CN112681345A - 一种骨架护坡预制块安装工艺 - Google Patents
一种骨架护坡预制块安装工艺 Download PDFInfo
- Publication number
- CN112681345A CN112681345A CN202011399171.8A CN202011399171A CN112681345A CN 112681345 A CN112681345 A CN 112681345A CN 202011399171 A CN202011399171 A CN 202011399171A CN 112681345 A CN112681345 A CN 112681345A
- Authority
- CN
- China
- Prior art keywords
- framework
- slope protection
- precast
- block
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明公开一种骨架护坡预制块安装工艺,包括:(1)施工放样:依据设计图纸放样骨架护坡横、竖梁的位置;(2)坡面挖方施工;(3)防滑平台施工:放样骨架护坡底部C20砼现浇基座、坡面C20砼现浇防滑平台,支立模板并完成相应混凝土结构施工;(4)预制骨架块:骨架护坡采用C25预制块进行砌筑施工,预制块采用定型模板在预制场预制;(5)安装骨架护坡预制块提升装置:①轨道铺设;②动力装置安装;③骨架护坡预制块输送底座安装;(6)提升预制骨架块:利用骨架护坡预制块提升装置进行骨架护坡预制块运输;(7)安装、砌筑预制骨架块。本发明能保证骨架护坡预制块安装更方便、省力,安装效率高,安装质量好。
Description
技术领域
本发明涉及一种骨架护坡预制块安装工艺。
背景技术
现有骨架护坡预制块的安装过程中存在以下缺点:
①人工搬运骨架护坡预制块:由于预制块形状特殊,且重量较大,表面光滑,人工搬运极其困难,且危险性高。
②起重设备吊装骨架护坡预制块:由于预制块特殊的拱形结构,用钢丝绳吊运难以找准重心,容易滑落砸伤施工人员或损坏预制块。
③经济方面:人工搬运或起重设备吊装骨架护坡预制块消耗了大量的人力、物力,且搬运时预制块易损坏,损耗较大。
④进度方面:人工或起重设备吊装骨架护坡预制块,施工效率相对较低,易造成骨架护坡施工进度滞后,导致不能满足路基开挖一级防护一级的施工要求。
⑤质量方面:人工或起重设备吊装骨架护坡预制块,易造成预制块破碎、缺边、掉角等质量问题。
发明内容
针对上述现有技术存在的问题,本发明提供一种骨架护坡预制块安装工艺。
为了实现上述目的,本发明采用的一种骨架护坡预制块安装工艺,包括以下步骤:
(1)施工放样:依据设计图纸放样骨架护坡横、竖梁的位置;
(2)坡面挖方施工:施工前先清刷坡面浮土,填补坑凹,使坡面平整;
(3)防滑平台施工:根据施工图纸,放样骨架护坡底部C20砼现浇基座、坡面C20砼现浇防滑平台,支立模板并完成相应混凝土结构施工;
(4)预制骨架块:骨架护坡采用C25预制块进行砌筑施工,预制块采用定型模板在预制场预制;
(5)安装骨架护坡预制块提升装置:
①轨道铺设;②动力装置安装;③骨架护坡预制块输送底座安装;
(6)提升预制骨架块:提升装置安装完成后,利用骨架护坡预制块提升装置进行骨架护坡预制块运输;
(7)安装、砌筑预制骨架块。
作为改进,所述步骤(5)中①轨道铺设时,采用两条轨道,两轨道间安装有轨道支撑。
作为改进,所述轨道采用φ48脚手管、工字钢或槽钢。
作为改进,所述步骤(5)中②动力装置安装时,以小型卷扬机作为动力装置。
与现有技术相比,本发明能保证骨架护坡预制块安装更方便、省力,安装效率高,安装质量好。
附图说明
图1为本发明的结构示意图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明了,下面对本发明进行进一步详细说明。但是应该理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限制本发明的范围。
结合图1所示,一种骨架护坡预制块安装工艺,包括以下步骤:
(1)施工放样:依据设计图纸放样骨架护坡横、竖梁的位置,特别注意边坡边角处的放样,保证横、竖梁的顺畅性及整体线型的圆顺性,测量放样过程中及时做好护桩工作,以便后期准确使用,测量放样后,进行坡面挖方施工;
(2)坡面挖方施工:施工前先清刷坡面浮土,填补坑凹,使坡面大体平整,对相邻级边坡间的平台要做整平夯实处理,同时要保证一定的单向纵坡,以保证平台水沟的稳定性及排水顺畅性;根据放样后的骨架护坡横、竖梁位置,采用小型机具配合人工挖方;对不稳定的挖方槽底及坡面要做换填夯实处理;同一级边坡挖方顺序是:由上至下,一步到位,槽底密实平顺,禁止超挖;
(3)防滑平台施工:根据施工图纸,放样骨架护坡底部C20砼现浇基座、坡面C20砼现浇防滑平台,支立模板并完成相应混凝土结构施工;
(4)预制骨架块:骨架护坡采用C25预制块进行砌筑施工,预制块采用定型模板在预制场预制;
(5)安装骨架护坡预制块提升装置:
①轨道铺设:为保证骨架护坡预制块提升装置行走稳定,需在坡面上埋入轨道1,轨道起、终点的位置根据坡面长度确定;轨道1可使用φ48脚手管、工字钢或槽钢,轨道1的长度不足时需要拼接,拼接时要确保接头平顺,拼接轨道在一条直线上;铺完后,轨道1中间相隔1m,安装轨道支撑2,以防轨道1变形;
②动力装置安装:在坡顶安装小型卷扬机5作为骨架护坡预制块的提升动力装置;
③骨架护坡预制块输送底座安装:轨道1、动力装置安装完成后,可将骨架护坡预制块4的输送底座3安装到滑道1上并用钢丝绳与动力装置做好连接;
(6)提升预制骨架块:提升装置安装完成后,可利用骨架护坡预制块提升装置进行骨架护坡预制块4的运输;根据现场放样完成的骨架护坡预制块安装位置,选择相应型号的骨架护坡预制块4,将其放置在输送底座3上,然后启动动力装置,将预制块输送到预定位置;
(7)安装、砌筑预制骨架块:骨架护坡预制块安装、砌筑施工时立杆挂线以保证砌体线形顺适,砌体平整。骨架护坡预制块砌筑前先清除边坡松动岩石或浮土,清出新鲜面。在边坡上的超挖凹陷部分应设置台阶后,以骨架块相同的圬工砌补。预制块与坡面要密贴结合,砌体咬口紧密,错缝,砂浆饱满,无通缝、叠砌、贴砌和浮塞,保证砌体勾缝牢固美观。骨架护坡预制块应自下而上逐层砌筑,顺直到设计位置,骨架流水面与草皮表面平,若边坡有地下水露头,施工时应将地下水引入排水系统。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换或改进等,均应包含在本发明的保护范围之内。
Claims (4)
1.一种骨架护坡预制块安装工艺,其特征在于,包括以下步骤:
(1)施工放样:依据设计图纸放样骨架护坡横、竖梁的位置;
(2)坡面挖方施工:施工前先清刷坡面浮土,填补坑凹,使坡面平整;
(3)防滑平台施工:根据施工图纸,放样骨架护坡底部C20砼现浇基座、坡面C20砼现浇防滑平台,支立模板并完成相应混凝土结构施工;
(4)预制骨架块:骨架护坡采用C25预制块进行砌筑施工,预制块采用定型模板在预制场预制;
(5)安装骨架护坡预制块提升装置:
①轨道铺设;②动力装置安装;③骨架护坡预制块输送底座安装;
(6)提升预制骨架块:提升装置安装完成后,利用骨架护坡预制块提升装置进行骨架护坡预制块运输;
(7)安装、砌筑预制骨架块。
2.根据权利要求1所述的一种骨架护坡预制块安装工艺,其特征在于,所述步骤(5)中①轨道铺设时,采用两条轨道,两轨道间安装有轨道支撑。
3.根据权利要求2所述的一种骨架护坡预制块安装工艺,其特征在于,所述轨道采用φ48脚手管、工字钢或槽钢。
4.根据权利要求1所述的一种骨架护坡预制块安装工艺,其特征在于,所述步骤(5)中②动力装置安装时,以小型卷扬机作为动力装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011399171.8A CN112681345A (zh) | 2020-12-04 | 2020-12-04 | 一种骨架护坡预制块安装工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011399171.8A CN112681345A (zh) | 2020-12-04 | 2020-12-04 | 一种骨架护坡预制块安装工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112681345A true CN112681345A (zh) | 2021-04-20 |
Family
ID=75447275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011399171.8A Pending CN112681345A (zh) | 2020-12-04 | 2020-12-04 | 一种骨架护坡预制块安装工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112681345A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114293511A (zh) * | 2022-01-28 | 2022-04-08 | 中园园林股份有限公司 | 预制混凝土锁块机械衬砌护坡施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU8080691A (en) * | 1990-06-20 | 1992-01-07 | Savor ART Global Oy | A method for fixing an electrode arrangement to be used in the cathodic protection of concrete structures and a fixing element |
CN106939605A (zh) * | 2017-05-12 | 2017-07-11 | 山东大学 | 一种护坡砌块的搬运设备和搬运方法 |
CN207331618U (zh) * | 2017-10-26 | 2018-05-08 | 贵州智华建设工程有限责任公司 | 一种生态水利护坡 |
-
2020
- 2020-12-04 CN CN202011399171.8A patent/CN112681345A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU8080691A (en) * | 1990-06-20 | 1992-01-07 | Savor ART Global Oy | A method for fixing an electrode arrangement to be used in the cathodic protection of concrete structures and a fixing element |
CN106939605A (zh) * | 2017-05-12 | 2017-07-11 | 山东大学 | 一种护坡砌块的搬运设备和搬运方法 |
CN207331618U (zh) * | 2017-10-26 | 2018-05-08 | 贵州智华建设工程有限责任公司 | 一种生态水利护坡 |
Non-Patent Citations (1)
Title |
---|
RANBOLEE: "路基防护工程之喷播植草人字形骨架锚杆框架格子梁施工方案[优秀工程方案", 《豆丁建筑HTTPS://JZ.DOCIN.COM/P-2458715270.HTML》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114293511A (zh) * | 2022-01-28 | 2022-04-08 | 中园园林股份有限公司 | 预制混凝土锁块机械衬砌护坡施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612162B (zh) | 一种地铁车站深基坑开挖施工方法 | |
CN101906768B (zh) | 混凝土面板堆石坝的面板施工方法 | |
CN102359123B (zh) | 现浇混凝土电力排管施工方法 | |
CN108915696B (zh) | 一种隧道成套化机械设备施工组织方法 | |
CN108487297B (zh) | 一种地铁车站半盖挖施工中钢支撑架设的施工方法 | |
CN111576481A (zh) | 一种隧道洞口明洞加固施工方法 | |
CN111576431A (zh) | 四层地铁站基坑开挖方法 | |
CN110863498A (zh) | 一种紧邻地铁站的深基坑组合支护施工方法 | |
CN111455977A (zh) | 一种地下连续墙施工方法 | |
CN104594379A (zh) | 铁路站场内线间保温涵管系统及埋设施工方法 | |
CN113700018A (zh) | 一种大体积泵站沉井施工方法 | |
CN112681345A (zh) | 一种骨架护坡预制块安装工艺 | |
CN107100649B (zh) | 一种用于斜井混凝土浇筑的施工工艺 | |
CN109024670B (zh) | 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法 | |
CN207974149U (zh) | 预埋骨架劲芯砌体电缆沟 | |
CN116608323A (zh) | 一种全装配式混凝土排水管道快速施工设备及施工工法 | |
CN115262730A (zh) | 一种雨污水管道的施工方法 | |
CN107653787A (zh) | 一种保护跨越基坑的地下高压电缆箱涵的施工方法 | |
CN209779679U (zh) | 一种管廊节段的移位系统 | |
CN113550764A (zh) | 盾构混凝土套筒始发进洞方法及建筑结构 | |
CN108708370B (zh) | 高寒地区桥梁桩基的桩孔施工工艺 | |
CN110685719A (zh) | 一种双跨简支仰拱栈桥快速施工工法 | |
CN213839806U (zh) | 一种地面下方直埋管加固结构 | |
CN113232152B (zh) | 一种混凝土井室预制的方法 | |
CN217174817U (zh) | 一种复杂土层环境下深大基坑的复合支护体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210420 |
|
RJ01 | Rejection of invention patent application after publication |