CN111080175A - Logistics transportation method for collecting railway, highway and shipping - Google Patents

Logistics transportation method for collecting railway, highway and shipping Download PDF

Info

Publication number
CN111080175A
CN111080175A CN201911424316.2A CN201911424316A CN111080175A CN 111080175 A CN111080175 A CN 111080175A CN 201911424316 A CN201911424316 A CN 201911424316A CN 111080175 A CN111080175 A CN 111080175A
Authority
CN
China
Prior art keywords
goods
warehousing
dispatching
order
department
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911424316.2A
Other languages
Chinese (zh)
Inventor
封云虎
盛正平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Benniu Gangwu Group Co ltd
Original Assignee
Jiangsu Benniu Gangwu Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Benniu Gangwu Group Co ltd filed Critical Jiangsu Benniu Gangwu Group Co ltd
Priority to CN201911424316.2A priority Critical patent/CN111080175A/en
Publication of CN111080175A publication Critical patent/CN111080175A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping

Abstract

The invention discloses a logistics transportation method for gathering railway, highway and ship, wherein freight note information is acquired from a railway website by scheduling; scheduling preparation job ticket: dispatching, checking, towing vehicle operation and warehousing. The dispatching order indicates the operation team; the counting order is distributed to counting personnel; the field operating personnel opens the carriage, and the dispatching field checks the name of the product; the operator unloads and the counting responsible person records the name and weight of the goods unloaded from each wagon on the counting list; the forklift transports goods to a tractor, and the tractor works; the tractor transports the goods to the warehouse; the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot freight management personnel record information of putting in storage: the quantity of goods and the storage location; and (5) the delivery department additionally records the warehousing bill to finish warehousing. The warehouse management records the work load of the team; the dispatching department arranges the job order to generate a finished order to be handed to finance; and the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot. The invention adopts multi-channel transportation.

Description

Logistics transportation method for collecting railway, highway and shipping
Technical Field
The invention relates to a logistics transportation method for railway, highway and shipping collection, in particular to a logistics transportation method for railway, highway and shipping.
Background
Logistics is a system for controlling the movement of raw materials, finished products and information from supply to the end consumer via the transfer and possession of various intermediate links, thereby achieving the clear goal of organization. Modern logistics is a product of economic globalization and is also an important service industry for promoting economic globalization.
At present, current patent CN1102641138A discloses an internet alliance multi-type intermodal transport is futilely supported to link up and is got rid of and hang transportation system, include by a plurality of commodity circulation hub, the one-level gets rid of and hangs the point, sorts the point, gets rid of the distributed network that the trailer formed, material hub gets rid of with the one-level and hangs the point, gets rid of trailer communication connection, get rid of and hang point and sorting point road intercommunication, still include a plurality of infinitesimal commodity circulation enterprise hub, a plurality of infinitesimal commodity circulation enterprise hub and one or more commodity circulation hub communication connection.
The prior patent CN110288295A discloses a logistics transportation method based on the internet +, which includes obtaining a user request, where the user request carries user identification information;
verifying the identification information of the user, and providing the use authority matched with the identification information of the user after the verification is passed, wherein the use authority comprises:
the consignor: issuing a transportation scheme comprising a transportation route and a transportation offer;
the carrier: checking the transportation scheme of the consignor and sending a cooperation request to the consignor when the transportation scheme is accepted;
upon the consignor reaching the intent of collaboration with the carrier, an electronic contract is provided that matches the shipping scheme for the consignor to sign with the carrier to establish collaboration.
Based on the defect of single function in the prior art, the invention adopts a multi-channel transportation method.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a logistics transportation method for railway, road and ship transportation, which is used for the transportation from three aspects of railway, road and ship transportation.
The purpose of the invention is realized by the following technical scheme: a logistics transportation method for railway, highway and ship transportation comprises the following steps of railway warehousing:
1) scheduling and obtaining waybill information from railway website
The waybill includes: the car number, the wagon number, the type of goods (only the big type, such as PVC) contained in the wagon can be known at the moment), and the weight;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing.
The dispatching order indicates the operation team;
the counting order is distributed to counting personnel;
3) the field operating personnel opens the carriage and dispatches the field to check the name (specification, batch number and other detailed information);
4) the operator unloads the cargos and the counting responsible person records the name and the weight of the cargos unloaded from each wagon on a counting list;
5) the forklift transports the goods to the tractor, and the tractor (records the operation amount by itself);
6) the tractor transports the goods to a warehouse (including an open storage area);
7) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot cargo management (storehouse management) personnel record information of putting in storage: the quantity of goods and the storage location;
8) and the delivery department additionally records the warehousing bill to finish warehousing. The warehouse management records the work load of the team;
9) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
10) and generating related expenses according to the finished sheet for internal knots and external knots.
The logistics transportation method further comprises the following steps of warehousing by roads:
1) the client issues a warehouse-in forecast to a delivery department;
the forecasting comprises the following steps: goods name, specification, batch number, weight, transport vehicle license plate number and driver information;
2) receiving the warehouse-in forecast by a delivery department;
3) when the truck is transported to the place, the driver places a serial number in the service hall to give a warehousing operation order, and the warehousing operation order is given by a delivery department;
4) the dispatching department judges whether the truck is allowed to enter the field or not according to the field operation condition (monitoring), if so, the dispatching department informs the truck of entering the field (informing the operation position) by telephone and informs the field custody manager of dispatching;
5) when the freight car arrives at an operation area, the operation personnel unload the freight car on site, the warehouse management and the delivery personnel check the detail of the receipt, and abnormal conditions (wet package, broken package and polluted package) are generated in the process of receiving the freight car;
6) and the forklift transports the goods to the warehouse location, the warehouse management records the operation amount, the information of the goods to be warehoused and the warehouse location, and the warehousing is finished.
7) The delivery department additionally records the warehousing bill to finish warehousing;
8) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
9) and generating related expenses according to the finished sheet for internal knots and external knots.
The logistics transportation method further comprises the steps of shipping and warehousing:
1) the client sends a warehousing forecast to a delivery department;
the waybill includes: the ship number, the type of cargo (only the large type, such as PVC, is known at this time), the number of pieces, and the weight;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing operation; the dispatching order marks the operation team group, and the checking order is distributed to the checking personnel;
3) the hoisting personnel unload the goods to the tractor and the counting responsible person records the name and weight of the goods in operation on the counting list;
4) the tractor transports the goods to a warehouse (including an open storage area);
5) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot cargo management (storehouse management) personnel record information of putting in storage: the quantity of goods and the storage location;
6) the delivery department additionally records the warehousing bill to finish warehousing;
7) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
8) and generating related expenses according to the finished sheet for internal knots and external knots.
Compared with the prior art, the invention has the advantages that: the transportation is carried out from three aspects of railway, road and ship, a multi-channel transportation method is adopted, the transportation is flexible, mobile, convenient and fast,
drawings
FIG. 1 is a flow chart of the present invention.
Fig. 2 is a flow chart of the railroad warehousing process of the present invention.
Fig. 3 is a flow chart of the highway warehousing process of the invention.
Fig. 4 is a flow chart of the shipping and warehousing process of the invention.
Detailed Description
The invention is described in detail below with reference to the drawings and specific examples.
Example 1
The invention relates to a logistics transportation method for gathering railways, highways and ships, which comprises the following steps of warehousing by railways:
1) scheduling and obtaining waybill information from railway website
The waybill includes: the car number, the wagon number, the type of goods (only the big type, such as PVC) contained in the wagon can be known at the moment), and the weight;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing.
The dispatching order indicates the operation team;
the counting order is distributed to counting personnel;
3) the field operating personnel opens the carriage and dispatches the field to check the name (specification, batch number and other detailed information);
4) the operator unloads the cargos and the counting responsible person records the name and the weight of the cargos unloaded from each wagon on a counting list;
5) the forklift transports the goods to the tractor, and the tractor (records the operation amount by itself);
6) the tractor transports the goods to a warehouse (including an open storage area);
7) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot cargo management (storehouse management) personnel record information of putting in storage: the quantity of goods and the storage location;
8) and the delivery department additionally records the warehousing bill to finish warehousing. The warehouse management records the work load of the team;
9) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
10) and generating related expenses according to the finished sheet for internal knots and external knots.
Description of goods
1. The same train is provided with a plurality of train wagons for carrying goods;
2. the same train contains goods for multiple customers.
Before and during the operation, the belongings of the goods cannot be determined.
Abnormal situation
1. Bag breaking device
The package breaking is the situation that the package is damaged to cause partial loss of the goods, but the rest goods can be continuously used but cannot be normally stored.
Bag breaking ratio: on site, the proportions are subdivided by the delivery person according to actual statistics
Special attention is paid to:
1) the damage of the package is caused by improper transportation, and the railway transportation side bears the compensation.
2) Due to the limitation of railway claim settlement process, all broken packages are classified under one customer name.
3) Distinguishing wet bags, broken bags and polluted bags;
a bag breaking treatment process:
1. and the field operator stacks all broken bags in a centralized way.
2. All broken packages are conveyed to the weighing scale for weighing by the forklift, and the number and the weight of the broken packages are recorded by dispatching personnel.
3. And the forklift conveys the broken packages to a broken package warehouse.
4. And (4) receiving the number and the quantity of the broken packages by the broken package warehouse management personnel, and completing the broken package warehouse entry.
5. The broken bag is subjected to bag changing by a broken bag processor (if the customer provides a packaging bag, the customer uses the broken bag, and if the broken bag is not provided, the self-owned white standard bag is used). And recording the number of the packages and the weight of the packages after package replacement.
6. And (5) finishing on site and directly breaking the package and taking out the package from the warehouse.
And (5) moving the goods after the package replacement into a normal warehouse, and supplementing and recording the stock by a goods tube.
Railway straight-out
The railway is directly out of the storage and is connected with the railway storage, namely, the goods unloaded from the railway are directly transported away by a truck without entering the storage, and the storage is not involved.
Description of the flow:
1. the customer issues a direct forecast to the delivery department.
The forecasting comprises the following steps: number of wagon, name of goods, weight, license plate number of transport vehicle, driver information
2. The delivery department receives the direct forecast. Informing and scheduling all loading condition information and whether the information contains broken packets
3. When the truck arrives at the field, the driver enters the service hall to arrange the number, opens the work order and leaves the work order, and the delivery department opens the work order
4. The dispatching department judges whether the truck is allowed to enter the field or not according to the field operation condition (monitoring), if so, the dispatching department informs the truck of entering the field (informing the operation position) by telephone and informs the field dispatcher of dispatching.
5. The truck enters the field and the empty truck is weighing.
6. And the truck enters an operation area, the operator loads the goods, and the dispatcher records the workload.
7. The truck weighs a pound.
8. And (5) taking the truck out of the field to finish straight-out.
9. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
10. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Special cases are as follows: the driver can go out and transfer to the garage when not arriving at the scene
The logistics transportation method further comprises the following steps of warehousing by roads:
1) the client issues a warehouse-in forecast to a delivery department;
the forecasting comprises the following steps: goods name, specification, batch number, weight, transport vehicle license plate number and driver information;
2) receiving the warehouse-in forecast by a delivery department;
3) when the truck is transported to the place, the driver places a serial number in the service hall to give a warehousing operation order, and the warehousing operation order is given by a delivery department;
4) the dispatching department judges whether the truck is allowed to enter the field or not according to the field operation condition (monitoring), if so, the dispatching department informs the truck of entering the field (informing the operation position) by telephone and informs the field custody manager of dispatching;
5) when the freight car arrives at an operation area, the operation personnel unload the freight car on site, the warehouse management and the delivery personnel check the detail of the receipt, and abnormal conditions (wet package, broken package and polluted package) are generated in the process of receiving the freight car;
6) and the forklift transports the goods to the warehouse location, the warehouse management records the operation amount, the information of the goods to be warehoused and the warehouse location, and the warehousing is finished.
7) The delivery department additionally records the warehousing bill to finish warehousing;
8) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
9) and generating related expenses according to the finished sheet for internal knots and external knots.
Highway warehouse-out
General procedure
Description of the flow:
1. the customer issues a delivery forecast to the delivery department.
The forecasting comprises the following steps: direct (vehicle to refute)/self-picking/delivering goods name, weight, license plate number of transport vehicle, driver information 2, and delivery department receiving warehouse-out forecast.
3. When the truck arrives at the field, the driver enters the service hall to arrange the number, opens the work order and leaves the work order, and the delivery department opens the work order
4. The depot manager judges whether the truck is allowed to enter the field or not according to the field operation condition (monitoring), if so, the depot manager informs the truck of entering the field (informing the operation position) by telephone, and simultaneously informs the field depot manager of dispatching by telephone.
5. The truck enters the field and the empty truck is weighing.
6. When the truck enters an operation area, checking (the number, the name, the quantity and the tonnage (special condition: whether the broken package is included)) firstly;
the point loading/non-point loading is determined according to the loading area when the vehicle enters the operation area
1) Fixed-point loading: and checking the forklift worker and the warehouse management at the same time, and outputting the operation amount, the cargo information and the warehouse location.
2) Non-fixed-point loading: the warehouse management records the warehouse-out operation amount, the goods information and the warehouse location.
The operation personnel loads the goods, the warehouse management checks the warehouse position delivery information and finally confirms
7. The truck weighs a pound.
8. The truck leaves the yard to finish the delivery
9. And scheduling and arranging the job order to generate a finished order to be handed to finance.
10. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
The logistics transportation method further comprises the steps of shipping and warehousing:
1) the client sends a warehousing forecast to a delivery department;
the waybill includes: the ship number, the type of cargo (only the large type, such as PVC, is known at this time), the number of pieces, and the weight;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing operation; the dispatching order marks the operation team group, and the checking order is distributed to the checking personnel;
3) the hoisting personnel unload the goods to the tractor and the counting responsible person records the name and weight of the goods in operation on the counting list;
4) the tractor transports the goods to a warehouse (including an open storage area);
5) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot cargo management (storehouse management) personnel record information of putting in storage: the quantity of goods and the storage location;
6) the delivery department additionally records the warehousing bill to finish warehousing;
7) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
8) and generating related expenses according to the finished sheet for internal knots and external knots.
Straight out for shipping
General procedure
Description of the flow:
1. the customer issues a direct exit forecast (or port forecast) to the delivery department.
The forecasting comprises the following steps: ship number, goods name, weight, license plate number of transport vehicle, driver information
2. The delivery department receives the direct forecast.
3. When the truck arrives at the field, the driver enters the service hall to arrange the number, opens the work order and leaves the work order, and the delivery department opens the work order
4. The dispatching department judges whether the truck is allowed to enter the field or not according to the field operation condition (monitoring), if so, the dispatching department informs the truck of entering the field (informing the operation position) by telephone and informs the field dispatcher of dispatching.
5. The truck enters the field and the empty truck is weighing.
6. And (4) the truck enters an operation area, the lifting personnel loads the goods, and the dispatching personnel records the workload.
7. The truck weighs a pound.
8. And (5) taking the truck out of the field to finish straight-out.
9. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
10. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Cross-park service
The overbooking service is a dumping service for hoisting goods from a search ship to another ship, and inventory is not involved.
General procedure
Description of the flow:
1. the customer sends a overbooking forecast (or port forecast) to the delivery department.
2. The delivery department receives the forecast and notifies the dispatch to dispatch.
3. The ship arrives at a port, the operating personnel works on site, the goods are hoisted (or the tractor is used for short fall), and the dispatching personnel records the workload.
4. The operation is completed and the ship is driven out of the port.
5. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
6. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Outsourcing labor management
The business can be regarded as outsourcing business of the railway, and workers working at the east station often in Bennigang pay labor cost for the railway.
General procedure
Description of the flow:
1. the dispatcher collects railway transportation business orders in advance from the railway website.
2. Dispatching personnel.
3. And (4) operating on site, and recording the workload by a dispatcher.
4. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
5. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Labor management
General procedure
Description of the flow:
1. and the client applies for operation from the scene to a window of a dispatching department.
2. And the dispatching personnel opens a work order according to the situation.
3. And the operator works on the spot and records the working amount.
4. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
5. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Damage management
Service flow control point specification
Figure BDA0002353169640000081
Figure BDA0002353169640000091
System integration requirements
Function item Functional requirements
Entrance and exit barrier gate Obtaining vehicle information and carrying out business linkage with background
Billing all-in-one machine Self-service printing of driver bill of lading
RFID Tray
The container service container is divided into a railway shared container and a client-owned container shared container processing flow
Warehousing the containers:
1. the containers arrive at a running port following a railroad warehousing procedure.
2. Delivery and dispatch of railway box pipe system, and dispatch of box number and train wagon number
3. The dispatching checks the forecast information delivered, confirms the name and weight of the goods, dispatches the dispatching list (note the name, heavy box/empty box, and the placement position), dispatches the work,
1. The operating personnel checks the number of the wagon, the sound condition of the wagon, the number of the container and the placing position on site, and checks the unloading of the box body (the damaged condition). And reporting to a delivery department after completion.
Pre-warehousing: warehousing the whole box
And (3) digging a box: actual warehouse entry
And (3) straightening out: taking out the whole box, picking out the box and taking out the box;
returning the container:
4. the delivery department applies for the container return command to the railway (telephone);
5. receiving the back order, arranging the vehicle to recover at any time (container number)
6. And dispatching work by the dispatching department, hoisting the container to the train by an operator, and informing the delivery department of completion.
7. The delivery department confirms the container issue record.
8. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
9. And the finance generates related expenses according to the finished sheet and is used for the internal knot and the external knot.
Container turnover box
Customer self-contained container processing flow
Description of the flow:
4. the customer sends a container return forecast (flow) to the delivery department.
5. The delivery department applies for a container transportation plan to the relevant railroad department.
6. After approval by the rail department, a (telephone) container return job notification is sent to the dispatch department.
7. And dispatching work by the dispatching department, hoisting the container to the train by an operator, and informing the delivery department of completion.
8. The railway department makes a bill, and the delivery informs the customer to pay the freight to the railway in advance by the collected finance,
8. confirming the container issuing the record.
9. And the dispatching department arranges the job order to generate a finished order for handing over to the finance.
10. The financial affairs generate the related expenses according to the finished products, and are used for the inner knot and the outer knot.

Claims (3)

1. A logistics transportation method for railway, highway and ship transportation is characterized in that: the method comprises the following steps of railway warehousing:
1) scheduling and obtaining waybill information from railway website
The waybill includes: the number of the car, the number of the wagon, the types and the weight of goods contained in the wagon;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing.
The dispatching order indicates the operation team;
the counting order is distributed to counting personnel;
3) opening the carriage by field operating personnel, and checking the name of the carriage by dispatching the field;
4) the operator unloads the cargos and the counting responsible person records the name and the weight of the cargos unloaded from each wagon on a counting list;
5) the forklift transports the goods to the tractor, and the operation amount of the tractor is reduced;
6) the tractor transports the goods to the warehouse;
7) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot freight management personnel record information of putting in storage: the quantity of goods and the storage location;
8) and the delivery department additionally records the warehousing bill to finish warehousing. The warehouse management records the work load of the team;
9) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
10) and generating related expenses according to the finished sheet for internal knots and external knots.
2. The logistics transportation method of claim 1, wherein the logistics transportation method comprises the following steps: the logistics transportation method further comprises the following steps of warehousing by roads:
1) the client issues a warehouse-in forecast to a delivery department;
the forecasting comprises the following steps: goods name, specification, batch number, weight, transport vehicle license plate number and driver information;
2) receiving the warehouse-in forecast by a delivery department;
3) when the truck is transported to the place, the driver places a serial number in the service hall to give a warehousing operation order, and the warehousing operation order is given by a delivery department;
4) the dispatching department judges whether the truck is allowed to enter the field according to the field operation condition, if so, the dispatching department informs the truck of entering the field (informs the operation position) by telephone, and simultaneously informs the field custody manager of dispatching;
5) when the freight car arrives at the operation area, the operator unloads the freight car on site, and the warehouse management and the delivery personnel check the detail of the receipt and the abnormal condition in the process of receiving the freight car;
6) and the forklift transports the goods to the warehouse location, the warehouse management records the operation amount, the information of the goods to be warehoused and the warehouse location, and the warehousing is finished.
7) The delivery department additionally records the warehousing bill to finish warehousing;
8) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
9) and generating related expenses according to the finished sheet for internal knots and external knots.
3. The logistics transportation method of claim 1, wherein the logistics transportation method comprises the following steps: the logistics transportation method further comprises the steps of shipping and warehousing:
1) the client sends a warehousing forecast to a delivery department;
the waybill includes: the ship number, the goods type, the number of the goods and the weight of the goods;
2) scheduling preparation job list: dispatching, checking, towing vehicle operation and warehousing operation; the dispatching order marks the operation team group, and the checking order is distributed to the checking personnel;
3) the hoisting personnel unload the goods to the tractor and the counting responsible person records the name and weight of the goods in operation on the counting list;
4) the tractor transports the goods to the warehouse;
5) the fork truck unloads the goods from the tractor and transports to the storehouse position, and on-the-spot freight management personnel record information of putting in storage: the quantity of goods and the storage location;
6) the delivery department additionally records the warehousing bill to finish warehousing;
7) the dispatching department arranges the job order to generate a finished order to be handed to the finance;
8) and generating related expenses according to the finished sheet for internal knots and external knots.
CN201911424316.2A 2019-12-31 2019-12-31 Logistics transportation method for collecting railway, highway and shipping Pending CN111080175A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911424316.2A CN111080175A (en) 2019-12-31 2019-12-31 Logistics transportation method for collecting railway, highway and shipping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911424316.2A CN111080175A (en) 2019-12-31 2019-12-31 Logistics transportation method for collecting railway, highway and shipping

Publications (1)

Publication Number Publication Date
CN111080175A true CN111080175A (en) 2020-04-28

Family

ID=70321611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911424316.2A Pending CN111080175A (en) 2019-12-31 2019-12-31 Logistics transportation method for collecting railway, highway and shipping

Country Status (1)

Country Link
CN (1) CN111080175A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113205290A (en) * 2021-04-16 2021-08-03 深圳前海粤十信息技术有限公司 Supply chain management system applied to cold chain refrigeration house
CN117474451A (en) * 2023-12-25 2024-01-30 深圳市今天国际软件技术有限公司 Goods throwing and hanging scheduling method and device based on intelligent warehouse and related components

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521725A (en) * 2011-12-16 2012-06-27 芜湖安得物流股份有限公司 RFID-based warehouse management system
CN108389018A (en) * 2018-03-02 2018-08-10 侨益物流股份有限公司 A kind of intelligence staple commodities logistic management system
CN109409841A (en) * 2018-11-01 2019-03-01 江苏物云通物流科技有限公司 Railway goods yard management system
CN110276583A (en) * 2019-06-26 2019-09-24 武汉理工大学 A kind of wisdom Features of Railway Logistics port, information processing system and information processing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521725A (en) * 2011-12-16 2012-06-27 芜湖安得物流股份有限公司 RFID-based warehouse management system
CN108389018A (en) * 2018-03-02 2018-08-10 侨益物流股份有限公司 A kind of intelligence staple commodities logistic management system
CN109409841A (en) * 2018-11-01 2019-03-01 江苏物云通物流科技有限公司 Railway goods yard management system
CN110276583A (en) * 2019-06-26 2019-09-24 武汉理工大学 A kind of wisdom Features of Railway Logistics port, information processing system and information processing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113205290A (en) * 2021-04-16 2021-08-03 深圳前海粤十信息技术有限公司 Supply chain management system applied to cold chain refrigeration house
CN117474451A (en) * 2023-12-25 2024-01-30 深圳市今天国际软件技术有限公司 Goods throwing and hanging scheduling method and device based on intelligent warehouse and related components
CN117474451B (en) * 2023-12-25 2024-03-22 深圳市今天国际软件技术有限公司 Goods throwing and hanging scheduling method and device based on intelligent warehouse and related components

Similar Documents

Publication Publication Date Title
US9965739B2 (en) Systems and methods for freight tracking and monitoring
US7613617B2 (en) Systems and methods for managing powered industrial vehicles
US6974928B2 (en) Method and apparatus for efficient package delivery and storage
US20100057592A1 (en) Systems and methods for freight tracking and monitoring
US20020178074A1 (en) Method and apparatus for efficient package delivery and storage
JPWO2006028086A1 (en) Goods access control system
CN103914762A (en) System and method for putting processed grain intelligently in and out of storage based on RFID technology
JP2019112226A (en) Delivery method of article and delivery information processing system
CN111815231B (en) Intelligent carpooling method and system for logistics platform
Bolten Managing time and space in the modern warehouse: With ready-to-use forms, checklist & documentation
CN110276583A (en) A kind of wisdom Features of Railway Logistics port, information processing system and information processing method
CN111080175A (en) Logistics transportation method for collecting railway, highway and shipping
CN113525989A (en) Intelligent unmanned warehouse
KR100558829B1 (en) Method of circulation-type logistics transportation handling which uses the subway
CN111429067A (en) Intelligent logistics management system
Reinhardt et al. Solving vehicle routing with full container load and time windows
CN107767013A (en) A kind of foundation lorry computing with words flow package method and system
KR100816983B1 (en) Sending system and method using the wireless information
CN1936941A (en) Third part logistics management system
EP3010657B1 (en) Distribution system and method for transporting parcels or piece goods
WO2007041275A2 (en) Systems and methods for freight transportation
Merkulina et al. The organization of transportations by container trains
JP2003323646A (en) Cargo shipping system on payroad
CN110002236A (en) Railway container shipping device and railway container shipping method
Seisonen Developing paper and paperboard warehouse

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200428