CN112012216A - 提高钢管桩承载力的双液旋喷加固方法 - Google Patents

提高钢管桩承载力的双液旋喷加固方法 Download PDF

Info

Publication number
CN112012216A
CN112012216A CN202010800261.7A CN202010800261A CN112012216A CN 112012216 A CN112012216 A CN 112012216A CN 202010800261 A CN202010800261 A CN 202010800261A CN 112012216 A CN112012216 A CN 112012216A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
bearing capacity
pile
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010800261.7A
Other languages
English (en)
Inventor
赵文亮
汲亮
代振宁
杜广清
邱忞
吕有旭
朱志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN202010800261.7A priority Critical patent/CN112012216A/zh
Publication of CN112012216A publication Critical patent/CN112012216A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

本发明涉及一种提高钢管桩承载力的双液旋喷加固方法,首先,在钢管桩施工完成之后,采用多重管高压旋喷钻机,在钢管桩中心成孔,然后进行高压双液旋喷注浆,在钢管桩的桩端形成可靠的固结加固体,形成复合结构,提高其桩体承载力。本发明适用于软土地区钢管桩承载力不足,通过双液旋喷形成复合桩提高其承载力,也适用于其他开口式预制桩的承载力提升。

Description

提高钢管桩承载力的双液旋喷加固方法
技术领域
本发明涉及一种钢管桩施工方法,尤其是一种用于钢管桩完成施工后对钢管桩承载力进行补强的施工方法。
背景技术
某市政桥梁工程采用免共振钢管桩,在钢管桩试桩检测时,发现其承载力略低于设计值的情况。这种情况根据要求需要调整设计桩长,重新施工成桩,但这种方式需要重新进行设备配套等,影响其工程推进。常规采用桩底注浆工艺,但注浆工艺往往有很大的不确定性,质量保证性差。综上所述,针对钢管桩成桩后可能存在承载力不满足要求的情况,需要一种满足施工难度小,周期短,见效快,节约成本的补强钢管桩承载力的技术工艺。
借鉴土体加固的设计施工技术,进行提高钢管桩承载力技术研究,运用到原桩承载力不足的补强,即在原桩的基础上通过双液旋喷进行加固处理,无需废桩,成本低、工期短、效果好。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是补强钢管桩承载力,而提供一种提高钢管桩承载力的双液旋喷加固方法。
为了解决上述技术问题,本发明采用的技术方案是:一种提高钢管桩承载力的双液旋喷加固方法,首先,在钢管桩施工完成之后,采用多重管高压旋喷钻机,在钢管桩中心成孔,然后进行高压双液旋喷注浆,在钢管桩的桩端形成可靠的固结加固体,形成复合结构,提高其桩体承载力。
进一步,所述多重管高压旋喷钻机在钢管桩中心成成孔至钢管桩底部设计标高位置。
进一步,所述多重管高压旋喷钻机采用两台高压注浆泵及一台空压机,先开启空压机及固化液泵,后开启促凝剂泵,同步提升至钢管桩体内若干米。
进一步,采用“气包浆”的方式减少浆液能量损失,保证加固范围满足要求,同步注入促凝剂,加速浆液固化。
本发明的有益效果是:
本发明的旋喷设备及工艺:采用高压旋喷钻机成孔,在钢管桩中心成孔,按照施工参数对桩端底部土体及桩端位置进行加固处理,保证固结体的范围和对周边土体的挤密效果。
本发明通过双液旋喷钻机一次成孔进行土体固结加固,施工周期短,最终与原桩形成复合基础,有效提高钢管桩承载力。
附图说明
图1是本发明的施工工艺原理图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述。
如图1所示,一种提高钢管桩承载力的双液旋喷加固方法,其步骤如下:
(1)引孔采用多重管高压旋喷钻机,在钢管桩1中心成孔。
(2)成孔至钢管桩底部设计标高位置,然后进行高压双液旋喷,采用两台高压注浆泵及一台空压机。先开启空压机及固化液泵,后开启促凝剂泵,同步提升至桩体内若干米。
(3)采用高压空气2的“气包浆”的方式减少浆液能量损失,保证加固范围满足要求。同步注入促凝剂3,加速浆液固化。固化剂4压力20MPa以上,流量60L/min以上;最终形成桩端底部加固体及桩端管内加固体。
本发明的实施例的使用方法如下:
a、根据现场情况确定孔位及加固范围,加固范围包括钢管桩桩底土体以及钢管桩底部部分桩身内土体;
b、采用多重管钻机一次成孔;
c、双液旋喷采用固化液+促凝剂的方式进行,达到快速固化不跑浆的目的。
此施工工艺适用于提高钢管桩承载力的工况,特别适用于钢管桩完成施工后未能达到承载力要求,需对钢管桩承载力进行补强的情况。

Claims (4)

1.一种提高钢管桩承载力的双液旋喷加固方法,其特征在于:首先,在钢管桩施工完成之后,采用多重管高压旋喷钻机,在钢管桩中心成孔,然后进行高压双液旋喷注浆,在钢管桩的桩端形成可靠的固结加固体,形成复合结构,提高其桩体承载力。
2.根据权利要求1所述的提高钢管桩承载力的双液旋喷加固方法,其特征在于:所述多重管高压旋喷钻机在钢管桩中心成成孔至钢管桩底部设计标高位置。
3.根据权利要求1所述的提高钢管桩承载力的双液旋喷加固方法,其特征在于:所述多重管高压旋喷钻机,同时注入水泥浆和促凝剂,同步提升至钢管桩体内若干米。
4.根据权利要求3所述的提高钢管桩承载力的双液旋喷加固方法,其特征在于:采用“气包浆”的方式减少浆液能量损失,即能形成800mm以上的桩径,同步注入促凝剂,加速桩体成型固化,也能挤密周边土体,形成大范围土体加固的目的。
CN202010800261.7A 2020-08-11 2020-08-11 提高钢管桩承载力的双液旋喷加固方法 Pending CN112012216A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010800261.7A CN112012216A (zh) 2020-08-11 2020-08-11 提高钢管桩承载力的双液旋喷加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010800261.7A CN112012216A (zh) 2020-08-11 2020-08-11 提高钢管桩承载力的双液旋喷加固方法

Publications (1)

Publication Number Publication Date
CN112012216A true CN112012216A (zh) 2020-12-01

Family

ID=73504186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010800261.7A Pending CN112012216A (zh) 2020-08-11 2020-08-11 提高钢管桩承载力的双液旋喷加固方法

Country Status (1)

Country Link
CN (1) CN112012216A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718756A (zh) * 2021-08-18 2021-11-30 中铁大桥局集团第二工程有限公司 一种复合沉桩及其施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3793844A (en) * 1971-04-07 1974-02-26 Bolt Associates Inc System for increasing the load-bearing capacity of soil
KR20030026940A (ko) * 2003-02-10 2003-04-03 주식회사 동아지질 제트 그라우팅 파일 공법에 있어 고압분사로드를 이용한 강관 삽입방법
CN1944809A (zh) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 三重管双高压旋喷注浆加固施工方法及其设备
CN101235640A (zh) * 2008-02-28 2008-08-06 上海市第二市政工程有限公司 四重管地层减压式双液旋喷的施工方法
CN101245599A (zh) * 2008-02-28 2008-08-20 上海市第二市政工程有限公司 用高压喷射双液浆生成水平旋喷加固体的施工设备
CN101768957A (zh) * 2008-02-08 2010-07-07 上海交通大学 用高压喷射双液浆体使软土地基快速凝固的设备
CN102493437A (zh) * 2011-11-26 2012-06-13 山东大学 注浆式微型钢管桩及注浆加固方法
CN109024641A (zh) * 2018-07-11 2018-12-18 上海市基础工程集团有限公司 三重管双液旋喷用于深基坑堵漏的施工方法
CN110438985A (zh) * 2019-07-26 2019-11-12 湖南化工地质工程勘察院有限责任公司 钻孔灌注桩桩基持力层补强加固施工方法
CN110725305A (zh) * 2019-10-31 2020-01-24 上海长凯岩土工程有限公司 一种提高斜向钢管桩承载力的施工方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3793844A (en) * 1971-04-07 1974-02-26 Bolt Associates Inc System for increasing the load-bearing capacity of soil
KR20030026940A (ko) * 2003-02-10 2003-04-03 주식회사 동아지질 제트 그라우팅 파일 공법에 있어 고압분사로드를 이용한 강관 삽입방법
CN1944809A (zh) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 三重管双高压旋喷注浆加固施工方法及其设备
CN101768957A (zh) * 2008-02-08 2010-07-07 上海交通大学 用高压喷射双液浆体使软土地基快速凝固的设备
CN101235640A (zh) * 2008-02-28 2008-08-06 上海市第二市政工程有限公司 四重管地层减压式双液旋喷的施工方法
CN101245599A (zh) * 2008-02-28 2008-08-20 上海市第二市政工程有限公司 用高压喷射双液浆生成水平旋喷加固体的施工设备
CN102493437A (zh) * 2011-11-26 2012-06-13 山东大学 注浆式微型钢管桩及注浆加固方法
CN109024641A (zh) * 2018-07-11 2018-12-18 上海市基础工程集团有限公司 三重管双液旋喷用于深基坑堵漏的施工方法
CN110438985A (zh) * 2019-07-26 2019-11-12 湖南化工地质工程勘察院有限责任公司 钻孔灌注桩桩基持力层补强加固施工方法
CN110725305A (zh) * 2019-10-31 2020-01-24 上海长凯岩土工程有限公司 一种提高斜向钢管桩承载力的施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
何康维等: "《建设工程计价原理与方法》", 31 October 2004, 同济大学出版社 *
汲亮: "排桩围护的基坑渗漏处置技术", 《建筑施工》 *
胡贺松等: "复合注浆法加固处理缺陷桩基技术", 《广州建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718756A (zh) * 2021-08-18 2021-11-30 中铁大桥局集团第二工程有限公司 一种复合沉桩及其施工方法

Similar Documents

Publication Publication Date Title
CN206467647U (zh) 一种应用于边坡夯实的夯实机
CN101016740A (zh) 多重增压快速固结密实软土地基处理方法
CN112609673B (zh) 深层共振密实加固杂填土地基的装置及方法
CN103526766A (zh) 一种深基坑减压井封堵方法
WO2018184254A1 (zh) 一种碳化搅拌桩-透气管桩复合地基及其施工方法
CN111074883A (zh) 一种后注浆透水混凝土管桩及其施工方法
CN104846809A (zh) 一种能排水并增大摩阻力的预制管桩及其施工方法
CN102296588B (zh) 水下挤密砂桩施工工艺
CN111074878B (zh) 一种淤长型滩涂地基加固装置及其施工方法
CN112012216A (zh) 提高钢管桩承载力的双液旋喷加固方法
CN201826302U (zh) 用于大直径现浇薄壁混凝土复合桩的成孔器
CN105297717A (zh) 一种下部扩大直径段复合基桩及其施工方法
WO2020215419A1 (zh) 一种淤泥与软土地基原位固化与排水结构
CN203639952U (zh) 地下变电站地下连续墙接缝防水结构
CN105507336A (zh) 一种利用降水井形成复合地基的方法
CN112281927A (zh) 框架柱独立基础渗漏治理施工方法
CN217270125U (zh) 一种超高压喷射切割土体注浆装置
CN205348154U (zh) 一种定位定向注浆抗拔承载预制桩
CN201288325Y (zh) 高压旋喷扩大头预应力管桩
CN214614009U (zh) 应用于软土地基加固的橡胶囊式注浆挤密桩
CN209482292U (zh) 一种饱和粘性土处理的三维固结筒体结构
CN205188933U (zh) 一种利用降水井形成的复合地基
CN106592586A (zh) 外加套箍填砂石料预制桩及其施工方法
CN209959261U (zh) 一种矫正地铁隧道水平变形的实时反馈注浆装置
CN210288356U (zh) 一种桩底沉渣超高压置换喷浆结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201201

RJ01 Rejection of invention patent application after publication