CN111778960A - 一种低净空富水沙卵层钢侧模咬合桩施工方法 - Google Patents
一种低净空富水沙卵层钢侧模咬合桩施工方法 Download PDFInfo
- Publication number
- CN111778960A CN111778960A CN202010540673.1A CN202010540673A CN111778960A CN 111778960 A CN111778960 A CN 111778960A CN 202010540673 A CN202010540673 A CN 202010540673A CN 111778960 A CN111778960 A CN 111778960A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel side
- arc
- constructing
- meat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/14—Sealing joints between adjacent sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/182—Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/187—Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Revetment (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010540673.1A CN111778960B (zh) | 2020-06-15 | 2020-06-15 | 一种低净空富水沙卵层钢侧模咬合桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010540673.1A CN111778960B (zh) | 2020-06-15 | 2020-06-15 | 一种低净空富水沙卵层钢侧模咬合桩施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111778960A true CN111778960A (zh) | 2020-10-16 |
CN111778960B CN111778960B (zh) | 2022-02-22 |
Family
ID=72756423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010540673.1A Active CN111778960B (zh) | 2020-06-15 | 2020-06-15 | 一种低净空富水沙卵层钢侧模咬合桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111778960B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668557A (zh) * | 2021-08-18 | 2021-11-19 | 中铁第四勘察设计院集团有限公司 | 用于咬合桩素桩施工的钢套筒、咬合桩、咬合桩施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1090189A1 (en) * | 1999-04-26 | 2001-04-11 | Cementation Foundations Skanska Limited | Improved formation of capping beams for piles |
RU2352718C1 (ru) * | 2007-10-16 | 2009-04-20 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Способ сооружения пакета буронабивных свай |
CN204728703U (zh) * | 2015-03-31 | 2015-10-28 | 黄豪杰 | 一种塑料模板连接卡 |
CN107142952A (zh) * | 2017-06-19 | 2017-09-08 | 中国市政工程中南设计研究总院有限公司 | 咬合桩施工方法及应用于该方法的咬合管 |
CN107268636A (zh) * | 2017-07-18 | 2017-10-20 | 江苏景源万河环境科技有限公司 | 一种密封槽及咬合结构的钢筒或钢板桩构成的连续墙基坑用围护及施工法 |
CN111042119A (zh) * | 2019-12-18 | 2020-04-21 | 付志成 | 预制件、咬合桩及咬合桩的施工方法 |
-
2020
- 2020-06-15 CN CN202010540673.1A patent/CN111778960B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1090189A1 (en) * | 1999-04-26 | 2001-04-11 | Cementation Foundations Skanska Limited | Improved formation of capping beams for piles |
RU2352718C1 (ru) * | 2007-10-16 | 2009-04-20 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Способ сооружения пакета буронабивных свай |
CN204728703U (zh) * | 2015-03-31 | 2015-10-28 | 黄豪杰 | 一种塑料模板连接卡 |
CN107142952A (zh) * | 2017-06-19 | 2017-09-08 | 中国市政工程中南设计研究总院有限公司 | 咬合桩施工方法及应用于该方法的咬合管 |
CN107268636A (zh) * | 2017-07-18 | 2017-10-20 | 江苏景源万河环境科技有限公司 | 一种密封槽及咬合结构的钢筒或钢板桩构成的连续墙基坑用围护及施工法 |
CN111042119A (zh) * | 2019-12-18 | 2020-04-21 | 付志成 | 预制件、咬合桩及咬合桩的施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668557A (zh) * | 2021-08-18 | 2021-11-19 | 中铁第四勘察设计院集团有限公司 | 用于咬合桩素桩施工的钢套筒、咬合桩、咬合桩施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111778960B (zh) | 2022-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110486018B (zh) | 格构式复合井筒结构及施工方法 | |
CN203684399U (zh) | 暗柱式预制构件连接节点 | |
CN103758291A (zh) | 一种剪力增强型半灌浆套筒 | |
CN204626707U (zh) | 一种带芯柱免立模钢板连接的墙-墙水平连接节点 | |
CN111778960B (zh) | 一种低净空富水沙卵层钢侧模咬合桩施工方法 | |
CN113513015A (zh) | 一种半预制式混凝土钢筋笼地下连续墙及施工方法 | |
CN106381804A (zh) | 一种采用u形钢筋制作的预制拼装桥墩及其连接工艺 | |
CN112523200A (zh) | 集成式管桩 | |
CN105544382A (zh) | 一种哑铃型承台的施工方法 | |
CN209891187U (zh) | 现浇地连墙相邻槽段工字钢接头砂袋装置 | |
CN204080844U (zh) | 用于房屋建筑工程基础承台的装配式钢模 | |
CN106351235A (zh) | 装配式四根组合圆钢管混凝土内支撑结构及制作方法 | |
CN203530990U (zh) | 一种深基坑支护挡墙钢管混凝土支撑结构 | |
CN212295172U (zh) | 一种装配式建筑用砖 | |
CN211143496U (zh) | 一种立柱pc构件 | |
CN212689203U (zh) | 一种装配式剪力墙的连接结构 | |
CN211257274U (zh) | 装配式地下结构构配件 | |
CN204225360U (zh) | 一种预制柱及与预制梁的连接结构 | |
CN210636384U (zh) | 一种堆石混凝土坝预制模板 | |
CN109778806B (zh) | 一种墩墙带联系梁整体滑升的施工方法 | |
CN210033430U (zh) | 一种用于竖井内衬墙施工的模板与支撑体系 | |
CN113738102A (zh) | 一种土建工程的模板砌块及其制造方法和使用方法 | |
CN105822023A (zh) | 适用于夯土墙的预制抗剪连接件、其成型方法及夯土墙 | |
CN211257075U (zh) | 一种装配式综合管廊叠合墙结构 | |
CN216712992U (zh) | 一种基于bim技术的预制-现浇地下连续墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zhanying Inventor after: Wang Wenbo Inventor after: He Jianzhong Inventor after: Hao Dongjuan Inventor after: Zhu Shufeng Inventor after: Wang Yong Inventor after: Gao Libin Inventor after: Yu Chuanze Inventor after: Liang Shaodong Inventor after: Wang Xiang Inventor after: Yang Ning Inventor after: Li Wenxin Inventor before: Liu Zhanying Inventor before: He Jianzhong Inventor before: Zhu Shufeng Inventor before: Gao Libin Inventor before: Yu Chuanze Inventor before: Liang Shaodong Inventor before: Wang Xiang Inventor before: Yang Ning Inventor before: Li Wenxin Inventor before: Wang Wenbo |