CN104179122A - 钢塔节段定位装置及方法 - Google Patents

钢塔节段定位装置及方法 Download PDF

Info

Publication number
CN104179122A
CN104179122A CN201410419789.4A CN201410419789A CN104179122A CN 104179122 A CN104179122 A CN 104179122A CN 201410419789 A CN201410419789 A CN 201410419789A CN 104179122 A CN104179122 A CN 104179122A
Authority
CN
China
Prior art keywords
sections
alignment pin
locating hole
detent
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410419789.4A
Other languages
English (en)
Inventor
王晶
岳莹
李建明
宋珍琼
董亦孟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchuan Heavy Engineering Co Ltd
Original Assignee
Wuchuan Heavy Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuchuan Heavy Engineering Co Ltd filed Critical Wuchuan Heavy Engineering Co Ltd
Priority to CN201410419789.4A priority Critical patent/CN104179122A/zh
Publication of CN104179122A publication Critical patent/CN104179122A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种钢塔节段定位装置及方法,属于桥梁工艺技术领域。所述钢塔节段定位装置包括第一节段、第二节段、连接部件及定位机构;第二节段设置在第一节段的上方;定位机构固定在第一节段上端;第二节段下端开设有与定位机构相对应的定位孔;第一节段通过定位机构插入定位孔进行定位;第一节段通过连接部件与第二节段连接。本发明钢塔节段定位装置提高了定位精度,且省工省时。

Description

钢塔节段定位装置及方法
技术领域
[0001] 本发明涉及桥梁工艺技术领域,特别涉及钢塔节段定位装置及方法。
背景技术
[0002] 现有技术中,栓接钢塔定位均借用栓接孔,将楔形定位块用销钉和螺栓固定在两节段端口处。吊装定位时,采用同方向楔形块进行定位,由于销钉与螺栓孔有间隙,在节段落位时,楔形块间会发生碰撞,使楔形块产生位移,无法一次精定位,还需进行二次精定位;如将楔形块一正一反进行安装,楔形块会产生反方向位移,使得节段无法落位。由于本塔节段截面超大、重量超重,如采用楔形块定位,进行二次精定位非常困难,费工费时并且定位精度不高。
发明内容
[0003] 本发明所要解决的技术问题是提供一种提高了定位精度,且省工省时的钢塔节段定位装置及方法。
[0004] 为解决上述技术问题,本发明提供了一种钢塔节段定位装置,包括第一节段、第二节段、连接部件及定位机构;所述第二节段设置在所述第一节段的上方;所述定位机构固定在所述第一节段上端;所述第二节段下端开设有与所述定位机构相对应的定位孔;所述第一节段通过所述定位机构插入所述定位孔进行定位;所述第一节段通过所述连接部件与所述第二节段连接。
[0005] 进一步地,所述定位机构包括定位销;所述定位销固定在所述第一节段上端;所述定位销与所述定位孔相对应。
[0006] 进一步地,所述定位销与所述定位孔紧密配合。
[0007] 进一步地,所述连接部件包括连接板;所述连接板一端与所述第一节段连接,另一端与所述第二节段连接。
[0008] 进一步地,一种钢塔节段定位方法,包括以下步骤:
[0009] 在第一节段的上段安装定位销;
[0010] 在第二节段下端与定位销相对应的位置开设定位孔;
[0011] 在内场进行预拼装,将第二节段安装在第一节段的上方,使定位销与定位孔紧密配合;
[0012] 将第一节段及第二节段运输到工地,第二节段安装在第一节段的上方,通过定位销及定位孔进行定位;
[0013] 定位完成后,将连接板的一端与第一节段连接,另一端与第二节段连接。
[0014] 本发明提供的钢塔节段定位装置的第一节段通过连接部件与第二节段连接,第二节段设置在第一节段的上方,定位机构固定在第一节段上端,第二节段下端开设有与定位机构相对应的定位孔,第一节段通过定位机构插入定位孔进行定位,将定位机构插入定位孔中,就可完成定位,提高了定位精度,且省工省时。
附图说明
[0015]图1为本发明实施例提供的钢塔节段定位装置的结构示意图;
[0016] 图2为本发明实施例提供的第一节段的主视图;
[0017] 图3为图2的俯视图;
[0018] 图4为本发明实施例提供的第二节段的主视图;
[0019] 图5为图4的仰视图。
具体实施方式
[0020] 参见图1-5,本发明实施例提供的一种钢塔节段定位装置,包括第一节段1、第二节段2、连接部件及定位机构。第二节段2设置在第一节段I的上方。定位机构固定在第一节段I上端;第二节段2下端开设有与定位机构相对应的定位孔4,第一节段I通过定位机构插入定位孔4进行定位,定位机构包括定位销3 ;定位销3固定在第一节段I上端;定位销与定位孔4相对应,定位销3与定位孔4紧密配合。第一节段I通过连接部件与第二节段2连接,连接部件包括连接板;连接板一端与第一节段I连接,另一端与第二节段2连接。
[0021] 当使用本发明钢塔节段定位方法时,包括以下步骤:
[0022] 在第一节段I的上段焊接定位销3,防止在运输过程中损坏定位销3 ;
[0023] 在第二节段2下端与定位销3相对应的位置开设定位孔4 ;
[0024] 在内场进行预拼装,将第二节段2安装在第一节段I的上方,使定位销3与定位孔4紧密配合;
[0025] 将第一节段I及第二节段2运输到工地,第二节段2安装在第一节段I的上方,通过定位销及定位孔进行定位;
[0026] 定位完成后,在连接板两端上开设螺栓孔,在第一节段I的上端开设螺栓孔,第二节段2的下端开设螺栓孔,第一节段I及第二节段2上的螺栓孔与连接板上开设的连接孔相对应;将连接板的一端通过螺栓与第一节段I的上端连接,另一端通过螺栓与第二节段2下端连接。
[0027] 本发明提供的钢塔节段定位装置的第一节段通过连接部件与第二节段连接,第二节段设置在第一节段的上方,定位机构固定在第一节段上端,第二节段下端开设有与定位机构相对应的定位孔,第一节段通过定位机构插入定位孔进行定位,将定位机构插入定位孔中,就可完成定位,提高了定位精度,且省工省时。
[0028] 最后所应说明的是,以上具体实施方式仅用以说明本发明的技术方案而非限制,尽管参照实例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (5)

1.一种钢塔节段定位装置,其特征在于,包括:第一节段(I)、第二节段(2)、连接部件及定位机构;所述第二节段(2)设置在所述第一节段(I)的上方;所述定位机构固定在所述第一节段(I)上端;所述第二节段(2)下端开设有与所述定位机构相对应的定位孔(4);所述第一节段(I)通过所述定位机构插入所述定位孔(4)进行定位;所述第一节段(I)通过所述连接部件与所述第二节段(2)连接。
2.根据权利要求1所述的定位装置,其特征在于:所述定位机构包括定位销(3);所述定位销(3)固定在所述第一节段(I)上端;所述定位销与所述定位孔(4)相对应。
3.根据权利要求2所述的定位装置,其特征在于:所述定位销(3)与所述定位孔(4)紧密配合。
4.根据权利要求1所述的定位装置,其特征在于:所述连接部件包括连接板;所述连接板一端与所述第一节段(I)连接,另一端与所述第二节段(2)连接。
5.一种钢塔节段定位方法,其特征在于,包括以下步骤: 在第一节段(I)的上段安装定位销(3); 在第二节段(2)下端与定位销(3)相对应的位置开设定位孔(4); 在内场进行预拼装,将第二节段(2)安装在第一节段(I)的上方,使定位销(3)与定位孔⑷紧密配合; 将第一节段(I)及第二节段(2)运输到工地,第二节段(2)安装在第一节段(I)的上方,通过定位销及定位孔进行定位; 定位完成后,将连接板的一端与第一节段(I)连接,另一端与第二节段(2)连接。
CN201410419789.4A 2014-08-22 2014-08-22 钢塔节段定位装置及方法 Pending CN104179122A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410419789.4A CN104179122A (zh) 2014-08-22 2014-08-22 钢塔节段定位装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410419789.4A CN104179122A (zh) 2014-08-22 2014-08-22 钢塔节段定位装置及方法

Publications (1)

Publication Number Publication Date
CN104179122A true CN104179122A (zh) 2014-12-03

Family

ID=51960442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410419789.4A Pending CN104179122A (zh) 2014-08-22 2014-08-22 钢塔节段定位装置及方法

Country Status (1)

Country Link
CN (1) CN104179122A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN105129614A (zh) * 2015-08-05 2015-12-09 武船重型工程股份有限公司 一种拼接板预置方法
CN110904857A (zh) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 一种自锚式悬索桥施工临时扣塔安装方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1181230A (ja) * 1997-09-03 1999-03-26 Mitsubishi Heavy Ind Ltd 橋梁のタワーリンク
CN201306031Y (zh) * 2008-11-21 2009-09-09 宁波沪甬电力器材股份有限公司 插入式内法兰连接钢管塔
CN201850512U (zh) * 2010-11-12 2011-06-01 中国路桥工程有限责任公司 一种钢拱塔
CN201933823U (zh) * 2010-12-10 2011-08-17 中铁九局集团有限公司 定位导向钢塔
KR101118526B1 (ko) * 2011-09-08 2012-03-12 주식회사 한국종합기술 강재 주탑 가설공법 및 리프팅 프레임 철거공법
CN202380399U (zh) * 2011-12-02 2012-08-15 江苏中泰桥梁钢构股份有限公司 钢塔预拼装轴向加力装置
CN102877412A (zh) * 2011-07-13 2013-01-16 上海振华重工(集团)股份有限公司 钢塔整体竖立式预拼装方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1181230A (ja) * 1997-09-03 1999-03-26 Mitsubishi Heavy Ind Ltd 橋梁のタワーリンク
CN201306031Y (zh) * 2008-11-21 2009-09-09 宁波沪甬电力器材股份有限公司 插入式内法兰连接钢管塔
CN201850512U (zh) * 2010-11-12 2011-06-01 中国路桥工程有限责任公司 一种钢拱塔
CN201933823U (zh) * 2010-12-10 2011-08-17 中铁九局集团有限公司 定位导向钢塔
CN102877412A (zh) * 2011-07-13 2013-01-16 上海振华重工(集团)股份有限公司 钢塔整体竖立式预拼装方法
KR101118526B1 (ko) * 2011-09-08 2012-03-12 주식회사 한국종합기술 강재 주탑 가설공법 및 리프팅 프레임 철거공법
CN202380399U (zh) * 2011-12-02 2012-08-15 江苏中泰桥梁钢构股份有限公司 钢塔预拼装轴向加力装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方兴 等: "索支撑桥梁钢主塔节段现场连接形式", 《中国铁道科学》, vol. 28, no. 6, 15 November 2007 (2007-11-15) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN105129614A (zh) * 2015-08-05 2015-12-09 武船重型工程股份有限公司 一种拼接板预置方法
CN105002830B (zh) * 2015-08-05 2017-08-04 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN110904857A (zh) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 一种自锚式悬索桥施工临时扣塔安装方法

Similar Documents

Publication Publication Date Title
CN104179122A (zh) 钢塔节段定位装置及方法
CN102632273B (zh) 一种可调节多点定位制孔装置及制孔方法
CN102398164B (zh) 用于排气管钻小法兰丝孔夹具的固定板
CN103639633B (zh) 一种转向架构架组合式组对胎及组对方法
CN104328795A (zh) 一种塔架连接支脚和安装地脚螺栓的定位器及使用方法
CN202324202U (zh) 用于连接钢制竖向构件与钢制水平构件的可调节装置
CN204456923U (zh) 预埋螺栓定位安装组件
CN204248735U (zh) 一种凸轮轴定位连接工装
CN203891486U (zh) 角钢梁端部角钢快速定位装置
CN203817238U (zh) 一种用于钢筋笼加工中箍筋的定位装置
CN205857234U (zh) 塔类设备基础螺栓群精确安装定位装置
CN105014577A (zh) 一种游艺设备轨道拼接对准夹具及方法
CN202144673U (zh) 一体化基站固定结构
CN205421049U (zh) 一种箱涵组装调正机
CN203656493U (zh) 一种大型底座十字槽连接装置
CN203474223U (zh) 核电站蒸汽发生器吊装工具
CN204677102U (zh) 可调节式过桥梯子
CN202621370U (zh) 一种定点喷雾装置
CN104384799B (zh) 一种汽轮机中压控制阀操纵座托架焊接用定位紧固装置
CN103672312B (zh) 一种大型底座十字槽连接装置
CN203753948U (zh) 一种用于cpu自动取放机上的分体对位装置
CN209243956U (zh) 双面钢板预埋件
CN203679625U (zh) 转向架侧梁的上下板焊接工装
CN203292252U (zh) 弯管机可调节工作台
CN204386187U (zh) 一种空间管桁架安装工具

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141203

RJ01 Rejection of invention patent application after publication