CN111648791B - 一种隧道的开挖支护结构及施工方法 - Google Patents
一种隧道的开挖支护结构及施工方法 Download PDFInfo
- Publication number
- CN111648791B CN111648791B CN202010545950.8A CN202010545950A CN111648791B CN 111648791 B CN111648791 B CN 111648791B CN 202010545950 A CN202010545950 A CN 202010545950A CN 111648791 B CN111648791 B CN 111648791B
- Authority
- CN
- China
- Prior art keywords
- support
- plate
- bottom plate
- layer
- mounting bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010545950.8A CN111648791B (zh) | 2020-06-16 | 2020-06-16 | 一种隧道的开挖支护结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010545950.8A CN111648791B (zh) | 2020-06-16 | 2020-06-16 | 一种隧道的开挖支护结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111648791A CN111648791A (zh) | 2020-09-11 |
CN111648791B true CN111648791B (zh) | 2021-09-10 |
Family
ID=72352894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010545950.8A Active CN111648791B (zh) | 2020-06-16 | 2020-06-16 | 一种隧道的开挖支护结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111648791B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB147618A (en) * | 1918-11-30 | 1921-08-11 | Alfred Kunz | Improvements in tunnel shoring |
CN109057821A (zh) * | 2018-09-28 | 2018-12-21 | 浙江八达隧道工程股份有限公司 | 公路软岩隧道双层拱架支护施工系统及其施工方法 |
CN109538252A (zh) * | 2018-11-20 | 2019-03-29 | 四川蓝海智能装备制造有限公司 | 多功能拱架台车及多榀拱架的架设方法 |
CN109538268A (zh) * | 2018-11-15 | 2019-03-29 | 河南工程学院 | 一种矿井巷道扩修时的临时可移动支护装置 |
CN110130923A (zh) * | 2019-04-03 | 2019-08-16 | 中船第九设计研究院工程有限公司 | 一种用于隧道的型钢支护拱架结构 |
-
2020
- 2020-06-16 CN CN202010545950.8A patent/CN111648791B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB147618A (en) * | 1918-11-30 | 1921-08-11 | Alfred Kunz | Improvements in tunnel shoring |
CN109057821A (zh) * | 2018-09-28 | 2018-12-21 | 浙江八达隧道工程股份有限公司 | 公路软岩隧道双层拱架支护施工系统及其施工方法 |
CN109538268A (zh) * | 2018-11-15 | 2019-03-29 | 河南工程学院 | 一种矿井巷道扩修时的临时可移动支护装置 |
CN109538252A (zh) * | 2018-11-20 | 2019-03-29 | 四川蓝海智能装备制造有限公司 | 多功能拱架台车及多榀拱架的架设方法 |
CN110130923A (zh) * | 2019-04-03 | 2019-08-16 | 中船第九设计研究院工程有限公司 | 一种用于隧道的型钢支护拱架结构 |
Also Published As
Publication number | Publication date |
---|---|
CN111648791A (zh) | 2020-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101668925B (zh) | 弧形面板衬砌 | |
CN108915720B (zh) | 一种大断面隧道穿越断层破碎带施工方法 | |
CN111271092A (zh) | 一种多种变截面暗挖隧道二衬快速施工结构及方法 | |
CN108868834B (zh) | 隧道拱墙初期支护侵限换拱施工临时支护装置 | |
CN111472801A (zh) | 浅埋暗挖排水廊道下穿既有线的施工方法 | |
CN107762529A (zh) | 基于临时支护体系的车行横洞与隧道正洞交叉处施工方法 | |
CN111379577B (zh) | 一种与棚盖法施工结合的可拆卸u型初期支护的方法 | |
CN111648791B (zh) | 一种隧道的开挖支护结构及施工方法 | |
JP3677699B2 (ja) | トンネル合流部の施工方法 | |
CN208456616U (zh) | 穿越断层破碎带隧道初期支护及中隔壁加强支护体系 | |
JPH0673735A (ja) | 地中連続壁拡底方法 | |
CN113266363B (zh) | 大断面隧道临时中隔墙加固结构开挖方法 | |
CN115898473A (zh) | 一种装配式波纹钢隧道初期支护结构及其施工方法 | |
CN112796767A (zh) | 用于管幕顶管群管掘进井的掌子面支护构造及施工方法 | |
CN113958337A (zh) | 一种与盾构隧道相结合的渡线段隧道结构及施工方法 | |
CN114607389A (zh) | 城市超大断面浅埋车站的改进型双侧壁导洞施工方法 | |
CN111810166A (zh) | 一种地铁车站基坑端头围护桩的施工方法 | |
CN111577294A (zh) | 复杂地形陡峭岩体逆作洞门隧道进洞及施工方法 | |
CN111779489A (zh) | 一种“⊕c”形区间人防段的大断面隧道施工方法 | |
CN213684159U (zh) | 一种连拱隧道复合式中墙π型支撑结构 | |
CN219011246U (zh) | 一种可移动的沟槽支护装置 | |
CN114016560B (zh) | 地铁车站施工结构与既有地下通道连接处防渗漏施工结构 | |
KR20050012615A (ko) | 분할 메서플레이트를 이용한 메서실드 굴착장치 및 이를이용한 지중터널굴착공법 | |
CN113279393B (zh) | 一种预应力型钢支护桩及安装方法 | |
CN113944479B (zh) | 一种不良地质隧道三岔口施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Su Changhui Inventor after: Xiong Yongchuan Inventor after: Cao Zhenfan Inventor after: Hu Jianjin Inventor after: Liu Fei Inventor after: Wang Yingsen Inventor after: Zhang Fan Inventor after: Du Bin Inventor after: Huang Mingqi Inventor after: Xu Buyun Inventor after: Long Jiao Inventor after: Qi Xiaolei Inventor before: Su Changhui Inventor before: Liu Fei Inventor before: Xu Buyun Inventor before: Deng Qihua Inventor before: Zhang Fan Inventor before: Wang Yingsen Inventor before: Du Bin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |