CN109409841A - Railway goods yard management system - Google Patents
Railway goods yard management system Download PDFInfo
- Publication number
- CN109409841A CN109409841A CN201811297274.6A CN201811297274A CN109409841A CN 109409841 A CN109409841 A CN 109409841A CN 201811297274 A CN201811297274 A CN 201811297274A CN 109409841 A CN109409841 A CN 109409841A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- railway
- train number
- communication module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention is railway goods yard management system, and structure includes: delivery staff terminal, order entry module, entrucking data input module, storage recording module, memory module, data processing module, handling personnel's communication module, handling staff terminal, railway communication module, railway department's terminal, train number recording module, arrival communication module and the staff terminal that receives.Advantages of the present invention: it realizes and delivery management, train number arrangement, arrival management is effectively integrated, delivery personnel self-service can place an order, railway side is notified to distribute train number after handling by system, automatic notice handling personnel handling goods, it notifies to receive personnel's back case automatically after arrival storage or draws case, efficiency is improved, the time has been saved, is very suitable for promoting the use of.
Description
Technical field
The present invention relates to railway goods yard management systems.
Background technique
Railway transportation is important one of shipping approach, and upwards of movement is big, speed is fast, cost is relatively low, general not climate item
Part limitation, is suitable for large, bulky goods long-distance transport.Railway goods yard is one of important link of railway transportation, is used for goods
The transfer of object saves.
In the prior art, the system that can be managed to railway goods yard management effectively generally requires and uses a variety of systems
System, use is many and diverse, inefficiency, is unable to satisfy growing logistics transportation needs.
Summary of the invention
Proposed by the present invention is railway goods yard management system, and purpose is intended to overcome deficiencies of the prior art,
Realization effectively integrates delivery management, train number arrangement, arrival management, improves efficiency.
Technical solution of the invention: railway goods yard management system, structure include:
Deliver staff terminal, for order data to be transferred to order entry module;
Order entry module, for receiving the order data sent of delivery staff terminal and being transferred to memory module;
Entrucking data input module, for inputting entrucking information data and being transferred to memory module;
It is put in storage recording module, for inputting storage data and being transferred to memory module;
Memory module, for storing order data, entrucking information data, storage data and rail link data;
Data processing module is gone forward side by side for reading storage order data, entrucking information data, storage data and train number data
Row processing, transmission handling director data give handling personnel's communication module, and transmission train number request data gives railway communication module, and passes
Defeated arrival data give arrival communication module;
Handling personnel's communication module, processing module is sent for receiving data handling director data are simultaneously transferred to handling people
Member's terminal;
Load and unload staff terminal, the handling director data sent for receiving handling personnel's communication module;
Railway communication module, processing module is sent for receiving data train number request data are simultaneously transferred to railway department's end
End, and receive the train number data sent of railway department's terminal and be transferred to train number recording module;
Railway department's terminal;The train number request data sent for receiving railway communication module, and send train number data to
Railway communication module;
Train number recording module, for receiving train number data that railway communication module is sent and being transferred to memory module;
Arrival communication module, processing module is sent for receiving data arrival data are simultaneously transferred to the staff terminal that receives;
Receive staff terminal, the arrival data sent for receiving arrival communication module.
Preferably, the entrucking information includes that weigh information, cartonning information and cartonning of admission is weighed information.
Preferably, the order entry module, entrucking data input module, train number recording module, memory module, data
Processing module, handling personnel's communication module, railway communication module, train number recording module and arrival communication module are all disposed within service
In device.
The data processing method of railway goods yard management system, method includes the following steps:
1) order data is transferred to order entry module by delivery staff terminal by personnel to be delivered, by order entry mould
Block is transmitted and is stored in memory module;
2) it after goods to be carried transports railway goods yard, by the typing of entrucking information data and is passed by entrucking data input module
It is defeated and be stored in memory module;
3) data processing module reads order data and entrucking information data in memory module, and train number request is obtained after processing
Data and handling director data, train number request data give railway department's terminal, handling instruction number by railway communication module transfer
Handling staff terminal is transferred to according to by handling personnel's communication module;
4) railway department's terminal gives train number data to train number recording module by railway communication module transfer, by train number typing
Storage in module transfer to memory module;
5) after freighting, dispatch a car, being put in storage, storage recording module transmission storage data are simultaneously transferred to memory module storage;
6) data processing module, which is read, is put in storage data in memory module, arrival data are obtained after processing and are communicated by arrival
Module transfer is to the staff terminal that receives.
Advantages of the present invention: realizing and effectively integrate to delivery management, train number arrangement, arrival management, and delivery personnel can
It is self-service to place an order, notify railway side to distribute train number, automatic notice handling personnel handling goods, after arrival is put in storage after handling by system
It is automatic to notify to receive personnel's back case or draw case, efficiency is improved, the time has been saved, is very suitable for promoting the use of.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of railway goods yard management system of the present invention.
Specific embodiment
Below with reference to embodiment and specific embodiment, the present invention is described in further detail.
As shown in Figure 1, railway goods yard management system, structure include:
Deliver staff terminal, for order data to be transferred to order entry module;
Order entry module, for receiving the order data sent of delivery staff terminal and being transferred to memory module;
Entrucking data input module, for inputting entrucking information data and being transferred to memory module;
It is put in storage recording module, for inputting storage data and being transferred to memory module;
Memory module, for storing order data, entrucking information data, storage data and rail link data;
Data processing module is gone forward side by side for reading storage order data, entrucking information data, storage data and train number data
Row processing, transmission handling director data give handling personnel's communication module, and transmission train number request data gives railway communication module, and passes
Defeated arrival data give arrival communication module;
Handling personnel's communication module, processing module is sent for receiving data handling director data are simultaneously transferred to handling people
Member's terminal;
Load and unload staff terminal, the handling director data sent for receiving handling personnel's communication module;
Railway communication module, processing module is sent for receiving data train number request data are simultaneously transferred to railway department's end
End, and receive the train number data sent of railway department's terminal and be transferred to train number recording module;
Railway department's terminal;The train number request data sent for receiving railway communication module, and send train number data to
Railway communication module;
Train number recording module, for receiving train number data that railway communication module is sent and being transferred to memory module;
Arrival communication module, processing module is sent for receiving data arrival data are simultaneously transferred to the staff terminal that receives;
Receive staff terminal, the arrival data sent for receiving arrival communication module.
The entrucking information includes that weigh information, cartonning information and cartonning of admission is weighed information.
The order entry module, entrucking data input module, train number recording module, memory module, data processing mould
Block, handling personnel's communication module, railway communication module, train number recording module and arrival communication module are all disposed in server.
The data processing method of railway goods yard management system, method includes the following steps:
1) order data is transferred to order entry module by delivery staff terminal by personnel to be delivered, by order entry mould
Block is transmitted and is stored in memory module;
2) it after goods to be carried transports railway goods yard, by the typing of entrucking information data and is passed by entrucking data input module
It is defeated and be stored in memory module;
3) data processing module reads order data and entrucking information data in memory module, and train number request is obtained after processing
Data and handling director data, train number request data give railway department's terminal, handling instruction number by railway communication module transfer
Handling staff terminal is transferred to according to by handling personnel's communication module;
4) railway department's terminal gives train number data to train number recording module by railway communication module transfer, by train number typing
Storage in module transfer to memory module;
5) after freighting, dispatch a car, being put in storage, storage recording module transmission storage data are simultaneously transferred to memory module storage;
6) data processing module, which is read, is put in storage data in memory module, arrival data are obtained after processing and are communicated by arrival
Module transfer is to the staff terminal that receives.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those of ordinary skill in the art
For, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to the present invention
Protection scope.
Claims (4)
1. railway goods yard management system, feature include:
Deliver staff terminal, for order data to be transferred to order entry module;
Order entry module, for receiving the order data sent of delivery staff terminal and being transferred to memory module;
Entrucking data input module, for inputting entrucking information data and being transferred to memory module;
It is put in storage recording module, for inputting storage data and being transferred to memory module;
Memory module, for storing order data, entrucking information data, storage data and rail link data;
Data processing module, for reading storage order data, entrucking information data, storage data and train number data and being located
Reason, transmission handling director data give handling personnel's communication module, and transmission train number request data gives railway communication module, and is transferred to
Goods data give arrival communication module;
Handling personnel's communication module, processing module is sent for receiving data handling director data and to be transferred to handling personnel whole
End;
Load and unload staff terminal, the handling director data sent for receiving handling personnel's communication module;
Railway communication module, processing module is sent for receiving data train number request data are simultaneously transferred to railway department's terminal,
With receive the train number data sent of railway department's terminal and be transferred to train number recording module;
Railway department's terminal;The train number request data sent for receiving railway communication module, and train number data are sent to railway
Communication module;
Train number recording module, for receiving train number data that railway communication module is sent and being transferred to memory module;
Arrival communication module, processing module is sent for receiving data arrival data are simultaneously transferred to the staff terminal that receives;
Receive staff terminal, the arrival data sent for receiving arrival communication module.
2. railway goods yard management system as described in claim 1, it is characterized in that the entrucking information includes that admission is weighed letter
Breath, cartonning information and cartonning weigh information.
3. railway goods yard management system as described in claim 1, it is characterized in that the order entry module, entrucking information are recorded
Enter module, train number recording module, memory module, data processing module, handling personnel's communication module, railway communication module, train number
Recording module and arrival communication module are all disposed in server.
4. the data processing method of railway goods yard management system as described in claim 1, it is characterized in that this method includes following
Step:
1) order data is transferred to order entry module by delivery staff terminal by personnel to be delivered, and is passed by order entry module
It is defeated and be stored in memory module;
2) after goods to be carried transports railway goods yard, by entrucking data input module by the typing of entrucking information data and transmit and
It is stored in memory module;
3) data processing module reads order data and entrucking information data in memory module, and train number request data is obtained after processing
With handling director data, train number request data gives railway department's terminal by railway communication module transfer, and handling director data is logical
It crosses handling personnel's communication module and is transferred to handling staff terminal;
4) railway department's terminal gives train number data to train number recording module by railway communication module transfer, by train number recording module
It is transferred to storage in memory module;
5) after freighting, dispatch a car, being put in storage, storage recording module transmission storage data are simultaneously transferred to memory module storage;
6) data processing module, which is read, is put in storage data in memory module, arrival data are obtained after processing and by arrival communication module
It is transferred to the staff terminal that receives.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811297274.6A CN109409841A (en) | 2018-11-01 | 2018-11-01 | Railway goods yard management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811297274.6A CN109409841A (en) | 2018-11-01 | 2018-11-01 | Railway goods yard management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109409841A true CN109409841A (en) | 2019-03-01 |
Family
ID=65471279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811297274.6A Pending CN109409841A (en) | 2018-11-01 | 2018-11-01 | Railway goods yard management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109409841A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111080175A (en) * | 2019-12-31 | 2020-04-28 | 江苏奔牛港务集团有限公司 | Logistics transportation method for collecting railway, highway and shipping |
CN111137700A (en) * | 2019-09-02 | 2020-05-12 | 浙江中控技术股份有限公司 | Method suitable for batch ordering of train loading |
CN111461541A (en) * | 2020-03-31 | 2020-07-28 | 中国铁路工会丰台货运中心委员会 | Management system for loading and unloading goods on train |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012073835A (en) * | 2010-09-29 | 2012-04-12 | Railway Technical Research Institute | Evaluation method for railroad freight transportation effect |
CN107392377A (en) * | 2017-07-25 | 2017-11-24 | 青岛中科慧畅信息科技有限公司 | Parallel logistic information systems |
-
2018
- 2018-11-01 CN CN201811297274.6A patent/CN109409841A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012073835A (en) * | 2010-09-29 | 2012-04-12 | Railway Technical Research Institute | Evaluation method for railroad freight transportation effect |
CN107392377A (en) * | 2017-07-25 | 2017-11-24 | 青岛中科慧畅信息科技有限公司 | Parallel logistic information systems |
Non-Patent Citations (2)
Title |
---|
卿周阳: "基于Android的铁路快运货物信息管理系统的研究与开发", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
王彦芳: "货运信息管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111137700A (en) * | 2019-09-02 | 2020-05-12 | 浙江中控技术股份有限公司 | Method suitable for batch ordering of train loading |
CN111080175A (en) * | 2019-12-31 | 2020-04-28 | 江苏奔牛港务集团有限公司 | Logistics transportation method for collecting railway, highway and shipping |
CN111461541A (en) * | 2020-03-31 | 2020-07-28 | 中国铁路工会丰台货运中心委员会 | Management system for loading and unloading goods on train |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109409841A (en) | Railway goods yard management system | |
CN104599102A (en) | Cold-chain logistics storage supervisory system and method | |
CN102439614B (en) | For collecting and propagate the system of load vehicle/sky vehicle-related information | |
CN104571044A (en) | Cold-chain logistics visual monitoring system and method | |
CN104843408A (en) | Unmanned aerial vehicle express receiving cabinet | |
CN103473665B (en) | Container dispatching management information system and method | |
CN108510219A (en) | A kind of cargo transport intelligent monitoring method for tracing, system | |
CN107392377A (en) | Parallel logistic information systems | |
JP4573423B2 (en) | Logistics management system | |
CN104954491A (en) | Novel intelligent distributed storing and conveying system | |
CN111754174A (en) | Method and terminal for displaying logistics state | |
CN112330261A (en) | Cargo tracking system and application thereof | |
CN108108931A (en) | A kind of logistics supply chain information management system | |
CN103559598A (en) | Standardization logistics field station internet of things | |
CN208188887U (en) | It is a kind of based on unmanned plane, bus and the logistics system at station | |
CN111284892A (en) | Transportation system and method of cargo turnover box | |
CN204990394U (en) | Railway freight collection dressization apparatus management system | |
US20130173488A1 (en) | Methods and Systems for Facilitating Movement of Articles of Freight | |
CN205581968U (en) | Storage commodity circulation tracking system | |
CN102063644A (en) | Electronic tail box providing system and control method based on RFID (radio frequency identification device) technique | |
CN103383757A (en) | Cage trolley dispatching system for tobacco logistics distribution and dispatching method of system | |
KR101562389B1 (en) | System for Collecting and Proffering of Empty Vehicle's Information and Method of Proffering Empty Vehicle's using the same | |
CN108921481A (en) | A kind of logistics transportation transaction intelligent information handling system | |
CN109214758A (en) | A kind of city distribution monitoring system | |
CN107600930A (en) | A kind of public Huo Jian transportation systems in same city and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 214000 building 63, Hengsheng Science Park, 1588 Zhonghui Avenue, Huishan District, Wuxi City, Jiangsu Province Applicant after: JIANGSU WUYUNTONG LOGISTICS TECHNOLOGY Co.,Ltd. Address before: Room 1302, 18 Zhihui Road, Huishan District, Wuxi City, Jiangsu Province Applicant before: JIANGSU WUYUNTONG LOGISTICS TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |
|
RJ01 | Rejection of invention patent application after publication |