CN112347607A - 一种基于凸松弛的热电联合调度方法 - Google Patents

一种基于凸松弛的热电联合调度方法 Download PDF

Info

Publication number
CN112347607A
CN112347607A CN202010995024.0A CN202010995024A CN112347607A CN 112347607 A CN112347607 A CN 112347607A CN 202010995024 A CN202010995024 A CN 202010995024A CN 112347607 A CN112347607 A CN 112347607A
Authority
CN
China
Prior art keywords
dhs
constraint
heat
power
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010995024.0A
Other languages
English (en)
Other versions
CN112347607B (zh
Inventor
万灿
江艺宝
宋永华
余鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
State Grid Tianjin Electric Power Co Ltd
Original Assignee
Zhejiang University ZJU
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, State Grid Tianjin Electric Power Co Ltd filed Critical Zhejiang University ZJU
Priority to CN202010995024.0A priority Critical patent/CN112347607B/zh
Publication of CN112347607A publication Critical patent/CN112347607A/zh
Application granted granted Critical
Publication of CN112347607B publication Critical patent/CN112347607B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

本发明提供一种基于凸松弛的热电联合调度方法,该方法构建了一个简化的热动力学模型来描述区域供热系统中的水温变化,并利用锥松弛和多面体松弛的方法对模型中的非凸等式约束和双线性约束进行松弛从而获得一种凸化的CHPD模型,将基于该模型获得的松弛解进一步投影到了可行解空间,最终可提高CHPD的求解质量和计算性能。本发明建立了关于供热网络温度变化的简化热动力学模型,降低了传统供热网络建模方法中所用节点法的数学复杂度;利用二阶锥松弛和多面体松弛构建凸化的CHPD模型,充分模拟了DHS的水力和热力条件。本发明还提出一种自适应边界紧缩策略来提高松弛解的质量,能够快速有效地找到热电联合调度问题的局部最优解。

Description

一种基于凸松弛的热电联合调度方法
技术领域
本发明涉及一种热电联合调度方法,尤其设计一种基于凸松弛的热电联合调度方法。
背景技术
近年来,热电联产机组(Combined heat and power,CHP)和热泵的广泛应用加强了电力系统(electric power systems,EPS)和区域供热系统(district heatingsystems,DHS) 之间的能量交互。因此,采取有效的热电联合调度(Combined heat andpower dispatch,CHPD) 方法用于相互耦合的电力和区域供热系统的协调运行,可以促进整个系统的操作成本的最小化并且能提高可再生能源的消纳水平。
对于CHPD问题,需对供热网络中热水的分布与传热的过程进行建模。但是,考虑电网潮流和区域供热能流的CHPD问题在数学上属于非凸非线性规划或混合整数非线性规划,通常在有限时内很难求得该问题的最优解。为了解决CHPD问题,可采用的方法可以简单地分启发式迭代算法或模型假设这两类。然而,对于启发式迭代算法,已有的方法往往不把复杂的热流方程作为模型约束,或是只是针对特定场景并依赖于大量的经验来设计CHPD的可行策略,另外,还可能存在只获得该非凸问题的局部解且求解性能并不理想的问题。而对于模型假设的方法,供热网络通常会被简化为线性模型,这虽然能提高求解的计算速度,但是却以牺牲解的最优性为代价。因此,如何对CHPD进行建模,提高CHPD问题的求解质量和计算性能,是目前亟需解决的关键问题之一。
发明内容
针对以上问题,本发明提供了一种基于凸松弛的热电联合调度方法。
本发明所采用的技术方案如下:
一种基于凸松弛的热电联合调度方法,包括如下步骤:
1)建立电力系统运行约束条件与区域供热系统运行约束条件,形成带有复杂逻辑约束的非凸非线性热电联合调度模型。
2)基于区域供热系统的热动力学模型形成简化的供热网络温度变化约束,代替步骤1) 中的复杂逻辑约束形成新的热电联合调度模型。
3)利用二阶锥松弛和多面体松弛,形成凸化的热电联合调度模型。
4)利用步骤3)中的凸化的热电联合调度模型获得热电联合调度的松弛解。
5)固定步骤4)中松弛解的管道流量,重新求解热电联合调度问题获得可行解。
6)判断步骤5)中得到的可行解是否达到局部最优解,如果达到,则终止程序并输出最终解;如果未达到,则根据边界紧缩策略减小流量变量的边界范围,并回到步骤3)重新迭代计算。
上述技术方案中,作为优选,所述步骤1)中的电力系统运行约束条件包括:
a.EPS母线节点有功功率约束:
Figure RE-GDA0002825392780000011
式中,Pj,t为EPS母线节点j的净有功功率,J为EPS母线集合,T为调度时段的集合,Gj、Cj、Pj、Wj、Hj分别为与EPS母线节点j相连的燃气发电机组、热电联产机组、光伏电站、风电场、热泵的集合,
Figure RE-GDA0002825392780000021
为与EPS母线j相耦合的水泵对应的DHS的管道集合Pj,t为EPS母线节点j时流出的有功功率,
Figure RE-GDA0002825392780000022
为第g个燃气发电机组的有功功率,
Figure RE-GDA0002825392780000023
为第c个热电联产机组的有功功率,
Figure RE-GDA0002825392780000024
为第p个光伏电站的预测有功功率,
Figure RE-GDA0002825392780000025
为第w 个风电场的预测有功功率,
Figure RE-GDA0002825392780000026
为在DHS的管道(k,l)上的水泵消耗的有功功率,
Figure RE-GDA0002825392780000027
为第 h个热泵消耗的有功功率,
Figure RE-GDA0002825392780000028
为第j个电负荷消耗的有功功率;
b.EPS母线节点无功功率约束:
Figure RE-GDA0002825392780000029
式中,Qj,t为EPS母线节点j流出的无功功率,
Figure RE-GDA00028253927800000210
为第g个燃气发电机组的无功功率,
Figure RE-GDA00028253927800000211
为第c个热电联产机组的无功功率,
Figure RE-GDA00028253927800000212
为第p个光伏电站的预测无功功率,
Figure RE-GDA00028253927800000213
为第w个风电场的预测无功功率,
Figure RE-GDA00028253927800000214
为第j个电负荷消耗的无功功率;
c.二阶锥松弛后的EPS配电网潮流约束:
Figure RE-GDA00028253927800000215
Figure RE-GDA00028253927800000216
Figure RE-GDA00028253927800000217
Figure RE-GDA00028253927800000218
式中,E为EPS支路的集合,Pij,t、Qij,t分别为t时刻从母线i流向母线j的有功功率、无功功率,rij、xij分别为EPS支路(i,j)的电阻和电抗,Iij,t为t时刻EPS支路(i,j)流过的电流幅值的平方,Vj,t为t时刻EPS母线j的电压幅值的平方;
d.燃气发电机组运行约束:
Figure RE-GDA00028253927800000219
Figure RE-GDA00028253927800000220
式中,G为所有燃气发电机组的集合,
Figure RE-GDA0002825392780000031
分别为燃气发电机组的最小、最大有功功率输出,
Figure RE-GDA0002825392780000032
分别为燃气发电机组的最小、最大无功功率输出,
Figure RE-GDA0002825392780000033
分别为第g个燃气发电机组的最大有功功率向下、向上爬坡率,
Figure RE-GDA0002825392780000034
分别为第g 个燃气发电机组的最大无功功率向下、向上爬坡率;
e.CHP运行约束:
Figure RE-GDA0002825392780000035
Figure RE-GDA0002825392780000036
式中,C为所有热电联产机组的集合,
Figure RE-GDA0002825392780000037
分别为热电联产机组的最小、最大有功功率输出,
Figure RE-GDA0002825392780000038
分别为热电联产机组的最小、最大无功功率输出,
Figure RE-GDA0002825392780000039
为第c个热电联产机组的最大有功功率爬坡率,
Figure RE-GDA00028253927800000310
为第c个热电联产机组的最大无功功率爬坡率;
Figure RE-GDA00028253927800000311
分别为第c个热电联产机组的最大有功功率向下、向上爬坡率,
Figure RE-GDA00028253927800000312
分别为第c个热电联产机组的最大无功功率向下、向上爬坡率;
f.热泵运行约束:
Figure RE-GDA00028253927800000313
Figure RE-GDA00028253927800000314
式中,H为所有热泵的集合,
Figure RE-GDA00028253927800000315
分别为热泵的最小、最大有功功率输出,
Figure RE-GDA00028253927800000316
Figure RE-GDA00028253927800000317
分别为第h个热泵的最大有功功率向下、向上爬坡率;
g.光伏电站运行约束:
Figure RE-GDA00028253927800000318
式中,P为所有光伏电站的集合,
Figure RE-GDA00028253927800000319
为t时刻光伏电站最大的有功功率输出;
h.风电场运行约束:
Figure RE-GDA00028253927800000320
式中,W为所有风电场的集合,
Figure RE-GDA00028253927800000321
为t时刻风电场最大的有功功率输出,
Figure RE-GDA00028253927800000322
为风电场输出无功功率与输出有功功率的比值;
i.电力系统电压、电流约束:
Figure RE-GDA00028253927800000323
Figure RE-GDA0002825392780000041
式中,V j
Figure RE-GDA0002825392780000042
为EPS母线j的电压幅度平方的最小值与最大值,
Figure RE-GDA0002825392780000043
为EPS支路(i,j)电流平方的最大值;
所述区域供热系统运行约束条件包括:
a.DHS流量约束:
Figure RE-GDA0002825392780000044
Figure RE-GDA0002825392780000045
Figure RE-GDA0002825392780000046
式中,N为DHS的节点集合,B为DHS的管道集合,
Figure RE-GDA0002825392780000047
分别为t时刻DHS节点 k的注入流量、流出流量,mkl,t、mjk,t分别为t时刻DHS管道(k,l)、(j,k)的流量,m kl
Figure RE-GDA0002825392780000048
分别为t时刻DHS管道(k,l)的最小、最大流量,m k
Figure RE-GDA0002825392780000049
分别为t时刻DHS节点k 的最小、最大流量;
b.DHS管道压力损失约束:
Figure RE-GDA00028253927800000410
式中,
Figure RE-GDA00028253927800000411
分别为t时刻DHS节点k的供水压力、回水压力,μkl为DHS管道(k,l)的摩擦损耗;
c.热交换器压力损失约束:
Figure RE-GDA00028253927800000412
式中,Ak为DHS节点k的定值系数,与节点k的损失系数、热交换器的横截面积、水的密度、重力加速度有关;
d.DHS阀门压力调节约束:
Figure RE-GDA00028253927800000413
式中,BVL为DHS中安装有阀门的管道集合,
Figure RE-GDA00028253927800000414
为t时刻DHS管道(k,l)的阀门所处的压差;
e.DHS水泵压力调节约束:
Figure RE-GDA00028253927800000415
式中,BWP为装有水泵的管道的集合,wkl,t为t时刻DHS管道(k,l)水泵的相对转数,
Figure RE-GDA00028253927800000416
Figure RE-GDA0002825392780000051
为对水泵进行数学建模后根据经验数据估计得到的系数,可分别取99.02、57.74,cPa为压力水头(水的高度与其特定压力有关,单位为米)到压力(Pa)的转化系数,ρ为水的密度;
f.DHS水泵电功率消耗约束:
Figure RE-GDA0002825392780000052
式中,
Figure RE-GDA0002825392780000053
为DHS管道(k,l)上水泵的效率,
Figure RE-GDA0002825392780000054
为DHS管道(k,l)上水泵的有功功率最大值;
g.DHS节点压力约束:
Figure RE-GDA0002825392780000055
式中,
Figure RE-GDA0002825392780000056
分别为DHS节点k的供水网络压力的最小值与最大值,
Figure RE-GDA0002825392780000057
分别为DHS节点k的回水网络压力的最小值与最大值;
h.热源产热约束:
Figure RE-GDA0002825392780000058
式中,
Figure RE-GDA0002825392780000059
分别为t时刻第c个热电联产机组、第h个热泵的热功率输出,
Figure RE-GDA00028253927800000510
Figure RE-GDA00028253927800000511
分别为第c个热电联产机组、第h个热泵的电热比;
i.DHS节点温度变化约束:
Figure RE-GDA00028253927800000512
Figure RE-GDA00028253927800000513
式中,Ck为DHS节点k上的热电联产机组的集合,Hk为DHS节点k上的热泵的集合,
Figure RE-GDA00028253927800000514
分别为t时刻DHS节点k从热源处获得的供水温度与回水网络中的节点温度,
Figure RE-GDA00028253927800000515
Figure RE-GDA00028253927800000516
分别为t时刻DHS节点k的供水网络中的节点温度与经过热负荷后的回水温度,
Figure RE-GDA00028253927800000517
为 t时刻DHS节点k的热负荷,c为水的比热容;
j.管道温度平衡约束
Figure RE-GDA00028253927800000518
Figure RE-GDA00028253927800000519
式中,
Figure RE-GDA0002825392780000061
分别为DHS管道(k,l)在供水网络与回水网络中的出口温度;
k.管道入口温度约束:
Figure RE-GDA0002825392780000062
l.管道出口温度约束:
所述管道出口温度约束分为供热网络管道出口温度约束与回水网络管道出口温度约束,其中,供热网络管道出口温度约束为:
Figure RE-GDA0002825392780000063
Figure RE-GDA0002825392780000064
Figure RE-GDA0002825392780000065
Figure RE-GDA0002825392780000066
Figure RE-GDA0002825392780000067
Figure RE-GDA0002825392780000068
Figure RE-GDA0002825392780000069
Figure RE-GDA00028253927800000610
Figure RE-GDA00028253927800000611
式中,
Figure RE-GDA00028253927800000612
为t时刻供水网络中管道(k,l)不考虑损耗时的出口温度,Δt为时间间隔,
Figure RE-GDA00028253927800000613
为辅助时间变量,Mkl为供水网络中管道(k,l)中水的总质量,
Figure RE-GDA00028253927800000614
为辅助流量变量,Akl为管道(k,l)的横截面积,λkl管道(k,l)的热传递系数,
Figure RE-GDA00028253927800000615
为t时刻周围地面温度;
回水网络管道出口温度约束与供水网络管道出口温度约束相似;
m.DHS节点温度限制
Figure RE-GDA0002825392780000071
式中,
Figure RE-GDA0002825392780000072
分别为DHS节点k的供水温度下限、供水温度上限,
Figure RE-GDA0002825392780000073
分别为DHS节点k的回水温度下限、回水温度上限;
所述的复杂逻辑约束为式(32)-(39);
所述的非凸非线性热电联合调度模型为式(1)-(40)。
作为优选,所述步骤2)中的区域供热系统的热动力学模型为考虑流量流动速度和对流热影响的偏微分方程:
Figure RE-GDA0002825392780000074
式中,T为温度,m为流量,TGD为周围地面温度,λ为热传递系数,A为管道的横截面积;
所述简化的供热网络温度变化约束为,在时间t和距离x上,使用一阶微分逼近式(41) 中的偏导数并进行离散化,应用于每个管道以及每个时刻所得到的约束:
Figure RE-GDA0002825392780000075
式中,Lkl为DHS管道(k,l)的长度;
Figure RE-GDA0002825392780000076
Figure RE-GDA0002825392780000077
Figure RE-GDA0002825392780000078
所述的新的热电联合调度模型为式(1)-(31),(40),(42)-(45)。
作为优选,所述步骤3)中的二阶锥松弛,指对二次等式约束式(20)、(21)进行松弛,获得松弛后的约束:
Figure RE-GDA0002825392780000079
Figure RE-GDA00028253927800000710
所述的多面体松弛,指对双线性项式(24)、(27)-(30)、(42)、(44)进行松弛,由于双线性项具有相同的r=kpq的形式,其中,r、p、q为变量,k为常数,因此,以松弛式(28)为例,获得松弛后的约束:
Figure RE-GDA00028253927800000711
Figure RE-GDA0002825392780000081
Figure RE-GDA0002825392780000082
Figure RE-GDA0002825392780000083
所述的凸化的热电联合调度模型为在热电联合调度模型(1)-(31),(40),(42) -(45)的基础上,对二次等式约束式(20)、(21)以及双线性项式(24)、(27)-(30)、 (42)、(44)进行松弛后所得到的模型。
作为优选,所述步骤6)中判断步骤5)中得到的可行解是否达到局部最优解的方法,指在每次迭代中通过所述步骤4)和步骤5)分别获得目标函数的下界obj和上界
Figure RE-GDA0002825392780000084
当上界和下界的相对差值小于给定的一个极小的数ε时,即
Figure RE-GDA0002825392780000085
则步骤5)中得到的可行解达到了局部最优解,否则未达到,其中,ε的取值根据计算时间和计算精度确定,可取0.01。
作为优选,所述步骤6)中的边界紧缩策略具体如下:首先将所有流量变量
Figure RE-GDA0002825392780000086
的上边界记为
Figure RE-GDA0002825392780000087
初值为
Figure RE-GDA0002825392780000088
所有流量变量的下边界记为
Figure RE-GDA0002825392780000089
初值为
Figure RE-GDA00028253927800000810
步骤4)中所获得的管道流量记为
Figure RE-GDA00028253927800000811
同时设定自定义的边界紧缩因子
Figure RE-GDA00028253927800000812
其中,边界紧缩因子大于0小于1,一般可取0.2,然后,对变量的边界进行紧缩,如下所示:
Figure RE-GDA00028253927800000813
Figure RE-GDA00028253927800000814
最后,将计算得到的流量变量上边界与下边界作为之后迭代运算的流量变量上边界与下边界,从而减小流量变量的边界范围。
本发明的一种基于凸松弛的热电联合调度方法,没有任何运行状态的假设,同时,构建了一个简化的热动力学模型来描述区域供热系统中的水温变化,并利用锥松弛和多面体松弛的方法对模型中的非凸等式约束和双线性约束进行松弛从而获得一种凸化的CHPD模型,将基于该模型获得的松弛解进一步投影到了可行解空间,最终可提高CHPD的求解质量和计算性能。相比于传统的热电联合调度方法,本发明具有如下优点:
1)本发明提出了一种全新的凸化的CHPD模型,且不需要假设供热网络需要固定质量流量,该模型联合优化了EPS和DHS的运行策略,计算效率高,并大大提高了求解质量。
2)本发明建立了关于供热网络温度变化的简化热动力学模型,降低了传统供热网络建模方法中所用节点法的数学复杂度。
3)本发明利用二阶锥松弛和多面体松弛构建了凸化的CHPD模型,充分模拟了DHS的水力和热力条件。
4)本发明提出一种自适应边界紧缩策略来提高松弛解的质量,能够快速有效地找到热电联合调度问题的局部最优解。
附图说明
图1是基于凸松弛的热电联合调度方法流程图。
具体实施方案
下面结合附图,对本发明进行进一步的详细说明。
一种基于凸松弛的热电联合调度方法,包括如下步骤,如图1所示:
1)建立电力系统运行约束条件与区域供热系统运行约束条件,形成带有复杂逻辑约束的非凸非线性热电联合调度模型。
所述的电力系统内包含电力网络、燃气发电机组、热电联产机组、光伏电站、风电场、热泵、水泵等,所述的电力系统运行约束条件包括:
a.EPS母线节点有功功率约束:
Figure RE-GDA0002825392780000091
式中,Pj,t为EPS母线节点j的净有功功率,J为EPS母线集合,T为所有调度时段的集合,Gj、Cj、Pj、Wj、Hj分别为与EPS母线节点j相连的燃气发电机组、热电联产机组、光伏电站、风电场、热泵的集合,
Figure RE-GDA0002825392780000092
为与EPS母线j相耦合的水泵对应的DHS 的管道集合Pj,t为EPS母线节点j时流出的有功功率,
Figure RE-GDA0002825392780000093
为第g个燃气发电机组的有功功率,
Figure RE-GDA0002825392780000094
为第c个热电联产机组的有功功率,
Figure RE-GDA0002825392780000095
为第p个光伏电站的预测有功功率,
Figure RE-GDA0002825392780000096
为第w个风电场的预测有功功率,
Figure RE-GDA0002825392780000097
为在DHS的管道(k,l)上的水泵消耗的有功功率,
Figure RE-GDA0002825392780000098
为第h个热泵消耗的有功功率,
Figure RE-GDA0002825392780000099
为第j个电负荷消耗的有功功率;
b.EPS母线节点无功功率约束:
Figure RE-GDA00028253927800000910
式中,Qj,t为EPS母线节点j流出的无功功率,
Figure RE-GDA00028253927800000911
为第g个燃气发电机组的无功功率,
Figure RE-GDA00028253927800000912
为第c个热电联产机组的无功功率,
Figure RE-GDA00028253927800000913
为第p个光伏电站的预测无功功率,
Figure RE-GDA00028253927800000914
为第w个风电场的预测无功功率,
Figure RE-GDA00028253927800000915
为第j个电负荷消耗的无功功率;
c.二阶锥松弛后的EPS配电网潮流约束:
Figure RE-GDA00028253927800000916
Figure RE-GDA00028253927800000917
Figure RE-GDA00028253927800000918
Figure RE-GDA0002825392780000101
式中,E为EPS支路的集合,Pij,t、Qij,t分别为t时刻从母线i流向母线j的有功功率、无功功率,rij、xij分别为EPS支路(i,j)的电阻和电抗,Iij,t为t时刻EPS支路(i,j)流过的电流幅值的平方,Vj,t为t时刻EPS母线j的电压幅值的平方;
d.燃气发电机组运行约束:
Figure RE-GDA0002825392780000102
Figure RE-GDA0002825392780000103
式中,G为所有燃气发电机组的集合,
Figure RE-GDA0002825392780000104
分别为燃气发电机组的最小、最大有功功率输出,
Figure RE-GDA0002825392780000105
分别为燃气发电机组的最小、最大无功功率输出,
Figure RE-GDA0002825392780000106
分别为第g个燃气发电机组的最大有功功率向下、向上爬坡率,
Figure RE-GDA0002825392780000107
分别为第g 个燃气发电机组的最大无功功率向下、向上爬坡率;
e.CHP运行约束:
Figure RE-GDA0002825392780000108
Figure RE-GDA0002825392780000109
式中,C为所有热电联产机组的集合,
Figure RE-GDA00028253927800001010
分别为热电联产机组的最小、最大有功功率输出,
Figure RE-GDA00028253927800001011
分别为热电联产机组的最小、最大无功功率输出,
Figure RE-GDA00028253927800001012
为第c个热电联产机组的最大有功功率爬坡率,
Figure RE-GDA00028253927800001013
为第c个热电联产机组的最大无功功率爬坡率;
Figure RE-GDA00028253927800001014
分别为第c个热电联产机组的最大有功功率向下、向上爬坡率,
Figure RE-GDA00028253927800001015
分别为第c个热电联产机组的最大无功功率向下、向上爬坡率;
f.热泵运行约束:
Figure RE-GDA00028253927800001016
Figure RE-GDA00028253927800001017
式中,H为所有热泵的集合,
Figure RE-GDA00028253927800001018
分别为热泵的最小、最大有功功率输出,
Figure RE-GDA00028253927800001019
Figure RE-GDA0002825392780000111
分别为第h个热泵的最大有功功率向下、向上爬坡率;
g.光伏电站运行约束:
Figure RE-GDA0002825392780000112
式中,P为所有光伏电站的集合,
Figure RE-GDA0002825392780000113
为t时刻光伏电站最大的有功功率输出;
h.风电场运行约束:
Figure RE-GDA0002825392780000114
式中,W为所有风电场的集合,
Figure RE-GDA0002825392780000115
为t时刻风电场最大的有功功率输出,
Figure RE-GDA0002825392780000116
为风电场输出无功功率与输出有功功率的比值;
i.电力系统电压、电流约束:
Figure RE-GDA0002825392780000117
Figure RE-GDA0002825392780000118
式中,V j
Figure RE-GDA0002825392780000119
为EPS母线j的电压幅度平方的最小值与最大值,
Figure RE-GDA00028253927800001110
为EPS支路(i,j)电流平方的最大值;
所述的区域供热系统运包括供热网络、热交换器、阀门、水泵、热电联产机组、热泵,所述区域供热系统运行约束条件包括:
a.DHS流量约束:
Figure RE-GDA00028253927800001111
Figure RE-GDA00028253927800001112
Figure RE-GDA00028253927800001113
式中,N为DHS的节点集合,B为DHS的管道集合,
Figure RE-GDA00028253927800001114
分别为t时刻DHS节点 k的注入流量、流出流量,mkl,t、mjk,t分别为t时刻DHS管道(k,l)、(j,k)的流量,m kl
Figure RE-GDA00028253927800001115
分别为t时刻DHS管道(k,l)的最小、最大流量,m k
Figure RE-GDA00028253927800001116
分别为t时刻DHS节点k 的最小、最大流量;
b.DHS管道压力损失约束:
Figure RE-GDA00028253927800001117
式中,
Figure RE-GDA00028253927800001118
分别为t时刻DHS节点k的供水压力、回水压力,μkl为DHS管道(k,l)的摩擦损耗;
c.热交换器压力损失约束:
Figure RE-GDA0002825392780000121
式中,Ak为DHS节点k的定值系数,与节点k的损失系数、热交换器的横截面积、水的密度、重力加速度有关;
d.DHS阀门压力调节约束:
Figure RE-GDA0002825392780000122
式中,BVL为DHS中安装有阀门的管道集合,
Figure RE-GDA0002825392780000123
为t时刻DHS管道(k,l)的阀门所处的压差;
e.DHS水泵压力调节约束:
Figure RE-GDA0002825392780000124
式中,BWP为装有水泵的管道的集合,wkl,t为t时刻DHS管道(k,l)水泵的相对转数,
Figure RE-GDA0002825392780000125
为对水泵进行数学建模后根据经验数据进行估计的系数,可分别取99.02、57.74,cPa为压力水头(水的高度与其特定压力有关,单位为米)到压力(Pa)的转化系数,ρ为水的密度;
f.DHS水泵电功率消耗约束:
Figure RE-GDA0002825392780000126
式中,
Figure RE-GDA0002825392780000127
为DHS管道(k,l)上水泵的效率,
Figure RE-GDA0002825392780000128
为DHS管道(k,l)上水泵的有功功率最大值;
g.DHS节点压力约束:
Figure RE-GDA0002825392780000129
式中,
Figure RE-GDA00028253927800001210
分别为DHS节点k的供水网络压力的最小值与最大值,
Figure RE-GDA00028253927800001211
分别为DHS节点k的回水网络压力的最小值与最大值;
h.热源产热约束:
Figure RE-GDA00028253927800001212
式中,
Figure RE-GDA00028253927800001213
分别为t时刻第c个热电联产机组、第h个热泵的热功率输出,
Figure RE-GDA00028253927800001214
Figure RE-GDA00028253927800001215
分别为第c个热电联产机组、第h个热泵的电热比;
i.DHS节点温度变化约束:
Figure RE-GDA0002825392780000131
Figure RE-GDA0002825392780000132
式中,Ck为DHS节点k上的热电联产机组的集合,Hk DHS节点k上的热泵的集合,
Figure RE-GDA0002825392780000133
Figure RE-GDA0002825392780000134
分别为t时刻DHS节点k从热源处获得的供水温度与回水网络中的节点温度,
Figure RE-GDA0002825392780000135
分别为t时刻DHS节点k的供水网络中的节点温度与经过热负荷后的回水温度,
Figure RE-GDA0002825392780000136
为t时刻DHS节点k的热负荷,c为水的比热容;
j.管道温度平衡约束
Figure RE-GDA0002825392780000137
Figure RE-GDA0002825392780000138
式中,
Figure RE-GDA0002825392780000139
分别为DHS管道(k,l)在供水网络与回水网络中的出口温度;
k.管道入口温度约束:
Figure RE-GDA00028253927800001310
l.管道出口温度约束:
所述管道出口温度约束分为供热网络管道出口温度约束与回水网络管道出口温度约束,其中,供热网络管道出口温度约束为:
Figure RE-GDA00028253927800001311
Figure RE-GDA00028253927800001312
Figure RE-GDA00028253927800001313
Figure RE-GDA00028253927800001314
Figure RE-GDA00028253927800001315
Figure RE-GDA0002825392780000141
Figure RE-GDA0002825392780000142
Figure RE-GDA0002825392780000143
式中,
Figure RE-GDA0002825392780000144
为t时刻供水网络中管道(k,l)不考虑损耗时的出口温度,Δt为时间间隔,
Figure RE-GDA0002825392780000145
为辅助时间变量,Mkl为供水网络中管道(k,l)中水的总质量,
Figure RE-GDA0002825392780000146
为辅助流量变量,Akl为管道(k,l)的横截面积,λkl管道(k,l)的热传递系数,
Figure RE-GDA0002825392780000147
为t时刻周围地面温度;
回水网络管道出口温度约束与供水网络管道出口温度约束相似;
m.DHS节点温度限制
Figure RE-GDA0002825392780000148
式中,
Figure RE-GDA0002825392780000149
分别为DHS节点k的供水温度下限、供水温度上限,
Figure RE-GDA00028253927800001410
分别为DHS节点k的回水温度下限、回水温度上限;
所述的复杂逻辑约束为式(32)-(39);
所述的非凸非线性热电联合调度模型为式(1)-(40)。
2)基于区域供热系统的热动力学模型形成简化的供热网络温度变化约束,代替步骤1) 中的复杂逻辑约束形成新的热电联合调度模型。
所述的区域供热系统的热动力学模型为考虑流量流动速度和对流热影响的偏微分方程:
Figure RE-GDA00028253927800001411
式中,T为温度,m为流量,TGD为周围地面温度,λ为热传递系数,A为管道的横截面积;
所述简化的供热网络温度变化约束为,在时间t和距离x上,使用一阶微分逼近式(41) 中的偏导数并进行离散化,应用于每个管道以及每个时刻所得到的约束:
Figure RE-GDA00028253927800001412
式中,Lkl为DHS管道(k,l)的长度;
Figure RE-GDA0002825392780000151
Figure RE-GDA0002825392780000152
Figure RE-GDA0002825392780000153
所述的新的热电联合调度模型为式(1)-(31),(40),(42)-(45)。
3)利用二阶锥松弛和多面体松弛,形成凸化的热电联合调度模型。
所述的二阶锥松弛,指对二次等式约束式(20)、(21)进行松弛,获得松弛后的约束:
Figure RE-GDA0002825392780000154
Figure RE-GDA0002825392780000155
所述的多面体松弛,指对双线性项式(24)、(27)-(30)、(42)、(44)进行松弛,由于双线性项具有相同的r=kpq的形式,其中,r、p、q为变量,k为常数,因此,以松弛式(28)为例,获得松弛后的约束:
Figure RE-GDA0002825392780000156
Figure RE-GDA0002825392780000157
Figure RE-GDA0002825392780000158
Figure RE-GDA0002825392780000159
所述的凸化的热电联合调度模型为在热电联合调度模型(1)-(31),(40),(42) -(45)的基础上,对二次等式约束式(20)、(21)以及双线性项式(24)、(27)-(30)、 (42)、(44)进行松弛后所得到的模型。
4)利用步骤3)中的凸化的热电联合调度模型获得热电联合调度的松弛解。由于整个 CHPD问题为二阶锥规划,故可在MATLAB软件上安装“yalmip”的工具包,通过yalmip调用Cplex求解器对该CHPD问题进行快速求解,获得的松弛解是包括管道流量、管道温度、机组出力等所有变量在内的解。
5)固定步骤4)中松弛解的管道流量,重新求解热电联合调度问题获得可行解。
6)判断步骤5)中得到的可行解是否达到局部最优解,如果达到,则终止程序并输出最终解;如果未达到,则根据边界紧缩策略减小流量变量的边界范围,并回到步骤3)重新迭代计算。
所述的判断步骤5)中得到的可行解是否达到局部最优解的方法,指在每次迭代中通过所述步骤4)和步骤5)分别获得目标函数的下界obj和上界
Figure RE-GDA00028253927800001510
当上界和下界的相对差值小于给定的一个极小的数ε时,即
Figure RE-GDA00028253927800001511
则步骤5)中得到的可行解达到了局部最优解,否则未达到,其中,ε的取值根据计算时间和计算精度确定,可取0.01。
所述的步骤6)中根据边界紧缩策略减小流量变量的边界范围的方法具体如下:首先将所有流量变量
Figure RE-GDA0002825392780000161
的上边界记为
Figure RE-GDA0002825392780000162
初值为
Figure RE-GDA0002825392780000163
所有流量变量的下边界记为
Figure RE-GDA0002825392780000164
初值为
Figure RE-GDA0002825392780000165
步骤4)中所获得的管道流量记为
Figure RE-GDA0002825392780000166
同时设定自定义的边界紧缩因子
Figure RE-GDA0002825392780000167
其中,边界紧缩因子
Figure RE-GDA0002825392780000168
Figure RE-GDA0002825392780000169
均大于0小于1,然后,对变量的边界进行紧缩,如下所示:
Figure RE-GDA00028253927800001610
Figure RE-GDA00028253927800001611
最后,将计算得到的流量变量上边界与下边界作为之后迭代运算的流量变量上边界与下边界,从而减小流量变量的边界范围。

Claims (5)

1.一种基于凸松弛的热电联合调度方法,其特征在于:该方法包括如下步骤:
步骤1):建立电力系统运行约束条件与区域供热系统运行约束条件,形成带有复杂逻辑约束的非凸非线性热电联合调度模型;
步骤2):基于区域供热系统的热动力学模型形成简化的供热网络温度变化约束,代替步骤1)中的复杂逻辑约束形成新的热电联合调度模型;
步骤3):利用二阶锥松弛和多面体松弛,形成凸化的热电联合调度模型;
步骤4):利用步骤3)中的凸化的热电联合调度模型获得热电联合调度的松弛解;
步骤5):固定步骤4)中松弛解的管道流量,重新求解热电联合调度问题获得可行解;
步骤6):判断步骤5)中得到的可行解是否达到局部最优解,如果达到,则终止程序并输出最终解;如果未达到,则根据边界紧缩策略减小流量变量的边界范围,并回到步骤3)重新迭代计算。
2.根据权利要求1所述的一种基于凸松弛的热电联合调度方法,其特征在于:所述步骤1)中的电力系统运行约束条件包括:
a.EPS母线节点有功功率约束:
Figure RE-FDA0002825392770000011
式中,Pj,t为EPS母线节点j的净有功功率,J为EPS母线集合,T为所有调度时段的集合,Gj、Cj、Pj、Wj、Hj分别为与EPS母线节点j相连的燃气发电机组、热电联产机组、光伏电站、风电场、热泵的集合,
Figure RE-FDA0002825392770000012
为与EPS母线j相耦合的水泵对应的DHS的管道集合Pj,t为EPS母线节点j时流出的有功功率,
Figure RE-FDA0002825392770000013
为第g个燃气发电机组的有功功率,
Figure RE-FDA0002825392770000014
为第c个热电联产机组的有功功率,
Figure RE-FDA0002825392770000015
为第p个光伏电站的预测有功功率,
Figure RE-FDA0002825392770000016
为第w个风电场的预测有功功率,
Figure RE-FDA0002825392770000017
为在DHS的管道(k,l)上的水泵消耗的有功功率,
Figure RE-FDA0002825392770000018
为第h个热泵消耗的有功功率,
Figure RE-FDA0002825392770000019
为第j个电负荷消耗的有功功率;
b.EPS母线节点无功功率约束:
Figure RE-FDA00028253927700000110
式中,Qj,t为EPS母线节点j流出的无功功率,
Figure RE-FDA00028253927700000111
为第g个燃气发电机组的无功功率,
Figure RE-FDA00028253927700000112
为第c个热电联产机组的无功功率,
Figure RE-FDA00028253927700000113
为第p个光伏电站的预测无功功率,
Figure RE-FDA00028253927700000114
为第w个风电场的预测无功功率,
Figure RE-FDA00028253927700000115
为第j个电负荷消耗的无功功率;
c.二阶锥松弛后的EPS配电网潮流约束:
Figure RE-FDA0002825392770000021
Figure RE-FDA0002825392770000022
Figure RE-FDA0002825392770000023
Figure RE-FDA0002825392770000024
式中,E为EPS支路的集合,Pij,t、Qij,t分别为t时刻从母线i流向母线j的有功功率、无功功率,rij、xij分别为EPS支路(i,j)的电阻和电抗,Iij,t为t时刻EPS支路(i,j)流过的电流幅值的平方,Vj,t为t时刻EPS母线j的电压幅值的平方;
d.燃气发电机组运行约束:
Figure RE-FDA0002825392770000025
Figure RE-FDA0002825392770000026
式中,G为所有燃气发电机组的集合,
Figure RE-FDA0002825392770000027
分别为燃气发电机组的最小、最大有功功率输出,
Figure RE-FDA0002825392770000028
分别为燃气发电机组的最小、最大无功功率输出,
Figure RE-FDA0002825392770000029
分别为第g个燃气发电机组的最大有功功率向下、向上爬坡率,
Figure RE-FDA00028253927700000210
分别为第g个燃气发电机组的最大无功功率向下、向上爬坡率;
e.CHP运行约束:
Figure RE-FDA00028253927700000211
Figure RE-FDA00028253927700000212
式中,C为所有热电联产机组的集合,
Figure RE-FDA00028253927700000213
分别为热电联产机组的最小、最大有功功率输出,
Figure RE-FDA00028253927700000214
分别为热电联产机组的最小、最大无功功率输出,
Figure RE-FDA00028253927700000215
为第c个热电联产机组的最大有功功率爬坡率,
Figure RE-FDA00028253927700000216
为第c个热电联产机组的最大无功功率爬坡率;
Figure RE-FDA00028253927700000217
分别为第c个热电联产机组的最大有功功率向下、向上爬坡率,
Figure RE-FDA00028253927700000218
分别为第c个热电联产机组的最大无功功率向下、向上爬坡率;
f.热泵运行约束:
Figure RE-FDA0002825392770000031
Figure RE-FDA0002825392770000032
式中,H为所有热泵的集合,
Figure RE-FDA0002825392770000033
分别为热泵的最小、最大有功功率输出,
Figure RE-FDA0002825392770000034
Figure RE-FDA0002825392770000035
分别为第h个热泵的最大有功功率向下、向上爬坡率;
g.光伏电站运行约束:
Figure RE-FDA0002825392770000036
式中,P为所有光伏电站的集合,
Figure RE-FDA0002825392770000037
为t时刻光伏电站最大的有功功率输出;
h.风电场运行约束:
Figure RE-FDA0002825392770000038
式中,W为所有风电场的集合,
Figure RE-FDA0002825392770000039
为t时刻风电场最大的有功功率输出,
Figure RE-FDA00028253927700000310
为风电场输出无功功率与输出有功功率的比值;
i.电力系统电压、电流约束:
Figure RE-FDA00028253927700000311
Figure RE-FDA00028253927700000312
式中,V j
Figure RE-FDA00028253927700000313
为EPS母线j的电压幅度平方的最小值与最大值,
Figure RE-FDA00028253927700000314
为EPS支路(i,j)电流平方的最大值;
所述区域供热系统运行约束条件包括:
a.DHS流量约束:
Figure RE-FDA00028253927700000315
Figure RE-FDA00028253927700000316
Figure RE-FDA00028253927700000317
式中,N为DHS的节点集合,B为DHS的管道集合,
Figure RE-FDA00028253927700000318
分别为t时刻DHS节点k的注入流量、流出流量,mkl,t、mjk,t分别为t时刻DHS管道(k,l)、(j,k)的流量,m kl
Figure RE-FDA00028253927700000319
分别为t时刻DHS管道(k,l)的最小、最大流量,m k
Figure RE-FDA00028253927700000320
分别为t时刻DHS节点k的最小、最大流量;
b.DHS管道压力损失约束:
Figure RE-FDA0002825392770000041
式中,
Figure RE-FDA0002825392770000042
分别为t时刻DHS节点k的供水压力、回水压力,μkl为DHS管道(k,l)的摩擦损耗;
c.热交换器压力损失约束:
Figure RE-FDA0002825392770000043
式中,Ak为DHS节点k的定值系数,与节点k的损失系数、热交换器的横截面积、水的密度、重力加速度有关;
d.DHS阀门压力调节约束:
Figure RE-FDA0002825392770000044
式中,BVL为DHS中安装有阀门的管道集合,
Figure RE-FDA0002825392770000045
为t时刻DHS管道(k,l)的阀门所处的压差;
e.DHS水泵压力调节约束:
Figure RE-FDA0002825392770000046
式中,BWP为装有水泵的管道的集合,wkl,t为t时刻DHS管道(k,l)水泵的相对转数,
Figure RE-FDA0002825392770000047
为对水泵进行数学建模后根据经验数据估计得到的系数,cPa为压力水头到压力的转化系数,ρ为水的密度;
f.DHS水泵电功率消耗约束:
Figure RE-FDA0002825392770000048
式中,
Figure RE-FDA0002825392770000049
为DHS管道(k,l)上水泵的效率,
Figure RE-FDA00028253927700000410
为DHS管道(k,l)上水泵的有功功率最大值;
g.DHS点压力约束:
Figure RE-FDA00028253927700000411
式中,
Figure RE-FDA00028253927700000412
分别为DHS节点k的供水网络压力的最小值与最大值,
Figure RE-FDA00028253927700000413
分别为DHS节点k的回水网络压力的最小值与最大值;
h.热源产热约束:
Figure RE-FDA00028253927700000414
式中,
Figure RE-FDA00028253927700000415
分别为t时刻第c个热电联产机组、第h个热泵的热功率输出,
Figure RE-FDA00028253927700000416
Figure RE-FDA0002825392770000051
分别为第c个热电联产机组、第h个热泵的电热比;
i.DHS节点温度变化约束:
Figure RE-FDA0002825392770000052
Figure RE-FDA0002825392770000053
式中,Ck为DHS节点k上的热电联产机组的集合,Hk为DHS节点k上的热泵的集合,
Figure RE-FDA0002825392770000054
分别为t时刻DHS节点k从热源处获得的供水温度与回水网络中的节点温度,
Figure RE-FDA0002825392770000055
Figure RE-FDA0002825392770000056
分别为t时刻DHS节点k的供水网络中的节点温度与经过热负荷后的回水温度,
Figure RE-FDA0002825392770000057
为t时刻DHS节点k的热负荷,c为水的比热容;
j.管道温度平衡约束
Figure RE-FDA0002825392770000058
Figure RE-FDA0002825392770000059
式中,
Figure RE-FDA00028253927700000510
分别为DHS管道(k,l)在供水网络与回水网络中的出口温度;
k.管道入口温度约束:
Figure RE-FDA00028253927700000511
l.管道出口温度约束:
所述管道出口温度约束分为供热网络管道出口温度约束与回水网络管道出口温度约束,其中,供热网络管道出口温度约束为:
Figure RE-FDA00028253927700000512
Figure RE-FDA00028253927700000513
Figure RE-FDA00028253927700000514
Figure RE-FDA00028253927700000515
Figure RE-FDA0002825392770000061
Figure RE-FDA0002825392770000062
Figure RE-FDA0002825392770000063
Figure RE-FDA0002825392770000064
式中,
Figure RE-FDA0002825392770000065
为t时刻供水网络中管道(k,l)不考虑损耗时的出口温度,Δt为时间间隔,
Figure RE-FDA0002825392770000066
为辅助时间变量,Mkl为供水网络中管道(k,l)中水的总质量,
Figure RE-FDA0002825392770000067
为辅助流量变量,Akl为管道(k,l)的横截面积,λkl管道(k,l)的热传递系数,Tt GD为t时刻周围地面温度;
回水网络管道出口温度约束与供水网络管道出口温度约束相似;
m.DHS节点温度限制
Figure RE-FDA0002825392770000068
式中,
Figure RE-FDA0002825392770000069
分别为DHS节点k的供水温度下限、供水温度上限,
Figure RE-FDA00028253927700000610
分别为DHS节点k的回水温度下限、回水温度上限;
所述的复杂逻辑约束为式(32)-(39);
所述的非凸非线性热电联合调度模型为式(1)-(40)。
3.根据权利要求2所述的一种基于凸松弛的热电联合调度方法,其特征在于:所述步骤2)中的区域供热系统的热动力学模型为考虑流量流动速度和对流热影响的偏微分方程:
Figure RE-FDA00028253927700000611
式中,T为温度,m为流量,TGD为周围地面温度,λ为热传递系数,A为管道的横截面积;
所述简化的供热网络温度变化约束为,在时间t和距离x上,使用一阶微分逼近式(41)中的偏导数并进行离散化,应用于每个管道以及每个时刻所得到的约束:
Figure RE-FDA00028253927700000612
式中,Lkl为DHS管道(k,l)的长度;
Figure RE-FDA0002825392770000071
Figure RE-FDA0002825392770000072
Figure RE-FDA0002825392770000073
所述的新的热电联合调度模型为式(1)-(31),(40),(42)-(45)。
4.根据权利要求2所述的一种基于凸松弛的热电联合调度方法,其特征在于:所述步骤3)中的二阶锥松弛,指对二次等式约束式(20)、(21)进行松弛,获得松弛后的约束:
Figure RE-FDA0002825392770000074
Figure RE-FDA0002825392770000075
所述的多面体松弛,指对双线性项式(24)、(27)-(30)、(42)、(44)进行松弛,由于双线性项具有相同的r=kpq的形式,其中,r、p、q为变量,k为常数,因此,以松弛式(28)为例,获得松弛后的约束:
Figure RE-FDA0002825392770000076
Figure RE-FDA0002825392770000077
Figure RE-FDA0002825392770000078
Figure RE-FDA0002825392770000079
所述的凸化的热电联合调度模型为在热电联合调度模型(1)-(31),(40),(42)-(45)的基础上,对二次等式约束式(20)、(21)以及双线性项式(24)、(27)-(30)、(42)、(44)进行松弛后所得到的模型。
5.根据权利要求1所述的一种基于凸松弛的热电联合调度方法,其特征在于:
所述步骤6)中判断步骤5)中得到的可行解是否达到局部最优解的方法为:在每次迭代中通过所述步骤4)和步骤5)分别获得目标函数的下界obj和上界
Figure RE-FDA00028253927700000710
当上界和下界的相对差值小于给定的一个极小的数ε时,即
Figure RE-FDA00028253927700000711
则步骤5)中得到的可行解达到了局部最优解,否则未达到,其中,ε的取值根据计算时间和计算精度确定;
所述步骤6)中根据边界紧缩策略减小流量变量的边界范围的方法具体如下:首先将所有流量变量
Figure RE-FDA00028253927700000712
的上边界记为
Figure RE-FDA00028253927700000713
初值为
Figure RE-FDA00028253927700000714
所有流量变量的下边界记为
Figure RE-FDA00028253927700000715
初值为
Figure RE-FDA00028253927700000716
步骤4)中所获得的管道流量记为
Figure RE-FDA0002825392770000081
同时设定自定义的边界紧缩因子
Figure RE-FDA0002825392770000082
其中,边界紧缩因子大于0小于1,然后,对变量的边界进行紧缩,如下所示:
Figure RE-FDA0002825392770000083
Figure RE-FDA0002825392770000084
最后,将计算得到的流量变量上边界与下边界作为之后迭代运算的流量变量上边界与下边界,从而减小流量变量的边界范围。
CN202010995024.0A 2020-09-21 2020-09-21 一种基于凸松弛的热电联合调度方法 Active CN112347607B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010995024.0A CN112347607B (zh) 2020-09-21 2020-09-21 一种基于凸松弛的热电联合调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010995024.0A CN112347607B (zh) 2020-09-21 2020-09-21 一种基于凸松弛的热电联合调度方法

Publications (2)

Publication Number Publication Date
CN112347607A true CN112347607A (zh) 2021-02-09
CN112347607B CN112347607B (zh) 2022-09-27

Family

ID=74357356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010995024.0A Active CN112347607B (zh) 2020-09-21 2020-09-21 一种基于凸松弛的热电联合调度方法

Country Status (1)

Country Link
CN (1) CN112347607B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113036819A (zh) * 2021-03-10 2021-06-25 浙江大学 一种考虑源荷双侧不确定性的电热综合能源系统鲁棒调度方法
CN113108353A (zh) * 2021-04-26 2021-07-13 杭州鸿晟电力设计咨询有限公司 考虑热损非线性的变流量变温度区域供热系统调度方法
CN113177185A (zh) * 2021-04-25 2021-07-27 国网吉林省电力有限公司 基于缩紧McCormick方法的综合热电系统调度方法
CN113705883A (zh) * 2021-08-26 2021-11-26 华南理工大学 一种基于紧密凸松弛的交流配电网实时可调度域计算方法
CN114865630A (zh) * 2022-07-05 2022-08-05 华中科技大学 一种热电机组的建模方法与装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130304266A1 (en) * 2012-04-13 2013-11-14 Regents Of The University Of Minnesota State estimation of electrical power networks using semidefinite relaxation
CN106208160A (zh) * 2016-07-28 2016-12-07 东南大学 基于二阶锥优化的售电公司所辖区域配电网的调度方法
CN106253350A (zh) * 2016-08-11 2016-12-21 清华大学 基于供热管网储热效益的热‑电联合机组组合方法
US20170133851A1 (en) * 2015-11-06 2017-05-11 Tsinghua University Method and device for controlling active distribution network
CN106709610A (zh) * 2017-01-12 2017-05-24 浙江大学 一种微电网电储能、冰蓄冷联合优化调度方法
CN108717594A (zh) * 2018-04-16 2018-10-30 东南大学 一种冷热电联供型多微网系统经济优化调度方法
CN109815530A (zh) * 2018-12-13 2019-05-28 中电智慧综合能源有限公司 一种考虑余热锅炉换热饱和的热电联产系统的调度方法
AU2019101104A4 (en) * 2019-09-25 2019-10-31 Southeast University An optimal dispatching method of multi-region power and gas coupled integrated energy system using tiered gas tariff
CN111222257A (zh) * 2020-02-27 2020-06-02 东南大学 基于凸优化的电热水多能流协同调度方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130304266A1 (en) * 2012-04-13 2013-11-14 Regents Of The University Of Minnesota State estimation of electrical power networks using semidefinite relaxation
US20170133851A1 (en) * 2015-11-06 2017-05-11 Tsinghua University Method and device for controlling active distribution network
CN106208160A (zh) * 2016-07-28 2016-12-07 东南大学 基于二阶锥优化的售电公司所辖区域配电网的调度方法
CN106253350A (zh) * 2016-08-11 2016-12-21 清华大学 基于供热管网储热效益的热‑电联合机组组合方法
CN106709610A (zh) * 2017-01-12 2017-05-24 浙江大学 一种微电网电储能、冰蓄冷联合优化调度方法
CN108717594A (zh) * 2018-04-16 2018-10-30 东南大学 一种冷热电联供型多微网系统经济优化调度方法
CN109815530A (zh) * 2018-12-13 2019-05-28 中电智慧综合能源有限公司 一种考虑余热锅炉换热饱和的热电联产系统的调度方法
AU2019101104A4 (en) * 2019-09-25 2019-10-31 Southeast University An optimal dispatching method of multi-region power and gas coupled integrated energy system using tiered gas tariff
CN111222257A (zh) * 2020-02-27 2020-06-02 东南大学 基于凸优化的电热水多能流协同调度方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
YIBAO JIANG: "Combined Heat and Power Dispatch Using", 《IEEE》 *
陈聪: "计及㶲效率的综合能源系统多目标优化调度方法", 《电力系统自动化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113036819A (zh) * 2021-03-10 2021-06-25 浙江大学 一种考虑源荷双侧不确定性的电热综合能源系统鲁棒调度方法
CN113177185A (zh) * 2021-04-25 2021-07-27 国网吉林省电力有限公司 基于缩紧McCormick方法的综合热电系统调度方法
CN113177185B (zh) * 2021-04-25 2023-05-23 国网吉林省电力有限公司 基于缩紧McCormick方法的综合热电系统调度方法
CN113108353A (zh) * 2021-04-26 2021-07-13 杭州鸿晟电力设计咨询有限公司 考虑热损非线性的变流量变温度区域供热系统调度方法
CN113705883A (zh) * 2021-08-26 2021-11-26 华南理工大学 一种基于紧密凸松弛的交流配电网实时可调度域计算方法
CN114865630A (zh) * 2022-07-05 2022-08-05 华中科技大学 一种热电机组的建模方法与装置

Also Published As

Publication number Publication date
CN112347607B (zh) 2022-09-27

Similar Documents

Publication Publication Date Title
CN112347607B (zh) 一种基于凸松弛的热电联合调度方法
Lv et al. Model predictive control based robust scheduling of community integrated energy system with operational flexibility
CN106339772B (zh) 基于供热管网储热效益的热-电联合优化调度方法
Li et al. Optimal operation of the integrated electrical and heating systems to accommodate the intermittent renewable sources
CN107808216B (zh) 电-气-热互联系统弃风弃光和电气热负荷削减综合最小优化模型构建方法
CN110348602B (zh) 计及天然气管网和热力管网特性的综合能源系统优化方法
CN107609680B (zh) 一种多热源环状集中供热管网水力工况优化调度方法
CN110188492B (zh) 一种考虑热网特性的冷热电联供微网优化调度方法
CN105576657A (zh) 能源互联下主动配网与输电网集成系统的随机模糊连续潮流建模及算法
CN112668188B (zh) 多园区综合能源系统的分布式鲁棒协同优化调度方法
Chen et al. Optimal coordinative operation strategy of the electric–thermal–gas integrated energy system considering CSP plant
CN111191353B (zh) 考虑热惯性的电-热综合能源系统协调运行方法
CN114330827B (zh) 多能流虚拟电厂分布式鲁棒自调度优化方法及其应用
CN109523076A (zh) 一种储能参与下的综合能源系统日前稳态优化分析方法
CN111222257A (zh) 基于凸优化的电热水多能流协同调度方法
CN110729720A (zh) 一种蓄热罐容量规划方法和电转气参数敏感性分析方法
Zhang et al. Stochastic optimal dispatch of combined heat and power integrated AA-CAES power station considering thermal inertia of DHN
CN114595868A (zh) 一种综合能源系统源网荷储协同规划方法及系统
CN110443467A (zh) 一种区域综合能源系统太阳能消纳能力评估方法
Li et al. Gradient descent iterative method for energy flow of integrated energy system considering multiple modes of compressors
CN111428962A (zh) 一种基于热网动态特性端口等值模型的电热协同调度方法
CN111724026B (zh) 一种多能源网络与配水网耦合运行的优化方法
CN117035202A (zh) 考虑需求响应的电热综合能源系统双层协同扩展规划方法
CN112200695A (zh) 一种城市级综合能源系统优化调度方法
CN111275271B (zh) 一种冷-热-电综合能源系统潮流优化方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant