CN111809565B CN202010561496.5A CN202010561496A CN111809565B CN 111809565 B CN111809565 B CN 111809565B CN 202010561496 A CN202010561496 A CN 202010561496A CN 111809565 B CN111809565 B CN 111809565B
Authority
CN
China
Prior art keywords
slope
concrete
bank protection
hydraulic engineering
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010561496.5A
Other languages
Chinese (zh)
Other versions
CN111809565A (en
Inventor
寸小娟
马敏
万红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai River Construction Co ltd
Original Assignee
Shanghai River Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai River Construction Co ltd filed Critical Shanghai River Construction Co ltd
Priority to CN202010561496.5A priority Critical patent/CN111809565B/en
Publication of CN111809565A publication Critical patent/CN111809565A/en
Application granted granted Critical
Publication of CN111809565B publication Critical patent/CN111809565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/023Multi-tiered planters
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/128Coherent linings made on the spot, e.g. cast in situ, extruded on the spot
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/001Methods, systems, or installations for draining-off sewage or storm water into a body of water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

The invention relates to a hydraulic engineering ecological slope protection, which belongs to the technical field of river slope protection and comprises a slope body, a slope surface and a top surface, wherein a soil fixing layer is fixedly laid on the slope surface, the slope surface is covered by the soil fixing layer, a plurality of anchor bolts are inserted into the upper surface of the soil fixing layer and distributed along the inclined direction of the slope surface, the anchor bolts positioned on the same inclined line form a group, a plurality of injection grooves are formed in the top surface, one end of each group of anchor bolts extending into the slope body is positioned in the same injection groove, and concrete is poured into the injection grooves to form concrete reinforcing columns.

Description

Ecological bank protection of hydraulic engineering
Technical Field
The invention relates to the technical field of river channel revetments, in particular to a hydraulic engineering ecological revetments.
Background of the invention
Ecological slope protection, which is a slope protection technology for supporting a slope or a side slope by basic knowledge of subjects such as comprehensive engineering mechanics, soil science, ecology, phytology and the like to form a comprehensive slope protection system consisting of plants or engineering and plants; after the excavation side slope forms, through planting the plant, utilize the plant and rock, the interact of the soil body (root system anchor effect) protects, consolidates the side slope top layer, makes it can satisfy the stable requirement on side slope top layer, can resume the slope protection mode of destroyed natural ecological environment again, is an effectual bank protection, solid slope means, and the bank protection of river course all adopts ecological bank protection.
The existing Chinese patent with reference to publication number CN107217642B discloses an ecological slope protection, which comprises slope surfaces obliquely laid on two sides of a river channel, a pull rope capable of sinking into the river under a normal state is arranged between the two slope surfaces, and a stretching device capable of stretching the pull rope from the river to the river surface is arranged on the slope protection. Under the normal condition, the stay cord is sunken in the river bottom, the stay cord is hidden in the river course, can not cause the influence to the navigation of the ship in the river course or people's normal activity, when someone falls into water and needs the succour when discovering, stretching device pulls out the stay cord from the river course, make the stay cord emerge the river course, like this when the succour when the circumstances that physical power is not sufficient appears, can be with the help of the stay cord, as supporting, make it can temporarily cushion or follow the stay cord and swim back the river course both sides, avoid it at the succour in-process, because physical power consumption is too big and lead to oneself unable bank limit of swimming back, the success rate of rescue has been improved.
The above prior art solutions have the following drawbacks: in actual life, the steadiness of above-mentioned bank protection is relatively poor, takes place the phenomenon that soil erosion and water loss leads to the landslide easily, bank protection self can't be stable, what talk about rescue people, and then greatly reduced the safeguard effect of bank protection.
Disclosure of Invention
The invention aims to provide an ecological slope protection for hydraulic engineering, which achieves the effects of improving the stability of the slope protection and strengthening the protection function.
The above object of the present invention is achieved by the following technical solutions:
the utility model provides an ecological bank protection of hydraulic engineering, includes slope and the top surface on the slope and the slope, the slope is fixed to be laid solid soil layer, and solid soil layer covers the slope, and solid soil layer upper surface is inserted and is equipped with a plurality of crab-bolts, and the crab-bolt distributes along the incline direction of slope, and the crab-bolt that is located on same slope line is a set of, and a plurality of injection grooves have been seted up to the top surface, and the one end that every group crab-bolt stretched into in the slope all is located same injection groove, pours into concrete in the injection groove and makes it form the concrete reinforced column.
Through adopting above-mentioned technical scheme, the soil covering of slope face on the solid soil horizon with the slope body, carry out the preliminary reinforcement of bank protection, a plurality of crab-bolts of rethread nail tightly on the slope, fastening force through between crab-bolt and the slope body makes solid soil horizon more firm, and pour into the concrete in the injection tank, make every group crab-bolt all link into an organic whole through the concrete reinforcement post, the concrete reinforcement post is at first can strengthen the self intensity of the slope body, can also fix on the slope body with solid soil horizon more firm, when making solid soil horizon atress, can be more with the even each place of sharing for the slope body of power, the solid soil horizon atress of having prevented effectively is uneven, lead to partial position skew, and then reached and improved the bank protection steadiness, strengthen safeguard function's effect.
The invention is further configured to: the top surface is provided with a fixing pit, the fixing pit is located on one side, away from the slope, of the injection groove, a plurality of connecting holes are formed between the fixing pit and the injection groove, concrete is poured into the fixing pit to form a concrete reinforcing block, and the concrete reinforcing block and the concrete reinforcing column are integrally formed.
Through adopting the above technical scheme, the set pit is dug and is established on the top surface of the slope body, when can self reinforcing the slope body, through pouring concrete toward the set pit in, can make the concrete pass through in the connecting hole gets into the injection tank, need not to pour into the concrete at the opening part of each injection tank, make the shaping of concrete reinforced column more convenient, concrete reinforced column and concrete boss are for pouring integrated into one piece simultaneously, and then improved its steadiness greatly, the concrete boss can play the effect of pull-up to the concrete reinforced column simultaneously, if the solid layer receives the power of gliding, transmit for the concrete reinforced column through the crab-bolt, and the concrete boss then has played fixed effect to the concrete reinforced column, and then has improved the steadiness of bank protection greatly, the safeguard function of bank protection has been strengthened.
The invention is further configured to: the connecting holes are obliquely arranged, and one end of each connecting hole communicated with the injection groove is a low end.
Through adopting above-mentioned technical scheme, the connecting hole that the slope set up can be so that when pouring concrete toward fixed pit in, the concrete can be more quick enter into the injection tank in, and then improved the reinforced efficiency of bank protection greatly.
The invention is further configured to: and the top surface is sprayed with concrete to form a concrete reinforcing plate, and the lower surface of the concrete reinforcing plate is fixedly connected with the concrete reinforcing block, the concrete reinforcing column and the concrete-fixing layer.
Through adopting above-mentioned technical scheme, the concrete reinforcing plate covers the top surface, because concrete boss and concrete strengthening post are the concrete material for what the concrete reinforcing plate can be better plays the fixed action to concrete boss and concrete strengthening post, and the concrete reinforcing plate can also play the fixed action to the top on solid soil layer simultaneously, prevents effectively that solid soil layer from moving down, further improvement the steadiness of bank protection.
The invention is further configured to: the soil fixing layer is characterized in that the upper surface of the soil fixing layer is fixedly connected with a plurality of first baffles and a plurality of second baffles, the first baffles and the second baffles are perpendicular to each other and are connected with each other to form a grid shape, the length direction of the first baffles is perpendicular to the inclination direction of the slope surface, and the length direction of the second baffles is parallel to the inclination direction of the slope surface.
Through adopting above-mentioned technical scheme, first baffle and second baffle interconnect form a plurality of grids, and the grid that is located the water level below can supply the fish to perch and play, and the setting that is located the grid and first baffle and the slope contained angle of water level top can block dust and debris of scraping in the air to effectively prevent quality of water decline, first baffle and second baffle can play positive effect to the reinforcement of bank protection simultaneously, and improve the aesthetic property.
The invention is further configured to: and a gabion net is fixed between the bottom of the soil fixing layer and the bottom of the river channel, and one end, far away from the river channel, of the gabion net extends into the grid at the lowest part.
Through adopting above-mentioned technical scheme, be full of the stone in the gabion net, can play the effect of support to the top on solid soil layer, the biology that can also supply the aquatic simultaneously perches and lives for inside more variety in river course.
The invention is further configured to: a plurality of planting holes are formed in the upper surface of the soil fixing layer, the planting holes are respectively located in grids formed by the first baffle and the second baffle, and a planting soil layer is filled in each grid.
Through adopting above-mentioned technical scheme, can plant the plant on planting the soil layer, the setting of planting the hole simultaneously can make the root of plant can enter into the slope through solid soil layer internal for the root system of plant plays reinforced (rfd) effect to the slope body, and ecological environmental protection more simultaneously has further improved the steadiness of bank protection.
The invention is further configured to: and a nutrient soil layer is filled between the planting soil layer and the slope body, and the planting holes are filled with the nutrient soil layer.
Through adopting above-mentioned technical scheme, the nutrition soil layer is filled by nutrient soil and forms, and nutrient soil layer can provide abundant nutrition for the plant for plant roots's growth rate, and then accelerates the protective capacities of bank protection.
The invention is further configured to: the lateral wall that first baffle kept away from the river course has seted up a plurality of wash ports, and planting soil layer upper surface slope sets up, and the one end that planting soil layer upper surface is close to the river course is the low side, and the wash port slope sets up, and the wash port is unanimous with the incline direction of planting soil layer upper surface, and the wash port is located the top of planting soil layer upper surface low side.
Through adopting above-mentioned technical scheme, when rainy day, if the rainwater is excessive to store up in the net, the rainwater can flow into in the drain hole along the upper surface of planting the soil layer, and the wash port of rethread slope flows fast in next net until converging with the water in river course, has prevented effectively that the plant from being flooded, has improved the drainage ability of ecological bank protection.
The invention is further configured to: and a reinforcing hole is communicated between the adjacent injection grooves and is obliquely arranged.
Through adopting above-mentioned technical scheme, strengthen the hole with adjacent filling channel intercommunication for when the concrete was poured into to the filling channel is inherent, the concrete can flow into adjacent filling channel through strengthening the hole in, makes the shaping of concrete reinforcing post faster, strengthens downthehole concrete simultaneously and strengthens the post with adjacent concrete and fix together, further improvement the steadiness of bank protection.
In summary, the invention includes at least one of the following beneficial technical effects:
1. the soil fixing layer is more stable through the fastening force between the anchor bolts and the slope body, concrete is poured into the injection groove, so that each group of anchor bolts are connected into a whole through the concrete reinforcing column, the concrete reinforcing column can firstly reinforce the self strength of the slope body and can also more stably fix the soil fixing layer on the slope body, and the effects of improving the slope protection stability and enhancing the protection function are achieved;
2. the concrete reinforcing blocks play a role in fixing the concrete reinforcing columns, so that the stability of the slope protection is greatly improved, and the protection function of the slope protection is enhanced;
3. rainwater can flow into the drain hole along the upper surface of the planting soil layer, and then quickly flows into the next grid through the inclined drain hole until meeting with the water in the river channel, so that the drainage capacity of the ecological slope protection is improved.
Drawings
FIG. 1 is a schematic structural view of the present embodiment;
FIG. 2 is a sectional view showing a reinforcement hole;
FIG. 3 is a sectional view of the present embodiment;
FIG. 4 is an enlarged partial schematic view of portion A of FIG. 3;
FIG. 5 is a schematic view showing the structure of the planting hole.
In the figure, 1, a slope body; 11. a slope surface; 12. a top surface; 2. a river channel; 3. soil layer fixing; 31. an anchor bolt; 32. planting holes; 4. injecting into a groove; 41. a concrete reinforcing column; 42. a reinforcement hole; 5. a fixing pit; 51. a concrete reinforcing block; 52. connecting holes; 6. a concrete reinforcing plate; 7. a first baffle plate; 71. a second baffle; 72. planting a soil layer; 73. a nutrient soil layer; 74. a drain hole; 9. a gabion mesh.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 3, the ecological slope protection for hydraulic engineering disclosed by the present invention comprises a slope body 1, a slope surface 11 on the slope body 1 and a top surface 12 horizontally arranged, a river channel 2 is arranged on one side of the slope body 1, a soil fixing layer 3 is fixedly laid on the slope surface 11, in this embodiment, the soil fixing layer 3 is formed by concrete injection, the slope surface 11 is covered by the soil fixing layer 3, a plurality of anchor bolts 31 perpendicular to the slope surface 11 are inserted on the upper surface of the soil fixing layer 3, the anchor bolts 31 are distributed along the inclined direction of the slope surface 11, the anchor bolts 31 on the same inclined line are in a group, the top surface 12 is provided with injection grooves 4 parallel to the inclined direction of the slope surface 11, one end of each group of anchor bolts 31 extending into the slope body 1 is located in the same injection groove 4, concrete is injected into the injection grooves 4 to form concrete reinforcing columns 41, reinforcing holes 42 are communicated between adjacent injection grooves 4 (refer to fig. 2), strengthen the hole 42 slope setting, the vertical fixed pit 5 that is located injection tank 4 and keeps away from slope 11 one side of seting up of top surface 12, set up the connecting hole 52 that a plurality of slopes set up between fixed pit 5 and the injection tank 4, connecting hole 52 is the low side with the communicating one end of injection tank 4, it makes it form concrete boss 51 to pour into the concrete in the fixed pit 5, concrete boss 51 and concrete reinforcing column 41 are integrated into one piece, top surface 12 sprays concrete and makes it form concrete reinforcing plate 6, concrete reinforcing plate 6 lower surface all with concrete boss 51, concrete reinforcing column 41 and solid concrete layer 3 fixed connection.
The solid soil layer 3 is fixed on the slope surface 11 through the fastening force between the anchor bolts 31 and the slope body 1, the concrete reinforcing columns 41 are used for fixedly connecting each group of anchor bolts 31, the concrete reinforcing blocks 51 are fixedly connected with the concrete reinforcing columns 41 through the concrete in the connecting holes 52, further, the concrete reinforcing columns 41 are fixed, finally, the concrete reinforcing plates 6 are used for fixing the concrete reinforcing blocks 51 and the concrete reinforcing columns 41 at the same time, the adjacent injection grooves 4 are communicated through the reinforcing holes 42, so that the concrete in the injection grooves 4 can enter the adjacent injection grooves 4 through the reinforcing holes 42, the forming efficiency of the concrete reinforcing columns 41 is improved, meanwhile, the concrete in the reinforcing holes 42 can also be used for fixing the adjacent concrete reinforcing columns 41, the stability of the slope protection and the solid soil layer 3 is greatly improved, and the stability of the slope protection is improved, the effect of the protective function is enhanced.
As shown in fig. 4 and 5, the upper surface of the soil stabilization layer 3 is fixedly connected with a plurality of first baffles 7 and second baffles 71 which are perpendicular to each other, the first baffles 7 and the second baffles 71 are connected with each other to form a grid, the first baffles 7 and the second baffles 71 are both vertically arranged, the length direction of the first baffles 7 is perpendicular to the inclined direction of the slope surface 11, the length direction of the second baffles 71 is parallel to the inclined direction of the slope surface 11, the first baffles 7 which are positioned at the top are fixedly connected with the concrete reinforcing plate 6, the upper surface of the soil stabilization layer 3 is provided with a plurality of planting holes 32 which are positioned in the grid, each grid is sequentially filled with a nutrient soil layer 73 and a planting soil layer 72 from bottom to top, the planting holes 32 are filled with the nutrient soil layer 73, the upper surface of the planting soil layer 72 is parallel to the slope surface 11, the first baffles 7 are provided with a plurality of drainage holes 74 which are obliquely arranged, the oblique direction of the drainage holes 74 is parallel to the oblique direction of the slope surface 11, the top end of the drain hole 74 is positioned above the lower end of the upper surface of the planting soil layer 72; through planting the plant toward planting on soil layer 72, can make the root system of plant enter into the slope body 1 through planting the nutrition soil layer 73 in the hole 32, and then consolidate the slope body 1, when rainy day, the rainwater can flow to in the wash port 74 along the upper surface of planting soil layer 72, flow to the planting soil layer 72 upper surface in the next net through wash port 74 again, join until the rainwater and the river water in river course 2, effectively prevented that the rainwater from piling up in the net, the drainage performance of bank protection has been strengthened, and then the protective capacities of bank protection has been improved.
As shown in fig. 1 and 3, be fixed with gabion net 9 between solid soil layer 3 and the river course 2, gabion net 9 is located river course 2 bottoms, and the one end that river course 2 was kept away from to gabion net 9 stretches into in the net of below, and gabion net 9 is inside to be full of a plurality of stones, can play the effect of support to solid soil layer 3, and the biology that can also supply the aquatic simultaneously perches and lives for river course 2 inside more variety has strengthened the protective capacities of bank protection.
The implementation principle of the embodiment is as follows: when reinforcing the ecological slope protection, firstly spraying concrete on the slope surface 11 to form a solid soil layer 3, arranging injection grooves 4 and fixing pits 5 on the top surface 12, communicating reinforcing holes 42 between the adjacent injection grooves 4, arranging connecting holes 52 between the fixing pits 5 and the injection grooves 4, inserting anchor bolts 31 into the slope body 1 through the solid soil layer 3, enabling the bottom ends of each group of anchor bolts 31 to be positioned in the same injection groove 4, pouring the concrete into the fixing pits 5, integrally forming a concrete reinforcing block 51 and a concrete reinforcing column 41, fixing a first baffle plate 7 and a second baffle plate 71 on the solid soil layer 3 to form a grid shape, arranging planting holes 32 on the solid soil layer 3 in each grid, backfilling the nutrient soil to form a nutrient soil layer 73, filling the nutrient soil layer 73 with a planting soil layer 72, planting plants on the planting soil layer 72, and finally spraying the concrete on the top surface 12 to form a concrete reinforcing plate 6, the lower surface of the concrete reinforcing plate 6 is fixedly connected with the concrete reinforcing block 51, the concrete reinforcing column 41 and the concrete layer 3, one side of the concrete reinforcing plate 6 is fixedly connected with the first baffle 7 on the top, the stability of the slope protection is greatly improved, the stability of the slope protection is improved, and the effects of improving the stability of the slope protection and strengthening the protection function are achieved.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (9)

1. The utility model provides an ecological bank protection of hydraulic engineering, includes slope face (11) and top surface (12) on the slope body (1) and the slope body (1), its characterized in that: a soil stabilization layer (3) is fixedly laid on the slope surface (11), the slope surface (11) is covered by the soil stabilization layer (3), a plurality of anchor bolts (31) are inserted into the upper surface of the soil stabilization layer (3), the anchor bolts (31) are distributed along the inclination direction of the slope surface (11), the anchor bolts (31) on the same inclination line form a group, a plurality of injection grooves (4) are formed in the top surface (12), one end of each group of anchor bolts (31) extending into the slope body (1) is located in the same injection groove (4), and concrete is poured into the injection grooves (4) to form concrete reinforcing columns (41); the concrete reinforcing column is characterized in that a fixing pit (5) is formed in the top surface (12), the fixing pit (5) is located on one side, away from the slope surface (11), of the injection groove (4), a plurality of connecting holes (52) are formed between the fixing pit (5) and the injection groove (4), concrete is poured into the fixing pit (5) to form a concrete reinforcing block (51), and the concrete reinforcing block (51) and the concrete reinforcing column (41) are integrally formed.
2. The ecological bank protection of hydraulic engineering of claim 1, characterized in that: the connecting holes (52) are all obliquely arranged, and one end of each connecting hole (52) communicated with the injection groove (4) is a lower end.
3. The ecological bank protection of hydraulic engineering of claim 1, characterized in that: concrete is sprayed on the top surface (12) to form a concrete reinforcing plate (6), and the lower surface of the concrete reinforcing plate (6) is fixedly connected with a concrete reinforcing block (51), a concrete reinforcing column (41) and a solid soil layer (3).
4. The ecological bank protection of hydraulic engineering of claim 1, characterized in that: the upper surface of the soil fixing layer (3) is fixedly connected with a plurality of first baffles (7) and second baffles (71), the first baffles (7) and the second baffles (71) are perpendicular to each other and are connected with each other to form a grid shape, the length direction of the first baffles (7) is perpendicular to the inclination direction of the slope surface (11), and the length direction of the second baffles (71) is parallel to the inclination direction of the slope surface (11).
5. The ecological bank protection of hydraulic engineering of claim 4, characterized in that: and a gabion net (9) is fixed between the bottom of the soil stabilization layer (3) and the bottom surface of the river channel (2), and one end, far away from the river channel (2), of the gabion net (9) extends into the grid at the lowest part.
6. The ecological bank protection of hydraulic engineering of claim 4, characterized in that: a plurality of planting holes (32) are formed in the upper surface of the soil fixing layer (3), the planting holes (32) are respectively located in grids formed by the first baffle (7) and the second baffle (71), and a planting soil layer (72) is filled in each grid.
7. The ecological bank protection of hydraulic engineering of claim 6, characterized in that: and a nutrient soil layer (73) is filled between the planting soil layer (72) and the slope body (1), and the planting holes (32) are filled with the nutrient soil layer (73).
8. The ecological bank protection of hydraulic engineering of claim 6, characterized in that: a plurality of drain holes (74) are formed in the side wall, away from the river channel (2), of the first baffle (7), the upper surface of the planting soil layer (72) is arranged in an inclined mode, the end, close to the river channel (2), of the upper surface of the planting soil layer (72) is a low end, the drain holes (74) are arranged in an inclined mode, the inclined direction of the upper surface of the planting soil layer (72) is consistent with that of the drain holes (74), and the drain holes (74) are located above the low end of the upper surface of the planting soil layer (72).
9. The ecological bank protection of hydraulic engineering of claim 1, characterized in that: and a reinforcing hole (42) is communicated between the adjacent injection grooves (4), and the reinforcing hole (42) is obliquely arranged.
CN202010561496.5A 2020-06-18 2020-06-18 Ecological bank protection of hydraulic engineering Active CN111809565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010561496.5A CN111809565B (en) 2020-06-18 2020-06-18 Ecological bank protection of hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010561496.5A CN111809565B (en) 2020-06-18 2020-06-18 Ecological bank protection of hydraulic engineering

Publications (2)

Publication Number Publication Date
CN111809565A CN111809565A (en) 2020-10-23
CN111809565B true CN111809565B (en) 2021-12-10

Family

ID=72845394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010561496.5A Active CN111809565B (en) 2020-06-18 2020-06-18 Ecological bank protection of hydraulic engineering

Country Status (1)

Country Link
CN (1) CN111809565B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431057A (en) * 2021-05-08 2021-09-24 甘肃恒通路桥工程有限公司 Loess slope ecological protection method
CN113216089B (en) * 2021-05-26 2022-07-01 湖南中泰水电建设工程有限公司 Ecological river bank protection of palm stone
CN114508161B (en) * 2022-03-02 2023-01-10 河南省地质矿产勘查开发局第二地质环境调查院 Ecological protection restoration landslide drainage system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201512810U (en) * 2009-06-08 2010-06-23 广东金辉华集团有限公司 Retaining wall
CN208844589U (en) * 2018-09-27 2019-05-10 中交一公局海威工程建设有限公司 Ecological Slope safeguard structure and guard system
CN209114482U (en) * 2018-10-24 2019-07-16 福建卓越建设工程开发有限公司 A kind of recyclable composite soil nailing wall of assembled flexible surface layer
CN210031903U (en) * 2019-05-14 2020-02-07 浙江春天建设有限公司 Retaining wall structure based on mortar rubble
CN210275363U (en) * 2019-08-02 2020-04-10 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Ecological protection system of bank falling zone
CN111206601B (en) * 2020-01-19 2021-06-15 湖南工程学院 Method for rapid rush repair and reinforcement of high and steep landslide

Also Published As

Publication number Publication date
CN111809565A (en) 2020-10-23

Similar Documents

Publication Publication Date Title
CN111809565B (en) Ecological bank protection of hydraulic engineering
US11952734B2 (en) Ecological revetment for regulating wandering rivers
CN207760804U (en) A kind of Multi-functional economy dike structure
CN106120651A (en) A kind of colonnade formula stacked arrangement ecological revetment and construction method thereof
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN206127992U (en) Mutual -nesting type ecological building block
CN206015604U (en) A kind of colonnade formula stacked arrangement ecological revetment
CN209854663U (en) Assembled ecological revetment structure
CN209741762U (en) combined ecological bank protection structure
CN111719500A (en) Ecological slope protection system based on building engineering
CN215801392U (en) Ecological pine-imitating pile view revetment
CN206189348U (en) A ecological brick for river levee soil and water conservation
CN216108324U (en) Coastal ecological bank protection structure
CN216973293U (en) Ecological retaining brick with novel structure
CN215105078U (en) Ecological restoration revetment
CN215405859U (en) Modularized gravity type ecological revetment structure
CN211898175U (en) Ecological protection structure of river course bank slope
CN107956216A (en) A kind of inter-embedding type ecological block
CN216839249U (en) Combined type ecological embankment structure
CN205742067U (en) The reservoir structure of limestone basic unit
CN215329705U (en) Prefabricated structure of assembled ecological riverbed bottom
CN213805224U (en) Ecological bank protection prefab
CN217128138U (en) Soil erosion and water conservation constructional device that soil erosion and water loss
CN212336083U (en) Green land landscape retaining wall
CN219671220U (en) Ecological barricade of precast composite pile and ecological bank protection system of river course

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant