CN112532472B - 一种相量测量单元上传延时的测试方法 - Google Patents
一种相量测量单元上传延时的测试方法 Download PDFInfo
- Publication number
- CN112532472B CN112532472B CN202011241375.9A CN202011241375A CN112532472B CN 112532472 B CN112532472 B CN 112532472B CN 202011241375 A CN202011241375 A CN 202011241375A CN 112532472 B CN112532472 B CN 112532472B
- Authority
- CN
- China
- Prior art keywords
- pmu
- time
- delay
- data
- master station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0852—Delays
- H04L43/0858—One way delays
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/22—Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
本发明公开了属于PMU测试技术领域的一种相量测量单元上传延时的测试方法。该方法首先在主站获取准确的时间源,从而得到主站接收到数据的准确时间;并提取出PMU输出数据中的时间戳;计算出主站接收到数据的时间与PMU输出数据中的时间戳之间的差值;同时考虑到通信的延时和主站处理数据的时间,计算出最终的上传延时。本发明可以自动,长期的在主站中测量出PMU的上传延时。
Description
技术领域
本发明属于PMU测试技术领域,特别涉及一种相量测量单元上传延时的测试方法。
背景技术
相量测量单元(PMU)是电力系统控制和保护应用的关键元件。在广域监控系统中,PMU的数量呈指数级增长。现代通信技术正成为支持分布式测量系统和电网控制应用的重要组成部分。由于适当的时间同步,远程PMU提供的测量值可以进行比较。此外,PMU的高上传速率允许跟踪电力系统的动态行为,因此有助于保证电力系统的安全。在这种情况下,必须知道每个测量何时可用,以及执行正确的控制操作需要多长时间。因此,测量出PMU的上传延迟(Latency)的十分必要的。
用于保护和控制电力系统电网的实时应用要求整个系统的延迟不会超过给定的最大值。对于通信延迟,内部和外部原因导致PMU和主站之间的通信延迟。针对PMU的报告延迟,所有的延迟都是PMU内部的采集、估计和传输过程导致的。测量算法所采用的窗口长度、滤波阶段和处理时间加在一起,就是最终的上传延迟。
发明内容
本发明的目的是提供一种相量测量单元上传延时的测试方法,其特征在于,所述测试方法包括如下步骤:
步骤1、得到准确的时间源,作为主站接收到PMU数据的时间;
步骤2、提取出主站接收到的PMU数据中的时间戳;
步骤3、计算出主站接收到PMU数据的时间与PMU数据中的时间戳之间的差值;根据标准定义,所测得的PMU的上传延时(Latency)可表示为:
Latency=t1-Tstamp
其中t1主站接收到PMU数据的GPS时间,这里是笔记本电脑的GPS时间;Tstamp是PMU输出数据的时间戳。
步骤4、考虑通信延时和主站处理数据的时间,并得出最后的上传延时;根据标准定义可表示为:
Latency’=t2-Tstamp
其中t2是数据离开输出端口的可用时间,定义为PMU通信接口处测量数据包的第一位转换的时间;Tstamp是PMU输出数据的时间戳。
所述步骤1中准确的时间源为采用的笔记本电脑的GPS时间。
所述步骤3中计算出主站接收到PMU数据的时间与PMU数据中的时间戳之间的差值;可以认为是从进行测量到从PMU发送测量的最大时间间隔。
所述PMU报告延迟定义为“应至少观察PMU输出20分钟,以确定最大延迟;如果所需的最大报告延迟出现上升或下降趋势,则需要进一步观察PMU输出的最大值,直到观察到局部最大值,趋势线的斜率变为零,或者超过最大允许报告延迟”。
本发明的有益效果是利用该方法可以在自动的,长期的在主站计算出PMU上传延时。
附图说明
图1为PMU上传延时测试方法流程示意图;
图2为本测试方法提供的的测试波形图。
具体实施方式
本发明提供一种相量测量单元上传延时的测试方法;下面结合实施例和附图,对本发明进行清楚、完整地描述。
如图1所示为PMU上传延时测试流程示意图,PMU上传延时测试流程包括:
步骤1、得到准确的时间源,作为主站接收到PMU数据的时间;
在该步骤中,为了正确评估延迟,PMU必须有一个准确的时间源,本测试采用了笔记本电脑的GPS时间。
步骤2、提取出主站接收到的PMU数据中的时间戳;
步骤3、计算出主站接收到PMU数据的时间与PMU数据中的时间戳之间的差值;
根据定义,PMU上传延时是从电力系统上的事件发生到数据报告的时间延迟,可以认为是从进行测量到从PMU发送测量的最大时间间隔。
标准IEEE 60255-118-1:2018,在关于测量报告延迟的第6.7小节中,将PMU报告延迟定义为“应至少观察PMU输出20分钟,以确定最大延迟;如果所需的最大报告延迟出现上升或下降趋势,则需要进一步观察PMU输出的最大值,直到观察到局部最大值,趋势线的斜率变为零,或者超过最大允许报告延迟”。
该标准根据报告速率Fs为两个性能类别的最大报告延迟提供了两个不同的限制。对于系统额定频率为50Hz、10帧、25帧和50帧/秒的Fs。保护应用程序专用的P类的限制(以秒为单位)等于2/Fs。M类,专门用于测量应用,其限制放宽到7/Fs,从而允许算法使用更多的周期,以获得更精确的测量结果。也就是说,对于50Hz系统和报告速率为50帧/秒的PMU,对于P类必须将延迟保持在40毫秒以下,对于M类必须保持在140毫秒以下。单个PMU的上传延时可以表示为:
Latency=t1-Tstamp
其中t1主站接收到PMU数据的GPS时间,这里是笔记本电脑的GPS时间。Tstamp是PMU输出数据的时间戳。
步骤4、考虑通信延时和主站处理数据的时间,并得出最后的上传延时;
标准IEEE C37.118.2[5]提出了将测量值发送到PDC的技术。第一代商用pmu实现了RS-232串行通信,但目前IP(Internet Protocol)通信被广泛使用,传输控制协议(TCP)和用户数据报协议(UDP)都被广泛采用。本发明将考虑基于以太网的IP/TCP和IP/UDP通信。
由于本测试是在一台电脑中用子站PMU的数据包发送数据,在主站中接收数据,所以测量的延迟中包括了通信延时和主站处理数据的时间,因为是在同一台电脑,所以通信延时可以忽略不计,附加的延时只有主站的处理时间(如图2所示),去掉附加的延时后,根据定义,单个PMU的上传延时则变为:
Latency’=t2-Tstamp
其中t2是数据离开输出端口的可用时间,定义为PMU通信接口处测量数据包的第一位转换的时间。Tstamp是PMU输出数据的时间戳。
经过计算,主站处理时间大约在在10-8到10-7s,可忽略不计,所以t1≈t2,Latency≈Latency’,可以认为测得的上传延时就是所要求的。测试结果如表1所示。
表1测试结果
综上所述,本申请所提供的方法可以自动的,长期的测量出PMU的上传延时,经过程序实现,可满足IEEE的标准。
Claims (1)
1.一种相量测量单元上传延时的测试方法,所述测试方法包括如下步骤:
步骤1、得到准确的时间源,作为主站接收到PMU数据的时间;
步骤2、提取出主站接收到的PMU数据中的时间戳;其特征在于,还包括:
步骤3、计算出主站接收到PMU数据的时间与PMU数据中的时间戳之间的差值;根据标准定义,所测得的PMU的上传延时Latency可表示为:
Latency=t1-Tstamp
其中t1主站接收到PMU数据的GPS时间,这里是笔记本电脑的GPS时间;Tstamp是PMU输出数据的时间戳;
步骤4、考虑通信延时和主站处理数据的时间,并得出最后的上传延时;根据标准定义可表示为:
Latency’=t2-Tstamp
其中t2是数据离开输出端口的可用时间,定义为PMU通信接口处测量数据包的第一位转换的时间;
测量主站处理时间和通信时间具体可表示为:
Latency’-Latency=t2-t1
PMU报告延迟定义为“应至少观察PMU输出20分钟,以确定最大延迟;如果所需的最大报告延迟出现上升或下降趋势,则需要进一步观察PMU输出的最大值,直到观察到局部最大值,趋势线的斜率变为零,或者超过最大允许报告延迟”。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011241375.9A CN112532472B (zh) | 2020-11-09 | 2020-11-09 | 一种相量测量单元上传延时的测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011241375.9A CN112532472B (zh) | 2020-11-09 | 2020-11-09 | 一种相量测量单元上传延时的测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112532472A CN112532472A (zh) | 2021-03-19 |
CN112532472B true CN112532472B (zh) | 2022-11-04 |
Family
ID=74980721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011241375.9A Active CN112532472B (zh) | 2020-11-09 | 2020-11-09 | 一种相量测量单元上传延时的测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112532472B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115529259A (zh) * | 2021-12-16 | 2022-12-27 | 四川高迪创智科技有限公司 | 一种新的信号延迟测量和同步方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102098155A (zh) * | 2011-03-18 | 2011-06-15 | 北京国智恒电力管理科技有限公司 | 基于ptp协议实现亚微秒级同步精度的方法 |
CN103427935A (zh) * | 2012-05-16 | 2013-12-04 | 中国科学院声学研究所 | 一种消除位置误差的网络时延测量方法及系统 |
CN103872769A (zh) * | 2012-12-09 | 2014-06-18 | 通用电气公司 | 用于同步相量数据管理的系统 |
CN204216917U (zh) * | 2014-11-10 | 2015-03-18 | 广州供电局有限公司 | 电力设备时间同步装置的同步精度监测系统 |
CN105703892A (zh) * | 2014-11-24 | 2016-06-22 | 管晓权 | 一种基于硬件时间戳实现ptp纳秒级精度的方法 |
CN108683472A (zh) * | 2018-05-09 | 2018-10-19 | 西安电子科技大学昆山创新研究院 | 一种基于延时测量的时钟同步方法 |
CN109818826A (zh) * | 2019-01-11 | 2019-05-28 | 西安电子科技大学工程技术研究院有限公司 | 一种网络路径延迟测量方法及其装置与时间同步系统 |
CN110708206A (zh) * | 2018-07-10 | 2020-01-17 | 普天信息技术有限公司 | 一种测量基站空口时延的方法和设备 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6141539A (en) * | 1999-01-27 | 2000-10-31 | Radio Frequency Systems Inc. | Isolation improvement circuit for a dual-polarization antenna |
JP2002223202A (ja) * | 2001-01-26 | 2002-08-09 | Fujitsu Ltd | データ伝送方法及びそれを用いた伝送装置 |
CN100381830C (zh) * | 2005-11-16 | 2008-04-16 | 上海华东电力信息工程技术有限公司 | 相量测量装置(pmu)现场校验方法 |
JP5228714B2 (ja) * | 2008-09-02 | 2013-07-03 | 富士通株式会社 | 時刻同期方法および中継装置 |
CN101958785B (zh) * | 2009-07-17 | 2013-01-02 | 中国科学院沈阳计算技术研究所有限公司 | 基于传递时差的数控系统现场总线时间同步方法及装置 |
EP2592757B1 (en) * | 2011-11-14 | 2017-04-26 | Telefonaktiebolaget LM Ericsson (publ) | Analog-to-digital converter |
CN103378993A (zh) * | 2012-04-20 | 2013-10-30 | 华东电网有限公司 | 基于ptp的从时钟监测方法 |
CN103033789B (zh) * | 2012-12-26 | 2015-12-09 | 华北电力大学 | 一种同步相量测量单元pmu的静动态测试系统 |
CN103024799B (zh) * | 2012-12-28 | 2015-09-30 | 清华大学 | 大范围无线传感网延迟分析方法 |
CN105577349A (zh) * | 2014-10-31 | 2016-05-11 | 中国飞行试验研究院 | 一种机载网络ieee1588协议主从时钟端口同步方法 |
CN104392069B (zh) * | 2014-12-11 | 2017-09-08 | 国家电网公司 | 一种广域测量系统时延特性建模方法 |
CN104618087B (zh) * | 2015-01-30 | 2018-07-17 | 国家电网公司 | 一种广域电网pmu数据时延精确测量的方法 |
CN106301624B (zh) * | 2016-07-26 | 2019-02-12 | 珠海许继电气有限公司 | 一种配电终端gprs无线数据传输延时自动测试方法 |
US10129950B1 (en) * | 2017-04-26 | 2018-11-13 | Abl Ip Holding Llc | Lighting relay panel features for improved safety and reliability |
CN108880946B (zh) * | 2018-08-03 | 2022-04-01 | 武汉大学 | 一种广域监测系统主站与pmu数据通信时延的估算方法 |
-
2020
- 2020-11-09 CN CN202011241375.9A patent/CN112532472B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102098155A (zh) * | 2011-03-18 | 2011-06-15 | 北京国智恒电力管理科技有限公司 | 基于ptp协议实现亚微秒级同步精度的方法 |
CN103427935A (zh) * | 2012-05-16 | 2013-12-04 | 中国科学院声学研究所 | 一种消除位置误差的网络时延测量方法及系统 |
CN103872769A (zh) * | 2012-12-09 | 2014-06-18 | 通用电气公司 | 用于同步相量数据管理的系统 |
CN204216917U (zh) * | 2014-11-10 | 2015-03-18 | 广州供电局有限公司 | 电力设备时间同步装置的同步精度监测系统 |
CN105703892A (zh) * | 2014-11-24 | 2016-06-22 | 管晓权 | 一种基于硬件时间戳实现ptp纳秒级精度的方法 |
CN108683472A (zh) * | 2018-05-09 | 2018-10-19 | 西安电子科技大学昆山创新研究院 | 一种基于延时测量的时钟同步方法 |
CN110708206A (zh) * | 2018-07-10 | 2020-01-17 | 普天信息技术有限公司 | 一种测量基站空口时延的方法和设备 |
CN109818826A (zh) * | 2019-01-11 | 2019-05-28 | 西安电子科技大学工程技术研究院有限公司 | 一种网络路径延迟测量方法及其装置与时间同步系统 |
Also Published As
Publication number | Publication date |
---|---|
CN112532472A (zh) | 2021-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9658259B2 (en) | System frequency measurement method, synchrophasor measurement method and device thereof | |
US20080031283A1 (en) | Time synchronization for network aware devices | |
Castello et al. | A new IED with PMU functionalities for electrical substations | |
Blair et al. | Measurement and analysis of PMU reporting latency for smart grid protection and control applications | |
Derviškadić et al. | The white rabbit time synchronization protocol for synchrophasor networks | |
WO2012075881A1 (zh) | 基于ieee1588多从钟的采样值多接口同步系统 | |
CN112532472B (zh) | 一种相量测量单元上传延时的测试方法 | |
CN114157377B (zh) | 一种配电终端实时时钟同步方法、同步系统及配电终端 | |
Ferrari et al. | Evaluation of timestamping uncertainty in a software-based IEEE1588 implementation | |
Lamonaca et al. | Time coordination of standalone measurement instruments by synchronized triggering | |
Li et al. | Time synchronization of white rabbit network based on kalman filter | |
Wu et al. | Enhancement for real-time Ethernet clock synchronization by internal processing delay measurement | |
Dervišskadić et al. | Impact of time dissemination technologies on synchrophasor estimation accuracy | |
JP6654498B2 (ja) | ディジタル保護継電装置及びディジタル保護継電システム | |
Ferrari et al. | Analysis of synchronization performance in redundant networks for substation automation | |
Pallares-Lopez et al. | Synchrophasor integration in IEC 61850 standard for SmartGrid and synchronism with PTP-base system | |
CN109709422B (zh) | 一种时钟漂移的消除方法及其装置 | |
Fletcher et al. | Smart clocks have a hand in the smart grid | |
CN111917503A (zh) | 用于提供时钟信号的方法和装置 | |
Castello et al. | A statistical investigation of PMU errors in current measurements | |
Raju et al. | Time synchronized diagnostic event data recording based on AUTOSAR | |
CN113300324B (zh) | 一种纵联差动保护同步方法及装置 | |
Duan et al. | Research of precision time protocol in intelligent switchgears | |
CN104901844A (zh) | 基于pcie的高精度时间戳获取方法、装置及网卡 | |
Peng et al. | An automatic evaluation system for IEEE1588 synchronization clock unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |