CN110904857A - 一种自锚式悬索桥施工临时扣塔安装方法 - Google Patents
一种自锚式悬索桥施工临时扣塔安装方法 Download PDFInfo
- Publication number
- CN110904857A CN110904857A CN201911398720.7A CN201911398720A CN110904857A CN 110904857 A CN110904857 A CN 110904857A CN 201911398720 A CN201911398720 A CN 201911398720A CN 110904857 A CN110904857 A CN 110904857A
- Authority
- CN
- China
- Prior art keywords
- segment
- tower
- self
- suspension bridge
- anchored suspension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911398720.7A CN110904857B (zh) | 2019-12-30 | 2019-12-30 | 一种自锚式悬索桥施工临时扣塔安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911398720.7A CN110904857B (zh) | 2019-12-30 | 2019-12-30 | 一种自锚式悬索桥施工临时扣塔安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110904857A true CN110904857A (zh) | 2020-03-24 |
CN110904857B CN110904857B (zh) | 2021-06-22 |
Family
ID=69814044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911398720.7A Active CN110904857B (zh) | 2019-12-30 | 2019-12-30 | 一种自锚式悬索桥施工临时扣塔安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110904857B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012001997A (ja) * | 2010-06-18 | 2012-01-05 | Yokogawa Koji Kk | 折り畳み式支保工 |
CN104179122A (zh) * | 2014-08-22 | 2014-12-03 | 武船重型工程股份有限公司 | 钢塔节段定位装置及方法 |
CN104295104A (zh) * | 2014-10-29 | 2015-01-21 | 防城港中一重工有限公司 | 箱型吊车梁高强螺栓群现场安装方法 |
CN104746437A (zh) * | 2015-04-20 | 2015-07-01 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥安装方法 |
CN204919348U (zh) * | 2015-08-07 | 2015-12-30 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥安装辅助用钢塔 |
CN108018780A (zh) * | 2017-12-15 | 2018-05-11 | 中交二航局第四工程有限公司 | 一种栓焊结合的钢塔柱设计施工方法 |
-
2019
- 2019-12-30 CN CN201911398720.7A patent/CN110904857B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012001997A (ja) * | 2010-06-18 | 2012-01-05 | Yokogawa Koji Kk | 折り畳み式支保工 |
CN104179122A (zh) * | 2014-08-22 | 2014-12-03 | 武船重型工程股份有限公司 | 钢塔节段定位装置及方法 |
CN104295104A (zh) * | 2014-10-29 | 2015-01-21 | 防城港中一重工有限公司 | 箱型吊车梁高强螺栓群现场安装方法 |
CN104746437A (zh) * | 2015-04-20 | 2015-07-01 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥安装方法 |
CN204919348U (zh) * | 2015-08-07 | 2015-12-30 | 中国铁建大桥工程局集团有限公司 | 一种自锚式悬索桥安装辅助用钢塔 |
CN108018780A (zh) * | 2017-12-15 | 2018-05-11 | 中交二航局第四工程有限公司 | 一种栓焊结合的钢塔柱设计施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110904857B (zh) | 2021-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111254796B (zh) | 下跨多条铁路营业线单侧整体吊装大跨度天桥及施工方法 | |
CN110847063B (zh) | 一种多跨双曲拱桥的拆除方法 | |
CN112084561A (zh) | 一种顶推施工大跨轨道钢箱叠合梁桥施工控制方法 | |
CN113463768A (zh) | 120m跨预应力三角钢管桁架梁施工方法 | |
CN110904857B (zh) | 一种自锚式悬索桥施工临时扣塔安装方法 | |
CN108547224B (zh) | 短平台箱梁顶推施工方法 | |
CN108518008B (zh) | 柔性拉索结构上的刚性屋盖结构及其安装方法 | |
CN102587280A (zh) | 底座支架辅助架梁吊机架设主塔区钢桁梁方法及底座支架 | |
CN104831928A (zh) | 高空大跨度混凝土连体结构模板支撑钢平台施工方法 | |
CN114214920A (zh) | 大跨度双层合建钢桁架拱桥及其施工方法 | |
CN114263114A (zh) | 大截面钢箱梁的施工体系及施工方法 | |
CN110184915B (zh) | 斜拉桥现浇塔柱及其施工方法 | |
CN106906756A (zh) | 可快速安装拆除的检修施工平台及其构建方法 | |
CN113969538A (zh) | 一种斜拉桥施工系统及施工方法 | |
CN211522928U (zh) | 一种自锚式悬索桥施工临时扣塔 | |
CN112376440A (zh) | 一种斜拉桥的主梁无合拢吊装的施工工艺 | |
CN216891927U (zh) | 大跨度双层合建钢桁架拱桥 | |
CN104818675A (zh) | 钢筋节段的组拼方法 | |
CN212128886U (zh) | 适用于上跨地下停车场钢箱梁安装的支架 | |
CN216640288U (zh) | 一种用于斜拉桥钢箱梁的过塔滑移平台 | |
CN112609586B (zh) | 一种钢箱梁自锚悬索桥塔梁同步施工方法 | |
CN212505806U (zh) | 一种斜拉桥施工系统 | |
CN217997838U (zh) | 跨河钢箱桥组装临时支架 | |
CN219753024U (zh) | 用于高架桥钢箱梁安装的装配式双门型临时支架 | |
CN219117931U (zh) | 一种适用于管线的临时迁改跨河结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Chaopeng Inventor after: Yu Guosheng Inventor after: Liao Shuwen Inventor after: Ma Nanfei Inventor after: Shi Zhibo Inventor after: Dong Guozhen Inventor after: Ding Haifeng Inventor after: Li Xinmin Inventor after: Liu Xiaojian Inventor after: Duan Xianghu Inventor after: Wang Hongwei Inventor after: Luo Ruzhou Inventor after: Wang Yonghai Inventor after: Lu Yongfei Inventor before: Wang Chaopeng Inventor before: Yu Guosheng Inventor before: Liao Shuwen Inventor before: Ma Nanfei Inventor before: Shi Zhibo Inventor before: Dong Guozhen Inventor before: Ding Haifeng Inventor before: Li Xinmin Inventor before: Liu Xiaojian Inventor before: Duan Xianghu Inventor before: Wang Hongwei Inventor before: Luo Ruzhou Inventor before: Wang Yonghai Inventor before: Lu Yongfei |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |