CN102383794A - Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure - Google Patents

Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure Download PDF

Info

Publication number
CN102383794A
CN102383794A CN2011101801179A CN201110180117A CN102383794A CN 102383794 A CN102383794 A CN 102383794A CN 2011101801179 A CN2011101801179 A CN 2011101801179A CN 201110180117 A CN201110180117 A CN 201110180117A CN 102383794 A CN102383794 A CN 102383794A
Authority
CN
China
Prior art keywords
coal
conveyer
rear portion
working face
caving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101801179A
Other languages
Chinese (zh)
Other versions
CN102383794B (en
Inventor
王国法
时成忠
李明忠
刘健
刘壮
王彪谋
吴立忠
胡万昌
亓玉皓
王春生
冯立友
任怀伟
孟凡龙
王建国
辛家祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Science and Technology Co Ltd
Yanzhou Coal Industry Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN201110180117.9A priority Critical patent/CN102383794B/en
Publication of CN102383794A publication Critical patent/CN102383794A/en
Application granted granted Critical
Publication of CN102383794B publication Critical patent/CN102383794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a new cross side dumping coordinated technology and a new supporting technology for an end region of a fully mechanized working face. The head of a rear conveyer is changed to a cross side dumping arrangement mode, and a motor of the rear conveyer is arranged in a smooth trough, so that the rear space of a transition support is not occupied any more, the center distance between the heads and the tails of the front and rear conveyers is consistent with the center distance of the middle sections, meanwhile, the unloading height of the conveyers is reduced, and the coal caving effect of the heads and the tails and the recovery rate of coal resources are further improved; and because the transition bracket is in the same structural form as a middle bracket, the category of hydraulic brackets of the working face can be reduced, and effective coal caving of the transition section of the top coal caving working face can be realized. A tunnel tail bracket is arranged at the rear part of a transferring machine, so that protection of the rear part of the transferring machine and smooth push of the transferring machine are realized; meanwhile, side guard plates which can be hinged are arranged on the lateral surfaces of the transferring machine, so that the rear gangue is prevented from falling into the tunnel tail bracket; end brackets are arranged at two sides of the transferring machine and have asymmetrical structures, a top beam has a step-type top beam structure, and the end brackets are matched with the tunnel tail bracket of the rear part, so that the stability of a top plate in the cross side dumping coordinated end region of the fully mechanized working face is maintained, and safe and efficiency recovery of the fully mechanized working face is realized.

Description

Supporting mode and supporting structure are arranged in the conveyer intersection side dumping of fully mechanized coal face rear portion
The present invention relates to a kind of method for designing of hydraulic support, is exactly the hydraulic support three-dimensional design method of considering coal-face country rock dynamic effects specifically.
Technical background
Coal Mining Equipment Complement (abbreviation longwall top coal caving) is one of China's high seam high-efficiency mining method, and in national wide popularization and application, caving roof coal hydraulic support is the critical equipment of longwall top coal caving.Existing fully mechanized coal face generally adopts front and rear portions conveyer drive division to be arranged in parallel, and the drive division motor is parallel to work plane, and the unloading manner of conveyer and elevating conveyor unloads for end.Because of receiving the influence of conveyer drive motors; Front and rear portions conveyer head, tail center to center distance and interlude center to center distance are inconsistent; Conveyer head, tail changeover portion are respectively arranged 3 transition brackets usually; Transition bracket adopts the reverse-four-link-bar structural shape mostly, causes changeover portion can't put coal, has restricted the raising of the fully mechanized coal face rate of recovery.With a coal seam average thickness is 9 meters, and strike length is that 1500 meters fully mechanized coal face is an example, and the coal amount that head, afterbody account for pressure is about 10~120,000 tons, if can improve drawing effectiveness here, can reclaim coal 6~80,000 ton more.For this reason; Invention rear portion conveyer intersection overall supporting new technology of side dumping and termination district support system; Improve fully mechanized coal face head, afterbody drawing effectiveness, the job safety in safeguard work face termination district further improves the supporting effect and the coal recovery rate in termination district.
Summary of the invention
The purpose of this invention is to provide a kind of fully mechanized coal face termination district intersection supporting new mode of side dumping and the new system of termination district supporting; Can control the stable of fully mechanized coal face termination district top board effectively; Realize the fully mechanized coal face changeover portion effectively put coal, be that rear portion conveyer drive division provides enough big support space in the termination district; And the action of each equipment of coordination termination district, realize safe, the efficient back production of fully mechanized coal face.
For realizing above-mentioned purpose, the longwall top coal caving process of the present invention's design is different with conventional longwall top coal caving with support pattern.First longwall top coal caving rear portion conveyer chain-drive section cooperates with elevating conveyor by the end mode of unloading and changes the side dumping mode of intersecting into; This mode is arranged in the conveyer motor in the crossheading; No longer take the space at transition bracket rear portion; Reduce the discharge height of conveyer simultaneously, that can realize head, afterbody effectively puts coal, improves the rate of recovery of coal resources; And make front and rear part conveyer head, tail center to center distance consistent with interlude center to center distance, and improve the operation condition of rear portion conveyer, improve equipment overall operation reliability.It two is to change traditional Caving Coal transition bracket structural shape; Adopt the caving roof coal hydraulic support identical with the middle bracket structure; Adapt to novel supporting production practice requirement, reduce the working surface hydraulic support device category, that can realize the top-coal caving face changeover portion effectively puts coal; Again the walkway parallel with work plane can be provided, make the walkway more smooth and easy.It three is to arrange end of a lane support at the rear portion of elevating conveyor, realize the protection at elevating conveyor rear portion and the smooth passing of elevating conveyor, simultaneously its side setting can be hinged the side guard, avoid the rear portion spoil to emit and drop into end of a lane internal stent.It four is that rear portion conveyer drive motors is placed in the tunnel, in view of its occupation space is bigger, therefore changes the structural shape of traditional Caving Coal face end support, adopts the dissymmetrical structure pattern that is arranged in the elevating conveyor both sides.Face end support adopts reverse-four-link-bar and two power bars as stabilizing mechanism, and the two is according to the needs in space, and arrangement is different, has formed the face end support of the anisopleual structural shape of elevating conveyor.Face end support cooperates with rear portion end of a lane support, reserves enough support space for rear portion conveyer drive motors, keeps the stable of fully mechanized coal face termination district top board simultaneously.
Description of drawings
Overall supporting arrangement diagram is arranged in the conveyer intersection side dumping of Fig. 1 top-coal caving face rear portion
Fig. 2 intersects side dumping top-coal caving face end of a lane supporting structure sketch map
Fig. 3 face end support I and end of a lane supporting structure sketch map
Fig. 4 face end support II and end of a lane supporting structure sketch map
Fig. 5 face end support I, II staged back timber structural representation
The specific embodiment
The present invention shown in Figure 1 intersects side dumping and arranges that fully mechanized coal face termination supporting technology capital equipment comprises coal-winning machine (1), anterior conveyer (2), Caving Coal middle bracket (3), rear portion conveyer (4), transition bracket (5), end of a lane support (6), elevating conveyor (7), face end support I (8) and face end support II (9) etc.
At fully mechanized coal face, coal-winning machine (1), anterior conveyer (2) are immediate support with the Matching Relationship of caving roof coal hydraulic support (3), promptly after coal-winning machine (1) coal cutting, in time draw support (3); Conveyer (2) changeover portion forwardly, coal-winning machine (1), anterior conveyer (2) are the hysteresis supporting with the Matching Relationship of Caving Coal transition bracket (5), i.e. after coal-winning machine (1) coal cutting, push away anterior conveyer (2) earlier, and then are pulled through and cross support (5).The unloading manner of rear portion conveyer (4) changes the intersection side dumping into here, and its drive motors is put in the tunnel, no longer takies the rear portion support space of changeover portion, changes the structural shape of transition bracket (5) for this reason, adopts the hydraulic support identical with the middle bracket structural shape.
In fully mechanized coal face termination district; Rear portion conveyer (4) adopts the side dumping mode of intersecting with elevating conveyor (7); End of a lane support (6) is arranged at elevating conveyor (7) rear portion, and end of a lane support (6) can think that elevating conveyor (7) provides enough support space, can also be the mobile thrust that provides of elevating conveyor (7).
Because the existence of rear portion conveyer intersection side dumping arrangement and rear portion conveyer drive division; Change the structural shape of traditional top-coal caving face face end support; Design the fully mechanized coal face face end support of novel adaptation intersection side dumping arrangement in the both sides of elevating conveyor (7), enough big no column support space is provided.Novel fully mechanized coal face face end support I (8) and face end support II (9) cooperate with end of a lane support (6), can realize the safety support of fully mechanized coal face termination portion, realize safety, the high-efficiency mining of fully mechanized coal face.
Be applicable to the top-coal caving face transition bracket (5) of intersection side dumping arrangement; Changed traditional Caving Coal transition bracket structural shape; Adopt the caving roof coal hydraulic support identical with the middle bracket structure, reduce the working surface hydraulic support device category, that can realize the top-coal caving face changeover portion effectively puts coal; Again the walkway parallel with work plane can be provided, be convenient to the pedestrian.
The top-coal caving face end of a lane support that is applicable to intersection side dumping arrangement for the present invention shown in Figure 2; Its characteristic mainly be its side be provided with can be hinged multistage side guard board (11), (12) cooperate with side guard board (13) on hinged and the base; Realize the totally-enclosed of end of a lane cradle, can prevent that the side spoil from rolling into end of a lane internal stent.
Shown in Figure 3ly intersect the top-coal caving face face end support I (8) of side dumping arrangement for the present invention is applicable to, it is arranged in elevating conveyor (7) near the rib side.Face end support I (8) is made up of preceding back timber (16), back back timber (17), preceding base (20), pull bar (21), rear base (22) and hinged therebetween stabilizing mechanism and column.Hinged reverse-four-link-bar structure between its preceding back timber (16) and the preceding base (17) (forming) by lower link (13), last connecting rod (14), caving shield (15); Thereafter hinged two power bars (forming) between back timber (17) and the rear base (22) by upper boom (18) and lower beam (19); Preceding back timber (16) is hinged with back back timber (17); Preceding base (20) is connected through pull bar (21) with rear base (22), and is different according to the space, can hinged 3~4 columns between back timber and the base.
Shown in Figure 4ly intersect the top-coal caving face face end support II (9) of side dumping arrangement for the present invention is applicable to, it is arranged in elevating conveyor (7) near People's Bank of China's side.Face end support II (9) is by being made up of preceding back timber (23), back back timber (24), preceding base (27), rear base (26) and hinged therebetween stabilizing mechanism and column.Thereafter hinged reverse-four-link-bar structure between back timber (23) and the rear base (27) (by lower link (13), go up connecting rod (14), caving shield (15) is formed); Hinged two power bars between its preceding back timber (24) and the preceding base (26) (forming) by upper boom (24) and lower beam (25); Preceding back timber (23) is hinged with back back timber (24), and preceding base (27) and rear base (26) are hinged, but are hinged with the wall supporting device (25) of leveling in the rear end of back timber; Different according to the space, can hinged 3~4 columns between back timber and the base.
The face end support staged back timber structure that designs for the present invention shown in Figure 5; The mid portion of every side back timber is than more than the low 200mm in back timber top; Can avoid support to interfering with anchor pole in the support repeatedly of top board and the reach process, can also the effective support top board, avoid top board inbreak from the middle part.
Working face ended support I (8), working face ended support II (9) cooperate with end of a lane support (6), top board that can supporting fully mechanized coal face termination district.

Claims (4)

1. supporting new mode of fully mechanized coal face; It is characterized in that two conveyers of longwall top coal caving work plane front and rear portions adopt different unloading manners; Its middle front part conveyer adopts end to unload arrangement; When the coal of coal-winning machine cut is transported to head through anterior conveyer, directly be unloaded on the elevating conveyor by anterior conveyer head; Rear portion conveyer and elevating conveyor adopt and intersect the side dumping arrangement, when the coal that put down at the work plane rear portion is transported to rear portion conveyer head, lead through coal-ploughing board, are discharged in the elevating conveyor chute through rear portion conveyer headstock.
2. rear portion according to claim 1 conveyer intersects the supporting new mode of side dumping, and rear portion conveyer drive motors axis normal in the work plane direction, and is arranged in it in tunnel; Can make front and rear portions conveyer head, tail center to center distance consistent with interlude center to center distance.At the Caving Coal transition bracket that the conveyer changeover portion is placed, structural shape is identical with middle bracket, and it puts coal mechanism can realize the effective Caving Coal of work plane transition section;
3. a kind of Caving Coal end of a lane support that adapts to intersection side dumping supporting technology according to claim 1; It is arranged in the rear portion of elevating conveyor; Its hinged secondary in back timber side or the hinged detachable side guard of multistage side guard and base side are realized the totally-enclosed of end of a lane cradle;
4. a kind of Caving Coal face end support that adapts to the supporting mode of intersection side dumping according to claim 1 adopt dissymmetrical structure, and back timber adopts rugged stepped construction.
CN201110180117.9A 2011-06-29 2011-06-29 Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure Active CN102383794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110180117.9A CN102383794B (en) 2011-06-29 2011-06-29 Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110180117.9A CN102383794B (en) 2011-06-29 2011-06-29 Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure

Publications (2)

Publication Number Publication Date
CN102383794A true CN102383794A (en) 2012-03-21
CN102383794B CN102383794B (en) 2014-06-18

Family

ID=45823580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110180117.9A Active CN102383794B (en) 2011-06-29 2011-06-29 Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure

Country Status (1)

Country Link
CN (1) CN102383794B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102749432A (en) * 2012-05-17 2012-10-24 中国矿业大学(北京) Fully mechanized caving top coal caving three-dimensional simulation experiment platform and experiment method
CN102900464A (en) * 2012-09-17 2013-01-30 宁夏天地奔牛实业集团有限公司 Tail drive transmission device for rear scraper conveyors
CN103498675A (en) * 2013-09-23 2014-01-08 三一重型装备有限公司 Scraper conveyor and coal conveying system
CN103775082A (en) * 2014-01-20 2014-05-07 宁夏天地奔牛实业集团有限公司 Novel thin coal seam overlapped side-unloading structure
CN104265344A (en) * 2014-10-17 2015-01-07 沈阳天安矿山机械股份有限公司 Conveyor unloading part rear-mounted end hydraulic support
CN104594932A (en) * 2014-12-29 2015-05-06 中国神华能源股份有限公司 Mining supporting support equipment and mining method thereof
CN105775608A (en) * 2016-03-30 2016-07-20 中煤张家口煤矿机械有限责任公司 Machine head pushing part of scraper conveyer
CN108412528A (en) * 2018-04-23 2018-08-17 山东塔高矿业机械装备制造有限公司 Based on the hydraulic support device and method for protecting support for extending tunnel
CN111022115A (en) * 2019-11-19 2020-04-17 中煤张家口煤矿机械有限责任公司 Arrangement method of front-lapping rear-end-unloading fully-mechanized caving face conveying and crushing equipment
CN111042858A (en) * 2019-11-14 2020-04-21 中煤张家口煤矿机械有限责任公司 Arrangement method of front-lap-joint rear-crossed fully mechanized caving face conveying and crushing equipment
CN112253116A (en) * 2020-10-27 2021-01-22 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320546A (en) * 2000-03-24 2001-11-07 株式会社椿本链索 Conveying chain for cross conveyer
CN2911186Y (en) * 2006-06-30 2007-06-13 兖州煤业股份有限公司 Conveying end support of integrated working surface
CN201125743Y (en) * 2007-08-03 2008-10-01 四川华蓥山广能(集团)有限责任公司 Sloped and high-sloped fully-mechanized mining hydraulic support side direction blocking apparatus
CN101509388A (en) * 2009-02-28 2009-08-19 山东天晟煤矿装备有限公司 Tunnel ahead support stent
CN201588646U (en) * 2010-01-26 2010-09-22 重庆大江工业有限责任公司 Top caving coal bracket for tunnel end of full-mechanized caving face of coal mine
CN101906979A (en) * 2009-06-08 2010-12-08 兖州煤业股份有限公司 Gob-side road retaining supporting method and road-injecting slip mould

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320546A (en) * 2000-03-24 2001-11-07 株式会社椿本链索 Conveying chain for cross conveyer
CN2911186Y (en) * 2006-06-30 2007-06-13 兖州煤业股份有限公司 Conveying end support of integrated working surface
CN201125743Y (en) * 2007-08-03 2008-10-01 四川华蓥山广能(集团)有限责任公司 Sloped and high-sloped fully-mechanized mining hydraulic support side direction blocking apparatus
CN101509388A (en) * 2009-02-28 2009-08-19 山东天晟煤矿装备有限公司 Tunnel ahead support stent
CN101906979A (en) * 2009-06-08 2010-12-08 兖州煤业股份有限公司 Gob-side road retaining supporting method and road-injecting slip mould
CN201588646U (en) * 2010-01-26 2010-09-22 重庆大江工业有限责任公司 Top caving coal bracket for tunnel end of full-mechanized caving face of coal mine

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
《煤炭科学技术》 20010228 李颖飞等 综放工作面输送机布置方式浅析 第32-34、38-39 3-4 第29卷, 第2期 *
《煤炭科学技术》 20010228 李颖飞等 综放工作面输送机布置方式浅析 第32-34、38-39页 1-2 第29卷, 第2期 *
张守祥: "薄煤层全自动化配刨煤机工作面端头支架设计研究", 《煤矿机械》 *
张守祥: "高产高效工作面端头支护的研究", 《煤矿机电》 *
李颖飞等: "综放工作面输送机布置方式浅析", 《煤炭科学技术》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102749432B (en) * 2012-05-17 2014-08-06 中国矿业大学(北京) Fully mechanized caving top coal caving three-dimensional simulation experiment method
CN102749432A (en) * 2012-05-17 2012-10-24 中国矿业大学(北京) Fully mechanized caving top coal caving three-dimensional simulation experiment platform and experiment method
CN102900464A (en) * 2012-09-17 2013-01-30 宁夏天地奔牛实业集团有限公司 Tail drive transmission device for rear scraper conveyors
CN102900464B (en) * 2012-09-17 2015-12-09 宁夏天地奔牛实业集团有限公司 Rear portion scraper conveyor tail drive transmission
CN103498675B (en) * 2013-09-23 2016-03-23 三一重型装备有限公司 Drag conveyor and coal conveying system
CN103498675A (en) * 2013-09-23 2014-01-08 三一重型装备有限公司 Scraper conveyor and coal conveying system
CN103775082A (en) * 2014-01-20 2014-05-07 宁夏天地奔牛实业集团有限公司 Novel thin coal seam overlapped side-unloading structure
CN103775082B (en) * 2014-01-20 2016-10-19 宁夏天地奔牛实业集团有限公司 Novel thin coal seam overlap side dump structure
CN104265344A (en) * 2014-10-17 2015-01-07 沈阳天安矿山机械股份有限公司 Conveyor unloading part rear-mounted end hydraulic support
CN104594932A (en) * 2014-12-29 2015-05-06 中国神华能源股份有限公司 Mining supporting support equipment and mining method thereof
CN105775608A (en) * 2016-03-30 2016-07-20 中煤张家口煤矿机械有限责任公司 Machine head pushing part of scraper conveyer
CN108412528A (en) * 2018-04-23 2018-08-17 山东塔高矿业机械装备制造有限公司 Based on the hydraulic support device and method for protecting support for extending tunnel
CN108412528B (en) * 2018-04-23 2019-09-17 山东塔高矿业机械装备制造有限公司 Based on the hydraulic support device and method for protecting support for extending tunnel
CN111042858A (en) * 2019-11-14 2020-04-21 中煤张家口煤矿机械有限责任公司 Arrangement method of front-lap-joint rear-crossed fully mechanized caving face conveying and crushing equipment
CN111022115A (en) * 2019-11-19 2020-04-17 中煤张家口煤矿机械有限责任公司 Arrangement method of front-lapping rear-end-unloading fully-mechanized caving face conveying and crushing equipment
CN112253116A (en) * 2020-10-27 2021-01-22 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face
CN112253116B (en) * 2020-10-27 2022-05-31 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face

Also Published As

Publication number Publication date
CN102383794B (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN102383794B (en) Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure
CN101915101B (en) Method of mining coal from heavy pitch thick coal seam
CN101514633B (en) Non-roadside supporting gob-side entry retaining process
CN104405437B (en) A kind of solid filling with combine the hybrid working face mining method of adopting
CN104653182B (en) A kind of coal-mining method that the bastard coal of coal seam containing thick dirt band point is adopted
CN105697013A (en) Contractible temporary support for tunneling tunnel
CN101187308A (en) Thin coal bed highly effective fully mechanized mining process
CN104265291A (en) Comprehensive mechanized coal mining method of steeply inclined and extremely thick coal seam planing conveyor
CN102094664A (en) Hydraulic bracket for end of comprehensive mechanized filling coal face
CN103104260A (en) Comprehensive-conventional mechanical mining double-unit face coal mining method under complicated geological conditions
CN203962014U (en) Combine and adopt the dual-purpose working surface hydraulic support of filling
CN215444108U (en) Hydraulic support for solid filling and mining of coal mine
CN110700870A (en) Advanced support system and process for fully mechanized coal mining face haulage roadway
CN104453902A (en) Method for switching coal face from false vertical dip mining into true inclination mining
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN201953391U (en) Comprehensively mechanized filling coal face tip hydraulic support
CN113586116A (en) Coal mine solid filling mining hydraulic support
CN105019903A (en) Integrated support for working face of steeply inclined coal seam and mining method thereof
CN104533417A (en) Dual-system two-hardness short-wall coal seam mining method
CN103195427A (en) Shovel top and bottom cutting type one-time full-height fully-mechanized mining method for extremely soft thick coal seam
CN208456613U (en) A kind of Mechanized roadway layout structure
CN102392663A (en) Forward supporting hydraulic support and forward supporting hydraulic support system
CN201568067U (en) Integrated fully mechanized top-coal caving face end support frame
CN204371398U (en) A kind of novel precise protection fully-mechanized mining working
CN115095386A (en) Continuous coal mining filling system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YANZHOU COAL INDUSTRY CO., LTD.

Effective date: 20130122

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Weimin

Inventor after: Hu Wanchang

Inventor after: Liu Jian

Inventor after: Wang Chunsheng

Inventor after: Liu Zhuang

Inventor after: Feng Liyou

Inventor after: Qi Yuhao

Inventor after: Ren Huaiwei

Inventor after: Wang Guofa

Inventor after: Jin Tai

Inventor after: Li Mingzhong

Inventor after: Shi Chengzhong

Inventor after: Wu Lizhong

Inventor after: Meng Xiangjun

Inventor after: Wang Biaomou

Inventor after: Zhang Chonghong

Inventor before: Wang Guofa

Inventor before: Wang Chunsheng

Inventor before: Feng Liyou

Inventor before: Ren Huaiwei

Inventor before: Meng Fanlong

Inventor before: Wang Jianguo

Inventor before: Xin Jiaxiang

Inventor before: Shi Chengzhong

Inventor before: Li Mingzhong

Inventor before: Liu Jian

Inventor before: Liu Zhuang

Inventor before: Wang Biaomou

Inventor before: Wu Lizhong

Inventor before: Hu Wanchang

Inventor before: Qi Yuhao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG GUOFA SHI CHENGZHONG LI MINGZHONG LIU JIAN LIU ZHUANG WANG BIAOMOU WULIZHONG HU WANCHANG QI YUHAO WANG CHUNSHENG FENG LIYOU REN HUAIWEI MENG FANLONG WANG JIANGUO XIN JIAXIANG TO: LI WEIMIN WANG GUOFA JIN TAI LI MINGZHONG SHI CHENGZHONG WU LIZHONG MENG XIANGJUN WANG BIAOMOU ZHANG CHONGHONG HU WANCHANG LIU JIAN WANG CHUNSHENG LIU ZHUANG FENG LIYOU QI YUHAO REN HUAIWEI

TA01 Transfer of patent application right

Effective date of registration: 20130122

Address after: 100013 mining design division, No. 5 Youth Ditch Road, Chaoyang District, Beijing, Hepingli

Applicant after: Tiandi Science & Technology Co., Ltd.

Applicant after: Yanzhou Coal Industry Co., Ltd.

Address before: 100013 mining design division, No. 5 Youth Ditch Road, Chaoyang District, Beijing, Hepingli

Applicant before: Tiandi Science & Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant