CN110984182A - Operation method of dumping machine - Google Patents

Operation method of dumping machine Download PDF

Info

Publication number
CN110984182A
CN110984182A CN201911258824.8A CN201911258824A CN110984182A CN 110984182 A CN110984182 A CN 110984182A CN 201911258824 A CN201911258824 A CN 201911258824A CN 110984182 A CN110984182 A CN 110984182A
Authority
CN
China
Prior art keywords
dumping
adhesive tape
machine
tape machine
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911258824.8A
Other languages
Chinese (zh)
Other versions
CN110984182B (en
Inventor
白俊
马跃林
王斌
高超
田巨明
李建成
冯文青
王高峰
辛作栋
王明亮
白冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tisco Lanxian Mining Co ltd
Taiyuan Iron and Steel Group Co Ltd
Original Assignee
Tisco Lanxian Mining Co ltd
Taiyuan Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tisco Lanxian Mining Co ltd, Taiyuan Iron and Steel Group Co Ltd filed Critical Tisco Lanxian Mining Co ltd
Priority to CN201911258824.8A priority Critical patent/CN110984182B/en
Publication of CN110984182A publication Critical patent/CN110984182A/en
Application granted granted Critical
Publication of CN110984182B publication Critical patent/CN110984182B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Loading Or Unloading Of Vehicles (AREA)

Abstract

An operation method of a dumping machine belongs to the field of mine dumping grounds, and comprises the following steps: the method comprises the following steps that a step toe of a dumping machine operation is piled with a preloading platform by adopting automobile rock dumping and piling toe in advance; after the adhesive tape machine finishes the transfer every time, the slope toe is discarded for stacking during the downward discharge, so that the pre-settlement of the slope toe is realized, and the bottom strength of the rock-discharging step is improved; the adhesive tape machine is moved and then arranged upwards and then arranged downwards, and when the adhesive tape machine is arranged upwards, the earth removing machine is firstly removed from the upstream side of the adhesive tape machine and then wound to the downstream side of the adhesive tape machine to be arranged upwards; the elevation of the standing position of the dumping plough is 0.5-1 m higher than that of the adhesive tape machine. The invention improves the strength stability of the base and the rock-discharging step of the refuse dump in essence, so that the refuse dump can realize continuous refuse discharging operation, and the rock-discharging efficiency can be fully exerted.

Description

Operation method of dumping machine
Technical Field
The invention relates to the field of mine dumping grounds, in particular to an operation method of a dumping machine.
Background
In the field of mine dumping grounds, a proper dumping mode is selected according to different exploiting transportation modes, rock and soil properties, transportation quantity, transportation distance and other factors, wherein the belt-dumping machine mode is suitable for large mines with large transportation quantity, long transportation distance and high transportation altitude difference.
The Yuanjiavillage iron ore is used as the current largest open-pit iron mine with single pit, and the quantity of stripped waste rocks reaches 6380 ten thousand tons every year. The lower-tray dumping ground is designed to adopt an automobile-semi-mobile crushing-belt conveyor combined development transportation mode and a belt-dumping machine dumping mode, the design capacity is 3500 ten thousand tons/year, the hourly capacity is 7650t/h, the operation rate is 52.23%, the belt speed of the belt conveyor is 5.027m/s, and the belt width is 1.8 m. The system adopts a B1800(50+50)9000t/h type dumping machine, the instantaneous rock dumping amount is equivalent to that of a 130 Haoho automobile, the rock dumping strength is very high, and the system belongs to a large rock dumping system with the largest equipment specification and the highest system capacity in China at present.
Because a large amount of fourth-system collapsible non-collapsible loess exists in the region, the average occurrence thickness reaches 19m, the method is limited by the technical problems of weak foundation conditions and easily weathered rock types of the dumping yard, low counterweight of the dumping machine, cross influence of a belt conveyor and the like, and the self stability and the foundation strength of the dumping yard cannot support the safe, continuous and efficient dumping operation of the dumping machine all the time.
Disclosure of Invention
The invention aims to overcome the defects that the self balance weight of the dumping plough is too low and the base of the dumping yard is soft, improve the strength of the base of the dumping yard and the operation method of steps, and further realize safe, continuous and efficient dumping operation of the dumping plough.
The invention provides an operation method of a dumping plough, aiming at improving the base strength and the strength stability of the dumping yard and realizing the safe and efficient dumping operation of the dumping plough.
The operation method of the dumping machine is characterized by comprising the following steps:
(1) adopting an automobile dumping preloading platform 3-6 months ahead of time to carry out back pressure on the slope toe of the rubber belt rock-discharging step, and controlling the height of the rock-discharging platform stage of the dumping machine to be no more than 80 m;
(2) when the dumping machine is used for dumping, firstly dumping the slope toe, wherein the primary dumping height is not more than 1/2 of the height of the integral dumping section, and after the interval is 35d, dumping for the second time is started, and the dumping for the height of the integral step is finished at least 2 times in a reciprocating way;
(3) after the adhesive tape machine is moved each time, the upper row of tissues is 45d, so that the lower row of steps at the outer side has time for consolidation and settlement; the dumping machine is firstly dumped at the upstream side of the adhesive tape machine during the upper dumping, the stacking height is 12m, the distance between the slope foot of the upper dumping step and the track of the adhesive tape machine is not less than 30m, and the walking requirement of the dumping machine during the return is ensured; the dumping machine finishes dumping on the upstream side of the adhesive tape machine and winds the end part of a head wheel of the adhesive tape machine to the downstream side of the adhesive tape machine, the dumping is carried out simultaneously for the lower-discharging operation, a dumping arm spans the adhesive tape machine for the upper-discharging operation, and the distance between a slope foot of an upper-discharging step and the adhesive tape machine is not less than 10 m;
(4) because the balance weight is arranged on the dumping machine below the material receiving arm, in order to avoid collision between the balance weight and the adhesive tape machine in the rotation process of the dumping machine, the dumping machine distributes materials at the front end of the operation in advance, the dumping machine is assisted to be pushed flat and lifted to the standing position of the dumping machine, and the height difference between the position of the dumping machine and the position of the adhesive tape machine parallel to the dumping machine is + 0.5-1 m.
The invention improves the operation efficiency of the dumping machine of the large-scale rubber belt dumping system, and the essential safety and reliability of the dumping site are greatly improved.
Detailed Description
Comparative example: the traditional operation method of the dumping plough is influenced by the soft foundation condition of the dumping site and the type of easily weathered rocks, the slope shoulder differential settlement representing the self stability of the dumping site is adopted, and the settlement amount 1d after the construction reaches 6.5 percent (about 5.2 m) of the height of the whole step.
Example 1: compared with a comparative example, differential settlement of the slope shoulder of the waste dump is obviously reduced by piling up the toe back pressure platform, and the settlement amount of 1d after construction is 1.9-2.4% (1.5-2 m) of the height of the whole step.
When the dumping machine is used for dumping, the slope toe is preferentially discarded, the dumping is carried out for more than 2 times to form an integral dumping step, and the differential settlement amount of the slope shoulder of the dumping step is only about 1% of the height of the integral dumping section after work and is 800mm after work for 1 d.
The adhesive tape machine of the invention is arranged in the upper row preferentially after each transfer, so that the operation steps in the lower row have a certain time for consolidation and settlement, the interval time is not less than 45d, and the differential settlement amount of the slope shoulder of the soil discharging step is only about 500mm after 1 d.
The invention adopts the dumping machine produced by Taiyuan heavy industry Co., Ltd, and the elevation of the standing position of the dumping machine is 0.5-1 m higher than that of the adhesive tape machine. The rock discharging operation of the dumping plough is not affected when rotating, and the dumping plough can realize continuous reading and material carrying operation.

Claims (2)

1. The operation method of the dumping machine is characterized by comprising the following steps:
the method comprises the following steps that a step toe of a dumping machine operation is piled with a preloading platform by adopting automobile rock dumping and piling toe in advance;
after the adhesive tape machine finishes the transfer every time, the slope toe is discarded for stacking during the downward discharge, so that the pre-settlement of the slope toe is realized, and the bottom strength of the rock-discharging step is improved;
the adhesive tape machine is moved and then arranged upwards and then arranged downwards, and when the adhesive tape machine is arranged upwards, the earth removing machine is firstly removed from the upstream side of the adhesive tape machine and then wound to the downstream side of the adhesive tape machine to be arranged upwards;
the elevation of the standing position of the dumping plough is 0.5-1 m higher than that of the adhesive tape machine.
2. The method of claim 1, comprising the steps of:
(1) the method comprises the following steps of (1) carrying out back pressure on the slope toe of the rubber belt rock-discharging step through an automobile filling and loading prepressing platform below the rubber belt rock-discharging step, and controlling the height of the rock-discharging platform stage of the dumping machine to be no more than 80 m;
(2) after the adhesive tape machine finishes moving every time, the slope toe is discarded firstly during lower discharge, the first discarding height is not more than 1/2 of the height of the integral discarding section, the second discarding is returned to start after the interval of 35d, and the steps are repeated until the discarding of the height of the integral step is finished;
(3) after the adhesive tape machine is moved each time, the upper row 45d is organized first, so that the lower row of steps on the outer side has time for consolidation and settlement; the dumping machine is firstly dumped at the upstream side of the adhesive tape machine during the upper-discharging, the stacking height is 12m, and the distance between the slope toe of the upper-discharging step and the track of the adhesive tape machine is not less than 30 m; the dumping machine finishes dumping on the upstream side of the adhesive tape machine and winds the end part of a head wheel of the adhesive tape machine to the downstream side of the adhesive tape machine, the dumping is carried out simultaneously for the lower-discharging operation, a dumping arm spans the adhesive tape machine for the upper-discharging operation, and the distance between a slope foot of an upper-discharging step and the adhesive tape machine is not less than 10 m;
(4) the height of the standing position of the dumping plough is 0.5-1 m higher than that of the parallel adhesive tape machine.
CN201911258824.8A 2019-12-10 2019-12-10 Operation method of dumping machine Active CN110984182B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911258824.8A CN110984182B (en) 2019-12-10 2019-12-10 Operation method of dumping machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911258824.8A CN110984182B (en) 2019-12-10 2019-12-10 Operation method of dumping machine

Publications (2)

Publication Number Publication Date
CN110984182A true CN110984182A (en) 2020-04-10
CN110984182B CN110984182B (en) 2021-03-30

Family

ID=70091883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911258824.8A Active CN110984182B (en) 2019-12-10 2019-12-10 Operation method of dumping machine

Country Status (1)

Country Link
CN (1) CN110984182B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852555A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
CN115492055A (en) * 2022-09-27 2022-12-20 太钢集团岚县矿业有限公司 Method for building dam by arranging waste rocks on dumping machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD219814A1 (en) * 1983-12-14 1985-03-13 Orgreb Inst Kraftwerke METHOD FOR THE HYDRAULIC STORAGE OF DUST-SOFT TO FINE-COATED SPOOLS
CN105173673A (en) * 2015-10-13 2015-12-23 云南省小龙潭矿务局机修总厂 Soil dumping process for multi-directional transferring and machine head dead zone eliminating by waste soil field rubber belt machines
CN105735238A (en) * 2016-03-04 2016-07-06 太原钢铁(集团)有限公司 Dump safety control method under collapsible loess foundation condition
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD219814A1 (en) * 1983-12-14 1985-03-13 Orgreb Inst Kraftwerke METHOD FOR THE HYDRAULIC STORAGE OF DUST-SOFT TO FINE-COATED SPOOLS
CN105173673A (en) * 2015-10-13 2015-12-23 云南省小龙潭矿务局机修总厂 Soil dumping process for multi-directional transferring and machine head dead zone eliminating by waste soil field rubber belt machines
CN105735238A (en) * 2016-03-04 2016-07-06 太原钢铁(集团)有限公司 Dump safety control method under collapsible loess foundation condition
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
杨忠林等: "露天胶带排土最大段高及排土机安全距离的确定 ", 《金属矿山》 *
王斌: "特大型排土场软弱地基胶带排土工艺研究 ", 《矿业工程》 *
石伟等: "大型露天矿山胶带排土工艺的研究 ", 《中国矿业》 *
赵乃晶等: "提高排土机排岩效率的有效途径", 《国外金属矿山》 *
邱宇等: "我国冶金矿山排土场研究现状及展望 ", 《金属矿山》 *
项伟: "浅论排土机的作业方法", 《金属矿山》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852555A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
CN111852555B (en) * 2020-07-06 2021-08-03 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
CN115492055A (en) * 2022-09-27 2022-12-20 太钢集团岚县矿业有限公司 Method for building dam by arranging waste rocks on dumping machine

Also Published As

Publication number Publication date
CN110984182B (en) 2021-03-30

Similar Documents

Publication Publication Date Title
CN110984182B (en) Operation method of dumping machine
CN106401586B (en) The coal petrography sorting and the method for utilizing of a kind of coal petrography with mining face
CN103216238B (en) A kind of Opencut coal mine mining technique
CN201007216Y (en) Mining with filling hydraulic support
CN108483056B (en) Mobile belt conveying system and method for large-scale sand and stone material stacking and unloading
CN101418690A (en) Flat coal deposit large open pit mine end-slope transport technological process
CN102261249B (en) Creasing-type sill-pillar-free stage caving stopping method based on steel structured artificial top
CN102383794A (en) Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure
CN104141506B (en) A kind of strong ore deposit pressure manifests the ore deposit pressure-controlled method of comprehensive extracting and caving face
CN1782326B (en) Method for treating waste rock in coal mine
CN211975051U (en) Filling equipment for open-air end slope coal-pressing filling mining
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN114622938B (en) Mining system and method of coal-based solid waste conveying and filling integrated machine
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN202717372U (en) Automatically moving type stacker reclaimer
CN214985333U (en) Telescopic movable slag-discharging shuttle mine car
CN203783634U (en) Mineral powder recycling structure for underground mine
CN203382232U (en) Large ultra-long single-arm material discharging and distributing machine
CN202047853U (en) Gob-side entry retaining end hydraulic support
CN107380987A (en) Vinasse skip car in vinasse extractive technique
RU2394158C1 (en) Procedure for open pit development of mineral deposits
CN212406771U (en) Fully-mechanized coal mining gangue-throwing filling hydraulic support
CN210047977U (en) Movable type stacking system
CN210031758U (en) A surcharge and carry pre-compaction structure for soft soil highway section construction
CN208266943U (en) It is a kind of to transmit reliable and stable load mode mine slag-raking machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant