the arena
The analysis of data, by its work attendance situation, the synthesis such as price bidding and wage clearing situation is sentenced in employee living area
It is disconnected, in comprehensive descision to withdraw from the arena after, send to user terminal and confirmed, after user terminal confirms that it withdraws from the arena, by its registered letter
Breath is deleted, and can so allow user terminal to grasp the real-time number of operation, convenient evidence obtaining and work in dispute between workers & employer in time
The support of evidence can be obtained by hindering in the processing of accident, additionally it is possible to convenient that job site is managed.
Further, the judge module of withdrawing from the arena sets weighted value, wherein work attendance module not according to the different pieces of information transferred
After the attendance data for detecting individual, to withdrawing from the arena, judge module sends attendance data, and its attendance data weighted value is arranged to 0.1;
WIFI internet records module is after the internet records of individual are not detected by, and to withdrawing from the arena, judge module sends internet records data, on
The weighted value of net record data is 0.1, and when weighted value summation 0.1X+0.1Y is more than 0.7, confirmation letter is sent to user terminal
Breath;Wherein X is the number of days that work attendance module is not detected by attendance record;Y is the day that internet records module is not detected by internet records
Number.Withdrawn from the arena because general worker can carry out registration when withdrawing from the arena, but be not excluded for some workers and do not carried out when construction team withdraws from the arena
Registration, now these construction teams and worker may occur labour and capital problem after moving into other building site projects or go out in the building site
Existing industrial accident, when being handled, situation that preceding project and rear project are mutually shifted responsibility onto others, now it needs to be determined that worker or construction
Information is withdrawn from the arena with regard to particularly important by team, and the system uses weights addition mode, by not having attendance record in certain number of days, or
Employee living area is not detected by the internet information of the employee and is defined in certain number of days, and judge module of withdrawing from the arena is carried out at above-mentioned analysis
After reason, after reaching the weighted value specified, sent to user terminal and be confirmed whether to withdraw from the arena, can so leave a complete evidence
Chain, it is convenient to be confirmed in the future.
Further, for disbursement of payrolls module after payment finishes wage, to withdrawing from the arena, judge module sends payment data, withdraws from the arena
Judge module sends payment data to user terminal, and employee's situation of withdrawing from the arena is confirmed.Typically on-site, at one
After construction team's engineering, wage clearing can be carried out, after clearing, the work of construction team is basically completed, it is necessary to carry out processing of withdrawing from the arena,
Now notice user terminal timely carries out processing of withdrawing from the arena, convenient management at the construction field (site).
Further, the user terminal is any one in mobile phone, notebook computer, PC ends, tablet personal computer, vehicle-mounted computer
Kind.Sending and receiving end of the such several electronic equipments of user terminal selecting as information, when it is more convenient, it is easy to Security Officer and enterprise
Industry, government related personnel check to field operation number, facilitate contractor (class monitor and group leader) when being withdrawn from the arena quickly
Handled, Optimizing construction tissue and improve progress quality.
Further, the Registration Module of marching into the arena carries out data input by recording device, need to pass through data input twice,
Data input creates personal essential information archives first, inputs personal essential information, after second of data input, registration mould of marching into the arena
Block is contrasted the data of input and first time data, and comparing result is consistent, then is sent the data of input to data processing
Terminal, if data input is inconsistent, input data it will delete twice.The Time Attendance Device detection data of the attendance management module
With the data that are stored in data processing terminal it is inconsistent when, send information warning to staff.The detection of attendance management module
If data are not stored in data processing terminal, then may the employee do not registered, wage can not be got, send information warning
Prompted, it is convenient to carry out subsequent treatment.
Further, the Time Attendance Device detection data of the attendance management module and the data stored in data processing terminal
When inconsistent, information warning is sent to staff.
Further, the attendance management module also carries out data integrity inspection, and the Work attendance management system is to marching into the arena
Information is detected in Registration Module, and whether detection information is complete, if information is imperfect, Incomplete information is marked, and is sent
To user terminal.
Further, the personal essential information is personal name, sex, age, work post, phone, identification card number, contract
Numbering, identity card picture, certification photo, bank's card number.The typing of essential information can allow backstage to grasp having for each worker
Information is imitated, and the information such as captured identity card and bank's card number helps to confirm worker's identity, and the side when paying wage
Just it is quick.
The present invention compared with prior art, has the following advantages and advantages:
1st, the system of management of withdrawing from the arena is entered in a kind of building site that can carry out of the present invention, and building site can be allowed to enter to withdraw from the arena more and have
Sequence, be advantageous to supervise worker's situation;
2nd, the system of management of withdrawing from the arena is entered in a kind of building site that can carry out of the present invention, passes through the personal work of disbursement of payrolls module calls
Table and bank card information are provided, wage can directly be squeezed into the bank card account of worker's registration, avoid intermediate link;
3rd, the system of management of withdrawing from the arena is entered in a kind of building site that can carry out of the present invention, by way of multiple spot monitoring, and weights
The processing of addition, which solves the problems, such as that worker withdraws from the arena, to be supervised;
4th, the system of management of withdrawing from the arena is entered in a kind of building site that can carry out of the present invention, will appreciate that to the real operation in job site
Number, on the problems such as dispute between workers & employer and industrial accident are handled, using the teaching of the invention it is possible to provide sufficient chain of evidence ensures.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application
Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is present system flow chart.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment one
As shown in figure 1, the system of management of withdrawing from the arena is entered in a kind of building site that can carry out of the present invention, one kind can carry out building site advance and retreat
The system of management, including Registration Module of marching into the arena, attendance management module, WIFI internet records module, disbursement of payrolls module, withdraw from the arena
Judge module, data processing terminal and user terminal, carry out data transmission each other between modules;The Registration Module of marching into the arena
Registration typing is carried out when workmen marches into the arena, and gathers personal essential information, the data after registration typing and of collection
People's essential information, which is sent to data processing terminal, to be stored;The Time Attendance Device set in the attendance management module is to constructor
The carry out work attendance of member, produces attendance data, and attendance management module is imported data in data processing terminal;The WIFI online note
Record module is arranged on employee living area, gathers the Internet data of different access terminals, and Internet data is transmitted to data
Manage in terminal;Data in the disbursement of payrolls module calls data processing terminal, contrasted and confirmed by personal information, by wage
Send to individual;Data in the judge module called data processing terminal of withdrawing from the arena, and data are judged, if being judged as moving back
, then confirmation is sent to user terminal, it is after receiving confirmation feedback, the personal information in data processing terminal is clear
Remove, and will determine that information of withdrawing from the arena is sent to user terminal.The called data that the data processing terminal receives other each modules refers to
Order, and after receiving judge module of withdrawing from the arena and sending confirmation instruction, using the data storage as history data store, and with newest
Data be defined.The user terminal receives the data for judge module transmission of withdrawing from the arena, and sends and confirm that confirmation command personnel withdraw from the arena,
The user terminal is additionally operable to called data processing terminal.Registration Module of marching into the arena is led to using PC equipment or mobile input equipment
Staff is crossed by Data Enter module, information is handled.Whole advance and retreat course management system can be all by what is marched into the arena
The personal essential information of worker is acquired, and the data of collection are detected automatically, and detection data comparison is confirmed, ensured
The essential information of admission personnel is authentic and valid, is conveniently operated management and disbursement of payrolls management.
At present, the management of entering to withdraw from the arena in whole building site is generally registered, arranged using manual record mode, whole place
The human intervention amount of reason flow is very big, and the data gathered are also and inaccurate, and the difficulty being like this managed is very big, and
, can be by the personal essential information of all workers to march into the arena using the advance and retreat course management system of the present invention and influence factor is very big
It is acquired, and the data of collection is detected automatically, detection data comparison is confirmed, ensures the essential information of admission personnel
It is authentic and valid, if without authentic and valid admission personal information and entry time, certain influence is had on carrying out wage clearing in the future,
The order of marching into the arena and withdraw from the arena of building-site so can be strictly monitored, it is convenient that building-site is managed, while also can
Manpower is reduced on management and disbursement of payrolls management is operated to pay.
The system obtains data by the way of multiple spot checking, is checked card information, WIFI by the information for registration of marching into the arena, work attendance
Internet information and wage settlement information carry out comprehensive data acquisition and obtain related data, and are carried out by judge module of withdrawing from the arena
The analysis of data, by its work attendance situation, the synthesis such as price bidding and wage clearing situation is sentenced in employee living area
It is disconnected, in comprehensive descision to withdraw from the arena after, send to user terminal and confirmed, after user terminal confirms that it withdraws from the arena, by its registered letter
Breath is deleted, and can so allow user terminal to grasp the real-time number of operation, convenient evidence obtaining and work in dispute between workers & employer in time
The support of evidence can be obtained by hindering in the processing of accident, additionally it is possible to convenient that job site is managed.
Disbursement of payrolls module is after payment finishes wage, and to withdrawing from the arena, judge module sends payment data, judge module of withdrawing from the arena
Payment data is sent to user terminal, and employee's situation of withdrawing from the arena is confirmed.Typically on-site, in construction team's work
After journey, wage clearing can be carried out, after clearing, the work of construction team is basically completed, it is necessary to carry out processing of withdrawing from the arena, and is now notified
User terminal timely carries out processing of withdrawing from the arena, convenient management at the construction field (site).
The user terminal is any one in mobile phone, notebook computer, PC ends, tablet personal computer, vehicle-mounted computer.User is whole
End selects sending and receiving end of such several electronic equipments as information, when it is more convenient, it is easy to Security Officer and enterprise, government's phase
Pass personnel check to field operation number, facilitate contractor (class monitor and group leader) quickly to be handled when being withdrawn from the arena,
Optimizing construction tissue and improve progress quality.
The Registration Module of marching into the arena carries out data input by recording device, need to pass through data input twice, first data
Input creates personal essential information archives, inputs personal essential information, and after second of data input, Registration Module of marching into the arena will input
Data contrasted with first time data, comparing result is consistent, then sends the data of input to data processing terminal, if number
It is inconsistent according to inputting, then input data it will delete twice.At the Time Attendance Device detection data and data of the attendance management module
When the data stored in reason terminal are inconsistent, information warning is sent to staff.The data of attendance management module detection are not deposited
If entering data processing terminal, then may the employee do not registered, wage can not be got, information warning is sent and carried
Show, it is convenient to carry out subsequent treatment.
When the Time Attendance Device detection data of the attendance management module and the inconsistent data stored in data processing terminal,
Information warning is sent to staff.
The attendance management module also carries out data integrity inspection, and the Work attendance management system is to marching into the arena in Registration Module
Information is detected, and whether detection information is complete, if information is imperfect, Incomplete information is marked, and is sent to user terminal.
The personal essential information is personal name, sex, age, work post, phone, identification card number, Contract NO, identity
License piece, certification photo, bank's card number.The typing of essential information can allow backstage to grasp the effective information of each worker, and
And the information such as captured identity card and bank's card number helps to confirm worker's identity, and it is convenient and swift when paying wage.
Embodiment two
The present embodiment is optimized on the basis of embodiment one, and the judge module of withdrawing from the arena is set according to the different pieces of information transferred
Weighted value is put, after wherein work attendance module is not detected by the attendance data of individual, judge module sends attendance data to withdrawing from the arena, and it is examined
Diligent data weighting value is arranged to 0.1;WIFI internet records module judges mould after the internet records of individual are not detected by withdrawing from the arena
Block sends internet records data, and the weighted value of internet records data is 0.1, when weighted value summation 0.1X+0.1Y is more than 0.7,
Confirmation is sent to user terminal;Wherein X is the number of days that work attendance module is not detected by attendance record;Y is internet records module
It is not detected by the number of days of internet records.Withdrawn from the arena because general worker can carry out registration when withdrawing from the arena, but be not excluded for some workers
Do not registered when being withdrawn from the arena with construction team, now after moving into other building site projects labor may occur for these construction teams and worker
There is industrial accident in the building site in money problem, when being handled, situation that preceding project and rear project are mutually shifted responsibility onto others, now
It needs to be determined that information is withdrawn from the arena with regard to particularly important by worker or construction team, the system uses weights addition mode, by certain day
Do not have attendance record in number, or necessarily in number of days employee living area is not detected by the internet information of the employee and is defined, withdraw from the arena and sentence
After disconnected module carries out above-mentioned analyzing and processing, after reaching the weighted value specified, sent to user terminal and be confirmed whether to withdraw from the arena, so
A complete chain of evidence can be left, it is convenient to be confirmed in the future.
After general construction team's checkout is withdrawn from the arena, user terminal can directly handle its information of withdrawing from the arena, but may construction team or
There is emergency episode in person individual, has little time or does not know system flow, and causes not confirmed position, now using attendance record
Investigated simultaneously with two kinds of data of internet records, when not carrying out work attendance in X days, the substantially life also moved away from building site
Area, the weights of setting are to being not detected by after data in 3~4 days the administrative staff of user terminal be allowed timely for 0.7
It was found that and quickly handle and leave the theatre, it is ensured that operation number it is accurate, true.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further
Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include
Within protection scope of the present invention.
Claims (8)
1. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out, it is characterised in that including Registration Module of marching into the arena, attendance management mould
Block, WIFI internet records module, disbursement of payrolls module, judge module of withdrawing from the arena, data processing terminal and user terminal, modules
Between carry out data transmission each other;
The Registration Module of marching into the arena carries out registration typing when workmen marches into the arena, and gathers personal essential information, and registration is recorded
The personal essential information of data and collection after entering, which is sent to data processing terminal, to be stored;
Carry out work attendance of the Time Attendance Device set in the attendance management module to workmen, produces attendance data, work attendance pipe
Reason module is imported data in data processing terminal;
The WIFI internet records module is arranged on employee living area, gathers the Internet data of different access terminals, and will be upper
Network data is transported in data processing terminal;
Data in the disbursement of payrolls module calls data processing terminal, contrasted and confirmed by personal information, wage is sent
To data processing terminal;
Data in the judge module called data processing terminal of withdrawing from the arena, and data are judged, if being judged as withdrawing from the arena, to
User terminal sends confirmation, and after receiving confirmation feedback, the personal information in data processing terminal is removed, and will be true
Surely information of withdrawing from the arena is sent to user terminal;
The data processing terminal receives the called data instruction of other each modules, and is sent really receiving judge module of withdrawing from the arena
After recognizing instruction, using the data storage as history data store;
The user terminal receives the data for judge module transmission of withdrawing from the arena, and sends and confirm that confirmation command personnel withdraw from the arena, the use
Family terminal is additionally operable to called data processing terminal.
2. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that described to withdraw from the arena
Judge module sets weighted value according to the different pieces of information transferred, after wherein work attendance module is not detected by the attendance data of individual, to
Judge module of withdrawing from the arena sends attendance data, and its attendance data weighted value is arranged to 0.1;WIFI internet records module is being not detected by
After personal internet records, internet records data are sent to judge module of withdrawing from the arena, the weighted value of internet records data is 0.1, when
When weighted value summation 0.1X+0.1Y is more than 0.7, confirmation is sent to user terminal;
Wherein X is the number of days that work attendance module is not detected by attendance record;Y is the day that internet records module is not detected by internet records
Number.
3. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that disbursement of payrolls
Module after payment finishes wage, to withdraw from the arena judge module send payment data, withdraw from the arena judge module by payment data send to
User terminal, and the situation of withdrawing from the arena is confirmed.
4. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that the user
Terminal is any one in mobile phone, notebook computer, PC ends, tablet personal computer, vehicle-mounted computer.
5. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that described to march into the arena
Registration Module carries out data input by recording device, need to pass through data input twice, and data input creates personal basic first
News file, inputs personal essential information, and after second of data input, Registration Module of marching into the arena is by the data of input and first number
According to being contrasted, comparing result is consistent, then sends the data of input to data processing terminal, if data input is inconsistent,
Input data it will delete twice.
6. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that the work attendance
When the Time Attendance Device detection data of management module and the inconsistent data stored in data processing terminal, send and warn to staff
Show information.
7. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that the work attendance
Management module also carries out data integrity inspection, and the Work attendance management system detects to information in Registration Module of marching into the arena, and
Whether detection information is complete, if information is imperfect, Incomplete information is marked, and sends to user terminal.
8. the system of management of withdrawing from the arena is entered in a kind of building site that can carry out according to claim 1, it is characterised in that the individual
Essential information is personal name, sex, age, work post, phone, identification card number, Contract NO, identity card picture, certification photograph
Piece, bank's card number.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710916497.5A CN107610261B (en) | 2017-09-30 | 2017-09-30 | System capable of managing entrance and exit of construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710916497.5A CN107610261B (en) | 2017-09-30 | 2017-09-30 | System capable of managing entrance and exit of construction site |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107610261A true CN107610261A (en) | 2018-01-19 |
CN107610261B CN107610261B (en) | 2020-06-23 |
Family
ID=61067792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710916497.5A Active CN107610261B (en) | 2017-09-30 | 2017-09-30 | System capable of managing entrance and exit of construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107610261B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109636933A (en) * | 2018-11-09 | 2019-04-16 | 平安科技(深圳)有限公司 | Intelligent personnel management methods, device and computer equipment based on pedestal O&M |
CN110111062A (en) * | 2018-09-03 | 2019-08-09 | 中国平安人寿保险股份有限公司 | A kind of camouflage attendance scene recognition method and device based on big data |
WO2019242151A1 (en) * | 2018-06-21 | 2019-12-26 | 平安科技(深圳)有限公司 | Data determining method and apparatus, and electronic device and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103369635A (en) * | 2013-07-29 | 2013-10-23 | 广州市沃希信息科技有限公司 | Sign-in method, mobile terminal and sign-in server |
CN105260857A (en) * | 2015-11-16 | 2016-01-20 | 苏州天地微易智能科技有限公司 | Intelligent management system and method thereof for rural migrant workers |
KR20160015551A (en) * | 2014-07-31 | 2016-02-15 | (주)플랜아이 | Attendance management system of enterprise with location based using wireless network |
CN106228632A (en) * | 2016-08-04 | 2016-12-14 | 深圳前海好工易网络科技有限公司 | A kind of building site Work attendance method and system |
CN106651314A (en) * | 2016-12-26 | 2017-05-10 | 重庆工程职业技术学院 | School attending prediction method and device |
CN206193897U (en) * | 2016-09-29 | 2017-05-24 | 长安大学 | Constructor management and wage management system |
CN106779449A (en) * | 2016-12-28 | 2017-05-31 | 四川民工加网络科技有限公司 | A kind of collection register method of labor service real-name management |
-
2017
- 2017-09-30 CN CN201710916497.5A patent/CN107610261B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103369635A (en) * | 2013-07-29 | 2013-10-23 | 广州市沃希信息科技有限公司 | Sign-in method, mobile terminal and sign-in server |
KR20160015551A (en) * | 2014-07-31 | 2016-02-15 | (주)플랜아이 | Attendance management system of enterprise with location based using wireless network |
CN105260857A (en) * | 2015-11-16 | 2016-01-20 | 苏州天地微易智能科技有限公司 | Intelligent management system and method thereof for rural migrant workers |
CN106228632A (en) * | 2016-08-04 | 2016-12-14 | 深圳前海好工易网络科技有限公司 | A kind of building site Work attendance method and system |
CN206193897U (en) * | 2016-09-29 | 2017-05-24 | 长安大学 | Constructor management and wage management system |
CN106651314A (en) * | 2016-12-26 | 2017-05-10 | 重庆工程职业技术学院 | School attending prediction method and device |
CN106779449A (en) * | 2016-12-28 | 2017-05-31 | 四川民工加网络科技有限公司 | A kind of collection register method of labor service real-name management |
Non-Patent Citations (1)
Title |
---|
三少91888: "施工现场农民工综合管理系统施工现场使用说明", 《百度文库》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019242151A1 (en) * | 2018-06-21 | 2019-12-26 | 平安科技(深圳)有限公司 | Data determining method and apparatus, and electronic device and storage medium |
CN110111062A (en) * | 2018-09-03 | 2019-08-09 | 中国平安人寿保险股份有限公司 | A kind of camouflage attendance scene recognition method and device based on big data |
CN109636933A (en) * | 2018-11-09 | 2019-04-16 | 平安科技(深圳)有限公司 | Intelligent personnel management methods, device and computer equipment based on pedestal O&M |
CN109636933B (en) * | 2018-11-09 | 2022-07-15 | 平安科技(深圳)有限公司 | Intelligent personnel management method and device based on pedestal operation and maintenance and computer equipment |
Also Published As
Publication number | Publication date |
---|---|
CN107610261B (en) | 2020-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021232588A1 (en) | Food safety risk assessment method, apparatus, device, and storage medium | |
CN104240349A (en) | Method for quickly confirming real name identity in important place and human image and identity comparison safety inspection system | |
CN106169131A (en) | Project management cloud platform system based on the Internet | |
CN107730130A (en) | A kind of management system based on rental housing management platform | |
Hinduja | Computer crime investigations in the United States: Leveraging knowledge from the past to address the future | |
CN101763459A (en) | Method for remotely invigilating individual | |
CN104778535A (en) | Management system for enterprise occupational health physical examination and management method | |
CN107610261A (en) | The system of management of withdrawing from the arena is entered in a kind of building site that can carry out | |
CN204087314U (en) | Portrait identity comparison safe examination system | |
CN108229174A (en) | Security risk management system and management method based on cloud data | |
CN109801416A (en) | A kind of total dimension computer lab management method of building together based on big data analysis | |
Valjarevic et al. | A harmonized process model for digital forensic investigation readiness | |
CN111524046A (en) | Traffic safety education management system | |
CN112633828A (en) | Safety management system | |
CN110910288A (en) | Intelligent safe bottom-crossing system | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
CN110545288A (en) | Financial institution security cloud management and control system | |
CN115860495A (en) | Emergency plan processing method, device, equipment, medium and product | |
CN115456593A (en) | Intelligent management and control system and method for personnel admission authority facing factory violation behaviors | |
CN213241249U (en) | Railway station six-in-one passenger real-name system verification system based on artificial intelligence | |
CN107644324A (en) | A kind of personnel's system of real name register system for project under construction | |
CN102446227A (en) | Interactive semi-automatic security accident tracing method and system | |
CN112615812A (en) | Information network unified vulnerability multi-dimensional security information collection, analysis and management system | |
CN112598267A (en) | Integral system enterprise security management method and system | |
Lakatos | Investigation of Smart Tools in Order to Improve the Effectiveness of the Administration of Disaster Management I. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200426 Address after: 610000 No.5, floor 16, building 1, No.66, Tianfu 4th Street, hi tech Zone, Chengdu, Sichuan Province Applicant after: Sichuan Yadong Century Technology Co., Ltd Applicant after: Wang Chengrong Address before: 610000, No. 2, No. 10, No. 13, No. 1366, Tianfu Road, Chengdu hi tech Zone, Sichuan 15, China Applicant before: SICHUAN MINGONGJIA NETWORK TECHNOLOGY Co.,Ltd. Applicant before: Wang Chengrong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |