CN110983977A - 一种梁拱组合桥吊杆初张拉力的计算方法 - Google Patents
一种梁拱组合桥吊杆初张拉力的计算方法 Download PDFInfo
- Publication number
- CN110983977A CN110983977A CN201911290163.7A CN201911290163A CN110983977A CN 110983977 A CN110983977 A CN 110983977A CN 201911290163 A CN201911290163 A CN 201911290163A CN 110983977 A CN110983977 A CN 110983977A
- Authority
- CN
- China
- Prior art keywords
- suspender
- arch
- initial tension
- deformation
- composite bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D12/00—Bridges characterised by a combination of structures not covered as a whole by a single one of groups E01D2/00 - E01D11/00
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D6/00—Truss-type bridges
- E01D6/02—Truss-type bridges of bowstring type
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种梁拱组合桥吊杆初张拉力的计算方法,包括以下步骤:(1)建立梁拱组合桥有限元模型;(2)在有限元模型中去除吊杆,在各吊杆两端位置反向施加大小为其成桥索力值的集中力;(3)计算吊杆两端的相对变形量,进而得到各吊杆初张拉力T′;(4)根据吊杆初张拉力与应变的关系得到各吊杆的初应变,并将其施加到原模型中的吊杆中,计算得到各吊杆内力值F′;(5)比较各吊杆内力值F′与其成桥索力值F,计算其相对误差,取相对误差最大值δmax;(6)若δmax>3%,调整内力值相对误差最大的吊杆的初张拉力至(1±δmax)T′,重复步骤(4)‑(5),若δmax≤3%,则输出各吊杆的最终初张拉力。本发明能快速准确地确定吊杆初张拉力,进而使吊杆内力达到成桥状态下的索力值。
Description
技术领域
本发明属于桥梁工程技术领域,涉及到梁拱组合桥,特别涉及到一种梁拱组合桥吊杆初张拉力的计算方法。
背景技术
在梁拱组合桥的有限元分析模型中,常以初应变的形式施加吊杆初张力。通常情况下,设计图纸中会给出吊杆的成桥索力值,但由于各吊杆之间在张拉过程中有相互影响以及吊杆两端出现相对变形,若以成桥索力值换算而来的初应变作为吊杆初张力的施加形式,这样得到的吊杆内力值将与成桥索力值存在误差。因此本发明提供了一种确定梁拱组合桥吊杆初张拉力的新方法(定义为迭代法),能快速准确地确定吊杆初张拉力,可使吊杆内力达到成桥状态下的索力值。
发明内容
本发明提供一种梁拱组合桥吊杆初张拉力的计算方法,该计算方法能快速准确地确定吊杆初张拉力,进而使吊杆内力达到成桥状态下的索力值。
为了解决上述技术问题,本发明采用如下技术方案:
一种梁拱组合桥吊杆初张拉力的计算方法,包括以下步骤:
(1)建立梁拱组合桥有限元模型;
(2)在步骤(1)中的有限元模型中去除吊杆,并在梁拱组合桥上各吊杆上下两端与梁拱组合桥连接的节点位置处施加大小相等且方向相反的集中力,施加集中力的大小为该吊杆的成桥索力值,即在梁拱组合桥上各吊杆上端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向下的集中力,而在梁拱组合桥上各吊杆下端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向上的集中力,各吊杆上端与梁拱组合桥连接的节点处产生向下的变形,各吊杆下端与梁拱组合桥连接的节点处产生向上或向下的变形;
(3)计算步骤(2)中梁拱组合桥在与各吊杆上下两端连接的节点处的变形量,并令梁拱组合桥在与各吊杆上端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥上节点变形量,并令梁拱组合桥在与各吊杆下端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥下节点变形量,各吊杆相对应的梁拱组合桥上节点变形量与对应吊杆相对应的梁拱组合桥下节点变形量之差即为不去除吊杆时相应吊杆上下两端的相对变形差,相应吊杆上下两端的相对变形差用Δl1表示,将计算得到的相应吊杆上下两端的相对变形差Δl1代入式中,进而得到相应吊杆的初张拉力T′,其中式中,T为吊杆的初张拉力,F为吊杆成桥索力值,E为吊杆弹性模量,A为吊杆横截面面积,l为吊杆初始长度;
(4)根据吊杆初张拉力T′与应变ε之间的关系:T′=EAε,将步骤(3)中得到的相应吊杆的初张拉力T′代入式T′=EAε中,得到相应吊杆的初应变,并将相应吊杆的初应变施加到步骤(1)中的有限元模型的相应吊杆中,计算得到相应吊杆的内力值F′;
(5)将步骤(4)中得到的相应吊杆的内力值F′与该吊杆的成桥索力值F进行比较,并计算相应吊杆的内力值相对误差δ=|F-F′|/F×100%,得到各吊杆中的内力值相对误差最大值δmax;
(6)根据设计要求,吊杆的成桥索力值误差一般为3%,则设定判定条件:δmax≤3%,若步骤(5)中的δmax不满足该判定条件,则调整内力值相对误差最大的吊杆的初张拉力至(1±δmax)T′,然后重复步骤(4)-(5),若步骤(5)中的δmax满足该判定条件,则输出各吊杆的最终初张拉力T。
张拉前的吊杆在施加完初张拉力后的总变形为Δl,由于吊杆张拉引起吊杆上下两端产生相对变形差Δl1,剩余吊杆变形Δl2产生吊杆内力,则:
Δl=Δl1+Δl2 (1)
由(1)式可得:
令:
则:
其中,T为吊杆的初张拉力,F为吊杆内力(目标值为成桥索力值),E为吊杆弹性模量,A为吊杆横截面面积,l为吊杆初始长度。
相对于现有技术,本发明的有益效果为:
本发明公开的梁拱组合桥吊杆初张拉力的计算方法属于迭代法,采用本发明提出的迭代法确定的各吊杆的最终初张拉力值,可使吊杆内力达到成桥状态下的索力值,迭代法概念清楚,能快速准确地确定吊杆初张拉力,可为类似桥梁数值分析中计算吊杆初张拉力提供一种新思路。
附图说明
图1为本发明的流程图;
图2为某梁拱组合桥的桥型布置图;
图3为吊杆变形示意图。
具体实施方式
一种梁拱组合桥吊杆初张拉力的计算方法,包括以下步骤:
(1)建立梁拱组合桥有限元模型;
(2)在步骤(1)中的有限元模型中去除吊杆,并在梁拱组合桥上各吊杆上下两端与梁拱组合桥连接的节点位置处施加大小相等且方向相反的集中力,施加集中力的大小为该吊杆的成桥索力值,即在梁拱组合桥上各吊杆上端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向下的集中力,而在梁拱组合桥上各吊杆下端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向上的集中力,各吊杆上端与梁拱组合桥连接的节点处产生向下的变形,各吊杆下端与梁拱组合桥连接的节点处产生向上或向下的变形;
(3)计算步骤(2)中梁拱组合桥在与各吊杆上下两端连接的节点处的变形量,并令梁拱组合桥在与各吊杆上端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥上节点变形量,并令梁拱组合桥在与各吊杆下端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥下节点变形量,各吊杆相对应的梁拱组合桥上节点变形量与对应吊杆相对应的梁拱组合桥下节点变形量之差即为不去除吊杆时相应吊杆上下两端的相对变形差,相应吊杆上下两端的相对变形差用Δl1表示;
而张拉前的吊杆在施加完初张拉力后的总变形为Δl,由于吊杆张拉引起吊杆上下两端产生相对变形差Δl1,剩余吊杆变形Δl2产生吊杆内力,如图3所示,则:
Δl=Δl1+Δl2 (1)
由(1)式可得:
令:
则:
其中,T为吊杆的初张拉力,F为吊杆内力(目标值为成桥索力值),E为吊杆弹性模量,A为吊杆横截面面积,l为吊杆初始长度;
(4)根据吊杆初张拉力T′与应变ε之间的关系:T′=EAε,将步骤(3)中得到的相应吊杆的初张拉力T′代入式T′=EAε中,得到相应吊杆的初应变,并将相应吊杆的初应变施加到步骤(1)中的有限元模型的相应吊杆中,计算得到相应吊杆的内力值F′;
(5)将步骤(4)中得到的相应吊杆的内力值F′与该吊杆的成桥索力值F进行比较,并计算相应吊杆的内力值相对误差δ=|F-F′|/F×100%,得到各吊杆中的内力值相对误差最大值δmax;
(6)根据设计要求,吊杆的成桥索力值误差一般为3%,则设定判定条件:δmax≤3%,若步骤(5)中的δmax不满足该判定条件,则调整内力值相对误差最大的吊杆的初张拉力至(1±δmax)T′,然后重复步骤(4)-(5),若步骤(5)中的δmax满足该判定条件,则输出各吊杆的最终初张拉力T。
实施例
如图2所示,某连续梁拱组合特大桥为(64+128+64)m预应力混凝土连续梁-拱组合体系,桥梁全长257.5m,桥梁全宽11.2m,梁体为单箱单室、变高度、变截面箱梁,拱肋计算跨径为128m,设计矢高f为25.6m,拱肋中心线矢跨比为1/5,全桥共设28根吊杆,即全桥前排和后排分别设14根吊杆,相邻吊杆在顺桥向的间距为8.0m,吊杆采用抗拉强度标准值fpk为1860Mpa、弹性模量为1.95e5MPa的特殊预应力钢绞线,吊杆上端穿过拱肋并锚于拱肋上缘张拉底座,吊杆下端锚于吊点横梁下缘固定底座。
基于上述有限元模型,采用迭代法得到各吊杆的初张拉力,在成桥状态下,计算得出的各吊杆内力与其成桥索力值对比情况如表1所示。
表1吊杆内力与成桥索力值的对比
由表1可知,在各吊杆上施加由迭代法确定的初张拉力,计算得到各吊杆内力值,将得到的各吊杆内力值与该吊杆的成桥索力值进行比较,并计算相应吊杆的内力值相对误差δ=|F-F′|/F×100%,计算得到的各吊杆的内力值相对误差均控制在3%之内,这说明在有限元模型中施加吊杆初张拉力时,为使各吊杆内力与成桥索力保持一致,可采用迭代法确定各吊杆的初张拉力值。
Claims (2)
1.一种梁拱组合桥吊杆初张拉力的计算方法,其特征在于包括以下步骤:
(1)建立梁拱组合桥有限元模型;
(2)在步骤(1)中的有限元模型中去除吊杆,并在梁拱组合桥上各吊杆上下两端与梁拱组合桥连接的节点位置处施加大小相等且方向相反的集中力,施加集中力的大小为该吊杆的成桥索力值,即在梁拱组合桥上各吊杆上端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向下的集中力,而在梁拱组合桥上各吊杆下端与梁拱组合桥连接的节点位置处施加大小等于该吊杆成桥索力值且方向为竖直向上的集中力,各吊杆上端与梁拱组合桥连接的节点处产生向下的变形,各吊杆下端与梁拱组合桥连接的节点处产生向上或向下的变形;
(3)计算步骤(2)中梁拱组合桥在与各吊杆上下两端连接的节点处的变形量,并令梁拱组合桥在与各吊杆上端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥上节点变形量,并令梁拱组合桥在与各吊杆下端连接的节点处的变形量称为各吊杆相对应的梁拱组合桥下节点变形量,各吊杆相对应的梁拱组合桥上节点变形量与对应吊杆相对应的梁拱组合桥下节点变形量之差即为不去除吊杆时相应吊杆上下两端的相对变形差,相应吊杆上下两端的相对变形差用Δl1表示,将计算得到的相应吊杆上下两端的相对变形差Δl1代入式中,进而得到相应吊杆的初张拉力T′,其中式中,T为吊杆的初张拉力,F为吊杆成桥索力值,E为吊杆弹性模量,A为吊杆横截面面积,l为吊杆初始长度;
(4)根据吊杆初张拉力T′与应变ε之间的关系:T′=EAε,将步骤(3)中得到的相应吊杆的初张拉力T′代入式T′=EAε中,得到相应吊杆的初应变,并将相应吊杆的初应变施加到步骤(1)中的有限元模型的相应吊杆中,计算得到相应吊杆的内力值F′;
(5)将步骤(4)中得到的相应吊杆的内力值F′与该吊杆的成桥索力值F进行比较,并计算相应吊杆的内力值相对误差δ=|F-F′|/F×100%,得到各吊杆中的内力值相对误差最大值δmax;
(6)根据设计要求,吊杆的成桥索力值误差一般为3%,则设定判定条件:δmax≤3%,若步骤(5)中的δmax不满足该判定条件,则调整内力值相对误差最大的吊杆的初张拉力至(1±δmax)T′,然后重复步骤(4)-(5),若步骤(5)中的δmax满足该判定条件,则输出各吊杆的最终初张拉力T。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911290163.7A CN110983977B (zh) | 2019-12-16 | 2019-12-16 | 一种梁拱组合桥吊杆初张拉力的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911290163.7A CN110983977B (zh) | 2019-12-16 | 2019-12-16 | 一种梁拱组合桥吊杆初张拉力的计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110983977A true CN110983977A (zh) | 2020-04-10 |
CN110983977B CN110983977B (zh) | 2021-05-04 |
Family
ID=70094035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911290163.7A Expired - Fee Related CN110983977B (zh) | 2019-12-16 | 2019-12-16 | 一种梁拱组合桥吊杆初张拉力的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110983977B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111553015A (zh) * | 2020-05-14 | 2020-08-18 | 广西交科集团有限公司 | 一种拱桥吊杆置换过程中的位移精确控制方法 |
CN111695284A (zh) * | 2020-06-16 | 2020-09-22 | 山东高速轨道交通集团有限公司 | 吊杆索力调整计算方法 |
CN112213092A (zh) * | 2020-10-09 | 2021-01-12 | 广西交科集团有限公司 | 一种采用惯性法测试拱桥吊杆内力增量的测量方法 |
CN112613204A (zh) * | 2020-12-02 | 2021-04-06 | 武汉理工大学 | 一种拱桥吊杆索力计算方法及装置 |
CN114319073A (zh) * | 2021-12-28 | 2022-04-12 | 中国建筑第五工程局有限公司 | 一种梁拱组合桥受力体系转换设计、施工方法及施工装置 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2003266439A1 (en) * | 2002-12-18 | 2004-07-08 | Soletanche Freyssinet | Method for erecting a stay |
US20090068617A1 (en) * | 2006-03-03 | 2009-03-12 | Lauren Mark D | Method Of Designing Dental Devices Using Four-Dimensional Data |
CN101900620A (zh) * | 2010-06-23 | 2010-12-01 | 华南理工大学 | 一种中长索的变边界索力识别方法 |
CN104790301A (zh) * | 2015-04-23 | 2015-07-22 | 中铁建设集团有限公司 | 一种索式桥体系转换吊索张拉一次到位施工方法 |
CN104899377A (zh) * | 2015-06-08 | 2015-09-09 | 大连理工大学 | 一种悬索桥索力优化方法 |
CN104947592A (zh) * | 2015-04-30 | 2015-09-30 | 湖南联智桥隧技术有限公司 | 索式桥梁吊索的张拉与调索施工方法 |
CN106777501A (zh) * | 2016-11-16 | 2017-05-31 | 杨继承 | 吊索张拉计算方法 |
CN109056533A (zh) * | 2018-07-17 | 2018-12-21 | 中铁大桥勘测设计院集团有限公司 | 一种缆索协作体系桥成桥索力确定方法 |
KR102034039B1 (ko) * | 2018-06-19 | 2019-10-18 | 김도빈 | 상시진동실험 데이터로 교량의 강성계수의 산출이 가능한 것을 특징으로 하는 교량의 강성계수 산출 방법 및 프로그램 |
CN110396936A (zh) * | 2019-07-31 | 2019-11-01 | 中国十七冶集团有限公司 | 一种非对称自锚式悬索桥体系转换结构受力的施工方法 |
-
2019
- 2019-12-16 CN CN201911290163.7A patent/CN110983977B/zh not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2003266439A1 (en) * | 2002-12-18 | 2004-07-08 | Soletanche Freyssinet | Method for erecting a stay |
US20090068617A1 (en) * | 2006-03-03 | 2009-03-12 | Lauren Mark D | Method Of Designing Dental Devices Using Four-Dimensional Data |
CN101900620A (zh) * | 2010-06-23 | 2010-12-01 | 华南理工大学 | 一种中长索的变边界索力识别方法 |
CN104790301A (zh) * | 2015-04-23 | 2015-07-22 | 中铁建设集团有限公司 | 一种索式桥体系转换吊索张拉一次到位施工方法 |
CN104947592A (zh) * | 2015-04-30 | 2015-09-30 | 湖南联智桥隧技术有限公司 | 索式桥梁吊索的张拉与调索施工方法 |
CN104899377A (zh) * | 2015-06-08 | 2015-09-09 | 大连理工大学 | 一种悬索桥索力优化方法 |
CN106777501A (zh) * | 2016-11-16 | 2017-05-31 | 杨继承 | 吊索张拉计算方法 |
KR102034039B1 (ko) * | 2018-06-19 | 2019-10-18 | 김도빈 | 상시진동실험 데이터로 교량의 강성계수의 산출이 가능한 것을 특징으로 하는 교량의 강성계수 산출 방법 및 프로그램 |
CN109056533A (zh) * | 2018-07-17 | 2018-12-21 | 中铁大桥勘测设计院集团有限公司 | 一种缆索协作体系桥成桥索力确定方法 |
CN110396936A (zh) * | 2019-07-31 | 2019-11-01 | 中国十七冶集团有限公司 | 一种非对称自锚式悬索桥体系转换结构受力的施工方法 |
Non-Patent Citations (2)
Title |
---|
林同炎等: "《结构概念和体系》", 31 July 1985, 中国建筑工业出版社 * |
陈亮等: "系杆拱桥吊杆张拉施工控制方法", 《现代交通技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111553015A (zh) * | 2020-05-14 | 2020-08-18 | 广西交科集团有限公司 | 一种拱桥吊杆置换过程中的位移精确控制方法 |
CN111553015B (zh) * | 2020-05-14 | 2022-08-30 | 广西交科集团有限公司 | 一种拱桥吊杆置换过程中的位移精确控制方法 |
CN111695284A (zh) * | 2020-06-16 | 2020-09-22 | 山东高速轨道交通集团有限公司 | 吊杆索力调整计算方法 |
CN111695284B (zh) * | 2020-06-16 | 2021-09-28 | 山东高速轨道交通集团有限公司 | 吊杆索力调整计算方法 |
CN112213092A (zh) * | 2020-10-09 | 2021-01-12 | 广西交科集团有限公司 | 一种采用惯性法测试拱桥吊杆内力增量的测量方法 |
CN112613204A (zh) * | 2020-12-02 | 2021-04-06 | 武汉理工大学 | 一种拱桥吊杆索力计算方法及装置 |
CN114319073A (zh) * | 2021-12-28 | 2022-04-12 | 中国建筑第五工程局有限公司 | 一种梁拱组合桥受力体系转换设计、施工方法及施工装置 |
CN114319073B (zh) * | 2021-12-28 | 2024-01-30 | 中国建筑第五工程局有限公司 | 一种梁拱组合桥受力体系转换设计、施工方法及施工装置 |
Also Published As
Publication number | Publication date |
---|---|
CN110983977B (zh) | 2021-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110983977B (zh) | 一种梁拱组合桥吊杆初张拉力的计算方法 | |
CN201450284U (zh) | 可调节角度的电缆桥架 | |
CN110807221B (zh) | 基于等效力位移法的索力计算方法 | |
CN108460229B (zh) | 连续桥面结构桥梁拉索内力的调整方法 | |
CN111222193B (zh) | 一种确定悬索桥主缆线形的方法 | |
CN111553015B (zh) | 一种拱桥吊杆置换过程中的位移精确控制方法 | |
CN106934179B (zh) | 输电铁塔角钢主节点拉伸试验数据处理方法 | |
CN108460197B (zh) | 基于变形量控制的拱上建筑拆装方案优选方法 | |
CN111651805A (zh) | 考虑线形与线长影响因子的悬垂绝缘子串最大风偏角及风振系数计算方法 | |
CN104201631A (zh) | 一种基于gis的三维跳线弧垂确定方法 | |
CN109056533B (zh) | 一种缆索协作体系桥成桥索力确定方法 | |
CN207244469U (zh) | 梁体辅助顶推装置 | |
CN114197316A (zh) | 斜拉桥拉索张拉控制方法和装置 | |
CN111967085B (zh) | 大跨径悬索管道桥成桥风索线形计算方法 | |
CN103422422B (zh) | 具有抑制纵向地震响应的多塔斜拉桥支承体系及工作方法 | |
CN116226986A (zh) | 一种拉索无应力长度计算方法 | |
CN112035928B (zh) | 大跨径悬索管道桥成桥主索线形计算方法 | |
CN108416104B (zh) | 一种斜拉桥混凝土索塔锚固区的预应力设计方法 | |
CN113686287B (zh) | 基于悬垂杆塔绝缘子串偏斜角的覆冰厚度测量方法及系统 | |
CN115630458A (zh) | 一种基于弹性地基梁理论的现浇连续梁的方法及其应用 | |
CN101397851B (zh) | 一种预应力钢结构张拉端索力的施工调整方法 | |
CN210999733U (zh) | 一种注塑机拉杆结构 | |
CN109190931B (zh) | 一种基于三维空间坐标的硬跳线迭代计算的方法 | |
CN111368483A (zh) | 一种基于有限元强度折减法的支护结构边坡稳定评价方法 | |
KR101044603B1 (ko) | 아이엘엠교량의 추진코의 최적단면 설계방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210504 Termination date: 20211216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |