CN111801468A - 发电生态洪水控制系统 - Google Patents

发电生态洪水控制系统 Download PDF

Info

Publication number
CN111801468A
CN111801468A CN201980013433.1A CN201980013433A CN111801468A CN 111801468 A CN111801468 A CN 111801468A CN 201980013433 A CN201980013433 A CN 201980013433A CN 111801468 A CN111801468 A CN 111801468A
Authority
CN
China
Prior art keywords
flood
water
control system
power generation
flood control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201980013433.1A
Other languages
English (en)
Inventor
伊万·伊万诺维奇·科特巴赫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yi WanYiwannuoweiqiKetebahe
Original Assignee
Yi WanYiwannuoweiqiKetebahe
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yi WanYiwannuoweiqiKetebahe filed Critical Yi WanYiwannuoweiqiKetebahe
Publication of CN111801468A publication Critical patent/CN111801468A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/041Structures or apparatus for, or methods of, protecting banks, coasts, or harbours using active mechanical means, e.g. fluidizing or pumping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

本发明涉及一种发电生态洪水控制系统,包括选择性收集器、加压管道、出口收集器、发电机,加压管道位于河底之下或位于河底处或位于水中或位于水上,通过加压收集器将洪水转移出可能的泛洪区的区域,根据调节电枢进行水流量和水流速度的调节,调节电枢被安装在管道上并具有调节出口能力。本发明的发电生态洪水控制系统,加快了可能的泛洪区的排洪速度,降低了泛洪前和泛洪期间河流的水位,形成了预防领地由于泛洪而产生危害的措施,由于加压管道出口处存在自然高度差,因而可以在系统工作时将水能转换成电能的情况下进行发电。

Description

发电生态洪水控制系统
技术领域
本发明涉及水利建筑领域,具体涉及一种发电生态洪水控制系统。
背景技术
著名的防洪方法包括:《防洪种类》,Zhorova.V.M.Subirian,联邦大学工程学院,UDK(来源1)和《通过使河流急流来防止雨水洪灾》,Kolosov M.A.,Seleznyova N.V.,国立大学通报,以海军上将S.O.Makarova命名的海军和河舰队,第4版(88)2016,UDK 627.8(来源2)。
这些作为防洪方法的资料来源显示出能够人为抬高有危险的(洪灾)地带,设计防洪水库,建设辅助防洪河道,增加河流的通行能力,拉直河床,修建水坝。
这样的防护方法的缺点在于,如果必须升高该区域的所有建筑物和工程建设体以防止潜在的泛洪(这又会导致地貌侵蚀),则人为抬高地貌的自身成本会很高并且是不足够的。
建设防洪水库的另一个缺点是效率低,地貌恶化,需要为潜在的洪灾区分配大面积的土地,这在缺乏土地和山区地貌的情况下在经济上和技术上的成本不足。
建设防洪水库的另一个缺点是地貌恶化,必须为辅助河道、沉淀分配大面积的土地,在冰漂流和拥堵的情况下无效,无法在山区建设,低通水量不能解决洪水的问题。
随着通过加深河底使通水量增加,建设防洪体的缺点是自身成本高,抽洪泵被快速污染,冰漂流不足和拥堵,需要持续投资。
拉直河床的主要缺点是破坏地貌,效率低,必须提供大面积的土地,无法在山区使用。
防洪方法的缺点在于大坝破坏地貌,效率低并且建造大坝的成本高。
发明内容
本发明的目的是提供一种发电生态洪水控制系统,以解决洪水从其形成区快速排泄的问题,避免出现可能的泛洪区,这是通过在泛洪期前和泛洪期间降低水位,分时段将水流的一部分从恒压转换为加压,降低冰的强度,防止泛洪产生的危害并发电。
为实现上述目的,本发明采用如下技术方案:
一种发电生态洪水控制系统,包括选择性收集器、加压管道、出口收集器、发电机,加压管道位于河底之下或位于河底处或位于水中或位于水上,通过加压收集器将洪水转移出可能的泛洪区的区域,根据调节电枢进行水流量和水流速度的调节,调节电枢被安装在管道上并具有调节出口能力。
进一步地,调节电枢至少两个,安装在管道的开始端和末端处。
本发明的发电生态洪水控制系统,加快了可能的泛洪区的排洪速度,降低了泛洪前和泛洪期间河流的水位,创建了时间划分,降低了冰的强度,形成了预防领地由于泛洪而产生危害的措施,并且所提供的系统的效果还在于,由于加压管道出口处存在自然高度差,因而可以在系统工作时将水能转换成电能的情况下进行发电。
洪水控制系统提供了许多著名的和新的重要标志,能够通过对位于河底之下或位于河底处或位于水中或位于水上的管道加压通过将洪水从常压流转换成加压流从可能泛洪的区域将洪水的一部分转移出洪水形成区,其中,用调节电枢的进行水流量和水流速度的调节,调节电枢被安装在管道上并具有调节出口能力。
本发明所提供系统除获得技术成果,同时还改善了生态状况并实现了所提供的防洪系统,不会对生态产生负面影响,不会导致结冰和拥堵,并且还排除了加压管道冻结的可能。
附图说明
图1是本发明的发电生态洪水控制系统的侧面剖视示意图;
图2是本发明的发电生态洪水控制系统的总体形状示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。
发电生态防洪系统,如图1-图2所示,在河流1的主河道附近,从配备有选择收集器2的支流一侧连接到加压管道3,加压管道位于河底之下(图1)或位于河底处或位于水中或位于水上(图2),离开可能泛洪的泛洪区4,并与管道5的出口收集器连接,在该出口收集器上设置发电机6。
通过至少一个调节电枢7来调节水流的吞吐能力和速度,该调节电枢做成阀和闩锁的形状,被设置在管道的一部分上,例如靠近选择性收集器2,或者在管道的两侧安装至少两个调节电枢7,一个靠近选择性收集器2,第二个靠近发电机6。
在出现洪灾危险、河流上升或可能上升时,打开调节电枢7,河流1主河道的部分水流流向位于河底之下或位于河底处或位于水中或位于水上的加压管道3,并被引向位于泛洪区4之外的管道5的出水部分,结果,在压力下自然高度差导致水流流向发电机或排入河流1中。

Claims (2)

1.一种发电生态洪水控制系统,其特征在于,包括选择性收集器、加压管道、出口收集器、发电机,加压管道位于河底之下或位于河底处或位于水中或位于水上,通过加压收集器将洪水转移出可能的泛洪区的区域,根据调节电枢进行水流量和水流速度的调节,调节电枢被安装在管道上并具有调节出口能力。
2.根据权利要求1所述的发电生态洪水控制系统,其特征在于,调节电枢至少两个,安装在管道的开始端和末端处。
CN201980013433.1A 2018-02-16 2019-01-29 发电生态洪水控制系统 Pending CN111801468A (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
UAU201801524 2018-02-16
UAU201801524U UA125637U (uk) 2018-02-16 2018-02-16 Електрогенеруюча екологічна протипаводкова система
PCT/UA2019/000019 WO2019160524A1 (ru) 2018-02-16 2019-01-29 Электрогенерирующая экологическая противопаводковая система

Publications (1)

Publication Number Publication Date
CN111801468A true CN111801468A (zh) 2020-10-20

Family

ID=62091147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201980013433.1A Pending CN111801468A (zh) 2018-02-16 2019-01-29 发电生态洪水控制系统

Country Status (6)

Country Link
US (1) US11578469B2 (zh)
EP (1) EP3754113A4 (zh)
CN (1) CN111801468A (zh)
EA (1) EA202091900A1 (zh)
UA (1) UA125637U (zh)
WO (1) WO2019160524A1 (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6751981B1 (ja) * 2020-04-30 2020-09-09 英世 村上 水路システム
JP7127791B1 (ja) * 2022-04-11 2022-08-30 株式会社美鷹 バックウォーター対策用水路システム

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2228996C1 (ru) * 2002-11-25 2004-05-20 Лихачев Василий Федорович Способ предотвращения затопления паводковой водой горной реки сельхозугодий
CN1900426A (zh) * 2005-07-18 2007-01-24 杜同 根治黄河水害和沙害的方案
CN202596969U (zh) * 2012-05-28 2012-12-12 曹爱平 一种生态微水发电系统
CN203067165U (zh) * 2013-02-21 2013-07-17 叶永祥 改进的江河低水位集流发电系统
CN104481016A (zh) * 2014-12-18 2015-04-01 天津大学前沿技术研究院有限公司 一种利用绿色水泵的排水系统
RU159397U1 (ru) * 2014-10-28 2016-02-10 Борис Валерьевич Журавлев Длинный цельный стационарно незакрепленный трубопровод для защиты прибрежных ландшафтов рек или водных каналов от паводковой опасности
CN107532396A (zh) * 2015-01-30 2018-01-02 普鲁格尼希思公司 水利发电设施

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2962599A (en) * 1957-09-09 1960-11-29 Frank Z Pirkey Apparatus for developing and accumulating hydroelectric energy
JPS6032036B2 (ja) * 1975-08-13 1985-07-25 株式会社日立製作所 発電所の制御装置
JPS5938372B2 (ja) * 1979-12-11 1984-09-17 昭夫 占部 河川の流量制御方法
US5360290A (en) * 1991-12-13 1994-11-01 Hitachi, Ltd. Underground drainage facility, vertical-shaft multi-stage adjustable vane pump, and method of running drainage pump
US5909982A (en) * 1992-06-18 1999-06-08 Hitachi, Ltd. Large-depth underground drainage facility and method of running same
JP3216437B2 (ja) * 1994-09-14 2001-10-09 株式会社日立製作所 排水ポンプ機場及び排水ポンプ機場の排水運転方法
US20010022085A1 (en) * 1995-10-19 2001-09-20 Stewart Leonard L. Method of combining wastewater treatment and power generation technologies
JPH1113039A (ja) * 1997-06-25 1999-01-19 Hiromi Ichikawa 河川の水の貯水装置
US6000880A (en) * 1997-12-23 1999-12-14 Halus; William J. Sewage water purification/reuse/redistribution, flood control, and power generating system
GB0121010D0 (en) * 2001-08-30 2001-10-24 Wadsworth George E River flood control network
ITRM20030186A1 (it) * 2003-04-24 2004-10-25 Antonio Marchetti Dispositivo anti-straripamento con trasferimento delle
US7866919B2 (en) * 2007-04-12 2011-01-11 Natural Energy Resources Company System and method for controlling water flow between multiple reservoirs of a renewable water and energy system
US7632040B2 (en) * 2007-10-30 2009-12-15 Criptonic Energy Solutions, Inc. Waste water electrical power generating system with storage system and methods for use therewith
DE102009057758A1 (de) * 2009-12-12 2011-06-16 Simon Franz Unterirdischer Wasserspeicher zur Energiegewinnung und zur Wasserstandsregulierung eines Wasserlaufes
US20140193201A1 (en) * 2013-01-06 2014-07-10 David William Stauffer River bottom siphon for hydro-electric generation and irrigation
US9261068B2 (en) * 2013-01-16 2016-02-16 Yaser K. Barakat Hydroelectric power generating system
UA86865U (en) * 2013-07-31 2014-01-10 Институт Водных Проблем И Мелиорации Национальной Академии Аграрных Наук Украины Hydro-power unit
DE102013109763A1 (de) * 2013-09-06 2015-03-12 Kai Motzkau Hochwasserschutz
RU142767U1 (ru) * 2013-10-22 2014-07-10 Борис Валерьевич Журавлев Длинный цельный стационарно закрепленный трубопровод для защиты прибрежных ландшафтов рек или водных каналов от паводковой опасности
US10359027B2 (en) * 2016-01-14 2019-07-23 Yaser Barakat Hydroelectric power generating system
US10213815B1 (en) * 2017-11-01 2019-02-26 Benton Frederick Baugh Method of cleaning the inlet to a thruster while in operation
US10947957B1 (en) * 2018-11-29 2021-03-16 Keith G. Bandy Apparatus, system and method for utilizing kinetic energy to generate electricity

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2228996C1 (ru) * 2002-11-25 2004-05-20 Лихачев Василий Федорович Способ предотвращения затопления паводковой водой горной реки сельхозугодий
CN1900426A (zh) * 2005-07-18 2007-01-24 杜同 根治黄河水害和沙害的方案
CN202596969U (zh) * 2012-05-28 2012-12-12 曹爱平 一种生态微水发电系统
CN203067165U (zh) * 2013-02-21 2013-07-17 叶永祥 改进的江河低水位集流发电系统
RU159397U1 (ru) * 2014-10-28 2016-02-10 Борис Валерьевич Журавлев Длинный цельный стационарно незакрепленный трубопровод для защиты прибрежных ландшафтов рек или водных каналов от паводковой опасности
CN104481016A (zh) * 2014-12-18 2015-04-01 天津大学前沿技术研究院有限公司 一种利用绿色水泵的排水系统
CN107532396A (zh) * 2015-01-30 2018-01-02 普鲁格尼希思公司 水利发电设施

Also Published As

Publication number Publication date
WO2019160524A1 (ru) 2019-08-22
EP3754113A1 (en) 2020-12-23
EA202091900A1 (ru) 2020-11-02
US20220064889A1 (en) 2022-03-03
US11578469B2 (en) 2023-02-14
EP3754113A4 (en) 2021-11-03
UA125637U (uk) 2018-05-10

Similar Documents

Publication Publication Date Title
CN100443667C (zh) 阶梯式水力发电站
TW201741528A (zh) 水力發電設備
CN111801468A (zh) 发电生态洪水控制系统
WO2012177182A1 (ru) Каскад деривационных гидроэлектростанций
JPS5873611A (ja) 導水圧管路による水路の布設方法
WO2011125072A2 (en) Water velocity enhancement in canal structure for low head electrical power generation system/turbine
CN207582440U (zh) 一种压力前池拦污栅前置的水电站
RU2639046C2 (ru) Эксплуатационный водосброс плотины гидроэлектростанции
CN212388498U (zh) 一种用于严寒地区水库拦截污物、保证泄洪及发电安全的装置
CN103898883A (zh) 用于严寒地区长距离引水式电站的引水系统
KR20230033276A (ko) 댐 없는 수력발전시스템
EP1377750B1 (de) Bewegliches, über- und unterströmbares wasserkraftwerk
CN103114565A (zh) 适用于斜坡急流河道引流发电的截流引水系统及水电站
RU2514640C1 (ru) Способ строительства сейсмобезопасных, сберегающих реки и экологию, гидроэлектростанций
CN203768882U (zh) 一种用于严寒地区长距离引水式电站的引水系统
CN101535629B (zh) 防洪系统
CN102352617A (zh) 灯泡贯流式水电站厂房导流的施工方法
CN206110099U (zh) 近距离截流水利发电站
CN210769127U (zh) 一种管道蓄能水力发电站
RU101461U1 (ru) Гидроударная электростанция
RU185644U1 (ru) Бесплотинная гидроэлектростанция
RU2671681C1 (ru) ГЭС, вырабатывающая электроэнергию от холостого водосброса
Wei et al. Research on flood discharge, energy dissipation, and operation mode of sluice gate for low-head and large-discharge hydropower stations.… and Safe Dams Around the World
JPS6352232B2 (zh)
CN106958236A (zh) 一种水电站地面厂房尾水出口结构及其水电站

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201020

WD01 Invention patent application deemed withdrawn after publication