CN104912034A - Plugging method and device for hydraulic structure tie rod hole - Google Patents
Plugging method and device for hydraulic structure tie rod hole Download PDFInfo
- Publication number
- CN104912034A CN104912034A CN201510173874.1A CN201510173874A CN104912034A CN 104912034 A CN104912034 A CN 104912034A CN 201510173874 A CN201510173874 A CN 201510173874A CN 104912034 A CN104912034 A CN 104912034A
- Authority
- CN
- China
- Prior art keywords
- mortar
- tie rod
- tapered steel
- rod hole
- tapered
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention relates to a plugging method for a hydraulic structure tie rod hole. The method comprises the following steps that 1, before formworks are installed, two tapered steel plugs are coaxially installed at the two ends of an opposite-pull threaded rod in a mirror symmetry and penetrating mode, the small-diameter ends of the tapered steel plugs are arranged to be opposite to each other, and then the formworks are assembled; 2, a concrete pool wall is poured between the formworks, after pouring is finished, the formworks and the opposite-pull threaded rod are dismantled, and internal hexagonal wrenches are inserted into internal hexagonal counter bores of the tapered steel plugs to take out the tapered steel plugs; 3, prepared mortar is filled in the tie rod hole of a tapered structure; 4, the mortar is compacted and troweled by using a plugging tool; 5, watering maintenance is performed. According to the plugging method for the hydraulic structure tie rod hole, the construction method is simple, the construction efficiency is high, the cost is low, the plugging method is easy to master, it is guaranteed that the mortar in the plugging tie rod hole is filled and tamped and the surface is level, the plugging quality and the appearance effect of the tie rod hole are guaranteed, the construction quality of this kind of projects is greatly improved, the application range is wide, and the wide application and popularization value is achieved.
Description
Technical field
The invention belongs to the realm of building construction, relate to water conservancy project structure, especially a kind of method for blocking of water conservancy project structure tie rod hole and device.
Background technology
Large-scale hydraulic structure mostly are half buried structure, and outer bay wall face, without finishing, is faced concrete surface, and this structure requires higher to Surface Quality of Concrete.After form removable, concrete basin leaving part Screw arbor with nut at both-ends hole, there is risk of leakage in these Screw arbor with nut at both-ends holes, therefore must carry out shutoff when constructing.
In traditional construction, Screw arbor with nut at both-ends hole cannot be shaped location, and often pollutes the body of wall of hole periphery in the process of shutoff, thus affects shutoff quality and appearance effect.There is the problem that the surperficial plugging effect of pull bar hole is poor in above-mentioned construction method, have a strong impact on structure presentation quality, requirement real in the outer light of concrete cannot be reached.
Through retrieval, find one section of patent document relevant to present patent application: the rapid plugging method of concrete structure outer screw hole and structure, notification number (CN103790382A), the method be the concreting of shear wall complete and by wall form remove after, in External Wall screw hole, outer both sides adopt mechanical hole reaming, and the pvc pipe of reaming place is removed, foreign material rubbish in cleaning eye, and in screw hole, outer both sides place water is moistening, toward screw rod hole, foamed glue is squeezed into inside screw hole, when the foamed glue of injection screw rod hole reaches outside screw hole, the shutoff of dry waterproofing mortar is used immediately outside screw hole, continue to squeeze into foamed glue until fill, to in screw hole, outside dry waterproofing mortar shutoff, finally brushing polymer cement-based waterproof film is in screw hole outside.
Contrasted by technical characteristic, the screw hole in method for blocking disclosed in above-mentioned document adopts the mode of mechanical hole reaming, and its construction is loaded down with trivial details, reduces efficiency of construction and improves cost.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of method for blocking and device of water conservancy project structure tie rod hole, the method construction is simple, effectively improves shutoff quality and the appearance effect of tie rod hole.
The solution of the present invention is achieved in that
A method for blocking for water conservancy project structure tie rod hole, comprises the steps:
Step one, before model sheetinstallat, tapered steel is blocked up the both ends that coaxial specular is installed on Screw arbor with nut at both-ends, and the stifled miner diameter end of two tapered steel is arranged in opposite directions, then assembled formwork, vertical for template note is covered and is supported on the lateral surface that tapered steel blocks up bigger diameter end, then pass through screw lock;
Step 2, between template concreting pool wall, stripping and Screw arbor with nut at both-ends after building, inner hexagon spanner is inserted tapered steel stifled in hexagonal counterbore, rotating inner hex wrench takes out tapered steel and blocks up, and by stifled for tapered steel clean out to retain use next time; After the stifled taking-up of tapered steel, pool wall two sides specular is shaped with the pull bar hole of shape and pyramidal structure of the same size;
Step 3, configuration plasticity low water content shutoff mortar, inserted by the mortar prepared in the pull bar hole of pyramidal structure, mortar must fill up, tamp;
Step 4, use capping tools by mortar compacting, floating, specifically doing method of operating is: the handle end rotating capping tools, the disk end of this capping tools together rotates thereupon, the floating mortar surface limit extruding in limit mortar, mortar is filled up completely, tamps pull bar hole, this mortar surface is embedded in body of wall inboard;
Step 5: watering maintenance.
And the mortar in described step 3 is made up of cement, medium sand, water and lithopone, its ratio is 230-260:1200-1300:280-300:50-100 (kg/m
3), by four mix after and get final product.
And described mortar is 240:1221:290:50-100 (kg/m by the ratio of cement, medium sand, water and lithopone
3).
And the mortar surface in described step 4 is inlaid in the inboard 1mm place of body of wall.
A kind of plugging device of water conservancy project structure tie rod hole, comprise tapered steel to block up and capping tools, the profile that described tapered steel blocks up is frustum type structure, and this tapered steel blocks up the centre bore being coaxially shaped with and holding Screw arbor with nut at both-ends, and the bigger diameter end that this tapered steel blocks up coaxially is shaped with interior hexagonal counterbore;
Described capping tools comprises disk and the handle of steel plate material, and this handle and disk are linked together by stock, and the diameter of described disk is less than the diameter that described frustum steel blocks up bigger diameter end.
And described disk is steel plate material.
Advantage of the present invention and good effect are:
1, in the present invention by using the tapered steel of new structure to block up, make to build shaping after concrete-pool-wall on the pull bar void shape that is shaped with and in the same size; Pull bar hole accurately can be located by using special capping tools and fill up, compacting, floating, solve in traditional handicraft exist tie rod hole sizing location difficult, pollute tie rod hole periphery body of wall and the problem such as shutoff profile is uncontrollable, achieve the object that pull bar holes blocking is attractive in appearance, shape size is consistent.
2, the mortar prepared in the present invention uses lithopone to replace white cement to mix colours, and solves the impact of white cement further hydration on color, ensures that pool wall appearance luster is consistent, improves pool wall overall appearance quality.
3, construction method of the present invention is simple, efficiency of construction is high, cost is low, easily grasp, ensure that the mortar of shutoff pull bar hole fills up, tamps and surfacing, ensure that shutoff quality and the appearance effect of pull bar hole, promote larger to this type of engineering construction quality, applied widely, there is the value of wide popularization and application.
Accompanying drawing explanation
Fig. 1 is the sectional view of concrete-pool-wall installation form of the present invention;
Fig. 2 is pull bar hole plugging structure schematic diagram of the present invention;
Fig. 3 is the perspective view that in Fig. 1, tapered steel is stifled;
Fig. 4 is the perspective view of capping tools in Fig. 2.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by specific embodiment, the invention will be further described.
Before introducing this method, first introduce two plugging devices for realizing this method: tapered steel stifled 3 and capping tools 6, its installation and use location are see shown in Fig. 1, Fig. 2.
As shown in Figure 3, its profile is frustum type structure to the structure that described tapered steel blocks up, and this tapered steel blocks up the centre bore 8 being coaxially shaped with and holding Screw arbor with nut at both-ends 4, and the bigger diameter end that this tapered steel blocks up coaxially is shaped with interior hexagonal counterbore 7.
As shown in Figure 4, comprise disk 11 and the handle 9 of steel plate material, this handle and disk are linked together by stock 10 structure of described capping tools, and the diameter of described disk is less than the diameter that described frustum steel blocks up bigger diameter end.
A method for blocking for water conservancy project structure tie rod hole, comprises the steps:
Step one, before model sheetinstallat, tapered steel is blocked up the both ends that coaxial specular is installed on Screw arbor with nut at both-ends, the stifled miner diameter end of two tapered steel is arranged in opposite directions, then assembled formwork 2, vertical for template note is covered and is supported on the lateral surface that tapered steel blocks up bigger diameter end, then by screw (not identifying in figure) locking, as shown in Figure 1;
Step 2, between template concreting pool wall 1, stripping and Screw arbor with nut at both-ends after building, use inner hexagon spanner inserts in the stifled interior hexagonal counterbore of tapered steel, and rotating inner hex wrench takes out tapered steel and blocks up, and stifled for tapered steel cleaning out is retained next use; After the stifled taking-up of tapered steel, pool wall two sides specular is shaped with the pull bar hole of shape and pyramidal structure of the same size;
Step 3, configuration plasticity low water content shutoff mortar 5, this mortar is made up of cement, medium sand, water and lithopone, and its ratio is 230-260:1200-1300:280-300:50-100 (kg/m
3), be preferably 240:1221:290:50-100 (kg/m
3), by four mix after and get final product.Because this mortar ampoule is less, adopt on-the-spot artificial preparation method.Lithopone is a kind of white pigments, need determine its consumption according to field condition.Inserted by the mortar prepared in the pull bar hole of pyramidal structure, mortar must fill up, tamp, as shown in Figure 2;
Step 4, use capping tools by mortar compacting, floating, specifically doing method of operating is: the handle end rotating capping tools, the disk end of this capping tools together rotates thereupon, the floating mortar surface limit extruding in limit mortar, mortar is filled up completely, tamps pull bar hole, the spacing A between this mortar surface and surface of wall is 1mm;
Step 5: watering maintenance.
Construction method of the present invention is simple, efficiency of construction is high, cost is low, easily grasp, ensure that the mortar of shutoff pull bar hole fills up, tamps and surfacing, ensure that shutoff quality and the appearance effect of pull bar hole, promote larger to this type of engineering construction quality, applied widely, there is the value of wide popularization and application.
It is emphasized that; embodiment of the present invention is illustrative; instead of it is determinate; therefore the present invention includes the embodiment be not limited to described in detailed description of the invention; every other embodiments drawn by those skilled in the art's technical scheme according to the present invention, belong to the scope of protection of the invention equally.
Claims (6)
1. a method for blocking for water conservancy project structure tie rod hole, is characterized in that: comprise the steps:
Step one, before model sheetinstallat, tapered steel is blocked up the both ends that coaxial specular is installed on Screw arbor with nut at both-ends, and the stifled miner diameter end of two tapered steel is arranged in opposite directions, then assembled formwork, vertical for template note is covered and is supported on the lateral surface that tapered steel blocks up bigger diameter end, then pass through screw lock;
Step 2, between template concreting pool wall, stripping and Screw arbor with nut at both-ends after building, inner hexagon spanner is inserted tapered steel stifled in hexagonal counterbore, rotating inner hex wrench takes out tapered steel and blocks up, and by stifled for tapered steel clean out to retain use next time; After the stifled taking-up of tapered steel, pool wall two sides specular is shaped with the pull bar hole of shape and pyramidal structure of the same size;
Step 3, configuration plasticity low water content shutoff mortar, inserted by the mortar prepared in the pull bar hole of pyramidal structure, mortar must fill up, tamp;
Step 4, use capping tools by mortar compacting, floating, specifically doing method of operating is: the handle end rotating capping tools, the disk end of this capping tools together rotates thereupon, the floating mortar surface limit extruding in limit mortar, mortar is filled up completely, tamps pull bar hole, this mortar surface is embedded in body of wall inboard;
Step 5: watering maintenance.
2. the method for blocking of water conservancy project structure tie rod hole according to claim 1, is characterized in that: the mortar in described step 3 is made up of cement, medium sand, water and lithopone, its ratio is 230-260:1200-1300:280-300:50-100 (kg/m
3), by four mix after and get final product.
3. the method for blocking of water conservancy project structure tie rod hole according to claim 2, is characterized in that: described mortar is 240:1221:290:50-100 (kg/m by the ratio of cement, medium sand, water and lithopone
3).
4. the method for blocking of water conservancy project structure tie rod hole according to claim 1, is characterized in that: the mortar surface in described step 4 is inlaid in the inboard 1mm place of body of wall.
5. the plugging device of the water conservancy project structure tie rod hole as described in any one of Claims 1-4, it is characterized in that: comprise tapered steel and block up and capping tools, the profile that described tapered steel blocks up is frustum type structure, this tapered steel blocks up the centre bore being coaxially shaped with and holding Screw arbor with nut at both-ends, and the bigger diameter end that this tapered steel blocks up coaxially is shaped with interior hexagonal counterbore;
Described capping tools comprises disk and the handle of steel plate material, and this handle and disk are linked together by stock, and the diameter of described disk is less than the diameter that described frustum steel blocks up bigger diameter end.
6. the plugging device of water conservancy project structure tie rod hole according to claim 5, is characterized in that: described disk is steel plate material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510173874.1A CN104912034A (en) | 2015-04-14 | 2015-04-14 | Plugging method and device for hydraulic structure tie rod hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510173874.1A CN104912034A (en) | 2015-04-14 | 2015-04-14 | Plugging method and device for hydraulic structure tie rod hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104912034A true CN104912034A (en) | 2015-09-16 |
Family
ID=54081440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510173874.1A Pending CN104912034A (en) | 2015-04-14 | 2015-04-14 | Plugging method and device for hydraulic structure tie rod hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104912034A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044169A (en) * | 2017-03-17 | 2017-08-15 | 中交航局第工程有限公司 | A kind of method in quick blocking Screw arbor with nut at both-ends hole |
CN111254830A (en) * | 2019-11-19 | 2020-06-09 | 中国铁建大桥工程局集团有限公司 | Rapid treatment method for bridge pier pull rod hole |
WO2022089532A1 (en) * | 2020-10-30 | 2022-05-05 | 广东博智林机器人有限公司 | Screw hole plugging method, apparatus, and device, storage medium, and processor |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2278202C1 (en) * | 2004-12-30 | 2006-06-20 | Государственное научное учреждение Поволжский научно-исследовательский институт эколого-мелиоративных технологий Российской академии сельскохозяйственных наук | Control joint for water-tight channel and water pool lining |
CN201125530Y (en) * | 2007-07-23 | 2008-10-01 | 张兵 | Split bolt |
CN201695686U (en) * | 2010-05-06 | 2011-01-05 | 中国建筑第六工程局有限公司 | Water-stop opposite-pulling screw rod |
CN202187556U (en) * | 2011-07-26 | 2012-04-11 | 北京城建北方建设有限责任公司 | Tool-type hole reserving mould |
CN102650169A (en) * | 2012-05-04 | 2012-08-29 | 中天建设集团有限公司 | Plugging structure for screw hole in external wall |
CN202519628U (en) * | 2012-04-01 | 2012-11-07 | 中国葛洲坝集团国际工程有限公司 | Inlet plugging device for temporary buried pipe in dense dam body |
-
2015
- 2015-04-14 CN CN201510173874.1A patent/CN104912034A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2278202C1 (en) * | 2004-12-30 | 2006-06-20 | Государственное научное учреждение Поволжский научно-исследовательский институт эколого-мелиоративных технологий Российской академии сельскохозяйственных наук | Control joint for water-tight channel and water pool lining |
CN201125530Y (en) * | 2007-07-23 | 2008-10-01 | 张兵 | Split bolt |
CN201695686U (en) * | 2010-05-06 | 2011-01-05 | 中国建筑第六工程局有限公司 | Water-stop opposite-pulling screw rod |
CN202187556U (en) * | 2011-07-26 | 2012-04-11 | 北京城建北方建设有限责任公司 | Tool-type hole reserving mould |
CN202519628U (en) * | 2012-04-01 | 2012-11-07 | 中国葛洲坝集团国际工程有限公司 | Inlet plugging device for temporary buried pipe in dense dam body |
CN102650169A (en) * | 2012-05-04 | 2012-08-29 | 中天建设集团有限公司 | Plugging structure for screw hole in external wall |
Non-Patent Citations (1)
Title |
---|
吴文生: "钢筋混凝土外墙螺杆堵洞施工技术", 《建筑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044169A (en) * | 2017-03-17 | 2017-08-15 | 中交航局第工程有限公司 | A kind of method in quick blocking Screw arbor with nut at both-ends hole |
CN111254830A (en) * | 2019-11-19 | 2020-06-09 | 中国铁建大桥工程局集团有限公司 | Rapid treatment method for bridge pier pull rod hole |
WO2022089532A1 (en) * | 2020-10-30 | 2022-05-05 | 广东博智林机器人有限公司 | Screw hole plugging method, apparatus, and device, storage medium, and processor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912034A (en) | Plugging method and device for hydraulic structure tie rod hole | |
CN111350294A (en) | Shear wall outer wall through-wall screw hole plugging device and construction method thereof | |
CN220058805U (en) | High-strength building template plate | |
CN101832025A (en) | Sealing up screw | |
CN210217684U (en) | Device for quickly fixing wall and stopping leakage | |
CN204663016U (en) | For the seat slurry device of hollow blocks built | |
CN204552145U (en) | The house that wall body structure is integrated with agent structure after-pouring | |
CN201074404Y (en) | Plugging tool | |
CN212359015U (en) | Controller for filling mortar thickness | |
CN215669650U (en) | Steel plate and wood formwork combined supporting device for secondary grouting of fan anchor bolt foundation | |
CN112049320B (en) | Precast concrete sandwich heat-insulation wall structure and construction method thereof | |
CN206000154U (en) | A kind of building pours uses template | |
CN210263900U (en) | Transparent building template | |
CN206987118U (en) | A kind of house internal partition wall | |
CN210659477U (en) | Tower barrel with pin shaft structure | |
CN201671338U (en) | Water-stop screw rod | |
CN221073507U (en) | Detachable water stop screw | |
CN201649626U (en) | Die plate component for grouting wall | |
CN107201793A (en) | A kind of house internal partition wall | |
CN206513030U (en) | Split bolt formwork reinforcement is pegged body | |
CN218029037U (en) | Turnover type cast-in-situ concrete member comprehensive internal support device | |
CN204977017U (en) | Prefabricated support sleeve's that cooperation split bolt used production mould | |
CN216042669U (en) | Formwork system for shear wall split bolt hole grouting | |
CN103967135A (en) | Device for blocking grout outlet for grouting of prefabricated concrete wall | |
CN209954903U (en) | PC component production mould for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150916 |