CN112228081A - Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct - Google Patents

Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct Download PDF

Info

Publication number
CN112228081A
CN112228081A CN202011150769.3A CN202011150769A CN112228081A CN 112228081 A CN112228081 A CN 112228081A CN 202011150769 A CN202011150769 A CN 202011150769A CN 112228081 A CN112228081 A CN 112228081A
Authority
CN
China
Prior art keywords
grouting
hole
pile foundation
drilling
shield tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011150769.3A
Other languages
Chinese (zh)
Inventor
张子洋
姚锐
张煜
李连和
邓文涛
肖云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
Tianjin Construction Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
Tianjin Construction Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd, Tianjin Construction Engineering Co Ltd of China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN202011150769.3A priority Critical patent/CN112228081A/en
Publication of CN112228081A publication Critical patent/CN112228081A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/0671Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end with means for consolidating the rock in front of the shield by injection of consolidating substances through boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The application relates to a method for reinforcing a pile foundation of a shield tunnel side-through high-speed rail viaduct, which comprises the following steps: s1 paying-off positioning: determining hole positions of the drill holes outside the protection area and marking the hole positions; s2 drilling machine positioning and drilling: the drilling machine is put in place outside the protection area, the drill rod drills holes in an oblique and accurate positioning mode, the drill holes extend to the area to be reinforced, each drill hole adopts different inclination angles, a sector shape is formed between the drill hole and the area to be reinforced, and the grouting pipe and the sleeve valve pipe are installed at the same time; s3 grouting: grouting in a single-hole grouting mode after the soil body is recovered, and finishing grouting after a pressure gauge has a second peak value; and (3) sealing holes by S4: and sealing the hole opening after grouting is finished, and then performing next hole operation. The method has the effect of solving the problem of soil isolation and reinforcement operation between the shield tunnel and the pile foundation of the existing high-speed railway viaduct.

Description

Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct
Technical Field
The application relates to the field of tunnel construction, in particular to a method for reinforcing a pile foundation of a shield tunnel side-through high-speed rail viaduct.
Background
In the shield tunnel construction process, the condition of passing the existing high-speed railway viaduct pile foundation under can meet inevitably, if the shield tunnel and the high-speed railway viaduct pile foundation can't satisfy the situation of 1.0 times tunnel diameter apart from each other, just need take the isolation reinforcement measure to the soil body between existing pile foundation and tunnel.
In view of the above-mentioned related technologies, the inventor found that the working surface is generally located in the high-speed rail protection area, and has no reinforcement operation condition, so that the reinforcement operation cannot be completed, and thus the safety of the existing high-speed rail pile foundation cannot be ensured.
Disclosure of Invention
In order to solve the problem of soil body isolation and reinforcement operation between a shield tunnel and an existing high-speed rail viaduct pile foundation, the application provides a method for reinforcing the side-through high-speed rail viaduct pile foundation of the shield tunnel.
The reinforcing method for the side-through high-speed rail viaduct pile foundation of the shield tunnel adopts the following technical scheme.
A method for reinforcing a pile foundation of a shield tunnel side-through high-speed rail viaduct comprises the following steps:
s1 paying-off positioning: determining hole positions of the drill holes outside the protection area and marking the hole positions;
s2 drilling machine positioning and drilling: the drilling machine is put in place outside the protection area, the drill rod drills holes in an oblique and accurate positioning mode, the drill holes extend to the area to be reinforced, each drill hole adopts different inclination angles, a sector shape is formed between the drill hole and the area to be reinforced, and the grouting pipe and the sleeve valve pipe are installed at the same time;
s3 grouting: grouting in a single-hole grouting mode after the soil body is recovered, and finishing grouting after a pressure gauge has a second peak value;
and (3) sealing holes by S4: and sealing the hole opening after grouting is finished, and then performing next hole operation.
By adopting the technical scheme, inclined drilling is carried out outside the protection area, the bottom end of the drilling hole extends to the area to be reinforced, grouting is carried out in the drilling hole, the grouting pipe and the grout form a sector after grouting, so that the area to be reinforced is reinforced and isolated, the sleeve valve pipe and the grouting pipe which are embedded in the drilling hole can also support and reinforce the drilling hole, the process of reinforcing the soil body between the existing high-speed rail pile foundation and the shield tunnel is realized, the safety of the existing high-speed rail pile foundation is improved, the reinforcing method enables the drilling machine to be positioned outside the railway protection area for inclined drilling and grouting construction, the hole forming angle is accurate, the disturbance on the soil body at the periphery of the reinforced area is extremely small, and the influence on the existing high-speed rail line is avoided.
Preferably, the drilling machine is in place in the step S2, and the grouting pipe and the sleeve valve pipe are sleeved on the drill pipe before drilling, and are in place simultaneously when drilling rod guiding holes.
By adopting the technical scheme, the traditional installation mode of the sleeve valve pipe and the grouting pipe is that the grouting pipe and the sleeve valve pipe are inserted into the drill hole after the drilling is finished, but because the reinforcement method adopts an inclined drilling mode, holes can have certain radian during drilling, the grouting pipe and the sleeve valve pipe are difficult to insert, and the installation process of the grouting pipe and the sleeve valve pipe is influenced. The grouting pipe and the sleeve valve pipe are sleeved on the drill rod before drilling, so that the grouting pipe and the sleeve valve pipe are obliquely inserted into a soil body along with the drilling process of the drill rod and the drill rod, the sleeve valve pipe and the grouting pipe are formed at one time, the in-place precision of the sleeve valve pipe and the grouting pipe is ensured, the installation process of the grouting pipe and the sleeve valve pipe is realized, the installation process of the sleeve valve pipe and the grouting pipe is more convenient, and the influence of the oblique drilling mode on the installation process of the sleeve valve pipe and the grouting pipe is avoided.
Preferably, the pilot hole angle needs to be rechecked before grouting in the step S3.
By adopting the technical scheme, the hole guiding angle is rechecked before grouting, so that the accuracy degree of the hole guiding angle during grouting is ensured, the disturbance to the external soil body of the area to be reinforced is reduced, and the invasion of a shield penetrating range or influence on the pile foundation of the bridge of the existing high-speed railway is avoided.
Preferably, the positioning of the pay-off in the step S1 and the position deviation of the hole opening in the positioning and drilling of the drilling machine in the step S2 are less than or equal to 1cm, the angle deviation is less than or equal to 2 degrees, and the verticality is less than or equal to 1/300.
By adopting the technical scheme, the position deviation of the hole opening is less than or equal to 1cm, the angle deviation is less than or equal to 2 degrees, and the verticality is less than or equal to 1/300 degrees during drilling, so that the drilling error is maintained in a smaller range, the drilling accuracy is improved, the disturbance to the soil body outside the area to be reinforced is further reduced, and the intrusion into the penetration range of the shield or the influence on the pile foundation of the existing high-speed railway bridge is avoided.
Preferably, the grouting sequence in the grouting of step S3 is performed from the side far away from the tunnel to the side near the tunnel, and the grouting time interval between adjacent grouting holes is greater than 24 hours.
Through adopting above-mentioned technical scheme, adopt by keeping away from one side in the tunnel to the slip casting order that goes on near one side in the tunnel, can make the slip casting body of keeping away from behind the slip casting of tunnel one side formation play the effect of blockking to the slip casting hole that is close to tunnel one side, the excessive phenomenon of thick liquid appears under the pressure effect when avoiding the slip casting to the slip casting hole slip casting that is close to tunnel one side, ensures the grouting effect. The grouting time interval of the adjacent grouting holes is larger than 24 hours, so that the grout in the adjacent grouting holes can be solidified into grouting body during grouting, the situation that the unset grout in the adjacent grouting holes overflows under the action of pressure during grouting is avoided, and the reinforcement effect of the grouting process on the soil body is further enhanced.
Preferably, the grouting process in the grouting of step S3 is performed in a jump grouting manner.
By adopting the technical scheme, because the grouting time interval of the adjacent grouting holes is longer, the grouting is carried out by adopting a hole jumping grouting mode, the grouting time can be shortened to a great extent, and the construction efficiency is improved; and meanwhile, the jumping hole grouting can also avoid the condition that adjacent grouting holes are connected in series, so that the loss of the grout is prevented, and the grouting effect is further ensured.
Preferably, the diameter of the grouting body in the grouting of the step S3 is not less than 30 cm.
By adopting the technical scheme, the diameter of the grouting body is not less than 30cm, and the grouting body formed by the grouting pipe and the grout is ensured to have enough strength, so that the soil body of the area to be reinforced is stably supported and reinforced, and the reinforcement effect on the soil body between the existing high-speed rail pile foundation and the shield tunnel is realized.
Preferably, the ground hole pitch in the setting-out positioning of the step S1 is 30 cm.
Through adopting above-mentioned technical scheme, set up ground pitch-row into 30cm, can avoid the pitch-row undersize and make and exert an influence between the adjacent drilling, prevent that the drilling pore wall from appearing destroying, also can reduce the construction area as far as possible under the prerequisite of guaranteeing drilling integrality.
Preferably, the step S2 is that the drilling machine is in place and the hole distance in the region to be reinforced in the drilling is 55-60 cm.
By adopting the technical scheme, the hole pitch in the area to be reinforced is set to be 55-60cm, so that the reinforcing effect on the area to be reinforced caused by overlarge hole pitch can be avoided, and the smooth construction process caused by the overlarge hole pitch can be prevented from being influenced.
In summary, the present application includes at least one of the following beneficial technical effects:
the method comprises the steps of obliquely drilling outside a protection area to enable the bottom end of a drill hole to extend to a to-be-reinforced area, and grouting in the drill hole, so that the to-be-reinforced area is reinforced and isolated, the process of reinforcing the soil body between the existing high-speed rail pile foundation and the shield tunnel is realized, the disturbance of the soil body around the reinforced area is extremely small, and the influence on the existing high-speed rail line is avoided;
the grouting pipe and the sleeve valve pipe are sleeved on the drill rod before drilling, so that the grouting pipe and the sleeve valve pipe are obliquely inserted into a soil body along with the drill rod in the drilling process of the drill rod, the sleeve valve pipe and the grouting pipe are ensured to be formed at one time, the sleeve valve pipe and the grouting pipe play a supporting and reinforcing role in drilling, and the sleeve valve pipe and the grouting pipe are prevented from being affected by the oblique drilling mode in the installation process of the sleeve valve pipe and the grouting pipe.
Drawings
FIG. 1 is a schematic view of a drilling mode according to an embodiment of the present application.
Description of reference numerals: 1. a region to be reinforced; 2. and (4) drilling direction.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses a method for reinforcing a side-through high-speed rail viaduct pile foundation of a shield tunnel.
Referring to fig. 1, a method for reinforcing a pile foundation of a shield tunnel side-through high-speed rail viaduct includes the following steps.
S1 paying-off positioning:
determining a drilling area outside the protection area, leveling the field, measuring the coordinate points of two outermost points at two sides of each row by using a total station, determining other drilling hole positions in the middle of the two points by using a stay wire and tape measuring method according to the coordinate points, determining the ground hole distance to be 30cm, and marking the hole positions by using paint after determining the hole positions.
S2 drilling machine positioning and drilling:
after the hole position is determined, a temporary concrete guide table is manufactured, a drilling machine enters a field to be in place, and the drilling machine is a hole leading and grouting integrated drilling machine, so that the bottom of the drilling machine is flat and stable.
After the drilling machine is in place, the grouting pipe and the sleeve valve pipe are sleeved on the drill rod, the drill rod is led to be in place while drilling, the sleeve valve pipe is a phi 30 multiplied by 3mm flexible plastic pipe, and the length of each sleeve valve pipe is 1 m. The sleeve valve pipe and the grouting pipe are in place along with the drill rod, the sleeve valve pipe and the grouting pipe are not pulled out in the later stage, the sleeve valve pipe and the grouting pipe can also support and reinforce the drilled holes, the installation process of the sleeve valve pipe and the grouting pipe is more convenient, and the mode of inclined drilling is prevented from influencing the installation process of the sleeve valve pipe and the grouting pipe.
The drilling direction 2 is an inclined direction, a drill rod, a sleeve valve pipe and a grouting pipe are simultaneously and obliquely extended into a soil body during drilling, the drill rod is drilled in an oblique accurate positioning mode to enable the drill hole to extend to the area 1 to be reinforced, the hole distance in the area 1 to be reinforced is 55-60cm, different inclination angles are adopted for each drill hole, a sector shape is formed between the drill hole and the area 1 to be reinforced, the angle deviation is less than or equal to 2 degrees, and the verticality is less than or equal to 1/300. Through carrying out the slope drilling outside the protected area, make the drilling bottom extend to plan to consolidate regional 1 to be convenient for consolidate regional 1, it is minimum to consolidating regional peripheral soil body disturbance, avoid producing the influence to existing high-speed railway line.
S3 grouting:
and cleaning the hole position after drilling, and making a mud pit and a mud discharge ditch.
And rechecking the angle of the pilot hole before grouting, and grouting in a single-hole grouting mode after the soil body is recovered. Grouting is carried out from one side far away from the tunnel to one side close to the tunnel, the grouting time interval of the adjacent grouting holes is more than 24 hours, and the grouting process is carried out in a hole jumping grouting mode.
During grouting, the grouting pressure is controlled to be 1-2 Mpa, 42.5 ordinary portland cement is adopted as a pulping material, the water cement ratio is 1:1, the water glass mixing amount is 3%, if cement slurry precipitates and separates, secondary stirring is carried out, after a pressure gauge has a secondary peak value, grouting is finished, and the diameter of the grouting body is not less than 30cm, so that the process of reinforcing the soil body of the area 1 to be reinforced between the existing high-speed rail pile foundation and the shield tunnel is realized, and the safety of the existing high-speed rail pile foundation is improved. During reinforcement, the drilling machine is positioned outside a railway protection area for inclined drilling and grouting construction, and influence on an existing high-speed railway is avoided.
And (3) sealing holes by S4:
after grouting, the orifice is sealed and protected by a blank cap, and then the next hole operation is carried out.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. A method for reinforcing a pile foundation of a shield tunnel side-through high-speed rail viaduct is characterized by comprising the following steps:
s1 paying-off positioning: determining hole positions of the drill holes outside the protection area and marking the hole positions;
s2 drilling machine positioning and drilling: the drilling machine is put in place outside the protection area, the drill rod drills holes in an oblique and accurate positioning mode to enable the drill holes to extend to the area (1) to be reinforced, each drill hole adopts different inclination angles to enable the drill holes and the area (1) to be reinforced to form a sector shape, and the grouting pipe and the sleeve valve pipe are installed at the same time;
s3 grouting: grouting in a single-hole grouting mode after the soil body is recovered, and finishing grouting after a pressure gauge has a second peak value;
and (3) sealing holes by S4: and sealing the hole opening after grouting is finished, and then performing next hole operation.
2. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct according to claim 1, wherein the step S2 comprises the steps of positioning the drilling machine, sleeving the grouting pipe and the sleeve valve pipe on the drill pipe before drilling, and positioning the drill pipe while drilling and guiding the hole.
3. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct of claim 1, wherein the pilot hole angle needs to be rechecked before grouting in the step S3.
4. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct according to claim 1, wherein the step S1 is performed with paying-off positioning, and the step S2 is performed with a drilling machine in position and a hole in a drill hole position deviation of less than or equal to 1cm, an angle deviation of less than or equal to 2 degrees, and a verticality of less than or equal to 1/300.
5. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct of claim 1, wherein the grouting in the step S3 is performed sequentially from the side far away from the tunnel to the side near the tunnel, and the grouting time interval between adjacent grouting holes is greater than 24 hours.
6. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct according to claim 5, wherein the grouting in the step S3 is performed by means of jump-hole grouting.
7. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct of claim 1, wherein the grouting in the step S3 is not less than 30cm in diameter.
8. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct of claim 1, wherein the ground hole pitch in the step S1 line-laying positioning is 30 cm.
9. The method for reinforcing the pile foundation of the shield tunnel side-through high-speed rail viaduct of claim 1, wherein the step S2 is implemented by a drilling machine, and the hole distance in the region (1) to be reinforced in the drilling is 55-60 cm.
CN202011150769.3A 2020-10-24 2020-10-24 Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct Pending CN112228081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011150769.3A CN112228081A (en) 2020-10-24 2020-10-24 Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011150769.3A CN112228081A (en) 2020-10-24 2020-10-24 Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct

Publications (1)

Publication Number Publication Date
CN112228081A true CN112228081A (en) 2021-01-15

Family

ID=74109494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011150769.3A Pending CN112228081A (en) 2020-10-24 2020-10-24 Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct

Country Status (1)

Country Link
CN (1) CN112228081A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983434A (en) * 2021-02-24 2021-06-18 中铁六局集团有限公司交通工程分公司 Construction method for using shield tunneling machine to penetrate through super-large bridge downwards
CN113482636A (en) * 2021-06-10 2021-10-08 中铁三局集团广东建设工程有限公司 Reinforcement treatment method in side-through pile foundation hole
CN113863280A (en) * 2021-10-25 2021-12-31 中交隧道工程局有限公司 Reinforced pipe shed structure suitable for karst or fault open caisson foundation grouting
CN114607391A (en) * 2022-04-08 2022-06-10 中南大学 Pre-reinforcing construction method for unconsolidated strata of subway tunnel

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU620613A1 (en) * 1976-02-06 1978-08-25 Кузнецкий Научно-Исследовательский Институт Строительства Угольных И Горнорудных Предприятий Shaft loading machine
SU1016519A1 (en) * 1981-08-14 1983-05-07 Государственный Ордена Трудового Красного Знамени Проектно-Изыскательский Институт "Метрогипротранс" Tunnel driving method
DE3501128A1 (en) * 1985-01-15 1986-07-17 Gkn Keller Gmbh, 6050 Offenbach SEALING AND THEIR MANUFACTURING METHOD FOR THE CREATION OF STRENGTHABLE, DEGRADABLE GROUND DIMENSIONS FOR THE EXECUTION OF UNDERGROUND CONSTRUCTIONS, LIKE CAVITY BUILDINGS OR THE LIKE.
SU1643722A1 (en) * 1989-04-11 1991-04-23 Строительно-Монтажное Управление Производственного Объединения Турбостроения "Ленинградский Металлический Завод" Apparatus for driving sinking lining
JPH09151691A (en) * 1995-11-30 1997-06-10 Kobe Steel Ltd Tunnel protection construction method
JPH11124843A (en) * 1997-10-22 1999-05-11 Nit Co Ltd Site preparation method and device for ground timbering cured layer
CN201883935U (en) * 2010-12-31 2011-06-29 中国水利水电第七工程局有限公司 Pore-forming drill tool for advance support of tunneling works
CN103867216A (en) * 2014-04-08 2014-06-18 中铁二十五局集团轨道交通工程有限公司 Soil stabilization structure and method for railway yard shield tunneling construction
CN103899323A (en) * 2014-05-06 2014-07-02 中铁二十五局集团轨道交通工程有限公司 Construction method of shield passing through railway yard
CN204212782U (en) * 2014-04-08 2015-03-18 中铁二十五局集团轨道交通工程有限公司 A kind of soil stabilization structure of shield crossing rail yard construction
CN104988815A (en) * 2015-07-03 2015-10-21 河海大学 Method for treating post-construction settlement disease of railroad bed
CN106677791A (en) * 2017-02-21 2017-05-17 中铁二十局集团第三工程有限公司 Construction method for enabling shallow shield tunnel to pass through highway
CN107130475A (en) * 2017-06-27 2017-09-05 中铁第四勘察设计院集团有限公司 Ballastless track roadbed Deformation control is worn under a kind of aqueduct with repairing structure and method
CN107386274A (en) * 2017-08-14 2017-11-24 中铁第勘察设计院集团有限公司 Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN108060908A (en) * 2017-11-14 2018-05-22 北京中煤矿山工程有限公司 Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN108590683A (en) * 2018-04-04 2018-09-28 中铁二十五局集团第五工程有限公司 A kind of rich water stream modeling stratum shield tunnel undercrossing tunnel frame bridge construction method
CN108842840A (en) * 2018-07-04 2018-11-20 湖南大学 Perforating causes the weak intercalated layer slip-casting lifting method of building settlement under a kind of compensation subway tunnel
CN109653755A (en) * 2019-01-03 2019-04-19 中铁隧道集团二处有限公司 The construction method of ballastless track roadbed is passed through in a kind of sedimentation of major diameter slurry shield zero
CN109653190A (en) * 2018-12-11 2019-04-19 宝钢集团新疆八钢铁有限公司 A kind of large-scale heavy duty Equipment Foundations grouting and consolidation on foundation technique
CN110952987A (en) * 2019-12-03 2020-04-03 济南轨道交通集团有限公司 Construction method for side-through bridge pile of stacked porous subway tunnel
CN111608688A (en) * 2020-05-27 2020-09-01 中铁建大桥工程局集团第二工程有限公司 Method for reinforcing ground of shield underpass building

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU620613A1 (en) * 1976-02-06 1978-08-25 Кузнецкий Научно-Исследовательский Институт Строительства Угольных И Горнорудных Предприятий Shaft loading machine
SU1016519A1 (en) * 1981-08-14 1983-05-07 Государственный Ордена Трудового Красного Знамени Проектно-Изыскательский Институт "Метрогипротранс" Tunnel driving method
DE3501128A1 (en) * 1985-01-15 1986-07-17 Gkn Keller Gmbh, 6050 Offenbach SEALING AND THEIR MANUFACTURING METHOD FOR THE CREATION OF STRENGTHABLE, DEGRADABLE GROUND DIMENSIONS FOR THE EXECUTION OF UNDERGROUND CONSTRUCTIONS, LIKE CAVITY BUILDINGS OR THE LIKE.
SU1643722A1 (en) * 1989-04-11 1991-04-23 Строительно-Монтажное Управление Производственного Объединения Турбостроения "Ленинградский Металлический Завод" Apparatus for driving sinking lining
JPH09151691A (en) * 1995-11-30 1997-06-10 Kobe Steel Ltd Tunnel protection construction method
JPH11124843A (en) * 1997-10-22 1999-05-11 Nit Co Ltd Site preparation method and device for ground timbering cured layer
CN201883935U (en) * 2010-12-31 2011-06-29 中国水利水电第七工程局有限公司 Pore-forming drill tool for advance support of tunneling works
CN103867216A (en) * 2014-04-08 2014-06-18 中铁二十五局集团轨道交通工程有限公司 Soil stabilization structure and method for railway yard shield tunneling construction
CN204212782U (en) * 2014-04-08 2015-03-18 中铁二十五局集团轨道交通工程有限公司 A kind of soil stabilization structure of shield crossing rail yard construction
CN103899323A (en) * 2014-05-06 2014-07-02 中铁二十五局集团轨道交通工程有限公司 Construction method of shield passing through railway yard
CN104988815A (en) * 2015-07-03 2015-10-21 河海大学 Method for treating post-construction settlement disease of railroad bed
CN106677791A (en) * 2017-02-21 2017-05-17 中铁二十局集团第三工程有限公司 Construction method for enabling shallow shield tunnel to pass through highway
CN107130475A (en) * 2017-06-27 2017-09-05 中铁第四勘察设计院集团有限公司 Ballastless track roadbed Deformation control is worn under a kind of aqueduct with repairing structure and method
CN107386274A (en) * 2017-08-14 2017-11-24 中铁第勘察设计院集团有限公司 Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN108060908A (en) * 2017-11-14 2018-05-22 北京中煤矿山工程有限公司 Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN108590683A (en) * 2018-04-04 2018-09-28 中铁二十五局集团第五工程有限公司 A kind of rich water stream modeling stratum shield tunnel undercrossing tunnel frame bridge construction method
CN108842840A (en) * 2018-07-04 2018-11-20 湖南大学 Perforating causes the weak intercalated layer slip-casting lifting method of building settlement under a kind of compensation subway tunnel
CN109653190A (en) * 2018-12-11 2019-04-19 宝钢集团新疆八钢铁有限公司 A kind of large-scale heavy duty Equipment Foundations grouting and consolidation on foundation technique
CN109653755A (en) * 2019-01-03 2019-04-19 中铁隧道集团二处有限公司 The construction method of ballastless track roadbed is passed through in a kind of sedimentation of major diameter slurry shield zero
CN110952987A (en) * 2019-12-03 2020-04-03 济南轨道交通集团有限公司 Construction method for side-through bridge pile of stacked porous subway tunnel
CN111608688A (en) * 2020-05-27 2020-09-01 中铁建大桥工程局集团第二工程有限公司 Method for reinforcing ground of shield underpass building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983434A (en) * 2021-02-24 2021-06-18 中铁六局集团有限公司交通工程分公司 Construction method for using shield tunneling machine to penetrate through super-large bridge downwards
CN113482636A (en) * 2021-06-10 2021-10-08 中铁三局集团广东建设工程有限公司 Reinforcement treatment method in side-through pile foundation hole
CN113482636B (en) * 2021-06-10 2023-05-26 中铁三局集团广东建设工程有限公司 Reinforcing treatment method in side-penetrating pile foundation hole
CN113863280A (en) * 2021-10-25 2021-12-31 中交隧道工程局有限公司 Reinforced pipe shed structure suitable for karst or fault open caisson foundation grouting
CN114607391A (en) * 2022-04-08 2022-06-10 中南大学 Pre-reinforcing construction method for unconsolidated strata of subway tunnel
CN114607391B (en) * 2022-04-08 2023-05-09 中南大学 Construction method for pre-reinforcing loose stratum of subway tunnel

Similar Documents

Publication Publication Date Title
CN112228081A (en) Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
CN112663600A (en) Construction method of cast-in-situ bored pile for water-rich sandy stratum
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN113882375A (en) Anti-floating anchor rod construction process
CN110284885A (en) Shield inspection-pit construction method
CN108678753B (en) Reverse-slope tunnel construction method
CN106223976A (en) Shield well termination steel tube shed reinforcement system based on agent structure and construction method thereof
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN112855179A (en) Tunnel construction method
CN112392049A (en) Excavation construction method for deep foundation pit in weak stratum
CN109826635B (en) Construction method for reinforcing shield receiving space peripheral soil body constructed by subsurface excavation method
CN107100164A (en) A kind of long auger guncreting pile construction method
CN113006109B (en) Construction method of waterproof curtain of foundation pit of highly permeable stratum area
CN113309526A (en) Construction method for excavation and support of subway station buckling arch
CN110872839B (en) Construction method of conical pile tip tubular pile capable of post-grouting
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN209228377U (en) A kind of multistage set arch structure and pipe canopy set arch structure for tunnel portal supporting
CN110344418A (en) The structure and its construction technology of support system in a kind of deep basal pit
CN105040699A (en) Drilling pile planting method
CN109751056A (en) A kind of water rich strata shield-tunneling construction active well end processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210115