CN112360177A - 一种无粘结预应力混凝土结构梁板开洞方法 - Google Patents
一种无粘结预应力混凝土结构梁板开洞方法 Download PDFInfo
- Publication number
- CN112360177A CN112360177A CN202011058154.8A CN202011058154A CN112360177A CN 112360177 A CN112360177 A CN 112360177A CN 202011058154 A CN202011058154 A CN 202011058154A CN 112360177 A CN112360177 A CN 112360177A
- Authority
- CN
- China
- Prior art keywords
- prestressed
- concrete
- hole
- concrete structure
- tendons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了一种无粘结预应力混凝土结构梁板开洞方法,包括以下步骤:1)人工剔凿混凝土,找出预应力筋,邻跨设置预应力钢支撑反顶;2)安装与预应力筋相适配的开口锚具;3)依次切断同一孔洞内两端的预应力筋;4)拆除开洞位置混凝土。本发明通过“先锚后断、外加预应力钢支撑”的方法对无粘结预应力混凝土结构开洞,该方法可有效避免在截断预应力筋时钢绞线的弹性回缩,防止对保留结构造成不利影响。
Description
技术领域
本发明属于建筑施工中结构加固改造技术领域,具体涉及一种无粘结预应力混凝土结构梁板开洞方法。
背景技术
无粘结预应力混凝土结构是指配置与混凝土之间可保持相对滑动的无粘结预应力筋的后张法预应力,广泛用于七度以下抗震地区的大跨度梁板结构和无梁楼盖。近些年来因建筑物使用功能发生改变,对无粘结预应力混凝土结构的改造项目越来越多,尤其是梁板开洞拆除等改造。而对于无粘结预应力结构若按常规方法(先断后锚)拆除开洞,则在截断预应力筋时,突然释放预应力会引起钢绞线弹性回缩,导致另一端锚具失效并引发事故,对保留结构产生不利影响。因此,提出一种“先锚后断、外加预应力钢支撑”的方法对无粘结预应力混凝土结构开洞,可以很好的解决上述存在的不足问题。
发明内容
针对现有技术中存在的问题,本发明设计的目的在于提供一种粘结预应力混凝土结构梁板开洞方法,该方法采用先锚后断,外加预应力钢支撑,已解决传统开洞方法中存在的问题。
本发明通过以下技术方案加以实现:
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于包括以下步骤:
1)人工剔凿混凝土,找出预应力筋,邻跨设置预应力钢支撑反顶;
2)安装与预应力筋相适配的开口锚具;
3)依次切断同一孔洞内两端的预应力筋;
4)拆除开洞位置混凝土。
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤1)中人工剔凿混凝土具体为凿除宽度不小于1000mm,凿除混凝土时需保护好钢绞线外的保护胶套,凿除前对拆除部分结构做好临时支撑。
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤1)中的预应力钢支撑反顶设置在临跨的最低点处。
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤2)安装开口锚具前根据梁体内钢绞线的根数及间距,做好承压钢板,并将承压钢板从上到下套住预应力筋,用C45无收缩灌浆料恢复承压钢板前150-250mm凿除部分混凝土,并养护3-5天,待灌浆料强度达到设计强度后用与预应力筋相适配的开口模具将孔洞中的预应力筋锚固好,工作锚与承压钢板顶紧。
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤3)具体操作步骤为待同一孔洞内的预应力筋全部用开口锚具锁紧后,在切断预应力筋前,在开口锚具外侧再安装1个锚具,预应力筋切断后需重新张拉,切断点必须在新张拉点外侧。
所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤4)中拆除开洞位置混凝土需在预应力筋重新张拉封锚后进行。
本发明通过“先锚后断、外加预应力钢支撑”的方法对无粘结预应力混凝土结构开洞,该方法可有效避免在截断预应力筋时钢绞线的弹性回缩,防止对保留结构造成不利影响。
附图说明
图1-图5为施工过程图;
图中,1-预应力筋,2-预应力钢支撑,3-开口模具,4-承压钢板。
具体实施方式
以下结合说明书附图对本发明做进一步详细描述,并给出具体实施方式。
本发明一种无粘结预应力混凝土结构梁板开洞方法,采用无粘结预应力筋的先锚后断技术,即拆除前先将无粘结预应力钢绞线在梁的保留部分边缘端采用特制开口锚具先锚固后截断、再拆除的施工方法。开口锚具能使保留部分的预应力筋的应力状态不发生改变,从而保证剩余部分建筑的结构安全,包括以下步骤:
1)人工剔凿混凝土,找出预应力筋,邻跨设置预应力钢支撑反顶;如图1所示。
梁体开槽采用人工配合电镐凿除,凿除宽度不小于1000mm,凿除混凝土时需保护好钢绞线外的保护胶套。凿除之前对拆除部分结构做好临时支撑。预应力钢支撑反顶设置在临跨的最低点处。
2)安装与预应力筋相适配的开口锚具,如图2所示。
根据梁体内钢绞线的根数及间距,做好承压钢板。并将承压钢板从上向下套住预应力钢绞线,用C45无收缩灌浆料恢复承压板前约150-250mm凿除部分混凝土,并养护3~5天,等灌浆料强度达到设计强度后用特制开口锚具将孔洞中的预应力钢绞线锚固好,工作锚与承压钢板顶紧。
3)依次切断同一孔洞内两端的预应力筋,如图3-4所示。
待同一孔洞内的预应力钢绞线全部用开口锚具锁紧后,为消除切断预应力钢绞线时对其应力的影响,在切断预应力钢绞线前,需在开口锚具外侧再安装1个锚具,预应力筋切断后需重新张拉,切断点必须在新张拉点外侧。无粘结预应力钢绞线要求采用机械方法切断,不得采用氧气吹割等加温方法切断。切断后对预应力筋进行逐根张拉,并重新封锚。若预应力筋在梁跨中区域截断时需对梁凿开段端头三侧设置包钢板箍保护。
4)拆除开洞位置混凝土,如图5所示。
拆除开洞位置混凝土需在预应力筋重新张拉封锚后进行。
若预应力筋截断段处于梁中部位时,预应力筋处于梁下部,按上方要求重新浇筑张拉端灌浆料后,重新张拉前,需对梁底进行包钢板箍加固,两侧4M24对穿螺杆固定,底部4M24化学锚栓固定,钢板箍与混凝土梁面空隙涂刷粘钢胶。
预应力筋处理要求:
1)预应力筋处理前需先按方案要求设置好临时卸载钢支撑;
2)梁预应力筋逐条切断重新封锚,禁止同一区域内多根梁同时切断;
3)预应力筋重新张拉封锚展开施工之前必须先做好试验性处理,开凿后根据预应力实际状况修正处理方案。
Claims (6)
1.一种无粘结预应力混凝土结构梁板开洞方法,其特征在于包括以下步骤:
1)人工剔凿混凝土,找出预应力筋(1),邻跨设置预应力钢支撑(2)反顶;
2)安装与预应力筋(1)相适配的开口锚具(3);
3)依次切断同一孔洞内两端的预应力筋(1);
4)拆除开洞位置混凝土。
2.如权利要求1所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤1)中人工剔凿混凝土具体为凿除宽度不小于1000mm,凿除混凝土时需保护好钢绞线外的保护胶套,凿除前对拆除部分结构做好临时支撑。
3.如权利要求1所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤1)中的预应力钢支撑(2)设置在临跨的最低点处。
4.如权利要求1所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤2)安装开口锚具(3)前根据梁体内钢绞线的根数及间距,做好承压钢板(4),并将承压钢板(4)从上到下套住预应力筋,用C45无收缩灌浆料恢复承压钢板前150-250mm凿除部分混凝土,并养护3-5天,待灌浆料强度达到设计强度后用与预应力筋(1)相适配的开口模具(3)将孔洞中的预应力筋(1)锚固好,工作锚与承压钢板顶紧。
5.如权利要求1所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤3)具体操作步骤为待同一孔洞内的预应力筋(1)全部用开口锚具(3)锁紧后,在切断预应力筋(1)前,在开口锚具(3)外侧再安装1个锚具,预应力筋(1)切断后需重新张拉,切断点必须在新张拉点外侧。
6.如权利要求1所述的一种无粘结预应力混凝土结构梁板开洞方法,其特征在于步骤4)中拆除开洞位置混凝土需在预应力筋(1)重新张拉封锚后进行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011058154.8A CN112360177A (zh) | 2020-09-30 | 2020-09-30 | 一种无粘结预应力混凝土结构梁板开洞方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011058154.8A CN112360177A (zh) | 2020-09-30 | 2020-09-30 | 一种无粘结预应力混凝土结构梁板开洞方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112360177A true CN112360177A (zh) | 2021-02-12 |
Family
ID=74508309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011058154.8A Pending CN112360177A (zh) | 2020-09-30 | 2020-09-30 | 一种无粘结预应力混凝土结构梁板开洞方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112360177A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116660049A (zh) * | 2023-07-28 | 2023-08-29 | 达州华冠砼业有限公司 | 一种混凝土管道水压测试设备及方法 |
CN117266626A (zh) * | 2023-11-23 | 2023-12-22 | 北京市第三建筑工程有限公司 | 一种梁板同步拆除的高层建筑顶层楼板拆除方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012107429A (ja) * | 2010-11-17 | 2012-06-07 | Ihi Corp | プレストレストコンクリート構造物の施工方法 |
CN103147592A (zh) * | 2013-03-25 | 2013-06-12 | 湖南省建筑工程集团总公司 | 既有建筑部分拆除中无粘结预应力筋重锚及截断施工方法 |
CN103628698A (zh) * | 2013-12-09 | 2014-03-12 | 中国建筑一局(集团)有限公司 | 结构加固工程中预应力楼板开洞的施工方法 |
CN109441138A (zh) * | 2018-12-20 | 2019-03-08 | 中冶建筑研究总院有限公司 | 对既有预应力结构板的开洞方法 |
CN110778139A (zh) * | 2019-10-21 | 2020-02-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种无粘结预应力筋混凝土板局部开洞施工方法 |
-
2020
- 2020-09-30 CN CN202011058154.8A patent/CN112360177A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012107429A (ja) * | 2010-11-17 | 2012-06-07 | Ihi Corp | プレストレストコンクリート構造物の施工方法 |
CN103147592A (zh) * | 2013-03-25 | 2013-06-12 | 湖南省建筑工程集团总公司 | 既有建筑部分拆除中无粘结预应力筋重锚及截断施工方法 |
CN103628698A (zh) * | 2013-12-09 | 2014-03-12 | 中国建筑一局(集团)有限公司 | 结构加固工程中预应力楼板开洞的施工方法 |
CN109441138A (zh) * | 2018-12-20 | 2019-03-08 | 中冶建筑研究总院有限公司 | 对既有预应力结构板的开洞方法 |
CN110778139A (zh) * | 2019-10-21 | 2020-02-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种无粘结预应力筋混凝土板局部开洞施工方法 |
Non-Patent Citations (1)
Title |
---|
住房城乡建设部工程质量安全监管司: "《筑业10项新技术 2010修订版》", 31 March 2014, 中国城市出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116660049A (zh) * | 2023-07-28 | 2023-08-29 | 达州华冠砼业有限公司 | 一种混凝土管道水压测试设备及方法 |
CN116660049B (zh) * | 2023-07-28 | 2023-10-03 | 达州华冠砼业有限公司 | 一种混凝土管道水压测试设备及方法 |
CN117266626A (zh) * | 2023-11-23 | 2023-12-22 | 北京市第三建筑工程有限公司 | 一种梁板同步拆除的高层建筑顶层楼板拆除方法 |
CN117266626B (zh) * | 2023-11-23 | 2024-04-05 | 北京市第三建筑工程有限公司 | 一种梁板同步拆除的高层建筑顶层楼板拆除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112360177A (zh) | 一种无粘结预应力混凝土结构梁板开洞方法 | |
RU2690988C2 (ru) | Способ увеличения пространства под каменным арочным мостом и каменный арочный мост | |
WO2023056984A1 (en) | Waterproof structure and construction method for foundation pit support | |
CN113123629B (zh) | 既有结构抽柱后梁增大截面预应力加固施工方法 | |
JP2017115485A (ja) | 道路橋防護柵及びその設置工法 | |
CN110847041A (zh) | 一种节段预制拼装混凝土箱梁临时锚固结构及锚固方法 | |
CN113152339A (zh) | 一种混凝土护栏附着式不动模浇筑施工方法 | |
CN104763161B (zh) | 一种钢筋混凝土楼板后开洞加梁补强结构的施工方法 | |
CN111411978A (zh) | 相邻出矿巷道夹板式支护结构及其施工工艺 | |
CN110485314A (zh) | 一种运营状态下高速公路t梁拼宽结构及方法 | |
CN105672324B (zh) | 基于锚索与土钉的可回收装配式复合土钉墙支护的施工方法 | |
CN113756339A (zh) | 一种预应力锚索框架梁结构的施工方法 | |
CN111852063A (zh) | 大型建筑屋面翻新改造施工方法 | |
KR100814958B1 (ko) | 신축이음장치의 재설치공법 | |
KR102193641B1 (ko) | 박층 프리캐스트 포장 구조, 박층 프리캐스트 포장의 시공방법 | |
CN108798681B (zh) | 中洞法零距离穿越既有地铁车站的托换体系及其施工方法 | |
CN115949091A (zh) | 一种适用于叠落隧道桩基托换的桩基础结构及方法 | |
CN115026944A (zh) | 一种公路市政预应力混凝土预制箱梁预应力施工的方法 | |
CN211472128U (zh) | 一种连续性组合梁 | |
CN104818678A (zh) | 一种对简支空心板主梁抗弯加固的方法 | |
CN115467241A (zh) | 一种用于主塔拉索锚固区的缓粘结预应力施工方法 | |
CN219410537U (zh) | 一种倒t型盖梁防撞墙快速维修结构 | |
CN114197335B (zh) | 一种空心板梁桥的体外预应力加固结构的施工方法 | |
CN212983609U (zh) | 一种用于预制混凝土节段箱梁拼装的临时预应力锚固装置 | |
CN220705275U (zh) | 一种用于既有墙体开洞的加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210212 |