CN111254830A - Rapid treatment method for bridge pier pull rod hole - Google Patents
Rapid treatment method for bridge pier pull rod hole Download PDFInfo
- Publication number
- CN111254830A CN111254830A CN201911132307.6A CN201911132307A CN111254830A CN 111254830 A CN111254830 A CN 111254830A CN 201911132307 A CN201911132307 A CN 201911132307A CN 111254830 A CN111254830 A CN 111254830A
- Authority
- CN
- China
- Prior art keywords
- portland cement
- glue
- pull rod
- rod hole
- ordinary portland
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/04—Portland cements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a rapid processing method of a bridge pier pull rod hole, which comprises the following specific operations: after the pull rod is pulled out, cutting off the sleeve exposed out of the surface of the concrete structure; picking the concrete with a ring cutting drill to the inner side of the surface of the concrete, wherein the diameter of the concrete is not less than 50 mm; and then cleaning sundries in the pull rod hole and the sleeve, and after cement mortar for filling the hole is injected into the pull rod hole, performing surface finishing treatment. The invention effectively solves the problems of pull rod hole plugging and uniform color, has high appearance quality and good waterproofness, and simultaneously has low construction cost, convenient operation and high working efficiency.
Description
Technical Field
The invention belongs to the technical field of bridge construction, and particularly relates to a rapid processing method for a bridge pier pull rod hole.
Background
In order to ensure the appearance size of the pier, the formwork does not run or expand in the concrete construction process, a pull rod is usually adopted for fixing in formwork reinforcing construction, after the pull rod is removed, a hole can be reserved in a concrete structure, and in order to ensure the appearance quality and the waterproof requirement of the structure, a pull rod hole needs to be filled and plugged.
Disclosure of Invention
In view of the above, the present invention provides a method for rapidly processing a bridge pier tie rod hole, which aims to overcome the defects in the prior art.
In order to achieve the purpose, the technical scheme of the invention is realized as follows:
a rapid processing method for a bridge pier pull rod hole comprises the following steps:
s1, cutting off the sleeve exposed out of the surface of the concrete structure after the pull rod is pulled out;
s2, using a cutting drill to pick the concrete into the surface of the concrete, wherein the thickness of the concrete is not less than 50 mm;
s3, cleaning sundries in the pull rod hole and the sleeve;
s4, sprinkling water to the inner and outer sides of the pull rod hole for wetting treatment;
s5, cement mortar for filling the hole is injected into the pull rod hole, and a hole for plastering is reserved at the hole opening;
s6, comparing the color of the concrete around the pull rod hole with a pre-manufactured mortar palette, and preparing cement mortar for plastering according to the proportion of the mortar palette corresponding to the sample;
and S7, performing surface finishing treatment on the pull rod hole by using the surface finishing cement mortar prepared in the step.
Further, the sample ratio on the mortar palette is respectively:
(1) ordinary portland cement: white portland cement: glue 107: water 1.0:7.0:1.2: 1.2;
(2) ordinary portland cement: white portland cement: glue 107: water 1.5:6.5:1.2: 1.2;
(3) ordinary portland cement: white portland cement: glue 107: 2.0:6.0:1.2: 1.2;
(4) ordinary portland cement: white portland cement: glue 107: 2.1:5.9:1.2
(5) Ordinary portland cement: white portland cement: glue 107: 2.3:5.7:1.2: 1.2;
(6) ordinary portland cement: white portland cement: glue 107: 2.4:5.6:1.2: 1.2;
(7) ordinary portland cement: white portland cement: glue 107: water 2.5:5.5:1.2: 1.2;
(8) ordinary portland cement: white portland cement: glue 107: 2.7:5.3:1.2: 1.2;
(9) ordinary portland cement: white portland cement: glue 107: 2.8:5.2:1.2: 1.2;
(10) ordinary portland cement: white portland cement: glue 107: 2.9:5.1:1.2: 1.2;
(11) ordinary portland cement: white portland cement: glue 107: water 3.0:5.0:1.2: 1.2;
(12) ordinary portland cement: white portland cement: glue 107: water 3.1:4.9:1.2: 1.2;
(13) ordinary portland cement: white portland cement: glue 107: water 3.2:4.8:1.2: 1.2;
(14) ordinary portland cement: white portland cement: glue 107: water 3.3:4.7:1.2: 1.2;
(15) ordinary portland cement: white portland cement: glue 107: water 3.6:4.4:1.2: 1.2;
(16) ordinary portland cement: white portland cement: glue 107: water-4.0: 4.0:1.2: 1.2.
Furthermore, the ring cutting drill adopts a handheld electric ring cutting drill.
Furthermore, when cleaning the pull rod hole and impurities in the sleeve, a long-barrel dust blowing gun is adopted for blowing.
Further, in step S5, a manual grouting gun is used for grouting into the draw-bar hole.
Further, in step S5, the depth of the hole for plastering reserved in the opening of the draw bar is 4-5 mm.
Compared with the prior art, the invention has the following advantages:
the cement mortar for plastering does not contain an expanding agent, adopts a plurality of proper silicate cement proportions, and is added with glue and water in proper proportion, thereby being more beneficial to the plastering treatment of the pull rod hole, the cement mortar for plastering is better combined with the concrete (pier body concrete) on the inner wall of the hole, the cement mortar can be fully bonded together without cracks, and the method effectively ensures the appearance quality and the waterproof performance requirements.
The mortar palette of preparation in advance has almost covered on-the-spot pier shaft colour difference scope, and during site operation, can confirm the component proportion fast through the sample on the contrast palette, and the efficiency of construction is high, and the effectual pull rod hole shutoff of having solved and the unified problem of colour.
In conclusion, the method provided by the invention has the advantages of low construction cost, convenience in operation, high working efficiency, high appearance quality after the pull rod hole is filled and blocked, and good waterproofness.
Detailed Description
It should be noted that the embodiments and features of the embodiments of the present invention may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in an orientation or positional relationship indicated for convenience in describing the present invention, but do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, the meaning of "a plurality" is two or more unless otherwise specified.
In the description of the invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "connected" are to be construed broadly, e.g. as being fixed or detachable or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
The invention will be described in detail with reference to the following examples.
A rapid processing method for a bridge pier pull rod hole comprises the following steps:
s1, cutting off the sleeve exposed out of the surface of the concrete structure after the pull rod is pulled out;
s2, using a cutting drill to pick the concrete into the surface of the concrete, wherein the thickness of the concrete is not less than 50 mm; the circular cutting drill generally adopts a handheld electric circular cutting drill;
s3, cleaning sundries in the pull rod hole and the sleeve; when cleaning the pull rod hole and impurities in the sleeve, a long-barrel dust blowing gun is adopted for blowing;
s4, spraying water to the inside and the periphery of the pull rod hole for wetting treatment, so that the expanded cement mortar and the pier body concrete are better bonded together to form a compact structure;
s5, injecting cement mortar for filling holes into the pull rod holes (the consistency is preferably 60-80mm, the setting time is about 3-5 hours), and reserving holes for plastering at the openings;
s6, comparing the color of the concrete around the pull rod hole with a pre-manufactured mortar palette, and preparing cement mortar for plastering according to the proportion of the mortar palette corresponding to the sample;
and S7, performing surface finishing treatment on the pull rod hole by using the surface finishing cement mortar prepared in the step.
The cement mortar for plastering does not contain an expanding agent, tests and practical use prove that the cement mortar is prepared by adopting a plurality of proper portland cement proportions and adding glue and water in a proper proportion, thereby being more beneficial to the plastering treatment of the pull rod hole, the cement mortar for plastering is better combined with the concrete (pier body concrete) on the inner wall of the hole, the cement mortar can be fully bonded together, and no crack exists.
In the invention, the color of the concrete around the pull rod hole is compared with the color of the blocking palette of the pier body pull rod hole, and the color of the plastering cement paste on the pull rod hole is consistent with the color of the plastering at the pull rod hole.
In an optional embodiment, in order to prevent the plastering material from being adhered to the surface of the existing concrete, a PVC transparent plastic hard rubber sheet with a round hole in the middle can be adhered to the surface of the concrete around the pull rod hole before plastering, and the concrete curing agent is sprayed in time after finishing for curing.
In the step S5, a manual grouting gun is adopted when grouting is carried out in the pull rod hole; the depth of the hole for plastering reserved in the orifice of the pull rod is 4-5 mm.
Be equipped with the multiunit sample on the above-mentioned mortar palette of having made in advance, specific ratio is:
(1) ordinary portland cement: white portland cement: glue 107: water 1.0:7.0:1.2: 1.2;
(2) ordinary portland cement: white portland cement: glue 107: water 1.5:6.5:1.2: 1.2;
(3) ordinary portland cement: white portland cement: glue 107: 2.0:6.0:1.2: 1.2;
(4) ordinary portland cement: white portland cement: glue 107: 2.1:5.9:1.2
(5) Ordinary portland cement: white portland cement: glue 107: 2.3:5.7:1.2: 1.2;
(6) ordinary portland cement: white portland cement: glue 107: 2.4:5.6:1.2: 1.2;
(7) ordinary portland cement: white portland cement: glue 107: water 2.5:5.5:1.2: 1.2;
(8) ordinary portland cement: white portland cement: glue 107: 2.7:5.3:1.2: 1.2;
(9) ordinary portland cement: white portland cement: glue 107: 2.8:5.2:1.2: 1.2;
(10) ordinary portland cement: white portland cement: glue 107: 2.9:5.1:1.2: 1.2;
(11) ordinary portland cement: white portland cement: glue 107: water 3.0:5.0:1.2: 1.2;
(12) ordinary portland cement: white portland cement: glue 107: water 3.1:4.9:1.2: 1.2;
(13) ordinary portland cement: white portland cement: glue 107: water 3.2:4.8:1.2: 1.2;
(14) ordinary portland cement: white portland cement: glue 107: water 3.3:4.7:1.2: 1.2;
(15) ordinary portland cement: white portland cement: glue 107: water 3.6:4.4:1.2: 1.2;
(16) ordinary portland cement: white portland cement: glue 107: water-4.0: 4.0:1.2: 1.2.
In an optional embodiment, the concrete component ratio of the cement mortar for filling the hole is as follows: swelling agent: cement: sand: water 1:10: 20: 3.5.
by adding the expanding agent into the cement mortar and blending according to the specific proportion, the crack problem caused by concrete shrinkage is effectively compensated, the compactness of the concrete is effectively ensured, and the anti-leakage effect of the concrete is improved.
The invention effectively solves the problems of pull rod hole plugging and uniform color, has high appearance quality and good waterproofness, and simultaneously has low construction cost, convenient operation and high working efficiency.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the invention, so that any modifications, equivalents, improvements and the like, which are within the spirit and principle of the present invention, should be included in the scope of the present invention.
Claims (6)
1. A rapid processing method for a bridge pier pull rod hole is characterized by comprising the following steps:
s1, cutting off the sleeve exposed out of the surface of the concrete structure after the pull rod is pulled out;
s2, using a cutting drill to pick the concrete into the surface of the concrete, wherein the thickness of the concrete is not less than 50 mm;
s3, cleaning sundries in the pull rod hole and the sleeve;
s4, sprinkling water to the inner and outer sides of the pull rod hole for wetting treatment;
s5, cement mortar for filling the hole is injected into the pull rod hole, and a hole for plastering is reserved at the hole opening;
s6, comparing the color of the concrete around the pull rod hole with a pre-manufactured mortar palette, and preparing cement mortar for plastering according to the proportion of the mortar palette corresponding to the sample;
and S7, performing surface finishing treatment on the pull rod hole by using the surface finishing cement mortar prepared in the step.
2. The rapid treatment method for the pier tie rod hole according to claim 1, wherein the rapid treatment method comprises the following steps: the sample proportion on the mortar palette is respectively as follows:
(1) ordinary portland cement: white portland cement: glue 107: water 1.0:7.0:1.2: 1.2;
(2) ordinary portland cement: white portland cement: glue 107: water 1.5:6.5:1.2: 1.2;
(3) ordinary portland cement: white portland cement: glue 107: 2.0:6.0:1.2: 1.2;
(4) ordinary portland cement: white portland cement: glue 107: 2.1:5.9:1.2
(5) Ordinary portland cement: white portland cement: glue 107: 2.3:5.7:1.2: 1.2;
(6) ordinary portland cement: white portland cement: glue 107: 2.4:5.6:1.2: 1.2;
(7) ordinary portland cement: white portland cement: glue 107: water 2.5:5.5:1.2: 1.2;
(8) ordinary portland cement: white portland cement: glue 107: 2.7:5.3:1.2: 1.2;
(9) ordinary portland cement: white portland cement: glue 107: 2.8:5.2:1.2: 1.2;
(10) ordinary portland cement: white portland cement: glue 107: 2.9:5.1:1.2: 1.2;
(11) ordinary portland cement: white portland cement: glue 107: water 3.0:5.0:1.2: 1.2;
(12) ordinary portland cement: white portland cement: glue 107: water 3.1:4.9:1.2: 1.2;
(13) ordinary portland cement: white portland cement: glue 107: water 3.2:4.8:1.2: 1.2;
(14) ordinary portland cement: white portland cement: glue 107: water 3.3:4.7:1.2: 1.2;
(15) ordinary portland cement: white portland cement: glue 107: water 3.6:4.4:1.2: 1.2;
(16) ordinary portland cement: white portland cement: glue 107: water-4.0: 4.0:1.2: 1.2.
3. The rapid treatment method for the pier tie rod hole according to claim 1, wherein the rapid treatment method comprises the following steps: the ring cutting drill adopts a hand-held electric ring cutting drill.
4. The rapid treatment method for the pier tie rod hole according to claim 1, wherein the rapid treatment method comprises the following steps: when cleaning the pull rod hole and impurities in the sleeve, a long cylinder dust blowing gun is adopted for blowing.
5. The rapid treatment method for the pier tie rod hole according to claim 1, wherein the rapid treatment method comprises the following steps: in step S5, a manual grouting gun is used to perform grouting into the draw-bar hole.
6. The rapid treatment method for the pier tie rod hole according to claim 1, wherein the rapid treatment method comprises the following steps: in step S5, the depth of the hole for plastering reserved in the pull rod hole is 4-5 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911132307.6A CN111254830A (en) | 2019-11-19 | 2019-11-19 | Rapid treatment method for bridge pier pull rod hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911132307.6A CN111254830A (en) | 2019-11-19 | 2019-11-19 | Rapid treatment method for bridge pier pull rod hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111254830A true CN111254830A (en) | 2020-06-09 |
Family
ID=70943802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911132307.6A Pending CN111254830A (en) | 2019-11-19 | 2019-11-19 | Rapid treatment method for bridge pier pull rod hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111254830A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910507A (en) * | 2020-07-02 | 2020-11-10 | 中铁六局集团有限公司 | Construction method for high-speed railway pier column pull rod hole plugging and appearance quality control |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2699200A1 (en) * | 1992-12-15 | 1994-06-17 | Sanef | Prefabricated slab slab and method of making a bridge using such slabs. |
CN101876162A (en) * | 2009-04-30 | 2010-11-03 | 上海惠邦特种涂料有限公司 | Durability traceless repair method for road and bridge concrete, color difference trimming putty and trimming material |
CN102491710A (en) * | 2011-12-14 | 2012-06-13 | 中国矿业大学(北京) | Texture decorative mortar and construction process thereof |
CN103570304A (en) * | 2012-07-20 | 2014-02-12 | 上海惠邦特种涂料有限公司 | Concrete protective coating, and construction method thereof |
CN103952975A (en) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | Assembled and disassembled form tie processor and using method thereof |
KR20140099586A (en) * | 2013-02-04 | 2014-08-13 | 김대인 | Construction Method of Genuine Continuous Bridge with P.S.C Beams |
CN104912034A (en) * | 2015-04-14 | 2015-09-16 | 中铁四局集团第三建设有限公司 | Plugging method and device for hydraulic structure tie rod hole |
CN106381937A (en) * | 2016-08-30 | 2017-02-08 | 中交第二航务工程局有限公司 | Concrete structured pre-buried hole repairing method |
CN106677355A (en) * | 2017-02-27 | 2017-05-17 | 中国冶集团有限公司 | Floor slab hole plugging device and method |
CN207686288U (en) * | 2017-06-08 | 2018-08-03 | 五冶集团上海有限公司 | The manufacture of the horizontal hole to be provided of wall and plugging device |
CN108643601A (en) * | 2018-04-28 | 2018-10-12 | 武汉冶建筑安装工程有限责任公司 | The plugging device and operating method of template wall-punching pair-pulling threaded spindle hole |
CN108691318A (en) * | 2018-05-28 | 2018-10-23 | 中国十七冶集团有限公司 | A kind of underground pipe gallery Screw arbor with nut at both-ends hole processing method |
CN109057341A (en) * | 2018-11-01 | 2018-12-21 | 上海宝冶集团有限公司 | A kind of method for blocking in Screw arbor with nut at both-ends hole |
CN109339440A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of high-layer shear force wall exterior wall upstream face Screw arbor with nut at both-ends hole method for blocking |
CN110344506A (en) * | 2019-07-12 | 2019-10-18 | 无锡市亨利富建设发展有限公司 | A kind of exterior wall split bolt hole antiseep blocks treatment process |
-
2019
- 2019-11-19 CN CN201911132307.6A patent/CN111254830A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2699200A1 (en) * | 1992-12-15 | 1994-06-17 | Sanef | Prefabricated slab slab and method of making a bridge using such slabs. |
CN101876162A (en) * | 2009-04-30 | 2010-11-03 | 上海惠邦特种涂料有限公司 | Durability traceless repair method for road and bridge concrete, color difference trimming putty and trimming material |
CN102491710A (en) * | 2011-12-14 | 2012-06-13 | 中国矿业大学(北京) | Texture decorative mortar and construction process thereof |
CN103570304A (en) * | 2012-07-20 | 2014-02-12 | 上海惠邦特种涂料有限公司 | Concrete protective coating, and construction method thereof |
KR20140099586A (en) * | 2013-02-04 | 2014-08-13 | 김대인 | Construction Method of Genuine Continuous Bridge with P.S.C Beams |
CN103952975A (en) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | Assembled and disassembled form tie processor and using method thereof |
CN104912034A (en) * | 2015-04-14 | 2015-09-16 | 中铁四局集团第三建设有限公司 | Plugging method and device for hydraulic structure tie rod hole |
CN106381937A (en) * | 2016-08-30 | 2017-02-08 | 中交第二航务工程局有限公司 | Concrete structured pre-buried hole repairing method |
CN106677355A (en) * | 2017-02-27 | 2017-05-17 | 中国冶集团有限公司 | Floor slab hole plugging device and method |
CN207686288U (en) * | 2017-06-08 | 2018-08-03 | 五冶集团上海有限公司 | The manufacture of the horizontal hole to be provided of wall and plugging device |
CN108643601A (en) * | 2018-04-28 | 2018-10-12 | 武汉冶建筑安装工程有限责任公司 | The plugging device and operating method of template wall-punching pair-pulling threaded spindle hole |
CN108691318A (en) * | 2018-05-28 | 2018-10-23 | 中国十七冶集团有限公司 | A kind of underground pipe gallery Screw arbor with nut at both-ends hole processing method |
CN109057341A (en) * | 2018-11-01 | 2018-12-21 | 上海宝冶集团有限公司 | A kind of method for blocking in Screw arbor with nut at both-ends hole |
CN109339440A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of high-layer shear force wall exterior wall upstream face Screw arbor with nut at both-ends hole method for blocking |
CN110344506A (en) * | 2019-07-12 | 2019-10-18 | 无锡市亨利富建设发展有限公司 | A kind of exterior wall split bolt hole antiseep blocks treatment process |
Non-Patent Citations (2)
Title |
---|
吴琼等: "《高速公路高墩高塔施工技术实践与创新》", 31 December 2016 * |
朋改非: "《土木工程材料》", 28 February 2013 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111910507A (en) * | 2020-07-02 | 2020-11-10 | 中铁六局集团有限公司 | Construction method for high-speed railway pier column pull rod hole plugging and appearance quality control |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746772B (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN107724704A (en) | The method for repairing and constructing of terrace hollowing cracking | |
CN109629699A (en) | Shear wall screw hole sealing agent and method for blocking | |
CN105274967A (en) | Repairing method for hydraulic concrete crack | |
CN111254830A (en) | Rapid treatment method for bridge pier pull rod hole | |
CN106760597A (en) | A kind of external wall seepage repair novel construction skill | |
CN101343898A (en) | Building construction and construction method for autoclaved aerated concrete blocks | |
CN104831895A (en) | Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof | |
CN113802698A (en) | Construction method for plugging split bolt holes of shear wall | |
CN109025338B (en) | Method for repairing reinforced concrete wall crack | |
CN105545006A (en) | HF-3 double-component polysulfide building sealant crack repairing method | |
CN110004974A (en) | A kind of prefabricated waterproof Retaining wall plate structure and its construction method | |
CN108060795A (en) | A kind of concrete wall repair technology | |
CN210947199U (en) | Simple and easy bolt hole plugging device | |
KR100413228B1 (en) | Method of construction for repairing crack and coming-off of concrete structures using ultra-fine particles suspension or polymer ceramics hybrid suspension grouts | |
CN206655379U (en) | It is a kind of to construct the building block for leading wall | |
WO2009121077A4 (en) | Self-priming surfacing compositions for finished surfaces | |
CN111593902A (en) | Wall surface crack prevention structure for joint of new wall body and old wall body and construction process | |
CN115126277B (en) | Integral type outer wall entrance to a cave shutoff watertight fittings that grout | |
CN215563434U (en) | Outer wall screw rod hole plugging device | |
CN205730987U (en) | A kind of building materials water-repellent paint blender | |
CN107254951B (en) | A kind of railing outdoor tile construction method | |
CN104290188A (en) | Constructing method for integrated precast concrete component | |
CN103741788B (en) | The building structure that a kind of former bamboo is built and construction method thereof | |
CN111042533B (en) | Construction method of vertical exposed aggregate concrete wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200609 |
|
RJ01 | Rejection of invention patent application after publication |